Loading...
2.5 TH 41/TH 7 Plans & Specs CITY OF CHANHASSEN ) Cby Cmttr Drive, PO Box 147 :hanhtJJSm, MjnlllSota 553/7 Phone 6/2.937./900 GenmdFax6/2.937.5739 ngineering Fax 6/2.937.9/52 ,blic Saftty Fax 6/2.934.2524 Veb www.â.chanhtJJSm.mn.us ~ ;¡.S' MEMORANDUM TO: Scott Botcher, City Manager Anita L Benson, City Engineer ~ February 7, 2000 FROM: DATE: SUBJ: Approve Layout and Plans & Specifications for the TH 41/TH 7 Intersection Improvements, S.P. 1008-58, File No. PW-067D-4, City of Shore wood Project No. 98-05 The City of Shorewood has entered into a cooperative agreement with the Minnesota Department of Transportation to construct roadway improvements in the area of Trunk Highway 7 and Trunk Highway 41 intersection. The plans and specifications for the above-referenced project were approved by the City of Chanhassen in July of 1999. However, significant changes in the project scope have occurred since that time. Specifically, the portion ofthe project concerning the access control and intersection improvements were removed from this project and were bid and constructed as a separate project during the summer of 1999. In addition, alignment changes and revisions to typical sections and pavement insets have occurred upon final review by the Minnesota Department of Transportation. The City of Shorewood bas contracted with Evergreen Land Services of Minnetonka to acquire the necessary easements in order to construct this project. Propertics-withinthe City ofChanhassen for which easements will be acquired are the 7/41 Crossing shopping mall center and Super America as well as the property to the east adjacent to Trunk Highway 41. One access closure will occur at the residence located across from the Minnetonka West Middle School. Tills residence currently has two driveway accesses onto Trunk Highway 41. Staff was directed at the May 17, 1999 work session to investigate the feasibility of constructing a trail from Minnewashta Park to the 7/41 Crossing shopping center concurrently with the project. An approximate cost estimate for the oonstruction of this trailis$65,000 based upon a per-foot cost basis of the recent City trai1oonstruction along Trunk Highway 7. Since any costs for trail constrnction in co~unction with the TH 71TH 41 project would be the TeSponsibility of1he City ofChanhassen, it was recommended that the trail be constructedundcr a separate City contract. Preparation of a feasibility report in the future will allow prioritization with other City trail needs. The City ofShorewoodanticipates City Council approval of the final plans and , specificatioD5 1IDd authorization for advertising for bids for this project to occur at their March 27,2000 Council meeting. It is anticipated that construction will ]ì(¡gÏlÜn mid~May ,öf200n with all work, including the final wear course, to be J'complêted mthe2000construction season. , City of Chat/h."",. A ?Towj""'&tJllImuml'! Jt.'¡tl!J:I£t1nl1lr,~ llJIoJifJ,,,,1m1s. 11 ~barmjn' downtown. thrivj.. businesses. and beautifùl POrks, A ",eat vlace to live. work. and ola. Scott Botcher February 7, 2000 Page 2 The final plans and specifications along with a color layout for the project are available in my office for review. Approval of the layout and plans and specifications for the Trunk Highway 41ITrunk Highway 7 Intersection Improvements, S.P. 1008-58, PW-067D-4 is recommended. Attachments: 1. Letter from Donald Sterna, WSB & Associates, dated January 21,2000 2. Sample Resolution. 3. Plan Sheets I, 2 and 100 - 105 of 136. c: Donald Sterna, WSB & Associates Larry Brown, City of Shorewood Kevin Hogland, MnDOT Metro State AID Jeff Stewart, WSB & Associates g:\eng\anita\cc\th 7 th 41 approval memo.doc · WSB ~ &Associates, Inc. 350 Westwood Lake Office 8441 Wæ¡zB.ta Boulevard Minneapolis, MN 55426 612-541-4800 FAX 541-1700 B.A. Mittelsteadt, P.E. Beet A. Weiss. P.E. Peter R. WiOenbring. P.E. Donald W. Sterna, P.E. Ronald B. Bray, P.E. January 21, 2000 Ms. Anita Benson City Engineer City ofChanhassen PO Box 147 Chanhassen, MN 55317-0147 Re: TH 7 / TH 41 Intersection Improvements City Approval of Preliminary Layout City of Shore wood Project 98-05 WSB Project No. 1122.10 Dear Ms. Benson: As you are aware, the City of Shorewood, in cooperation with Mn/DOT, has been developing proposed improvements for the TH 7 and TH 41 intersection. Mn/DOT has approved the enclosed preliminary layout and is asking that both the Cities of Chanhassen and Shorewood formally approve the layout and pass a resolution oflayout approval, which will then be forwarded to Mn/DOT for their files. Enclosed for your use is a draft resolution containing the necessary language that Mn/DOT would like to see in the City resolution. You may, ¡fyou desire, reformat this resolution to fit the City's needs. Please review the enclosed resolution, as well as the preliminary layout, and if you have any questions or comments, please contact me. Also, you should be aware that the City has been moving forward on acquiring the necessary temporary and permanent easements in order to construct this project. A few of these parcels are within the City limits of Chanhassen, and Evergreen Land Services ofMinnetonka has been working on securing these easements for the City of Shore wood. I have enclosed a land acquisition status report for your information in regard to the parcels that are being acquired. Also enclosed you will find a copy of the final plans, specifications, and estimate that are being forwarded to MnlDOT for their final approval on this project. We anticipate that Mn/DOT will have final plan and specification approval in time for the City of Shore wood's Council meeting on March 27, 2000. At this time, we are assuming that we only need the City of Shorewood's final approval on the plans and specifications in order to proceed on bidding the project. If this is different than you understand it to be, please do not hesitate to contact me or Larry Brown at the City of Shorewood. Minneapolis· St. Cloud Infrastructure Engineers Planners rn'T.ð" t"'\DOr\DTJ',..,TfTVC'\,ÆÐ'("\vt;'Ð F:\WPW[N\1122.1O\012Loo..b-wpd , "-- ...--.- Ms. Anita Benson City ofChanhassen, MN January 21, 2000 Page 2 The anticipated project schedule is final plan and specification approval and authorization for bids to occur on March 27, 2000, with an anticipated April 26, 2000, letting. Contract approval is anticipated by May 8, 2000, thereby allowing the contractor to proceed around the middle of May of this year. It is anticipated that all of the work, including the final wear, will be constructed in the 2000 construction season. Please review the enclosed information; and if you have any questions or comments regarding the layout, resolution, and/or the plans, please do not hesitate to contact me at (612) 541-4800. Once the City has formally adopted the resolution, one executed copy will need to be forwarded to our office for final processing with Mn/DOT. Again, thank you for your cooperation on this project, and we look forward to successfully completing this project in this upcoming construction season. Sincerely, ws~r,;~ Il,AI/ I , Donald W. Sterna, P.E. Project Manager Enclosures c: Larry Brown, City of Shorewood Kevin Hoglund, Mn/DOT, Metro State Aid Jeff Stewart, WSB & Associates kd F:\wPWIN\I122101012100.11b CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: RESOLUTION NO: MOTION BY: SECONDED BY: APPROVE LAYOUT AND PLANS AND SPECIFICATIONS FOR TRUNK HIGHWAY 41/TRUNK HIGHWAY 7 INTERSECTION IMPROVEMENTS, S.P.I008-58, PW067D4 WHEREAS, the Commissioner of the Department of Transportation has prepared a layout and plans and specifications for the improvement of a part of Trunk Highway Number 41 within the corporate limits of the City ofChanhassen, from 634 meters south of the city limits of Shorewood; and seeks the approval thereof, and WHEREAS, said layouts are on file in the Office of the Department of Transportation, Saint Paul, Minnesota, being marked, labeled, and identified as S.P. 1008-58, Layout No.2, dated September 23,1999 and plans and specifications dated January 21,2000. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council that said layouts and plans and specifications for the improvement of said Trunk Highway within the corporate limits be and hereby are approved. Passed and adopted by the Chanhassen City Council this _ day of ,2000. ATTEST: Scott A. Botcher, City ClerkIManager Nancy K. Mancino, Mayor YES NO ABSENT g:\admin\resol\th 41 reso1.doc