Loading...
1i-1 Final Plat/Paisley Park CITY OF CHANHASSEN 7700 Market Boulevard POBox 147 Chanhassen, MN55317 Administration Phone: 952.22/,1100 Fax: 952.22/,1110 Building Inspections Phone: 95222/,IIBO Fax: 952.22/,1190 Engineering Phone 952.227.1160 Fax 952.22/,1170 Finance Phone 952.22/'1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310CoullerBoulevard Phone 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.22/,1130 Fax: 952.22/,1110 Publi,Works 1591 Park Road Phone: 952.227.1300 Fax 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 WebSile www.cLchar¡hassen.mn.us ~,,¿-i MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Bob Generous, Senior Planner DATE: ~ March 28, 2005 SUBJ: Paisley Park Studio Storage Fina] Plat Planning Case #04-4] PROPOSAL SUMMARY The developer is requesting final plat approval to subdivide 7.64 acres in to one Lot (2.33 acres), one Outlot (5.11 acres) and right-of-way for Coulter Boulevard (0.2 acres), Studio Storage. ACTION REQUIRED City Council approval requires a majority of City Council present. BACKGROUND On January 10, 2005, the Chanhassen City Council approved the preliminary plat creating one Lot and one Outlot. Additionally, the Chanhassen City Council approved a 4,080 square-foot, one-story warehouse building. PARKS AND RECREATION The developer shal] pay park dedication fees for the proposed development of final plat recording. Park fees are collected only on the Lot being platted, not the Outlot. GRADING. DRAINAGE & EROSION CONTROL The applicant is proposing to grade about 35% of the site for the new lot and driveway access. In genera], the lot will be graded down from four to eight feet to obtain a building pad with a finished floor elevation of 979.6 and the proposed parking lot. At this elevation, stormwater from the building and parking lot will drain toward the proposed catch basins along the south and east sides of the lot and be conveyed via storm sewer to the existing Coulter Bou]evard storm sewer. There are a couple of grading areas on the plans with proposed slopes in excess of 3: 1. The applicant should be aware that a maximum of 3: 1 slopes are allowed otherwise a retaining wal] is required. Retaining walls in excess of four feet in height must be designed by a registered structural engineer and a building permit must be obtained. The building and parking lot drainage will be collected by proposed catch basins within the parking lot. The site drainage for the property will be routed to an existing regional pond located south of the Genera] Mills property. This pond has The City of Chanhassen' A growing community with clean lakes, quallly schools, a channrng downtown, thriving busrnesses, wrndlng trails, and beautltul parks A goat place to live, work, and play Paisley Park Studio March 28, 2005 Page 2 been sized for development of this property. As such, no additional ponding improvements are required with this development. Storm sewer sizing calculations have been submitted and only minor changes remain. The proposed storm sewer must be sized for a lO-year storm event. Additionally, an NPDES permit will be required from the MPCA along with a Watershed District permit. Staff recommends that Type I silt fence be added along the northeastern side of the proposed access drive. The entire site must be mulched and seeded or sodded within two weeks of grading completion. The applicant should be aware that any off-site grading will require an easement from the appropriate property owner. In addition, if importing or exporting of grading materia] will occur to/from the site, a detailed haul route must be provided for staff review. UTILITIES Municipa] water service is available to the site from the south on Coulter Boulevard and sanitary service is available to the site from the east on Audubon Road. The applicant is proposing to connect to existing service stubs and extend them to serve the site. The watermain and sanitary sewer services will be considered private utilities since they will serve only one lot. The site has previously been assessed for utility and street improvements. According to the City's Finance Department records, there is no remaining balance on the parcel. However, the sanitary sewer and water hookup charges will still be applicable for the new lot. The 2005 trunk hookup charge is $1,458 per unit for sanitary sewer and $2,955 per unit for water. Each of these charges is based on the number of SAC units calculated by the Met Council. Sanitary sewer and water hookup fees may be specially assessed against the parcel at the time of building permit issuance. STREETS No public streets are proposed as part ofthis project. The applicant is proposing a private, 30- foot wide full access to the site from the north off McGlynn Road. Since the access will cross through the outlot, it is considered a private street. This will require the access to be built to a 9- ton design and enclosed within a 40-foot wide cross-access easement. A concrete driveway apron and pedestrian ramps will also be required at the access location. The site is located along Coulter Boulevard, which is designated as a collector road in the city. Per City Code, collector roads are required to have 80 feet of total right-of-way or 40 feet from each side of the centerline of the road. Currently, Coulter Boulevard contains only 60 feet (30 feet from the centerline) of right-of-way. As such, the applicant is providing ten feet of additional platted right-of-way along Coulter Bou]evard. In addition, the minimum drive aisle width allowed is 26 feet. The proposed parking lot drive aisle width of 24 feet in the center of the site must be revised to comply. Currently, the configuration of the intersection at Audubon Road/Coulter Boulevard is inadequate for the traffic that utilizes it. Specifically, the 30-foot curb intersection radii along the north and south sides of Coulter Bou]evard are too small for the semi-truck traffic that uses the intersection. Routine]y, the semi-trucks rear wheels drive up and over the curbs during turning movements. This results in damaged curb, sidewalks, and boulevard rutting within the Paisley Park Studio March 28, 2005 Page 3 sodded areas. Staff is therefore recommending that, with the development of the studio lot, the existing 30-foot curb radius along the north side of Coulter Boulevard be removed and replaced with a 45-foot curb radius. This will provide a larger turning area for truck traffic at the intersection. The applicant has shown the curb revision on the plans. Staff will be working with General Mills on future development to accomplish a similar correction on the south side of Coulter Bou]evard. COMPLIANCE TABLE Area (sq. ft.) Frontage (feet) Depth (feet) Setbacks: Front (Audubon/Cou]ter), side, rear 30/50, 10, 10 30/50, 10, na Code 43,560 150 200 Lot 1 101,371 235 426.5 Outlot A 224,485 ROW 6,742 Tota] 332,598 REVIEW CONDITIONS OF APPROVAL 1. Full park fees shal] be collected at the rate in force at the time of final plat approval. *This condition shall be modified as follows: The developer shall pay park fees of $16,800.00. 2. Based on the proposed developed area of approximately 2.4 acres, the water quality fees associated with this project are $14,292; the water quantity fees are approximately $13,450. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $27,742. *This condition shall be modified as follows: Based on the proposed developed area of approximately 2.32 acres, the water quality fees associated with this project are $13,815.60; the water quantity fees are approximately $13,001.28. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $26,816.88. 3. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Ri]ey-Purgatory-B]uff Creek Watershed District, Minnesota Pollution Control Agency (NPDES Phase II Construction Permit), Minnesota Department of Natural Resources (for dewatering) and comply with their conditions of approval. *This condition still applies. 4. A revised landscape plan showing the required number of p]antings shall be submitted to the city prior to final plat approval. *This condition has been met. Paisley Park Studio March 28, 2005 Page 4 5. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must sign all plans. *This condition still applies. 6. A 40-foot cross-access easement for the shared driveway access must be obtained and recorded against the lots and the driveway must be built to a 9-ton design. *This condition still applies. 7. Sanitary sewer and water hookup charges will be applicab]e for the new lot. The 2004 trunk hook up charge is $1,458 per unit for sanitary sewer and $2,955 per unit for water. Each of these charges is based on the number of SAC units assigned by the Met Council for the new lots. Sanitary sewer and water hookup fees may be specially assessed against the parcel at the time of building permit issuance. *This condition shall be modified as follows: Sanitary sewer and water hookup charges will be applicab]e for the new lot. The 2005 trunk hook up charge is $1,458 per unit for sanitary sewer and $2,814 per unit for water. Each of these charges is based on the number of SAC units assigned by the Met Council for the new lots. Sanitary sewer and water hookup fees may be specially assessed against the parcel at the time of building permit issuance. 8. The applicant will be required to submit storm sewer sizing design data for a lO-year, 24- hour storm event with a drainage area map at the time of final plat. *This condition has been met. 9. This development is required to provide ten addition a] feet of platted right-of-way along Coulter Bou]evard. *This condition has been met. 10. The existing 30-foot curb radius along the north side of Coulter Boulevard must be removed and replaced with a 45-foot curb radius. *This condition still applies. Upon review of the plans dated February 4, 2005, prepared by Ryan Engineering, staff recommends that the following conditions be added: 1. The entire site must be mulched and seeded or sodded within two weeks of grading completion. 2. Show the curb radius, sidewalk, and pedestrian ramp revisions at Audubon/Coulter on the grading and site plans. Paisley Park Studio March 28, 2005 Page 5 RECOMMENDATION Staff recommends that the City Council adopt the following motion: "The Chanhassen City Council grants final plat approval of Planning Case #04-41 creating one lot, one outlot and right-of-way for Coulter Bou]evard, subject to the following conditions: 1. The developer shall pay park fees of $16,800.00. 2. Based on the proposed developed area of approximately 2.32 acres, the water quality fees associated with this project are $13,815.60; the water quantity fees are approximately $13,001.28. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $26,816.88. 3. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Ri]ey-Purgatory-B]uff Creek Watershed District, Minnesota Pollution Control Agency (NPDES Phase II Construction Permit), Minnesota Department of Natural Resources (for dewatering) and comply with their conditions of approval. 4. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must sign all plans. 5. A 40-foot cross-access easement for the shared driveway access must be obtained and recorded against the lots and the driveway must be built to a 9-ton design. 6. Sanitary sewer and water hookup charges will be applicab]e for the new lot. The 2005 trunk hookup charge is $1,458 per unit for sanitary sewer and $2,814 per unit for water. Each of these charges is based on the number of SAC units assigned by the Met Council for the new lots. Sanitary sewer and water hookup fees may be specially assessed against the parcel at the time of building permit issuance. 7. The existing 30-foot curb radius along the north side of Coulter Boulevard must be removed and replaced with a 45-foot curb radius. 8. The entire site must be mulched and seeded or sodded within two weeks of grading completion. 9. Show the curb radius, sidewalk, and pedestrian ramp revisions at Audubon/Cou]ter on the grading and site p]ans." ATTACHMENT 1. Fina] Plat. g:\plan\2004 planning cases\04-41 - paisley park studios storage studio\paisley park fp.doc I . A -a-~ . o Ilg i B!Î III~ I ¡Ii ~ III J¡ ø I ! . .. I ~ i ! . ....- .... .... / /þ.r-:o / II. / !~ (::!IS 'I I I J¡ l-~ b ~~ I \ \/ )' r..... /~'I I 3~ ~8 ~- \ \ , , \ID \ \ \ \ g ~ I ¡;; I \... I : Z I \ 1; II \ ~ l I , \ 1 \ : _J ID L ---- --- ~ "" '\ \ \ ,\ ID \ \ ~ \ -: ~ \ o ~ \ \ \ \ \ \ \ ID L_ ........- / 8 ,IIOJIO s_E -.... .... , ÞO-ra' '1. \ \ Ii' ~ \ . \ I I I I I I I I I I I I I 1 I I I I I I I I I OJ r o () ^ o c .- ¡::I (! 0 f2 -t -~ » <- -. <- '" )::' ;e. '" o c' ;3 Ö -, o Z fTl 'J -. CO Tþ/1)' Rtf h .>: I g r- I Z \1 I· 'b, I'" &~I õ o -I _œ Z45.OD S 01"81" E ï \ \i ~ f; \ \ \ \zl ¡¡ .:' \ I II I Ih .1\ II'" I !32S.IIO ___ I ~ ________J I --- SOl..... E ~ ~ o...o~ Hoenon... ------ ------ DRAFT ~ ~ 6 ä ~ t!j '" ." . r :-t > 0'" g F . '" z z p p