1p Eden Trace Corporation
-
;>
~
.J
J
1.
L
:(
:t
-
~
1J
-
-
f)
CITY OF
CHANHASSEN
PC DATE: January 19,2000
i.-E'~
CC DATE: February 14, 2000
REVIEW DEADLINE: 2-15-2000
CASE #: 00-2 SPR
By: AI-Jaff
STAFF REPORT
PROPOSAL:
Site Plan Review for a 43,730 square foot office/warehouse building.
LOCATION:
Lot 2, Block 1, Chanhassen Lakes Business Park 8th Addition, northwest of
Mallory Court and south of Chicago, Milwaukee, S1. Paul & Pacific Railroad.
APPLICANT:
Eden Trace Corporation
1711 Lake Drive West
Chanhassen, MN 55317
(612) 361-0722
PRESENT ZONING: Industrial Office Park, lOP
2020 LAND USE PLAN: OfficelIndustrial
ACREAGE: 3.12
DENSITY:
SUMMARY OF REQUEST:
Site Plan Review for a 43,730 square foot office/warehouse building.
Notice of this public hearing has been mailed to all property owners within 500 feet.
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The City's discretion in approving or denying a site plan is limited to whether or not the proposed
project complies with Zoning Ordinance requirements. If it meets these standards, the City must then
approve the site plan. This is a quasi-judicial decision.
! I
~I
I
/~park ) I
" Court
./
/
1~/\5~ôò
,"~Î\ ,/
,..I ' ./
tfl II // ~/
,I II' \ / 0)
;: /~/ ..l~/~/ ::::.0
: i /' J
i I / ,.¡ ~-o /// ~.:2.
~. ~ ?0-
r.... ':'- ~
/ ~ 0- .~-~
, ~ ./ ~::::./ \..a\(e Drive
/ /-- /--- /
//.// 1 Essex Rd '
/ I /'
. 2 Suffox Dr " ~
3 Burlwood Dr .' /~f\'~
4 Rosewood Dr / ~"8' '
P I rs Place~/Ci?::;~" fi I
/ I~/jþ~~~
Iftilö
. I
,
/
~
Lot 2, Block I, CLBP 8th
February 14,2000
Page 2
PROPOSAUSUMMARY
The applicant is requesting site plan approval for the construction of a 43,730 square foot office
warehouse building. The site is located on Lot 2, Block I, Chanhassen Lakes Business Park 8th
Addition and has an area of3.l2 acres. It is zoned IOP, Industrial Office Park, and is bordered by
Mallory Court to the east and Chicago, Milwaukee, St. Paul & Pacific Railroad to the north.
Access to the site is gained via a driveway off of Mallory Court.
The site plan is well laid out. Loading docks are located along the northeast comer and from
views. The building screens the docks. The building is 19 feet in height. The applicant is
proposing to utilize pre-colored (brown) rockface block as the main material on the building,
which will cover the bottom 13 feet of the building. Light tan ribbed concrete masonry units are
used along the top 6 feet of the building and are accented by three smooth face bands. The
entrances into the building are recessed with a projecting metal canopy. The overall design
provides variation and detail on the facade of the building.
Parking is located along the south, north and east portions of the site. The parking will not be
visible from Lake Drive West since the building proposed south of the subject site will screen it.
The driveway into the site is lined with trees on either side complementing the boulevard trees
along Lake Drive. The landscape plan is deficient and plantings must be increased to meet
minimum ordinance requirements.
A parking lot light plan is required. The plan should incorporate the light style, height, and
photo-metrics. Also, a detailed sign plan, which includes lighting method, has to be submitted.
The applicant explained that trash dumpsters will be located inside the building. Rooftop
equipment and mechanical equipment are not shown on the plans. All equipment must be
screened from views.
In summary, with the incorporation of staff recommendations the proposed site plan application
would meet ordinance requirements, and staff is recommending approval with conditions outlined
in the staff report.
GENERAL SITE PLAN/ARCHITECTURE
The proposed office/warehouse building, with an area of 43,730 square feet, will be situated on
the northwest comer of Mallory Court. The site is bordered by a proposed industrial building to
the south and east, vacant industrial site to the west, and Chicago, Milwaukee, St. Paul & Pacific
Railroad to the north. Access to the building is proposed from Mallory Court. Parking will be
located along the south, north and east portion of the site.
Lot 2, Block 1, CLBP 8th
February 14, 2000
Page 3
Materials used on the building, are pre-colored rock face block and ribbed concrete masonry
units on all four elevations. Entrances into the building are recessed with a projecting canopy.
The entire building is capped with metal flashing. Loading docks are located at the northeast
corner of the building and are completely screened from views.
The applicant explained that trash will be located inside the building. Current state statutes
require that recycling space be provided for all new buildings. The area of the recycling space
must be dedicated at the rate specified in Minnesota State Building Code (MSBC) 1300.4700
Subp. 5. The applicant should demonstrate the required area will be provided in addition to the
space required for other solid waste collection space. Recycling space and other solid waste
collection space should be contained within the same enclosure.
Rooftop equipment and mechanical equipment are not shown on the plans. All equipment must
be screened from views.
The building is located 70 feet from the north, 80 feet from the east, 82 from the south, and 26.8
feet from the westerly property line.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the city shall consider the development's compliance
with the following:
(1) Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may
be adopted;
(2) Consistency with this division;
(3) Preservation of the site in its natural state to the extent practicable by minimizing
tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing areas;
(4) Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
(5) Creation of functional and harmonious design for structures and site features, with
special attention to the following:
Lot 2, Block 1, CLBP 8th
February 14,2000
Page 4
a. An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
b. The amount and location of open space and landscaping;
c. Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
(6) Protection of adjacent and neighboring properties through reasonable provision
for surface water drainage, sound and sight buffers, preservation of views, light
and air and those aspects of design not adequately covered by other regulations
which may have substantial effects on neighboring land uses.
Finding: The proposed development is consistent with the City's comprehensive plan,
the zoning ordinance, and the site plan review requirements. The site design is
compatible with the surrounding development. It is functional and harmonious with the
approved development for this area.
GRADING
In conjunction with the development of Chanhassen Lakes Business Park (CLBP) 7th and 8th
Additions, the developer rough graded the building site and constructed the infrastructure and
street system to serve the site. The approved grading plan for CLBP 8th Addition suggested a
first floor elevation of919.0 for the site which is 4 feet lower than the proposed grading plan
(923.0). The site was left higher due to an unexpected excess of material that was generated
between the 7th and 8th Additions. The developer ofCLBP 7th and 8th Additions, EdenTrace,
which is also the applicant in this submittal, has not requested city approval for a revised grading
plan for the 8th Addition. Upon comparison of the change in building elevation, it is the
Engineering Department's position that the revised elevation of923.0 should not adversely affect
the site lines from the neighboring land uses since they are zoned similarly. In addition, the
building proposed on Lot 1 proposes to be 1.8 feet higher than the approved grading plan for the
8th Addition. The site lines from Lake Drive West towards these sites should not be noticeable
given the grade of Lake Drive West and distance of the building from Lake Drive West.
However, the site lines and/or perception of the building from the cul-de-sac (Mallory Court) will
Lot 2, Block 1, CLBP 8th
February 14, 2000
Page 5
be more noticeable. The first floor elevation of the building will be approximately 8 feet higher
than the cul-de-sac. The top of the building will be approximately the same elevation as the top
of the hill to the west (940.0). The building will be set back approximately 225 feet from
Mallory Court which will help reduce the perception of the building height. As proposed, only
minor grading is anticipated on the lot for the proposed site improvements. Staff is
recommending approval of the proposed building elevation.
Erosion control measures (silt fencing, rock construction entrance) in accordance with the City's
Best Management Practice Handbook are incorporated into the grading plan.
To facilitate the northerly parking lot and truck turnaround area, a large retaining wall up to 13
feet in height is proposed. Typically, in residential areas, staff would recommend a safety fence
when retaining walls exceed 4 feet in height. However, given the remote location and adjacent
land use, staff is recommending a landscaped hedge 3 to 4 feet high to provide a level of safety.
All retaining walls in excess of 4 feet in height need to be engineered and a separate building
permit obtained.
DRAINAGE
The stormwater runoff from the parking lotslbuilding will be conveyed via storm sewers into
Mallory Court where the storm sewers will discharge into a regional storm water pond located
southeast of the site for pretreatment pursuant to the City's Surface Water Management Plan.
The storm sewer system on the site shall be privately constructed by the applicant and owned and
maintained by the applicant upon completion.
Detailed storm drainage calculations will be required to determine ifthere are sufficient catch
basins being provided to convey surface water runoff from the site. The drainage calculations for
a 10- and 100-year, 24-hour storm event (rational method) shall be submitted to the City for
review and approval at time of building permit application.
UTILITIES
Municipal sewer and water is available to the site from Mallory Court. However, at this time, the
City has not approved or accepted the utility improvements, therefore, connection will not be
permitted pursuant to the development contract. The developer needs to complete an outstanding
punch list and formally request the City to accept the utility improvements prior to connection.
Installation of the private utilities throughout the site (i.e. storm sewer, sanitary sewer, water) will
require plumbing permits and inspections through the City's Building Department. All utility
improvements shall be constructed in accordance with the city's latest edition of standard
specifications and detail plates and/or state plumbing codes.
Lot 2, Block 1, CLBP 8th
February 14,2000
Page 6
Water and storm drainage improvements are proposed to serve both Lots 2 and 3. Cross access
easement agreements with maintenance responsibilities need to be prepared and recorded by the
applicant against both lots being served by the common lines.
STREETS/PARKING
The parking lot appears to be fairly well laid out. Access will be from Mallory Court. The drive
aisles and parking stall widths appear to meet city codes. Truck turning movements for the
loading docks will require a truck turnaround area which will encroach upon the northwest
comer of Lot 3. A cross access easement agreement will also need to be prepared and recorded
by the applicant against the benefited lots. The developer of the plat will be providing an
industrial driveway apron on Mallory Court. The city's parking ordinance requires 4.5 parking
stalls per 1,000 square feet of office (49 stalls) and one stall per square feet of warehouse area
(33 stalls). The total parking spaces required by ordinance are 82. The applicant is providing 91
spaces.
A 6-foot wide concrete sidewalk will be constructed along the west side of Mallory Court out to
Lake Drive West in conjunction CLBP 8th Addition. The city will be completing an 8-foot wide
asphalt trail along the north side of Lake Drive West as well this spring. The applicant should
be required to extend a 5-foot wide concrete sidewalk from the parking lot to Mallory Court to
provide for pedestrian traffic movement.
SURFACE WATER MANAGEMENT PLAN (SWMP)
Storm Water Quality and Quantity Fees
All fees were paid with the Chanhassen Lakes Business Park 7th Addition.
LANDSCAPING
Minimum requirements for landscaping include 3,497 sq. ft. oflandscaped area around the
parking lot, 11 trees for the parking lot, and buffer yard plantings along the east, west and south
property lines. The applicant's proposed as compared to the requirements for landscape area and
parking lot trees is shown in the following table.
Vehicular use landsca e area
Trees/ parking lot
Re uired
3,497 s . ft.
14 overstory trees
Pro osed
48,623 s . ft.
2 overstory trees
South prop. line- buffer yard B
*shown - 75% of total
4 canopy trees
6 understo trees
1 overstory trees
9 understo trees
Lot 2, Block 1, CLBP Sth
February 14, 2000
Page 7
20' width
East prop. line - buffer yard B
(*shown - 75% of total)
20' width
West prop. line - buffer yard B
(*shown - 75% of total)
30' width
11 shrubs
4 overstory trees
5 understory trees
9 shrubs
2 overstory trees
5 understory trees
5 shrubs
> 11 shrubs
o overstory trees
11 understory trees
> 9 shrubs
wildflower planting
ccor mg to City u er yar or mance, e project eve oper IS responsl e or on y 00 e requIre p antmgs. uttmg property owners
may plant the remaining 25% on their property.
Proposed landscaping does not meet minimum ordinance requirements for parking lot trees.
Staff recommends 12 overstory trees be incorporated into the landscape plan to bring the total
number of trees up to minimum requirements. The dozen trees should be spread out between the
southern, eastern and northern parking landscape areas. Additionally, buffer yards on the south
and east sides technically fall short of minimum requirements as well. However, applicant does
have the correct number of trees and the river birch specified to be planted in those areas will
provide satisfactory buffering from neighboring properties. The west side buffer yard and the
landscape area along the north property line is proposed to be seeded in a wildflower mix. Staff
supports this proposal on the condition that the city be able to approve seed mix and application
procedures and maintenance schedule. These details have not been submitted with the landscape
plan.
LIGHTING
Lighting locations have not been illustrated on the plans. Only shielded fixtures are allowed as
required by ordinance. A detailed lighting plan should be submitted.
SIGNAGE
The applicant has not submitted a signage plan. One ground low profile business sign is
permitted per lot. The area of the sign may not exceed SO square feet and a height of S feet.
Also, one wall mounted sign per business shall be permitted per street frontage. The total display
area shall not exceed 15% of the total area of the building wall upon which the signs are
mounted. No sign may exceed 90 square feet. Staff is recommending the following criteria be
adopted:
1. All businesses shall share one monument sign per lot. Monument signage shall be
subject to the monument standards in the sign ordinance.
2. Wall signs are permitted on no more that 2 street frontages.-
Lot 2, Block 1, CLBP 8th
February 14, 2000
Page 8
3. All signs require a separate permit.
4. The signage will have consistency throughout the development and add an
architectural accent to the building.
5. Consistency in signage shall relate to color, size, materials, and heights.
6. No illuminated signs within the development may be viewed from the residential
section south of the site.
7. Back-lit individual letter signs are permitted.
8. Only the name and logo of the business occupying the unit will be permitted on
the sign.
The applicant must obtain a sign permit prior to erecting the signs on site. A detailed sign plan
incorporating the method of lighting, acceptable to staff should be provided prior to requesting a
building permit.
Building Height
Building Setback
Parking stalls
Parking Setback
Hard surface
Coverage
Lot Area
COMPLIANCE TABLE - lOP DISTRICT
Ordinance Proposed Building
4 stories 1 story
N-lO' E-lO' N-70' E-80'
S-30' W-lO' S-82' W-26.8'
82 stalls 91 stalls
N-NA' E-NA' N-20'- EI0'
S-NA' W-lO' S-lO'- W-30'
70% 64%
I acre
3.12 acres
Lot 2, Block I, CLBP 8th
February 14,2000
Page 9
PLANNING COMMISSION UPDATE
On January 19,2000, the Planning Commission reviewed and unanimously approved this
application. The commission requested the applicant add a new element to the south elevation
and the applicant responded by adding a door with a canopy.
RECOMMENDATION
"The City Council approves site plan 2000-2 for a 43,730 square foot office warehouse building
to be located on Lot 2, Block 1, Chanhassen Lakes Business Park 8th Addition, as shown on the
plans dated received December 17, and revised rendering dated received January 28, 2000,
subject to the following conditions:
1. The applicant shall increase number of overstory trees in the parking lot area to a total of
14.
7. The applicant shall submit details of the wildflower seeding proposed on the north and
west sides of the property. Details shall include contents of seed mix, application
procedure, and maintenance schedule.
8. Full park and trail dedication fees shall be paid in accordance with ordinance
requirements.
9. One ground low profile business sign is permitted per lot. The area of the sign may not
exceed 80 square feet and a height of 8 feet. Also, one wall mounted sign per business
shall be permitted per street frontage. The total display area shall not exceed 15% of the
total area of the building wall upon which the signs are mounted. No sign may exceed 90
square feet. All signage must meet the following criteria:
a. All businesses shall share one monument sign per lot. Monument signage shall be
subject to the monument standards in the sign ordinance.
b. Wall signs are permitted on no more that 2 street frontages.-
c. All signs require a separate permit.
d. The signage will have consistency throughout the development and add an
architectural accent to the building.
e. Consistency in signage shall relate to color, size, materials, and heights.
Lot 2, Block 1, CLBP 8th
February 14, 2000
Page 10
f. No illuminated signs within the development may be viewed from the residential
section south of the site.
g. Back-lit individual letter signs are permitted.
h. Only the name and logo of the business occupying the unit will be permitted on
the sign.
i. The applicant must obtain a sign permit prior to erecting the signs on site. A
detailed sign plan incorporating the method of lighting, acceptable to staff should
be provided prior to requesting a building permit.
10. Building Official Conditions:
a. The building shall have an automatic fire extinguishing system.
b. Five accessible parking spots must be provided and they must be dispersed among the
various building entrances as close to the entrances as possible.
c. The utility plans will be reviewed when submitted for permit.
d. The owner and or their representative shall meet with the Inspections Division as
soon as possible to discuss plan review and permit procedures.
6. Fire Marshal conditions:
a) Refer to utility plan. Please note the location of post indicator valve on the plan. The
post indicator valve must be provided with tamper protection. Chanhassen Fire
Department/Fire Prevention Division Policy #40-1995.
b) Refer to the Chanhassen Fire DepartmentlFire Prevention Division policy
requirements for your subcontractors.
7. A lighting plan shall be submitted to the city. Only shielded fixtures are allowed as
required by ordinance. A detailed lighting plan should be submitted.
8. Current state statutes require that recycling space be provided for all new buildings. The
area of the recycling space must be dedicated at the rate specified in Minnesota State
Building Code (MSBC) 1300.4700 Subp. 5. The applicant should demonstrate the
required area would be provided in addition to the space required for other solid waste
collection space. Recycling space and other solid waste collection space should be
contained within the same enclosure.
Lot 2, Block 1, CLBP Sth
February 14,2000
Page 11
9. Rooftop equipment and mechanical equipment are not shown on the plans. All
equipment must be screened from views.
10. The applicant shall enter into a site plan contract with the city and provide the necessary
financial securities as required for landscaping.
11. Detailed storm drainage calculations for a 10-year, 24-hour storm event shall be
submitted to the City for review and approval prior to issuance of a building permit.
12. Installation of the private utilities throughout the site will require building permits .
through the City's Building Department. All utility improvements shall be constructed in
accordance with the City's latest edition of Standard Specifications and Detail Plates
and/or state plumbing codes.
13. The applicant shall construct a 5-foot wide concrete sidewalk from the parking lot to
Mallory Court.
14. The proposed driveway access shall incorporate an industrial driveway apron and
pedestrian ramps on the plans in accordance with City Detail Plate No. 5207.
15. The applicant will need to provide financial security in the amount of $2,500 to guarantee
the boulevard restoration and erosion control measures. Security may be in the form of a
letter of credit or cash escrow which will be returned upon satisfactorily completing the
project.
16. All areas disturbed as a result of construction activities shall be immediately restored with
seed and disc mulch or wood fiber blanket or sod in accordance with the
approved plans within two weeks the completion of each activity in accordance with the
City's Best Management Practice Handbook.
17. All private streets/driveways shall be constructed to support a minimum of 7-ton per
axle design weight in accordance with City Code 20-111S.
IS. The applicant shall apply for and obtain permits from the appropriate regulatory agency,
i.e. Watershed District.
19. No berming is permitted within the City's right-of-way. Landscaping improvements may
be permitted subject to staff review and approval.
20. The applicant shall prepare and record a cross access easement agreement against Lots 2
and 3 for the common use of the water and storm drainage system and encroachment of
Lot 2, Block 1, CLBP 8th
February 14,2000
Page 12
the truck turnaround area on Lot 3. The agreement shall also address maintenance
responsibilities.
21. All retaining walls in excess of 4 feet in height need to be engineered and a separate
building permit obtained. A landscape hedge 3 to 4 feet in height shall be installed along
the top of the retaining wall."
ATTACHMENTS
1. Application & Notice of Public Hearing and mailing list.
2. Memo from David Hempel, Assistant City Engineer, dated January 12, 2000.
3. Memo"from Greg Hayes, Fire Inspector/Training Coordinator, dated December 29, 1999.
4. Memo from Steve ToreIl, Building Official, dated December 28,1999.
5. Planning Commission minutes dated January 19, 2000.
6. Plans dated December 15, 1999.
Lot 2, Block I, CLBP sth
February 14,2000
Page 1
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
Site Plan Review #00-2
INRE:
Application for Eden Trace Corporation for a 43,730 square foot office warehouse building
On January 19, 2000, the Chanhassen Planning Commission met at its regularly schedule
meeting to consider the application of Eden Trace Corporation for a site plan review for the
property located at Lot 2, Block I, Chanhassen Lakes Business Park sth Addition. The Planning
Commission conducted a public hearing on the proposed site plan was preceded by published
and mailed notice. The Planning Commission heard testimony from all interested persons
wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Industrial Office Park.
2. The property is guided by the Land Use Plan for an industrial office park.
3. The legal description ofthe property is Lot 2, Block 1, Chanhassen Lakes Business
Park Sth Addition
4. Section 20-11 0:
(1) Is consistent with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may
be adopted;
(2) Is consistent with this division;
(3) Preserves the site in its natural state to the extent practicable by minimizing tree
and soil removal and designing grade changes to be in keeping with the general
appearance of the neighboring developed or developing or developing areas;
Lot 2, Block 1, CLBP Sth
February 14,2000
Page 2
(4) Creates a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
(5) Creates a functional and harmonious design for structures and site features, with
special attention to the following:
a. An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
b. The amount and location of open space and landscaping;
c. Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
(6) Protects adjacent and neighboring properties through reasonable provision for
surface water drainage, sound and sight buffers, preservation of views, light and
air and those aspects of design not adequately covered by other regulations which
may have substantial effects on neighboring land uses.
5. The planning report 00-2 dated January 19,2000, prepared by Sharmin Al-Jaff is
incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the site
plan review.
ADOPTED by the Chanhassen Planning Commission this 19th day of January, 2000.
Lot 2, Block 1, CLBP sth
February 14,2000
Page 3
CHANHASSEN PLANNING COMMISSION
BY:
Its Chairman
ATTEST:
Secretary
g:\plan\sa\chanhassen lakes business park\OO-2spr.doc
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937-1900
DEVELOPMENT REVIEW APPUCATlON
\PPUCANT: Eder. -r;.ðlU (ð¡rf'
ð,DDRESS: /7// take /)/, Wes-f
~..¡"t)S'S"~I'1. MN ~S3i7
.
TELEPHONE (Daytime) 36/, tJ7-z...2
OWNER: J:.de7'1 írticc ~(¡?
ADDRESS: /1 (I L4 k f)" tv
CkIl!.tt.J/~ /111' 5S;J;./7
TELEPHONE: :J'h/-0722-
_ Comprehensive Plan Amendment _ Temporary Sales Perm~
- Cond~ional Use Perm~ - Vacation of ROWlEasements
- Interim Use Perm~ - Variance
_ Non-conforming Use Perm~ - Wetland Alteration Perm~
,
_ Planned Un~ Development· _ Zoning Appeal
_ Rezoning _ Zoning Ordinance Amendment
_ Sign Permits
,L Sign Plan Review _ Notification Sign
~ S~e Plan Review· (, 50. y ...x.. Escrow for Filing Fees! Attorney Cost··
($50 CUP/SPRNACNARlWAPlMetes
and Bounds, $400 Minor SUB)
Subdivision· TOTAL FEE $ 7 w
- QC), ...-"
A list of all property owners within 500 feet of the boundaries of the property must be Included with the
application.
Building material samples must be submitted with site plan reviews.
*Twenty-six full size folded copies ofthe plans must be submitted, Including an av." X 11" reduced copy of
transparency for each plan sheet.
- Escrow will be required for other applications through the development contract
JOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME h, + ,2 J 7J
LOCATION Æa!/t)Vv C, II/f
(
LEGAl DESCRIPTION I..of ;¡ /3!o(.,;.. /
~Ji ~.
TOTAL ACREAGE 3. 7
WETLANDS PRESENT YES X-NO
PRESENT ZONING .£ 0 .p
REQUESTED ZONING
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR THIS REQUEST
(~élH¡étJ:fC'" ~ko 15&</_ hr¡£
This application must be completed in full and be typewritten or clearfy printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either
copy of Owner's Duplicate Certificate of Tille, Abstract of Title or purchase agreement), or I am the authorized person to make
this application and the fee owner has also signed this application.
1 wil1 keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge-
The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
extensions are approved by the applicant
~ ~o1,<~C"
Signature of Applicant
t/1~
Signature of Fee Owner
Application Received on Fee Paid
I-z. - q; -'1"1
Date
f "Z- - {<; ""to¡
Date
Receipt No.
The applicant should contact staff for a copy of the staff report whIch will be available on Friday prior to the meeting.
If not contacted, a copy of the report will be mailed to the applicant's address.
~ /ß.pp
.4W
NOTICE OF PUBLIC HEARING
PLANNING COMMISSION MEETING
WEDNESDAY, JANUARY 19, 2000 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
690 CITY CENTER DRIVE
PROPOSAL: Site Plan Review for an
OffIce Industrial Building
APPLICANT: Eden Trace Corporation
LOCATION: Mallory Court, North of
Lake Drive West
NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant,
Eden Trace Corporation, is requesting Site Plan Review for a 43,730 sq. ft. office warehouse building to
be located on Lot 2, Block 1, chanhassen Lakes Business Park 8th Addition on property zoned lOP,
Office Industrial Park and located west of Powers Blvd., north of Lake Drive West on Mallory Court.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the developer's
request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead
the pUblic hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The Developer will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses project.
Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during
office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project,
please contact Sharmin at 937-1900 ext. 120. If you choose to submit written comments. it is helpful to have one
copy to the department in advance of the meeting. Staff will provide copies to the Commission.
Notice of this public hearing has been published in the chanhassen Villager on January 6. 2000.
/v~
,-.
. i ¡ ~\ ~ ~LL ,.'m__,":',~-=~~'---------",~,
!'~~.º~: ,/ I. '---,~' -' I " ......
-·--C-- , . - I 'Court I -' ,.
i L-/~ . I ,----------' ; ... - \ ! ,
l ~ "'-~ ~---- -\~'t \ \-L__~
I' =- - _\\-..m \ \\ \ r~
J \\~. '\ \\ . ~..-J /
~~.~\1~\-~= '-~{~=-~-- ) I
il J~~;';~;'- ~ 6~
/ ~ rv;"\/ /~~....::;~" /
<J/ I /' // 1 E..ex Rd ...~ I ,·-(ìrn-
,/ 2 SuffaxDr ~~
'I( 3 BurtwoodDr / ~'{ _i:! J
) -lrTT-jfI~Ros~.~~:~&Æ
\_,~~0J '~)';~~)o/Sl
- / -7 \ i:s -0' ~ '¢ ""', ff>l0":, N I
'-. /1 Ii?' '~'="/--~\Ä'il' I~~~~r-< :
'.,I ~ìo \~'1.~~8 S 1=1. vo
.JEÆšO~' ~'~~":\'J§i3i i \ fof~
;:j/ìTrr''i .. ~\:;¡;' 81' \\J" \ ,
"y! ! ,,, I .1,-....', ,¿¡;.,~ ~ .lí:j., I ,'(.\, \~~'Î",,'
Smooth Feed Sheets™
UNITED MAILING INC
1001 PARK RD
CHANHASSEN, MIl 55317
DUKE REALTY LlMTED PTRSHP
1550UTICAAVES STE120
ST LOUIS PARK, MIl 55416
EDWARD A PAULS
8227 TOP OF THE VI.ORLD DR
SALT LAKE CITY, UT 84121
GARY F GOLL
1455 PARK RD
CHANHASSEN, MIl 55317
FLENINGE PTRSHP
C/O LARS E AKERBERG
121 3RD ST W
CHASKA, MIl 55318
LAKE SUSAN HILLS
7600 PARKLAI,o\,N AVE
MINNEAPOLIS, MN 55435
RAYEJOHNSON
11001 HMPSHIRE AVE S
BLOOMINGTON, MN 55438
--
,
LoK \ >.;)...
c.. L- B P g~
Use template for 5160(!
CITY OF
CIlANHASSEN
Q City Center Drive, PO Box 147
:hanhalStn, MinnNota 55317
Phone 612.937. 1900
Gmeral Fax 612.937.5739
nginming Fax 612.937.9152
.blic Safety Fax 612.934.2524
f!eb www.ci.chanhasstn.mn.us
MEMORANDUM
TO:
Sharmin Al-Jaff, Senior Planner
Dave Hempel, Assistant City Enginee~
FROM:
DATE:
January 12, 2000
SUBJ:
Site Plan Review for Lot 2, Block I, Chanhassen Lakes Business
Park Sth Addition - Land Use Review File No. 00-02
Upon review of the plans prepared by RSP Architects and Schoell & Madson, Inc.
dated December 15, 1999, I offer the following comments and recommendations:
GRADING
In conjunction with the development ofChanhassen Lakes Business Park (CLBP)
7th and Sth Additions, the developer rough graded the building site and constructed
the infrastructure and street system to serve the site. The approved grading plan
for CLBP Sth Addition suggested a first floor elevation of919.0 for the site which
is 4 feet lower than the proposed grading plan (923.0). The site was left higher
due to an unexpected excess of material that was generated between the 7th and Sth
Additions. The developer of CLBP 7th and Sth Additions, EdenTrace, which is
also the applicant in this submittal, has not requested city approval for a revised
grading plan for the Sth Addition. Upon comparison of the change in building
elevation, it is the Engineering Department's position that the revised elevation of
923.0 should not adversely affect the site lines from the neighboring land uses
since they are zoned similarly. In addition, the building proposed on Lot 1
proposes to be I.S feet higher than the approved grading plan for the Sth Addition.
The site lines from Lake Drive West towards these sites should not be noticeable
given the grade of Lake Drive West and distance of the building from Lake Drive
West. However, the site lines and/or perception of the building from the cul-de-
sac (Mallory Court) will be more noticeable. The first floor elevation of the
building will be approximately S feet higher than the cul-de-sac. The top of the
building will be approximately the same elevation as the top of the hill to the west
(940.0). The building will be set back approximately 225 feet from Mallory Court
which will help reduce the perception ofthe building height. As proposed, only
minor grading is anticipated on the lot for the proposed site improvements. Staff
is recommending approval of the proposed building elevation.
Erosion control measures (silt fencing, rock construction entrance) in accordance
with the City's Best Management Practice Handbook are incorporated into the
grading plan.
, City of Chl/1/hassCll. A f(/"fJwin[ communitv with clean lakes, quality schoo~. a charmint downtown, thrivint businesses, and beauti/ÙI parks. A treat place to live, work, and pia'!
Sharmin Al-Jaff
January 12, 2000
Page 2
To facilitate the northerly parking lot and truck turnaround area, a large retaining
wall up to 13 inches in height is proposed. Typically, in residential areas, staff
would recommend a safety fence when retaining walls exceed 4 feet in height.
However, given the remote location and adjacent land use, staff is recommending
a landscaped hedge 3 to 4 feet high to provide a level of safety. All retaining
walls in excess of 4 feet in height need to be engineered and a separate building
permit obtained.
DRAINAGE
The stormwater runoff from the parking lotslbuilding will be conveyed via storm
sewers into Mallory Court where the storm sewers will discharge into a regional
stormwater pond located southeast of the site for pretreatment pursuant to the
City's Surface Water Management Plan. The storm sewer system on the site shall
be privately constructed by the applicant and owned and maintained by the
applicant upon completion.
Detailed storm drainage calculations will be required to determine ifthere are
sufficient catch basins being provided to convey surface water runoff from the
site. The drainage calculations for a 10- and 100-year, 24-hour storm event
(rational method) shall be submitted to the City for review and approval at time of
building permit application.
UTILITIES
Municipal sewer and water is available to the site from Mallory Court. However,
at this time, the City has not approved or accepted the utility improvements,
therefore, connection will not be permitted pursuant to the development contract.
The developer needs to complete an outstanding punch list and formally request
the City to accept the utility improvements prior to connection.
Installation of the private utilities throughout the site (i.e. storm sewer, sanitary
sewer, water) will require plumbing permits and inspections through the City's
Building Department. All utility improvements shall be constructed in accordance
with the city's latest edition of standard specifications and detail plates and/or
state plumbing codes.
Water and storm drainage improvements are proposed to serve both Lots 2 and 3.
Cross access easement agreements with maintenance responsibilities need to be
prepared and recorded by the applicant against both lots being served by the
common lines.
Sharmin Al-Jaff
January 12, 2000
Page 3
STREETS/PARKING
The parking lot appears to be fairly well laid out. Access will be ftom Mallory
Court. The drive aisles and parking stall widths appear to meet city codes. Truck
turning movements for the loading docks will require a truck turnaround area
which will encroach upon the northwest comer of Lot 3. A cross access easement
agreement will also need to be prepared and recorded by the applicant against the
benefited lots. The developer ofthe plat will be providing an industrial driveway
apron on Mallory Court.
A 6-foot wide concrete sidewalk will be constructed along the west side of
Mallory Court out to Lake Drive West in conjunction CLBP 8th Addition. The
city will be completing an 8-foot wide asphalt trail along the north side of Lake
Drive West as well this spring. The applicant should be required to extend a 5-
foot wide concrete sidewalk ftom the parking lot to Mallory Court to provide for
pedestrian traffic movement.
RECOMMENDED CONDITIONS OF APPROVAL
1. Detailed storm drainage calculations for a 10-year, 24-hour storm event shall
be submitted to the City for review and approval prior to issuance of a
building permit.
2. Installation of the private utilities throughout the site will require building
permits through the City's Building Department. All utility improvements
shall be constructed in accordance with the City's latest edition of Standard
Specifications and Detail Plates and/or state plumbing codes.
3. The applicant shall construct a 5-foot wide concrete sidewalk from the parking
lot to Mallory Court.
4. The proposed driveway access shall incorporate an industrial driveway apron
and pedestrian ramps on the plans in accordance with City Detail Plate No.
5207.
5. The applicant will need to provide financial security in the amount of $2,500
to guarantee the boulevard restoration and erosion control measures. Security
may be in the form of a letter of credit or cash escrow which will be returned
upon satisfactorily completing the project.
Sharmin Al-Jaff
January 12, 2000
Page 4
6. All areas disturbed as a result of construction activities shall be immediately
restored with seed and disc mulch or wood fiber blanket or sod in accordance
with the approved plans within two weeks the completion of each activity in
accordance with the City's Best Management Practice Handbook.
7. All private streets/driveways shall be constructed to support a minimum of
7 -ton per axle design weight in accordance with City Code 20-1118.
8. The applicant shall apply for and obtain permits from the appropriate
regulatory agency, i.e. Watershed District.
9. No berming is permitted within the City's right-of-way. Landscaping
improvements may be permitted subject to staff review and approval.
10. The applicant shall prepare and record a cross access easement agreement
against Lots 2 and 3 for the common use ofthe water and storm drainage
system and encroachment of the truck turnaround area on Lot 3. The
agreement shall also address maintenance responsibilities.
11. All retaining walls in excess of 4 feet in height need to be engineered and a
separate building permit obtained. A landscape hedge 3 to 4 feet in height
shall be installed along the top of the retaining wall.
c: Anita Benson, City Engineer
llefsl IvoI2Iengldavelpcllot2.bk I c1bp8th.doc
CITY OF
CHANHASSEN
JCityCmterDrive,POBoxI47 MEMORANDUM
JJanhllSJen, Minnesota 55317
Phone 612.937.1900
General Fax 612.937.5739 FROM:
'ngineering Fax 612937.9152
·,b/ic Safety Fax 612.934.2524 DATE:
Veb www.ci.chanhassm.mn.us
TO:
Shannin Al-Jaff, Senior Planner
Greg Hayes, Fire Inspectorrrraining Coordinator
December 29,1999
SUBJECT:
Planning Case: 00-2 Site Plan Review. Request for site plan review for a
43,730 square foot office/warehouse building to be located on Lot 2,
Block 1, Chanhassen Business Park Sth Addition on property zoned lOP.
A plan review was done for the above project. In order to comply with the Chanhassen Fire
DepartmentlFire Prevention Division, I have the following fire code or city ordinance/policy
requirements. The site plan is based on the available infonnation supplied at this time. If
additional plans or changes are submitted the appropriate code or policy items will be
addressed.
1. Refer to utility plan. Please note the location of post indicator valve on the plan. The
post indicator valve must be provided with tamper protection. Chanhassen Fire
DepartmentIFire Prevention Division Policy #40-1995.
2. Please refer to,the enclosed policies for requirements for your different sub-contractors.
If you have any questions, please give me a call at ext. 262.
GHlbe
g:lsafetylghlplrevOO-2
~e City of Chm,hassm. A f{rOwinr communit"! with clean lakes, Qucdity schoob. a charmindowntown. thrivinv businesses. and beauti/ùl paries. A "eat pia" to live. work. and pia,
CITY OF
CHANHASSEN
690 City Cmter Drive. PO Box 147
ChaMlllitn, MinnfflJtII55317
PhoTlt 612.937.1900
General FI1X 612.937.5739
Engineering FI1X 612.937.9152
Public Safety FIIX 612.934.2524
mb wwwci.chaMIWtn.mn.us
MEMORANDUM
TO:
Sharmin AI-Jaff, Senior Planner
Steve Torell, Building Official 7~
December 28, 1999
FROM:
DATE:
SUBJ:
Site Plan Review for: Office/Warehouse Building on Lot 2, Block 1
Chanhassen Lakes Business Park S'" Addn.
PLANNING CASE: 00-2 Site Plan Review
I have reviewed the plans for the above building dated: December 15, 1999, and
received by the Planning Department on December 16, 1999. Following are my
comments, which should be included in the conditions of approval.
1. The building shall have an automatic fire extinguishing system.
2. Four accessible parking spots must be provided and they must be dispersed
among the various building entrances as close to the entrances as possible.
3. The owner and or their representative shall meet with the Inspections
Division as soon as possible to discuss plan review and permit procedures.
G/safety/st/memosiplanichanlakes8Iot2blk I
The City o{Chal/hllS"l/. A :<",owinfCommunity with clean lakes, aUtllity schools, a thanninr downtown, thrivinr businesses. and beautifùl parks. A ",at Place to live. work. and pj
Planning Commission Meeting - January 19,2000
PUBLIC HEARING:
REOUEST FOR SITE PLAN REVIEW FOR A 43.730 SQ. FT. OFFICE WAREHOUSE
BUILDING TO BE LOCATED ON LOT 2. BLOCK I. CHANHASSEN LAKES
BUSINESS PARK 8TH ADDITION ON PROPERTY ZONED lOP. OFFICE
INDUSTRIAL PARK AND LOCATED WEST OF POWERS BOULEVARD. NORTH OF
LAKE DRIVE WEST ON MALLORY COURT. EDEN TRACE CORPORATION.
Sharmin AI-Jaff presented the staff report on this item.
Hempel: Mr. Chairman, ifI could add one comment. I noticed an error in the staff report with
regards to the retaining wall height by the truck loading facility. I don't know if anybody caught
that. The staff report says 13 inch high retaining wall. It should be 13 foot high. Thank you.
Peterson: Thank you. Sharmin, I'm trying to figure out on the color rendering that we've got,
which elevation is this? I couldn't picture, figure out which one it was.
Mark Undestad: That's looking straight in this way. You're looking at the top one here?
Peterson: No, the bottom one.
Mark Undestad: Oh bottom. Okay, the bottom one is this face here. So as these step out, you're
seeing all the different jogs through here.
Peterson: So from the angle of the foyer, "entrance", how many feet to the west would you go
approximately? I'm just trying to get, it's a big, long wall. I'm just trying to figure, it doesn't
look as "nice" as your previously building.
Mark Undestad: Well, the difference in this one is that we're using a lot of the image is coming
on the top 6 feet of the building here. We're changing to using these break-off or a corduroy
block. To stand out a little more for more depth.
Peterson: And they'll be in, and they're not noted on here as I can see so about how far apart are
they on this to break up that wall on top?
Mark Undestad: Well if you look at this fIrst light tan line here. Okay, right above that, that
brown stripe will be a corduroy block or break-off block. Then there will be another smooth,
recessed band of smooth block and then the large, white band on top. The fmish end will be
another corduroy block.
Peterson: So on the other rendering we've got some angles, some 45 degree angles that are in
there. Am I dreaming when I say that?
Mark Undestad: At the top of the building?
29
Planning Commission Meeting-January 19,2000
Peterson: Yeah.
Mark Undestad: This is, what we're doing on these is very similar to what.. . step off the top 3 or
4 courses of block.
Peterson: So the corduroy will look like a 45 degree angle is really what I'm talking about is the.
Mark Undestad: Right. It will.. . corduroy sticks out another 3 inches farther than rock face or
smooth block. But we don't step them up, we're not doing the same design at the top of this one
so that this one will bring Lot 2 with Lot 3. .. But this is the same detail as Lots I and 2 in the 7th
Addition.
Peterson: Okay, thanks. Any other comments before we get Mark back to his seat and bring him
back up.
Blackowiak: Excuse me Mr. Chair, I do have a comment. So I didn't quite get the answer. How
long is it from this comer, which I'm guessing is the edge of the front entrance, to the back or the
farthest southwestern corner, which would be down here? What kind of length are we looking
at?
Mark Undestad: I don't have a scale on me...
Hempel: Mr. Chairman, Commissioners, I've scaled it off. It's approximately 140 feet.
Peterson: Thank you. You redeemed yourselffor the retaining wall.
Blackowiak: And what kind of view can we expect on the other two elevations? I know that
they're not as, maybe as prominent but yes.
Mark Undestad: Well, back there we're going to do part of the building is going to be buried
back there. Those hillsides go up, I don't know, 20 to 30 feet. Up the bank in the back. What
we're going to do is this will grade down and grade, there will be a swale in there to drain off and
then we're going to put windows in along the top of that. It's a production place. Put windows
in up there but they're going to be higher up built, maybe 12 feet. 10 to 12 feet off the ground.
Blackowiak: Okay, so the back would be basically just a single color?
Mark Undestad: No, no, no. It will look just like this all four sides even though.
BIackowiak: But just no low windows?
Mark Undestad: Right.
Blackowiak: It will just be the tall windows.
30
~
Planning Commission Meeting - January 19,2000
Mark Undestad: But the same design goes around all four sides.
Kate Aanenson: That is in the black and white packet.
Blackowiak: I know. Okay, thanks.
Peterson: Other questions of the applicant?
Kind: Yes Mr. Chairman. You just mentioned something that reminded me. You mentioned
that it's going to be a production facility and this is probably a partial question for staff and for
the applicant relating to ordinances on noise and odors and that sort of thing. Not to worry?
Thank you.
Peterson: Okay, other questions? Thanks. Can I have a motion and a second for a public
hearing please.
Kind moved, BIackowiak seconded to open the public hearing. The public hearing was
opened.
Peterson: This is a public hearing. Anyone wishing to address the commission, please come
forward.
Burton moved, Kind seconded to close the public hearing. The public hearing was closed.
Peterson: Thoughts on this one commissioners. Hearing none I'll entertain a motion.
Blackowiak: Oh, excuse me Mr. Chair. I'll just make a quick comment and I don't know, I kind
of alluded to it with my question. Lot 1, the building we just saw, I liked the south elevation a
lot. I liked the variation. The different entrances. Lot 2, I like it less. It's a pretty long stretch of
wall. I do understand it will be shielded for, I mean a lot of it will be shielded by Building 1, Lot
I but still 140 feet is 140 feet and I would maybe like the applicant to consider doing something
to break it up. I don't know whether landscaping or, it just seems like it's rather long. And that
would be my only concern at this point in time.
Mark Undestad: One of the things we're reviewing right now...there's an opening in here that
we may add another entrance in there.
BIackowiak: I'd like that.
Mark Undestad: Which would reduce, I mean it wouldn't be obviously as grand as the main
entrance here but we could get something.
BIackowiak: Just to break it up a little bit, okay. All right. Thank you.
Peterson: Motion please.
31
Planning Commission Meeting - January 19,2000
Burton: Mr. Chairman, I'll move that the Planning Commission recommends approval of Site
Plan 2000-2 for a 43,730 square foot office warehouse building to be located on Lot 2, Block 1,
Chanhassen Lakes Business Park Sth Addition as shown on the plans dated received December
17, subject to the conditions in the staff report, number I, am I reading the right thing? Oh, I see.
You've got it revised. Subject to the conditions I through 32.
Peterson: No...
Burton: I'm sorry, whatever the numbers are. My numbers are wacky here. I don't know ifI'm
looking at.
Peterson: 1 through 21.
Burton: Mine goes 1,7, S, 9. Okay, whatever they are, they are.
Aanenson: We'll correct that. How about subject to the conditions in the staff report.
Burton: That's fine. We'll leave it at that. However they turn out.
Peterson: Is there a second?
Kind: Second.
Burton moved, Kind seconded that the Planning Commission recommends approval of Site
Plan #2000-2 for a 43,730 square foot office warehouse building to be located on Lot 2,
Block 1, Chanhassen Lakes Business Park 8th Addition, as shown on the plans dated
received December 17, and subject to the following conditions:
1. The applicant shall increase the number of overstory trees in the parking lot area to a total
of 14.
2. The applicant shall submit details of the wildflower seeding proposed on the north and west
sides of the property. Details shall include contents of seed mix, application procedure, and
maintenance schedule.
3. Full park and trail dedication fees shall be paid in accordance with ordinance requirements.
4. One ground low profile business sign is permitted per lot. The area of the sign may not
exceed SO square feet and a height of S feet. Also, one wall mounted sign per business
shall be permitted per street frontage. The total display area shall not exceed 15% of the
total area of the building wall upon which the signs are mounted. No sign may exceed 90
square feet. All signage must meet the following criteria:
32
Planning Commission Meeting - January 19,2000
a. All businesses shall share one monument sign per lot. Monument signage shall be
subject to the monument standards in the sign ordinance.
b. Wall signs are permitted on no more than 2 street frontages.
c. All signs require a separate permit.
d. The signage will have consistency throughout the development and add an architectural
accent to the building.
e. Consistency in signage shall relate to color, size, materials, and heights.
f. No illuminated signs within the development may be viewed from the residential
section south of the site.
g. Back-lit individual letter signs are permitted.
h. Only the name and logo of the business occupying the unit will be permitted on the
sIgn.
1. The applicant must obtain a sign permit prior to erecting the signs on site. A detailed
sign plan incorporating the method of lighting, acceptable to staff should be provided
prior to requesting a building permit.
5. Building Official Conditions:
a. The building shall have an automatic fire extinguishing system.
b. Five accessible parking spots must be provided and they must be dispersed among the
various building entrances as close to the entrances as possible.
c. The utility plans will be reviewed when submitted for permit.
d. The owner and/or their representative shall meet with the Inspections Division as soon
as possible to discuss plan review and permit procedures.
6. Fire Marshal conditions:
a. Refer to the utility plan. Please note the location of the fire hydrants to be installed.
One hydrant will be off the northeast comer of the building and another hydrant must be
located off the southeast comer by the front entrance. The hydrant shown on the
southwest comer can be deleted. Minnesota Uniform Fire Code 1997 Section 903.4.2.
b. Refer to the Chanhassen Fire Department/Fire Prevention Division policy requirements
for your subcontractors.
33
Planning Commission Meeting - January 19, 2000
7. A lighting plan shall be submitted to the city. Only shielded fixtures are allowed as
required by ordinance. A detailed lighting plan should be submitted.
8. Current state statutes require that recycling space be provided for all new buildings. The
area of the recycling space must be dedicated at the rate specified in Minnesota State
Building Code (MSBC) 1300.4700 Subp.5. The applicant should demonstrate the required
area would be provided in addition to the space required for other solid waste collection
space. Recycling space and other solid waste collection space should be contained within
the same enclosure.
9. Rooftop equipment and mechanical equipment are not shown on the plans. All equipment
must be screened from views.
10. The applicant shall enter into a site plan contract with the city and provide the necessary
financial securities as required for landscaping.
II. Detailed storm drainage calculations for a 10 year, 24 hour storm event shall be submitted
to the city for review and approval prior to issuance of a building permit.
12. Installation of the private utilities throughout the site will require building permits through
the City's Building Department. All utility improvements shall be constructed in
accordance with the City's latest edition of Standard Specifications and Detail Plates
and/or state plumbing codes.
13. The applicant shall construct a 5 foot wide concrete sidewalk from the parking lot to
Mallory Court.
14. The proposed driveway access shall incorporate an industrial driveway apron and
pedestrian ramps on the plans in accordance with City Detail Plate No. 5207.
15. The applicant will need to provide fInancial security in the amount of$2,500 to guarantee
the boulevard restoration and erosion control measures. Security may be in the form of a
letter of credit or cash escrow which will be returned upon satisfactorily completing the
project.
16. All disturbed as a result of construction activities shall be immediately restored with seed
and disc mulch or wood fiber blanket or sod in accordance with the approved plans within
two weeks of the completion of each activity in accordance with the City's Best
Management Practice Handbook.
17. All private streets/driveways shall be constructed to support a minimum of7 ton per axle
design weight in accordance with City Code 20-1118.
34
Planning Commission Meeting - January 19, 2000
18. The applicant shall apply for and obtain permits from the appropriate regulatory agency, i.e.
Watershed District.
19. No berming is permitted within the City's right-of-way. Landscaping improvements may
be permitted subject to staff review and approval.
20. The applicant shall prepare and record a cross access easement agreement against Lots 2
and 3 for the common use of the water and storm drainage system and encroachment of the
truck turnaround area on Lot 3. The agreement shall also address maintenance
responsibilities.
21. All retaining walls in excess of 4 feet in height need to be engineered and a separate
building permit obtained. A landscape hedge 3 to 4 feet in height shall be installed along
the top of the retaining wall.
All voted in favor and the motion carried unanimously.
PUBLIC HEARING:
REOUEST FOR A VARIANCE FROM THE 40 FOOT SETBACK FOR THE
CONSTRUCTION OF A DECK LOCATED 7415 BENT BOW TRAIL (LOT 10, BLOCK
4, MEADOWS AT LONGACRES 4TH ADDITION) TERRY RADIL.
Cindy Kirchoff presented the staff report on this item.
Peterson: Questions of staff.
Kind: Mr. Chairman, I have one question. Trying to give the applicant their patio, could they
use pavers? Is that considered pervious or impervious?
Kirchoff: That is considered hard surface. Same as a patio.
Kind: Thank you.
Peterson: Cindy, what's a buffer strip monument?
Kirchoff: A buffer strip monument is a sign locating where the buffer strip is, correct?
Aanenson: Yeah, it's a post in the ground and it's got a marquee that the city makes up that says
wetland edge or conservation easement. We put it on every other lot to delineate that line. What
we found is, ifit's on paper and someone's out mowing their lawn, it's hard to find. So we do
require the developer to place those on the line.
Kind: And this one's missing?
35