Loading...
2 Feas Report for Lake Dr WestCITYOF CHANHASSEN Cio, Center Drive. PO Box I47 Oanhassen, Minnesota 55317 Phone 612.93Z 1900 General Fax 612.937.5739 .gi,eeri,g Fax' 612.937.9152 hlic S~O, Fax 612.934.2524 '/eb www. ci. cl~a,hassen.,m, us MEMORANDUM TO: FROM: DATE: Todd Gerhardt, Acting City Manager Anita L. Benson, City Engineer~) March 15, 1999 SUB J: Approve Feasibility Report for Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) Project No. 98-16 This is the public hearing on the feasibility report for the Lake Drive West Street and Utility Improvement Project No. 98-16. This proposed improvement project was petitioned for by Eden Trace Corporation and Redmond Products, Inc. to construct Lake Drive West from Powers Boulevard to Audubon Road. The primary project elements consist of the following: Extension of sanitary sewer services to the proposed lots in the Lake Drive West right-of-way. Installation of 12-inch diameter trunk watermain to connect water system in Powers Boulevard to Audubon Road. o Construction of Lake Drive West (36 feet wide) between the existing street returns constructed at the touchdown points of Powers Boulevard and Audubon Road. Construction will include street lighting and boulevard landscaping (tree planting) to be completed separately by the developers except along the boulevards adjacent to city property. A retaining wall will be included at the west end of the project to minimize impacts to the Lake Susan Hills storm pond/wetland. Construction of storm sewer within the project right-of-way and from the right-of-way to ponding areas provided by the developer. o The construction of an 8-foot wide bituminous trail along the north side of Lake Drive West. 6. Construction of an 18 to 20 stall parking area for Sunset Ridge Park. The feasibility report includes a detailed cost estimate, proposed preliminary assessment schedule, and construction schedule. The total project cost is estimated to be approximately $1,456,000. This project is proposed to be financed · Gev ofChanhassen. A erowme corem,nih, with clea, lakes, attaStl, schoo& a t'hmmi,~ downtown, thrivin~ businesses, and beautifid ~arks. A ereat a/ace to live. work. and o/av. Todd Gerhardt March 15, 1999 Page 2 by a combination of special assessments to benefiting properties and local funds. The project is considered feasible from an engineering and financial standpoint. As required by law, notification has been made to all property owners proposed for special assessments and publication has been made in the Chanhassen Villager newspaper. Along with the hearing notification, all property owners have been mailed a copy of the feasibility report. The project engineer, Mr. Phil Gravel of Bonestroo, Rosene, Anderlik & Associates, will be present at the public hearing to provide a presentation of the feasibility report and respond to any pertinent questions which may arise. If, at the close of the public hearing, there are no relevant questions or concerns which would require further investigation, it is recommended that the City Council formally approve the feasibility report dated February, 1999 (revised March, 1999) for Lake Drive West Street and Utility Improvements, Project No. 98-16. It is staff's intent to request authorization for preparation of plans and specifications for the project at the April 12, 1999 regular City Council meeting. Manager's Comments Staff is still reviewing the different funding/financing options for the project. Staff will present these options at your April 12, 1999 meeting. Attachments: 2. 3. 4. Feasibility Report. Affidavit of Mailing of Public Hearing Notice. Public Hearing Notice. Notice of Public Hearing in Chanhassen Villager. c: Dave Hempel, Assistant City Engineer Phil Gravel, Bonestroo & Associates Mark Undestad, Eden Trace Corporation Tom Ries, Lake Susan Partnership Don Patton, Lake Susan Partnership David Stockdale Redmond Products, Inc. \xc fs l\vo12XengXpublicX98-16~rove fea~ibilility.doc CITY OF CHAN SEN Feasibility Report for Lake Drive West Street and Utility Improvements Chanhassen, Minnesota February, 1999 (Revised March, 1999) City Project No. 98-16 File No. 393-98-810 Bonestroo Rosene Anderlik & Associates Engineers & Architects February 17, 1999 (Revised March 8, 1999) Bonestroo, Rosene, Anderlik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer Principals: Otto G. Bonestroo. RE. · Joseph C. Anderlik. RE, · Marvin L. Sorvala, RE. · Richard E. Turner, RE. · Glenn R. Cook. RE. · Robert G. Schunicht. P.E. · Jerry A. Bourdon, RE. o Robert ~ Rosene, P.E. and Susan M Eberlin, C.P.A.. Senior Consultants Associate Principals: Howard A. Sanford, RE. · KeitD ,~. Gordon, RE. · Rol~ert R. Pfefferle. P.E. · Richard '¢/. Foster, RE. · David O. Loskota, P.E. · Robert C, Russek, A.I.A. · Mark A, Hanson. RE, · Michael T. Rautmann, RE. · Ted K.Field; RE, · Kenneth R Anderson, RE. ° Mark R. Rolls, RE.. ~idney R ~[/illiamson, RE.. L.S. · Robert R Kotsmith · Agnes M. Ring · Michael R Rau, RE. o Allan Rick Schmidt, P.E. Offices: Si:. Paul, Rochester, Willmar and St. Cloud, MN · Milwaukee, WI V~ebsJ£e: www, bonestroo.com Honorable Mayor and City Council City of Chanhassen · 690 City Center Drive P.O. Box 147 Chanhassen, MN 55317 Re: Lake Drive West Street and Utility Improvements City Project No. 98-16 Our File No. 393-98-810 · Dear Mayor and Council: Transmitted herewith is our report on the street and utility improvements for Lake Drive West to serve Outlot D, Chanhassen Lakes Business Park. The project area includes the area south of the TCW Railroad between Audubon Road and Powers Drive. This project was previously proposed in 1990 as project 90-01. The report presents and discusses the proposed street and utility improvements and includes a cost estimate and preliminary assessment roll. An executive summary is included at the beginning of the report. We will be pleased to meet with the Council and other interested parties at a mutually convenient time to discuss this report. Thank you for the opportunity to assist the City v~ith this project. Respectfully submitted, BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. ,Phil Gravel LPG: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minr~sota. L. Phillip Gra~,el, IIi, P.E. Date: February 17, 1999 (Revised March 8, 1999) Reg. No. 19864 Table of Contents Transmittal Letter Table of Contents I. Executive Summary .................................................................... ~ ................................ 3 Figure 1 - Location Plan ....................................................................................... 4 II. Introduction ................................................................................................................ 5 Iit. Proposed Improvements ............................................................................................... 7 IV. Cost Analysis/Financing ........................................................................................... 10 Table 1 - Project Costs ........................................................................................ I0 Table 2 - Proposed Assessment Rates ................................................................ 11 Table 3 - Residential Equivalent Units (REUs) .................................................. 12 Table 4 - Revenue Summary .............................................................................. ! 3 Table 5 - Assessable Properties .......................................................................... 13 V. Project Schedule .......................................................................................................... 14 VI. Easements & Permits ......................................................................... .'. ............... i ....... 15 VII. Summary & Recommendations .................................................................................. 16 Appendix Appendix Appendix Appendix A - Preliminary Cost Estimate B - Summary of Assessment Charges C - Preliminary Assessment Roll D - Summary of Previous Assessments Figure 2 - Sanitary Sewer Figure 3 - Water Main Figure 4 - Streets, Trail and Storm Sewer Figure 5 - Street Typical Section - Lake Drive West Figure 6 - Typical Section - Retaining Wall Segment Figure 7 - Area to be Assessed Figure 8 - Assessable Footage Lake Drive West Street and Utility Improvements Feasibility Report Page 2 I. Executive Summary This report presents information concerning municipal improvements necessary to improve Lake Drive West between Audubon Road and Powers Boulevard (CSAH 17) as sho~vn on Figure 1. The improvements will serve the proposed development by Eden Trace Development on property sometimes referred to as the "Redmond" property. The proposed development by Eden Trace consists of 10 commercial/industrial lots located north of the proposed alignment for Lake Drive West. The south side of the proposed Lake Drive alignment includes a residential high density housing site (owned by Lake Susan Parmership), City park property (Sunset Ridge Park), and the back side of two lots in the Lake Susan Hills neighborhood. Municipal improvements for the site include the construction of Lake Drive West (including street lighting and landscaping) along the alignment of an existing trunk sanitary sewer line through the site. The alignment for the road was determined as part of the comprehensive plan and previous platting process. Water main, sanitary sewer services, storm sewer, bituminous trail, and a parking area for Sunset Ridge Park are also planned within the project. It is proposed to complete the project in one phase. There will be only minor traffic disruptions associated with this project as the water main stubs and other provisions were included with the Audubon Road and Powers Boulevard projects. The costs of the proposed improvements are presented in the appendices and a cost summary, cost allocation and unit cost summary are presented in the Cost Analysis section. Financing for the project will come from property assessments. A preliminary assessment roll is also included in the appendices. Lake Drive West Street and Utility Improvements Feasibility Report Page 3 CHANHAS,S:N , LAKE DRIVE WEST FIGURE 1, LOCATION PLAN II. Introduction This report is the result of petitions for a public improvement project submitted by the Eden Trace Corporation and Redmond Products, Inc. to construct Lake Drive West from Powers Boulevard to Audubon Road. Authorization for the preparation of the report was given by the City Council on December 14, 1998. The proposed improvements contained herein have been discussed conceptually by the City and the property owners for several years. The remaining necessary municipal improvements to serve the area will be completed with this project. Trunk sanitary sewer for the site was installed in 1992 as part of project 91-17. Provisions for street, trail, and water main extensions were made with previous projects on Audubon Road and Powers Boulevard. The project area is shown on Figure 1. The site is currently zoned Office/Industrial, Residential High Density, and Parks/Open Space. The site is bounded to the north by the TC&W railroad tracks, to the east by Powers Boulevard, to the south by the Lake Susan Hills neighborhood, and to the west by Audubon Road. The eastern portion of the site is currently vacant with no existing structures. The western portion of the site was used for agricultural cropland last year. This report examines the feasibility of completing street and utility improvements in the project area. Sewer and water service will be provided by extending utilities installed under previous projects. A summary of the proposed improvements with this project includes: 1. Extension of sanitary sewer services to the proposed lots from the Lake Drive West fight-of-way. 2. Installation of 12-inch diameter trunk water main to connect the water system in Powers Boulevard to Audubon Road. Lake Drive West Street and Utility Improvements Feasibility Report Page 5 o The construction of Lake Drive West (36-foot wide) between the existing street returns constructed at the touchdown points of Powers Boulevard and Audubon Road. Construction will include street lighting. Boulevard landscaping (tree planting) will be completed separately by the developers except along boulevards adjacent to City property. A retaining wall will be included at the west end of the project to minimize impacts to the Lake Susan Hills storm pond/wetland. 4. The construction of storm sewer within the project right-of-way and from the right-of- way to ponding areas provided by the developer. 5. The construction of an 8-foot wide bituminous trail along the north side of Lake Drive West. 6. The construction of an 18 to 20 stall parking area for Sunset Ridge Park. The site and street subgrade will be mass graded by the developer Prior to construction of the street and public utility improvements. Assessments proposed herein are consistent with the previous feasibility report for the site, City policy, and the Comprehensive Sewer and Water Plans. The proposed project assessment area is shown on Figure 7. A preliminary Assessment Roll is presented in AplSendix C at the back of this report. The amounts shown in the preliminary Assessment Roll are based on the preliminary information and may be revised at the time of the final assessment hearing based on final costs, development agreements, and final development plans. Lake Drive West Street and Utility Improvements Feasibility Report Page 6 III. Proposed Improvements Sanitary Sewer Sanitary sewer improvements for the project area are in conformance with the City's Comprehensive Sewer Policy Plan and are shown on Figure 2. The project will extend sanitary sewer services from the trunk sewer installed under Improvement Project No. 91-17A. Sanitary sewer flow from the project area flows eastward through the Lake Ann and Lotus Lake Sewer Districts to the eastern border of Chanhassen and ultimately to the MCES Blue Lake wastewater treatment facility. A portion of the existing trunk sanitary sewer is proposed to be relocated due to conflicts with the lowered street grades proposed by the developer. The lower street grades are requested by the developer to service the site north of Lake Drive West. Water Main Water main improvements proposed herein are consistent with the City's Water Supply and Distribution Plan and are shown on Figure 3. A 12-inch diameter trunk main will be constructed in Lake Drive West easterly fi.om AudUbon Road to Powers Boulevard. ~ Water main stubs will be provided to the adjacent developments where necessary. Fire hydrants will be included with the adjacent developments to provide adequate fire coverage. Fire hydrants on the trunk main in Lake Drive West will be installed in accordance with the City's Fire Marshall. Street and Storm Sewer Lake Drive West is designated as a Collector roadway in the City's Comprehensive Transportation Plan and is a Municipal State Aid Route. Lake Drive West is also identified as a 1999 project in the City's Capital Investment Plan. Lake Drive Vdest Street and Utility Improvements Feasibility Report Page 7 The street typical section will be similar to the existing Lake Drive section east of Powers Boulevard. Street construction for the project includes a standard 9 Ton, 36 foot wide commercial street as shown on Figures 4 and 5. The roadway section consists of 24-inches of select granular borrow, 12-inches of Class 5 aggregate, 2.5-inches bituminous base, 2.0-inches bituminous binder and 2.0-inches of bituminous wear course with B618 curb and gutter. Street lighting in accordance with standard City practice for collector streets is also included. Boulevard trees with this project are only included adjacent to City property. All other boulevard tree planting will be included with the developers landscaping plans. Storm sewer will be constructed within the roadway to convey runoff from the right-of-way and to facilitate site drainage. It is assumed that storm water ponding for the majority of Lake Drive West will be included with the site ponding provided by the Eden Trace developer. Drainage from the west end of Lake Drive West is to be directed to the pond located north of proposed Lot 3. Drainage from the east end of the project is to be directed to a new pond located near the west end of Outlot E. An existing pipe from Audobon Road will be extended eastward and then into the Lake Susan Hills pond on the south side of Lake Drive West. State Aid design standards will be followed and the construction documents will go through the State Aid review and approval process. Retaining Wall A modular block retaining wall will be required on the south side of the proposed Lake Drive West at the far west end. The wall is schematically shown on Figure 6 at the back of this report. The proposed wall will be located within the street right-of-way, approximately 20 feet from the south curb line. The wall will be approximately 5 to 8 feet tall and will be approximately 670 feet long. A guard rail is proposed behind the curb parallel with the wall. Landscaping is proposed on the slope between the street and the wall as well as in front of the wall. Parking Area A previous concept plan for Sunset Ridge Park included an 18 to 20 stall parking area. It is proposed to include the parking area as part of this project. The parking area will be located Lake Drive West Street and Utility Improvements Feasibility Report Page 8 along the edge of the right-of-way with the entrance located across from a proposed driveway on the other side of Lake Drive West (see Figure 4). A pedestrian crossing will be striped and signed at the parking area entrance. Bituminous Trail An 8-foot wide bituminous trail is proposed along the north side of Lake Drive. This portion of trail will connect the existing trail system along Powers Boulevard to Aububon Road. North- south trails are presently inplace on both Audubon Road and Powers Boulevard. The trail is proposed on the north side of the road to facilitate the existing trail and underpass at Powers Boulevard. This trail section will also provide additional pedestrian access to the park property (Sunset Ridge Park) within the project site. Site Grading Site grading for Outlot D, Chanhassen Business Park will be completed by the developer. The street subgrade will be graded to acceptable tolerances during mass grading of the site. It is anticipated that all storm water ponds and wetland mitigation work will also be completed by the developer. Lake Drive West Street and Utility Improvements Feasibility Report Page 9 IV. Cost Analysis / Financing Cost Estimate The estimated project cost to complete the street and utility improvements proposed herein are presented below in Table 1. These costs include legal, administrative, engineering, bonding, and interest costs estimated to be 30% of the construction costs. The estimated 30% indirect costs are reviewed at the time of the final assessment hearing. The estimate is based on previous similar projects and includes the following: engineering, geotechnical testing, bonding, legal, permits, and City administration. It is assumed that all required site grading and easements will be granted by the adjacent property owners at no cost to the project. A detailed cost estimate is included in Appendix A. Table 1, Project 98-16 Estimated Project Cost Summary Item Sanitary Sewer Water Main Storm Sewer Parking Area for Sunset Ridge Street and Trail Improvements Total Total Cost $ss,spo.0o 180,600.00 126,200.00 28,000.00 1,062,800.00 $1,456,100.00 With the exception of retaining wall costs, the above costs (and the sanitary sewer costs from Project 9 I-17) are within 3% of the original estimated costs for Project 90-01. Assessments Assessments are proposed to be levied against the benefited properties as shown on Figure 7 and 8. A Preliminary assessment Roll is presented in Appendix C. The proposed assessments herein are consistent with City policies and past practice. Some trunk sewer and water charges have Lake Drive West Street and Utility Improvements Feasibility Report Page 10 previously been assessed to some properties in the project area (see Appendix D). Additional trunk charges as established in the Comprehensive Sewer and Water Plans will be assessed as part of this project. Street assessments are based on the following criteria: · Abutting property owners are assessed for a standard 36ofoot wide, 9-ton design commercial/industrial roadway. · Trail, Street Lighting, Restoration, and Storm Sewer costs are included with the street assessments. · Grading costs for street and storm water ponding within the development will be completed by the Eden Trace developer. · Costs for the parking area for Sunset Ridge Park will not be assesse& A summary of the proposed Assessment Rates is presented in Table 2 below. Table 2 Project 98-16 Proposed Assessment Rates Item Sanitary Sewer (Lateral Benefit) Water System (12" Lateral Benefit) Sanitary Sewer (Trunk) Water Main (Trunk) Street, Trail, and Storm Sewer Rate Actual costs $21.00/front foot $1,252 per REU $1,632 per REU $192.08/front foot .Assessable equivalent units for sewer and water trunk charges are determined by multiplying the net assessable acreage for each parcel by number of residential equivalent units (REUs) for the planned use. The REUs for various land use types are shown below in Table 3. Net assessable acreage is gross acreage less wetlands and known major road right-of-way. The assessable equivalent units shown in the preliminary assessment roll are minimum numbers based on existing zoning and land use guideline conditions. Calculations for final assessment purposes will be based on actual development information at the time of the assessment heating and will be adjusted if actual development intensifies. Lake Drive West Street and Utility Improvements Feasibility Report Page 11 Table 3 Residential Equivalent Units (REUs) Land Use Type Minimum REUs Per New Assessable Acre Single Family 2 Medium Density 3 High Density 6 Commercial/Industrial 4 Public 2 The above REUs are the minimum number recommended to be charged at the time that trunk utility service is provided. If a property develops at a greater number of REUs, additional unit charges will be charged at the time of development based on Metropolitan Council Environmental Services (MCES) Sewer Availability charges (SAC) unit calculations. Street assessment rates are calculated by dividing the total street, trail, lighting, and storm sewer cost by the assessable front footage. Calculations are presented in Appendix B. Assessment Revenue It is proposed'to assess the project costs to the adjacent properties (except for the parking area for Sunset Ridge Park). The City will be responsible for costs assessed to City-owned property. Table 4 below summarizes the estimated revenue from assessments. Th~ table shows a positive revenue due to trunk area sanitary sewer and water main assessments. Positive trunk sanitary sewer and water main revenue should be directed to sewer and water funds to fund future mink facilities (wells, lif~ stations, trunk main, etc.). Lake Drive West Street and Utility Improvements Feasibility Report Page 12 Table 4 (Revised March 8, 1999) Project 98-16 Revenue Summary Item Estimated Cost Sanitary Sewer $58,500 Water Main $180,600 Assessments $58,500 (Lateral) $1,252 (Trunk) $59,752 (Total) 116,340 (Lateral) 326,400 (Trunk) 442,740 (Total) Net Revenue $1,252 $262,140 Street and Storm $1,189,000 $1,188,975.20 ($124.80) Parking Area $28,00~ 0 ($28,000) Total $1,456,100 * $1,691,467.20 $235,267.20 * Note: The total assessment amounts of $1,691,467.20 includes $323,769.60 for City property. The City's share will include an additional $28,000 for the Sunset Ridge Park parking area which is not included in the assessments. Area to be Included The area to be assessed for this project is shown on Figure 7 and listed below in Table 5. All owners of properties to be assessed should be notified of the project's public hearing and eventual assessment hearing. Properties with multiple owner interests should have all interested parties notified. In addition, owners of adjacent properties (within 500 feet), that may be affected by the project but are not in the area to be assessed, should also be notified. Table 5, Area to be Included Project 98-16 Assessable Properties PIN, 25.1900350 25.0140200 25.4030560 25.1900360 Owner Redmond Products Inc. Lake Susan Hills Chanhassen (Sunset Ridge Park) Chanhassen (Outlot E) Lake Drive West Street and Utility Improvements Feasibility Report Page 13 V. Project Schedule The improvements described in this report should be constructed in conjunction with the proposed development. The schedule shown below meets the needs of the proposed development and assumes that the mass site grading will be completed by mid-June. The City will require that the developers enter into a development contract with a final plat or that assessment waivers be obtained from the underlying fee holders to the property. Authorization for preparation of plans and specifications will be contingent on receipt of an assessment waiver from the developer. The schedule is based on completing construction in 1999 for building occupancy in the late fall. The project schedule can be modified and/or delayed if the City or adjacent developments request it. Authorize Feasibility Report December 14, 1998 Developer Deposit for Report Received January 20, 1999 Staff Review Draft Feasibility Report February 8, 1999 Council Receive & Review Feasibility Report March 8, 1999 Public Hearing March 22, 1999 Order Plans and Specifications Apri! 12, 1999 Approve Plans and Specifications May 10, 1999 MnDOT Approval May 28, 1999 Open Bids / Award Contract June 14, 1999 Begin Construction June 28, 1999 Substantial Completion October 1999 Assessment Hearing First Assessment Payments Due Final Paving / Project Completion October25,1999 Spring 2000 June, 2000 Lake Drive West Street and Utility Improvements Feasibility Report Page 14 VI. Easements and Permits Easements for proposed construction will be required from the adjacent developers. As part of the site and street grading, the Eden Trace Developer will be required to work with the Lake Susan Partnership property to obtain any necessary grading agreement. It is assumed in this report that all required easements from the developers will be granted at no cost. Right-of Way for Lake Drive West will be dedicated through the platting process. Right of Entry Agreements for the retaining wall construction will be required from Lots 8, 18, and 19, Block 1, Lake Susan Hills 3rd Addition. Platted drainage and utility easements currently exist on these three lots. Permits and approvals will be required from the following: Minnesota Pollution Control Agency Metropolitan Council Environmental Services Minnesota Department of Health Minnesota Department of Natural Resources Board of Water and Soil Resources Watershed District City of Chanhassen The proposed street and utility improvements with this project do not m~et the mandatory EAW (Environmental Assessment Worksheet) thresholds as defined in Part 4410.4300 of the Environmental Quality Board's rules. An EAW was prepared as part of the sanitary sewer improvements previously installed under Project 91-17. Review of the potential for significant environmental effects for the public improvements will be made through the permitting process from the agencies listed above. Therefore, the preparation of EAW specifically for the street and utility improvements for this project is not mandatory. However, the developer is required to complete an EAW due to building square footage as defined in 4410.4300, subp 14 of the EQB rules. We recommend that the proposed street and utility improvements contained herein be included as part of the EAW prepared by the developer. Lake Drive West Street and Utility Improvements Feasibility Report Page 15 VII. Summary and Recommendations This report presents an evaluation of the feasibility of constructing a municipal street and utilities necessary to serve the project area. The report provides estimated costs of the proposed improvements and presents a preliminary assessment roll for the construction. The total estimated cost for this project is $1,456,100.00, including both construction and indirect costs. Figures 2 and 3 in the next section of this report show the proposed sanitary sewer and water main construction. Figure 4 shows the street, storm sewer, and trail alignments. The proposed work is necessary, cost effective, and feasible from an engineering standpoint. Based on the results of our investigation for this report, the following recommendations are presented for the Chanhassen City Council: 1. This report be adopted as the criteria for installation of the street and utility improvements contained herein. 2. The City review and adopt the proposed assessment and financing methods contained herein. A formal public heating be held to discuss the proposed improvements and assessments. All properties that are proposed to be assessed and all properties within 500 feet of the project area will be notified of the public hearing. Lake Drive West Street and Utility Improvements Feasibility Report Page 16 APPENDIX A PRELIMINARY COST ESTIMATE LAKE DRIVE WEST, PROJECT 98-16 FEBRUARY 17, 1999 No. Item Units Qty Unit Price Total Price Part la - Sanitary Sewer - Eden Trace 1 i Connect to existing manhole, core drill EA 6 $500.00 $3,000.00 2 i24" RCP Sanitary sewer LF 581 $45.00 $26,145.00 3 18" PVC sanitary sewer service LF 195 $18.00 $3,510.00 4 4' diameter sanitary manholes EA 3 $1,450.00 $4,350.00 5 4" Insulation SF 250 $3.00 $750.00 6 4 ft. dia. MH depth greater than 8 feet LF 5 $90.00 $450.00 i Total Construction $38,205.00 :Plus 30% - Legal, Administration & Engineering $11,495.00 '.Total Part la - Sanitary Sewer $49,700.00 iPart lb - Sanitary Sewer- Lake Susan 7 :8" PVC sanitary sewer service LF 215 $18.00 $3,870.00 8 .4' diameter sanitary manholes EA 2 $1,450.00 $2,900.00 i Total Construction $6,770.00 i Plus 30% - Legal, Administration & Engineering $2,030.00 i Total Part lb - Sanitary Sewer $8,800.00 i Part 2 - Water Main 9 Connect to existing water main EA 2 $400.00 $800.00 10 12" water main LF 3610 $26.00 $93,860.00 11 12 8" water main 6" water main LF LF 390 220 $16.00 $14.00 $6,240.00 $3,080.00 13 12" butterfly valve and box EA 2 $1,200.00 $2,400.00 14 8" gate valve and box EA 1 $700.00 $700.00 ,15 i:6" gate valve and box EA 10 $550.00 $5,500.00 16 tHydrant w/marker sign in place EA 7 $1,600.00 $11,200.00 17 ~:Water main fittings LB 7585 $2.00 $15,170.00 Total Construction $138,950.00 Plus 30% - Legal, Administration & Engineering $41,650.00 Total Part 2 - Water Main $180,600.00 Part 3 - Storm Sewer 18 Salvage 24" sanitary pipe LF 475 $5.00 $2,375.00 19 112" RCP storm sewer, Class 5 LF 120 $21.00 $2,520.00 20 15" RCP storm sewer, Class 5 LF 450 $24.00 $10,800.00 21 18" RCP storm sewer, Class 5 LF 995 $26.00 $25,870.00 22 Install Salvaged 24" RCP storm sewer, Class 3 LF 400 $20.00 $8,000.00 Chanhassen, MN K:\393\393-98-810 APPENDIX A PRELIMINARY COST ESTIMATE LAKE DRIVE WEST, PROJECT 98-16 FEBRUARY 17, 1999 23 i36" RCP storm sewer, Class 3 LF 109 $50.00 $5,450.00 24 i4 ft. diameter storm MH (Plate 2101) EA 6 $1,500.00 $9,000.00 25 iStd. 2 ftx 3 ft CB w/cstg. (Plate 3101) EA 9 $1,100.00 $9,900.00 26 i4 ft. diameter storm CBMH (Plate 3102) EA 2 $1,400.00 $2,800.00 27 i6 ft. diameter storm CBMH (Plate 3102) EA 1 $2,800.00 $2,800.00 28 118" RCP flared end section EA 2 $700.00 $1,400.00 29 136" RCP flared end section EA 1 $1,500.00 $1,500.00 30 i24" RCP storm sewer, Class 3 LF 290 $45.00 $13,050.00 31 i Class III Riprap, placed at flared end section CY 30 $55.00 $1,650.00 !Total Construction $97,115.00 i Plus 30% - Legal, Administration & Engineering $29,085.00 Total Part 3 - Storm Sewer $126,200.00 i Part 4 - Streets 32 i Mobilization LS 1 $4,000.00 $4,000.00 33 !Traffic control LS 1 $12,200.00 $12,200.00 34 ~, Landscaping LS 1 $25,000.00 $25,000.00 35 i Excavation and grading for trail LS 1 $1,500.00 $1,500.00 36 iTest rolling LF 3360 $1.00 $3,360.00 37 i Subgrade preparation LF 3360 $2.00 $6,720.00 38 !Select Granular Borrow (CV) CY 10775 $11.00 $118,525.00 39 :Aggregate base, Class 5 TN 11655 $8.50 $99,067.50 40 !Bituminous Wear Course, Type 41 TN 2030 $29.00 $58,870.00 41 iBituminous Binder Course, Type 41 TN 1490 $27.00 $40,230.00 42 iBituminousBase Course, Type 31 TN 1865 , $27.00 $50,355.00 43 iPrep of bit. surface for wear paving 2000 LS 1 $3,000.00 $3,000.00 44 iBituminous material for tack coat GAL 1355 $1.50 $2,032.50 45 ;4" Polyethylene drain tile LF 6725 $5.00 $33,625.00 46 i7-1/2" concrete driveway (Plate 5207) SF 215 $4.00 $860.00 47 B618 concrete curb and gutter LF 6900 $7.00 $48,300.00 48 I Pedestrian curb ramp £A 2 $235.00 $470.00 49 ]Modular Block Retaining Wall SF 7370 $25.00 $18'4,250.00 50 !Guard Rail LF 690 $10.00 $6,900.00 51 iLighting unit, Type R3 EA 22 $2,200.00 $48,400.00 52 [2"NMC Conduit, Sch. 40 LF 6720 $3.75 $25,200.00 53 12" NMC Conduit, Sch. 80 LF 300 $4.50 $1,350.00 54 ~#2 AWG Wire LF 150 $1.75 $262.50 Chanhassen, MN K5393~393-98-810 A-2 APPENDIX A PRELIMINARY COST ESTIMATE LAKE DRIVE WEST, PROJECT 98-16 FEBRUARY 17, 1999 55 ;#6 AWG Wire LF 5000 $0.50 $2,500.00 56 Spare luminaries and ballast (Plate 5240) EA 2 $450.00 $900.00 57 iSign panels, Type C SF 90 $30.00 $2,700.00 58 4" double solid line, yellow paint LF 3360 $1.25 $4,200.00 59 i12" stop line, white epoxy LF 36 $12.00 $432.00 60 :i-1/4" rock for entrance mat TN 200 $12.00 $2,400.00 61 .Protection of catch basin in street EA 10 $50.00 $500.00 62 Seeding w/mulch & fertilizer and 6" salv. topsoil AC 6.5 $1,200.00 $7,800.00 63 iSodding, lawntype SY 6175 $2.50 $15,437.50 64 :Silt fence, regular LF 1200 $2.50 $3,000.00 65 iWood fiber blanket SY 1600 $2.00 $3,200.00 !Total Construction $817,547.00 !Plus 30% - Legal, Admin. & Engineering $245,253.00 Total Part 4 - Streets $1,062,800.00 Part 5 - Parking Area (Sunset Ridge Park) 66 'Grading LS 1 $1,600.00 $1,600.00 67 'Restoration LS 1 $1,000.00 $1,000.00 68 Ag~egatebase, Class 5 TN 970 $8.50 $8,245.00 69 Bituminous Wear Course, Type 41 TN 120 $29.00 $3,480.00 70 Bituminous Base Course, Type 31 TN 120 $27.00 $3,240.00 71 B618 concrete curb and gutter LF 585 $7.00 $4,095.00 Total Construction $21,660.00 Plus 30% - Legal, Admin. & Engineering $6,340.00 :Total Part 5 - Parking Area ~, $28,000.00 Total Part la - Sanitary Sewer - Eden Trace Dev. $49,700.00 Total Part lb - Sanitary Sewer - Lake Susan Part. $8,800.00 Total Part 2 - Water Main $180,600.00 Total Part 3 - Storm Sewer $126,200.00 Total Part 4 - Streets $1,062,800.00 Total Part 5 - Parking Area (Sunset Ridge Park) $28,000.00 Total Estimated Project Cost $1,456,100.00 Chanhassen, MN K:~393\393-98-810 A-3 II CITY PROP R E LOI]A~.E.-6-~TR l SEWER \ LAKE SUSAN PARTNERSHIP .~ TRUNI, SANITARY RIDGE PARK L ..... .r 0 400 AUDUBON RD. '"'~ANHASSEN MINNESOTA k,~,, I I I ~ L_ /'"t r\ l_t Alx/~ DRIVE VVEST FIGURE 2, SANITARY SEWER FEBRUARY 1999 k: ~.393~,393810~FIG2 CONNECT TO EXI'. NO WM :ITY PROPOSED 12" WATER MAIN LAKE SUSAN PARTNERSHIP SUNSET RIDGE PARK ~..,.__. _....J WATERMAIN BY OTHERS 2O0 40O RD. CONNECT TO EXISTING WM CHANHASSEN, MINNESOTA LAKE DRIVE WEST FIGURE 3, WATER FEBRUARY 1999 MAIN EX~STiNG TR AND :ASS PROP '~'---TURN LANE 56' F-F LAKE SUSAN PARTNERSHIP ~ET UTURE STALL RIDGE ~'~~Ai ~D (E BITUMINOUS NORTH SIDE) - L-Lx_x--,,,p~R 0 p 0 S E D _.,,-'~ ........ J C*O ,NO RD. CHANHASSEN, MINNESOTA LAKE DRIVE WEST FIGURE 4, STREET, FEBI~UARY 1999 TRAIL, AND STORM k: ~x595~395810~FIG4 SEWER Z~ 0._.= ¢)/NCI TY PROP 25. 19003~ (~)LAKE SUSAN PARTNERSHIP PIN 25,0140200 PIN ;ET RIDGE TO BE ASSESSED J )DAVE STOCKDALE/ EDGEWORK BUILDER.~ PIN 25.014.0900 AUDUBON RD. CHANHASSEN, MINNESOTA LAKE DRIVE WEST, PROJECT 98-16 FIGURE 7, AREA TO BE ASSESSED FEBRUARY 7999 k: X. Jg$'~$9$810'~FIG6 (~ CITY PROP PIN 25. (~)LAKE SUSAN PARTNERSHIP PIN 25.0140200 Fronl; footage = 1840' ~ET RIDGE PIN fool ~DAVE STOCKOALE/ EOOEWORK BUILDER... AUDUBON RD. =Street Assess GOt CHANHASSEN, MINNESOTA LAKE DRIVE WEST, PROJECT 98-16 ,FIGURE 8, ASSESSABLE FOOTAGE FEBRUARY 1999 k: '~595~395810~FIC8 CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) SS. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on March 9, 1999, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for the Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me this ~+h day of I'¥)ctcc' ¼ ,1999. Notary Pu~ ; .::.--"-'..',,,, K,M T. MEUWISSEN :; }; ;, :i':..?~,~NOTARY pur4',JC- :,;;,~INESOTA ;¢ :..' V.~'~ :?i~7CARVER COUNTY :~ · .; .t'-~.........- ~v' ' ~" ....... . Ccrnmlsslem Expires Jan. 31, 20CO ;:; \Xcfs lkvol2Nm gXl'ormsXa ~davit.doc March 9, 1999 C OF 690 Ciq Center Orive. PO Box I47 G~anhamn, 3,linnesara 55317 Phone 612937. I)00 General Fax 612.937.5739 Engineering Fax 612.937.9152 Public Safety Fax 612.934.2524 Web www. d. chanhassen, mn.m Redmond Products 18930 West 78th Street Chanhassen, MN 55317 Re: Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Gentlemen: Notice is hereby given that a public hearing has been scheduled for public discussion on the Lake Drive West street and utility improvement project (Powers Boulevard to Audubon Road in Section 14) feasibility study at the City Council's regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall, 690 City Center Drive. Lake Drive West will be constructed to an urban collector road with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer and street lighting, parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $1,456.000. Said in'rprovements are proposed to be financed by a combination of special assessments to the benefiting properties and local funds. Your property is within the benefit area of the project. Special assessments are proposed for your property (see attachment). A copy of the draft feasibility report was mailed to you on February 23, 1999 for your review. The feasibility report received by the City Council on March 8 showing the project scope and costs is available for review in the Engineering Department, Mondays through Fridays fi.om 8:00 a.m. to 4:30 p.m. If you have any questions or comments regarding this project you are encouraged to attend the punic hearing or submit them in wridng prior to the hearing. Sincere fy, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Pages B- l, C-I and D- 1 from the Feasibility Report The City of Chanhassen. A growb~g t'Ot,lt,?tt,li~, wid, dc, t, hkc:'. ,.!,,dj,7 .,.'/,, ,,tS. ,t d,,m,i;;ii ,b, wmott.,,, thrivi,(ff httsi, esses, ami be, ttt(/id ?arks. A feat place to live. work, ami March 9, 1999 CffYO C HASSEN 5~y Center Drivt, PO Box I47 ,anhassen, Minnesota 55317 Phone 6IZ937.1900 7enerat Far 612937.5739 ~neering Fax 612937.9152 lit Safety tax 512934.2524 k unvw. ci. chanhtmen, ran.us Mr. Mark Undestad Eden Trace Corporation 14500 Martin Drive Eden Prairie, MN 55344 Re: Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Undestad: Notice is hereby given that a public hearing has been scheduled for public discussion on the Lake Drive West street and utility improvement project (Powers Boulevard to Audubon Road in Section 14) feasibility study at the City Council's regular meeting on Monday, March 22. 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall, 690 City Center Drive. Lake Drive West will be constructed to an urban co[lector road with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer and street lighting, parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approx/mately $1,456,000. Said improvements are proposed to be financed by a combhnation of special assessments to the benefiting properties and local funds. Your pruperty is within the benefit area of the project. Special assessments are pruposed for your property (see attachment). A copy of the draft feasibility report was mailed to you on February 23, 1999 tbr your reviews The t~asibil/ty report received by the Cky Council on March 8 showing the project scope and costs is available for review in the Engineering Department, Mondays through Fridays from 8:00 a.m. to 4:30 p.m. [f you have any questions or comments regarding this project you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Pages B-I, C-1 and D-1 from the Feasibility Report ,., of C3anhassen. ,{ ~awing,',~,,,tna.;r.,' 'eir,; c/,:t, ./,&c.,'. q,,di.7 ,','/,o,,h. .~ c/,,,,,i,~.4 :i, tcurow,t, rl, ri:'mg busi,esses. ,t,td he. zs.,.!;id ?ari's. .t g'rear p/ace to live. work, and p[,¢ March 9, 1999 C OF 690 Oi(y Center Orive, PO Box I47 Chanhmsen. Minnaota 55317 Phone 612937. I900 6~neral £~r 612937.5739 Enginerting Fax 612.937.9152 Publir ~ Far 612934.2524 Web www. c&'hanhassen, mmus Mr. Don Patton Realty Center 7600 Parklawn Avenue Suite 200 Edina, MN 55425 Re: Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Patton: Notice is hereby given that a public hearing has been scheduled for public discussion on the Lake Drive West street and utility improvement project (Powers Boulevard to Audubon Road in Section 14) feasibility study at the City Council's regular meeting on Monday, March 22, 1.999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall. 690 City Center Drive. Lake Drive West will be constructed to an urban collector road with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer and street lighting, parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $I,456,000. Said improvements are proposed to be financed by a combination of special assessments to the benefiting properties and local funds. Your property is within the Benefit area of the project. Special assessments are proposed for your property (see attachment). A copy of the dr',fit feasibility report was ma/led to you on February 23, 1999 for your review° The feasibility report received by the City Council on March 8-showing the project scope and costs ks available for review in the Engineering Department, Mondays through Fridays fi.om 8:00 a.m. to 4:30 p.m. If you have any questions or comments regarding this project you are encouraged to attend the public hearing or submit them in wridng prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Pages B- 1, C-t and D- [ from the Feasibility Report The City of Chanl.,assen. A ~owing co,,,,,~:mi9, wid, ,!,,.Jr.,/ak,'s. qt,a[in' ,,'/,,,oh. ,~ c/,,m,d,~,~ ~bw,m, vn. d, rivin.,( httsinesses, and b,'.mti/id pa,{'s. A :;'e,~r place to live. work, March 9, 1999 CITYO CHANHASSEN ' Ci~. Center Drive, PO Box I47 hanhauen, Minnaota 553 I7 Phone 612.937. I900 Gtntrai Fax 61293Z5739 ~ntering £a~ 612.937.9152 blic Safe~. Fax 6IZ934.2524 'Zeb www. ci. chanhassen, mn. us Mr. Todd Hoffman Park Director City of Chanhassen 690 City Center Drive Chanhassen,'MN 55317 Re: Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Hoffman: Notice is hereby given that a public hearing has been scheduled for public discussion on the Lake Drive West street and utility improvement project (Powers Boulevard to Audubon Road in Section 14) feasibility study at the City Council's regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at: City Hall. 690 City Center Drive. Lake Drive West will be constructed to an urban collector road with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer and street lightingl parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to the benefiting properties and local funds. Your property is within the benefit area of the project, Special assessments are proposed for your property (see attachment). A copy of the draft feasibility report was mailed to you on February 23, 1999 for your review. The feasibility report received by the City Council on March 8 showing the project scope and costs is available for review in the Engineering Department, Mondays through Fridays from 8:00 a.m. to 4:30 p.m. If you have any questions or comments regarding this project you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely. CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Pages B-l, C-1 and D-I from the Feasibility Report Ci~, of Chanhmsen. A a, rawinj c,m,'.',,i.7; wi:l, ,'/,'.tn/,t/w. qu, di. y s,'/'o'h. ., ,'l,,,mi;.,i( /,,,c,tow,. :/,ri:,hrd hm'i,u'sses, and he, tutifid ?arks. A great place to live. work, and ?l,~':. March 9, 1999 ITYOF C HASSEN 690 City Cenrer Drive, PO aox I47 O~,anhauen, Minnesota 55317 Phone 612 937. I900 Gou, ral Fax 612937.5739 Engineering Fax 6IZ937.9152 Public Safe~, Fax 812.934.2524 Web www. ri. rhanhauen, ran. us Mr. David Stockdale 72 i0 Galpin Boulevard Chanhassen, MN 55317 Re: Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Stockdale: Notice is hereby given that a public hearing has been scheduled for public d/scussion on the Lake Drive West street and utility improvement project (Powers Boulevard to Audubon Road in Section 14.) feasibility study at the City Council's regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at City H',dl, 690 City Center Drive. Lake Drive West will be constructed to an urban collector road with concrete curb and gutter, storm dr',finage facilities, trunk watermain, sanitary sewer and street lighting, parking tot at Sunset Ridge Park and bituminous mail. The total project cost of said improvements is estimated to be approximately $l,456,000. Sa.id improvements are proposed to be financed by a combination of special assessments to the benefiting properties and local funds. Your property is within the benefit area of the project. Special assessments are proposed fiw your property (see attachment). A copy of the draft feasibility report was mailed to you on February 23, 1999 for your review. The feasibility report received by the City Council on March 8 showing the project scope and costs is available for review in the Engineering Department, Mondays through Fridays from 8:00 a.m. to 4:30 p.n-t . '. If you have any questions or comments regarding this project you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CiTY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Pages B-1, C-I and D-I from the Feasibility Report The Gq of Chanba. ssen. A ~owing ,'om.ut.ia., wid, de:z,/akes, q:t,t/,"5,' ~,';'.'.,,;-,'. ,t d,,tr, u';.,'i: ,';,,e,taw,. :hri:'3tg busi.esses, ,t.d be.c, trifid ?,t~f,s. .4 gre, tt place to live, work, and? March 9, 1999 CITYOF CHAN SEN 0 Cig CenrerDrive, PO aox I47 Danh~en, Minnesota 55317 Phone 612.937. i900 Geru, ral ]ax 612937.5739 :.ngineering tax 612937.9152 ublic SafeF Fax 6I*,..934.2524 Web www. ci. chanhassen, mn. us Mr. Todd Gerhardt Acting City Manager City of Chanhassen 690 City Center Drive Chanhassen, MN 55317 Re: Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Gerhardt: Notice is hereby given that a public hearing has been scheduled for public discussion on the Lake Drive West street and utility improvement project (Powers Boulevard to Audubon Road in Section 14) feasibility study at the City Council's regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hail Council Chambers located at City Hal/, 69{) City Center Drive. Lake Drive West will be constructed to an urban collector road with concrete curb and gutter, storm drainage facilities, trunk watermain, san/tars/sewer and street Lighting. parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to the benefiting properties and local funds. Your property is within the benefit area of the project. Special assessments are proposed for your property (see attachment). A copy of the draft feasibility report was mailed to you on February 23, 1999 tbr your review. The feasibility report received by the City Council on March 8 showing the project scope and costs is available for review in the Engineering Department, Mondays through Fridays from 8:00 a.m. to 4:30 p.m. If you have any questions or comments regarding this project you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Pages B- i, C-I and D- 1 from the Feasibility Report GOt of Chanhauen. A growing ,'o,t,,t,,i.ty witl, dean ~gl'~'. qt:,d?,'.,,¢,,',(". .. d,a,ni;,.i:./,,c,row,,, ct,,.ivi,g businesses, and be, tutS~id ?arks. A g,'~:tr g/ace to live. work. and CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) SSo COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on March 9, 1999, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for the Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Kar~;n J. En?~/tdt, Dep;'.},u}y Clerk Subscribed and sworn to before me this t-]l-~-~ day of [5"'~Ctcc. ilh ,1999. Notary Public~ \k:fs l\vol2Xen gXtbrm sXaffidavit.doc CITYOF '0 Ci~ Center Drive, PO Box 147 %anhassen, Minnesota 55317 Phone 612937. IYO0 General Fax 612. 937. 5739 :.n gincering Fax 612937.9152 ~blic Safe{7 Fax 612.934.2524 li3b www. ci. chanhassen, mn..s March 9, 1999 Re~ Proposed Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Resident: The Chanhassen City Council will be holding a public heating on the proposed Lake Drive West Street and Utility Improvement Project feasibility report at their regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall, 690 City Center Drive. Lake Drive West is proposed to be constructed to an urban collector roadway with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer, street lighting, parking lot at Sunset Ridge Park and bituminous trail. The total project cost of the improvements i} estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to benefiting properties and local funds. Your property is not proposed to be assessed for the project. If you have any questions or comments regarding this project, you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Project Location Map g:~ng~ublic~98-16',resident letter.doc Ci0' of Chanhassen. A grvwi~ cvmmmdO, wi;h c/em,/,z~'rs, q,,dity :vl, voh. ,~ c/~a,7,d%, &wmow,, t/,,ici,tg b,si~esses, a,d beautiful parks. I gmtt place to/ive, work, and ?la3: CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) SS. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on March 9, 1999, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for the Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon: that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me thisC]4-hx dayof rYlo~"ch ,1999. Notary", uP4~.tc \~fs l\vol2hengkformsMffidavit.doc March 9, 1999 CITYOF CH SEN 0 City CemerDrive, PO Box I47 7hanhassen, Minnesota 55317 £hone 612937.1900 General Fax 612.937. 5739 :.ngineering Far 612.937.9152 ublic Safety Fax 612.934.2524 "~b www. ci. chanhassen, mn. us Dawne Chrisfiansen Robin White 8451 Bittern Court Chanhassen; MN 55317 Re: Proposed Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Ms. Christiansen & Ms. White: The Chanhassen City Council will be holding a public hearing on the proposed Lake Drive West Street and Utility Improvement Project feasibility report at their regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall, 690 City Center Drive. Lake Drive West is proposed to be constructed to an urban collector roadway with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer, street lighting, a parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to benefiting properties and local funds. A 5' to 8' high retaining wall is proposed along the north property line as shown on the attached location map. It is anticipated that a Right-of-Entry agreement will be needed for construction of the wall. Your property is not proposed to be assessed for the project. If you have any questions or comments regarding this project, you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB :ktm Attachment: Project Location Map c: Phil Gravel, Bonestroo & Associates g:~ng\publicX98-16M, resident letter.doc City of Chanhassen. A growing com.tuniO, with de, t./,al'c,:, q,,div.,, ,'c/,o,ls. ach, m.ia¢ ,.[owntow,, t/.'ivin~, businesses, and be, mrihd oarks. .4 ~,'e March 9, 1999 CITYOF C HASSEN 690 City Center Drive, PO Box I47 Chanhassen, Minnesota 55317 Phone 612.937. I900 General Far 612937.5739 Engineering Far 6lZ937.9152 Public Safe{y Far 612.934.2524 Web www. ci. chanhassen, mn. us Charles A. Riggle 8461 Bittern Court Chanhassen, MN 55317 Re: Proposed Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Riggle: The Chanhassen City Council will be holding a public hearing on the proposed Lake Drive West Street and Utility Improvement Project feasibility report at their regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hail, 690 City Center Drive. Lake Drive West is proposed to be constructed to an urban collector roadway with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer, street lighting, a parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to benefiting properties and local funds. A 5' to 8' high retaining wall is proposed along the north property line as shown on the attached location map. It is anticipated that a Right-of-Entry agreement will be needed for construction of the wall. Your property is not proposed to be assessed for the project. If you have any questions or comments regarding this project, you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Project Location Map c: Phil Gravel, Bonestroo & Associates g:~ g',xoubiicX,98- 16x.4 resident letter.doc TheGty of Chanhassen. A .~owi,g co,,nunin, with c/c.m ,Skcs. ,!t,,din' .,c/.oo/s. ,t cl,,m,3;,, :/,:c,rr, c,u, tl,,'it,i,¢ businesses, ami he, tutz/id oark,. ..4 ~,'~,, March 9, 1999 C OF C HASSE I City Center Drive, PO Box 147 hanhassen. Minnesota 55317 Phone 612.93Z i900 General/Fax 612937.5739 ~gineeri,g Far 612.937.9152 blic Safe~. lax 612.934.2524 '~eb www. d. chanhassen, mn. us Curt Santjer 8460 Swan Court Chanhassen, MN 55317 Re.' Proposed Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Santjer: The Chanhassen City Council will be holding a public heating on the proposed Lake Drive West Street and Utility Improvement Project feasibility report at their regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall, 690 City Center Drive. Lake Drive West is proposed to be constructed to an urban collector roadway with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer, street lighting, a parking lot at Sunset Ridge Park and bituminous trail. The total projec.t cost of said improvements is estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to benefiting properties and local funds. A 5' to 8' high retaining wall is Proposed along the north property line as shown on the attached location map. It is anticipated that a Right-of-Entry agreement will be needed for construction of the wall. Your property is not proposed to be assessed for the project. If you have any questions or comments regarding this project, you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Project Location Map c: Phil Gravel, Bonestroo & Associates g:XengXpublic",98- I bM resident letter.doc Ci~. of Chanbassen. A ~owing co,tmunir] with c/ca, !,t.('c:'. q,,i[i5' .,','h,olS'. ,t ,'/,,t~mi,,.r ,[owntow,, #.,'ivine businesses. ,t,d he, utri/itl oar~',:. ,4 ~r,,r ~,b,'~' ,, /; ...... ,~r~. am/ o}t~: March 9, 1999 CITYO 690 City Center Drive, PO Box I47 Chanhassen, Minnesota 55317 Phone 612937.1900 General Fax 612.93Z5739 Engineering Fa.,: 612. 937. 9I 52 Public Safe~y Fax 61Z934.2524 Web www. ci. chanhassen, mn. us Roger Benson 8461 Swan Court Chanhassen, MN 55317 Re: Proposed Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Benson: The Chanhassen City Council will be holding a public hearing on the proposed Lake Drive West Street and Utility Improvement Project feasibility report at their regular meeting on Monday, March 22, 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall, 690 City Center Drive. Lake Drive West is proposed to be constructed to an urban collector roadway with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer, street lighting, a parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to benefiting properties and local funds. A 5' to 8' high retaining wall is proposed along the north property line as shown on the attached location map. It is anticipated that a Right-of-Entry agreement will be needed for construction of the wall. Your property is not proposed to be assessed for the project. If you have any questions or comments regarding this project, you are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Project Location Map c: Phil Gravel, Bonestroo & Associates g:M--ngXpublic',08-16',4 resident letter.dec The City of Chanhassen. A .o'rowin¢ co,mztmiz3' with c[e, JJ~ /,al'e:'. ,'ttt,dic~~ .,,'/,,,/s, ,t char, tiJ(~,, ~[otc~w~w,. thriving businesses, ,md be, utt(/id parks. A great place to live, work, CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) SS. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes'that she is and was on March 9, 1999, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98- o the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. K~.~e. xi J. Eng~lhar-~dt, De-~' Clerk Subscribed and sworn to before me this~'t4q'' dayof }q/1Ci,..c'Jq ,1999. ~ No~y P~blic '~ .~m~x KlM T. MEUWISSEN X~fslXvol~ng~o~sMffidavit.doc ;~ ~ ~.~ NOT.aRy PUBLIC-~INNESOTA ;~ "~.~ ;,4y Commi~ion Expires osn. 31. March 9, 1999 CITYOF CHAN SE 690 City Center Drive, PO Box 147 Chanhassen, Minnesota 55317 Phone 612.937. I900 General &x 612.937.5739 Engineering lax 612.937.9152 ?t~blir Xafe{y tax 612.934.2524 Web www. ri. chanhassen.mn, us Mr. Tom Riese Realty Center 7600 Park/awn Avenue Suite 200 Edina, MN 55425 Re: Lake Drive West Street and Utility Improvements (Powers Boulevard to Audubon Road) - Project No. 98-16 Dear Mr. Riese: Notice is hereby given that a public hearing has been scheduled for public discussion on the Lake Drive West street and utility improvermnt project (Powers Boulevard to Audubon Road in Section 14) feasibility study at the City Council's regular meeting on Monday, March 22. 1999 at 6:30 p.m. in the City Hall Council Chambers located at City Hall, 690 City Center Drive. Lake Drive West will be constructed to an urban collector road with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer and street lighting, parking lot at Sunset Ridge Park and bituminous trail. The total project cost of said improvements is estimated to be approximately $1,456,000. Said improvements are proposed to be financed by a combination of special assessments to the benefiting properties and local funds. Your property is within the benefit area of the project. Special assessments are proposed for your property (see attachment). A copy of the draft feasibility report was mailed to you on February 23, 1999 for your review° : The feasibility report received by the City Council on March ,8 showing the project scope and costs is available for review in the Engineering Department, Mondays through Fridays fi:om 8:00 a.m. to 4:30 p.m. If you have any questions or comments regarding this project yoii are encouraged to attend the public hearing or submit them in writing prior to the hearing. Sincerely, CITY OF CHANHASSEN Anita L. Benson, P.E. City Engineer ALB:ktm Attachment: Feasibility Report The City of Cbanbassen. A ~owing co,t,,,t,dO' `,c/ri, c/c,z;z/,zkcs, ,!t,,,z:';'{;, :','/,,,,!s. ,t ,'l,at:,.",:x .:'~,x '.,,':,:~,,, #,,'iz'i;,.,,Z i',tsim'~ses. ,~,~/ /;eam!fid #,v'l's. ,q $reat flace to lire. work, CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA NOTICE OF PUBLIC HEARING FOR LAKE DRIVE WEST STREET AND UTILITY IMPROVEMENTS (POWERS BOULEVARD TO AUDUBON ROAD) PROJECT NO. 98-16 NOTICE IS HEREBY GIVEN that the Chanhassen City Council will rmet in the City Hall Council Chambers located at 690 City Center Drive on Monday, March 22, 1999 at 6:30 p.m. for a public hearing on the Lake Drive West Street and Utility Improvement Project No. 98-16. This project will construct Lake Drive West through Outlot D, Chanhassen Lake Business Park between Powers Boulevard and Audubon Road. Proposed improvements consist of construction of an urban roadway section with concrete curb and gutter, storm drainage facilities, trunk watermain, sanitary sewer, street lighting, bituminous trail and a parking lot for Sunset Ridge Park. Said improvements are proposed to take place within Section 14 in the city and are proposed to be financed by a combination of special assessments and local funds. The total project cost of said improvements is estimated to be approximately $1,456,000.00. All persons interested may appear and be heard at said time and place. Anita L. Benson, City Engineer (Published in the Chanhassen Villager on 3/11/99 and 3/18/99) g:"~-ngXpublic~98-16Xpublic hearing notice.doc