MEMORANDUM
TO:
Scott Botcher, City Manager
FROM:
Bob Generous, Senior Planner
DATE:
August 28, 2000
SUBJ:
Eckankar, Final Reading of Rezoning to PUD, Approval of Land
Use Amendment, and Amendment to Site Plan Approval (#00-5)
PROPOSAL SUMMARY
The developer is requesting final approval of the Land Use Map amendment trom
low density residential, medium density residential, public/semi-public, and parks
and open space to public/semi-public; rezoning of the property from RSF, R4, and
R12; and an amendment to the conditions of the site plan approval to delete
condition 33.
BACKGROUND
On May 22, 2000, the Chanhassen City Council approved the following motions:
The City Council approved the Comprehensive Plan Land Use Amendment
trom low density residential, medium density residential, public/semi-public, and
parks and open space to public/semi-public contingent upon Metropolitan Council
review;
"The City Council granted Conceptual and preliminary planned unit
development-office/institutional (PUD) approval ofPUD #00-1;
The City Council approved site plan #00-5 for a 60,000 sq. ft. administrative office
and archive building and a 10,000 sq. ft. chapel, plans prepared by Korsunsky,
Krank Erickson Architects, Inc., dated May II, 2000; and
The City Council approved a resolution of Negative Declaration of the Need for
an Environmental Impact Statement for the Eckankar Religious Campus.
The Comprehensive Plan Land Use Amendment and Conceptual and preliminary
planned unit development-office/institutional approvals were only preliminary
approvals. We forwarded the Land Use Amendment to the Metropolitan Council
for their review and approval. Upon receipt of their comments, we scheduled the
final readings on the amendment and rezoning. The Metropolitan Council found
that the proposed amendment is in conformity with the metropolitan system plan,
consistent with the Regional Blueprint, and has no impact on other units of local
government.
Jty of Chanhass",. A tl'owint community wilh cltan lakes, aualitv schools. a charmi.. downlown, Ihrivi.. businesses. and beauti/ùl ..tits. A mal pia" /0 lior. work, and pia. ..
Scott Botcher, City Manager
August 28, 2000
Page 2
DISCUSSION
As part of our discussions with the developer, staffhas worked to resolve some issues that the
developer had with the conditions of approval. These changes are primarily proposed to clarify
the intent of the requirements. The idea of the caretaker's residence would allow for one single
family home to be constructed on the site. This could be similar to a parsonage in other similar
religious campuses, and, because it is limited to one dwelling it will not have a significant impact
on the overall project. Since there are no public improvements required with the development,
the rezoning will be performed by ordinance approval rather than through a PUD Agreement.
Planned Unit Develooment:
Delete condition one: The Developer shall enter into a Planned Unit Development Agreement
and provide the necessary security required by the agreement.
Since there are no public improvements proposed with the development, the City of Chanhassen
and developer will not enter any development agreement. The property will be rezoned by
ordinance and the design standards shall be the controlling development standards, which will be
adopted by reference. This eliminates the need for condition 2. "The developer must comply
with the Eckankar Religious Campus Development Design Standards".
The third condition of the PUD rezoning will now be incorporated within the development
design standards and shall be revised as follows: At the time of site plan review and approval,
the city and developer shall determine wherè a A conservation easement er ether emIR ef
fJreservlltien meehaniSHI shall be established to permanently preserve the natural areas wetland,
woodland, and bluff area in proximity to the area being proposed for development.
Development Design Standards:
Add to Section b. Permitted Ancillary Uses: Caretaker's Residence
Amend Section d. Development Site Coverage and Building Height criteria 5.:
Building square footages may be reallocated between phases subject to approval by the Planning
Director. Building square footages may be reallocated between uses subject to approval of the
Planning Director. In no instance shall more than 430,000 square feet of building square footage
be developed without an amendment to the PUD. However, the development may include
construction of up to a total of 2,000 square feet in maintenance and equipment storage
building(s) and one caretaker's residence of up to 2,500 square feet. Such a building(s) shall
not be greater than ;W 30 feet in height. If constructed as a detached building, thiese square
footages shall be excluded ITom building area totals.
Section e. Building Materials and Design:
Scott Botcher, City Manager
August 28, 2000
Page 3
Delete criteria 13. Windows shall be provided on a minimum of 50 percent of the wall face
perimeter of the building.
Section f. Site Landscaping and screening:
Add 6. At the time of site plan review and approval, the city and developer shall determine
where a conservation easement shall be established to permanently preserve wetland,
woodland, and bluff area in proximity to-the area being proposed for development.
Section g. Signage revise criteria 5.:
Directory signs \vith individual nameplate type àireetieFlal IHTO'.vs may be located within the
development. (Section 20-1255 (2))
Site Plan Review:
Delete Condition 33. The applicant shall post signage stating that their trail system is open to the
public.
As part of the discussion, the applicant had stated that they do and will provide the signage
welcoming visitors to use the Eckankar contemplative trails consistent with Eckankar's rules for
their use, e.g., pick up after dogs, do not destroy vegetation, no loud noises, no alcoholic beverages,
etc. However, the developer was concerned that requiring this as a condition of site plan approval,
which is recorded against the property, would give individuals the impression that these trails were
publicly owned and operated, when they are under private ownership. Use of the trails by the public
is a privilege, not a right.
RECOMMENDATION
Staff recommends that the City Council approve the following motions:
"The City Council approved the Comprehensive Plan Land Use Amendment from low density
residential, medium density residential, public/semi-public, and parks and open space to
public/semi-public."
"The City Council grants final Planned Unit Development-Office/lnstitutional (PUD) approval
ofPUD #00-1, approving an ordinance rezoning the property from RSF, R4 and RI2 to PUD."
"The City Council amends the conditions of site plan #00-5 for a 60,000 sq. ft. administrative
office and archive building and a I 0,000 sq. ft. chapel, shown on plans prepared by Korsunsky,
Krank Erickson Architects, Inc., dated May 11,2000 deleting condition number 33."
Scott Botcher, City Manager
August 28, 2000
Page 4
A IT ACHMENTS
I. Rezoning Ordinance
2. Eckankar Design Standards
3. Confirmation Letter from Robert Generous to William C. Griffith, Jr. dated 5/24/00
4. Letter ITom Richard Thompson to Robert Generous dated 7/14/00
g:\plan\bg\eckankar-finaJ pud approval.doc
.
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
ORDINANCE NO.
AN ORDINANCE AMENDING CHAPTER 20
OF THE CHANHASSEN CITY CODE, BEING THE
ZONING CHAPTER OF THE CITY OF CHANHASSEN
BY AMENDING A PLJtNNED UNIT DEVELOPMENT
THE CITY COUNCIL OF THE CITY OF CHANHASSEN ORDAINS:
SECTION 1. Chapter 20 of the Chanhassen City Code is hereby amended to rezone the following
described property located within the City of Chanhassen, Minnesota to Planned Unit Development. The
requirements of the "OI", Office and Industrial District shall apply unless they conflict with the requirements
of the zoning regulations set forth in Section 3 of the Ordinance:
Tract B, Registered Land Survey No. 88, Files of the Registrar of Titles,
Carver County, Minnesota.
SECTION 2. Zoning Regulations. The allowed uses and performance standards for the above
described property are set forth in the following documents on file with the City Clerk which are incorporated
herein by reference:
Eckankar Religious Campus Development Design Standards,
prepared by Robert Generous, dated August 28, 2000
SECTION 3. The Zoning Map of the City of Chanhassen referred to and described in Chapter 20
shall not be republished to show the aforesaid amendment, but the zoning map on file in the City Clerk's
office shall be appropriately marked for the purpose of indicating the zoning provided for in this ordinance.
SECTION 4. Effective Date. This ordinance shall be effective immediately upon its passage and
publication according to law.
PASSED AND ADOPTED this 28th day of August, 2000, by the City Council of the City of
Chanhassen, Minnesota.
ATTEST:
Scott A. Botcher, City Manager
Nancy K. Mancino, Mayor
(Published in the Chanhassen Villager on
, 2000).
85301.01
RNK:03/15/00
August 28, 2000
ECKANKAR RELIGIOUS CAMPUS
CHANHASSEN, MINNESOTA
DEVELOPMENT DESIGN STANDARDS
a. Intent
The purpose of this zone is to create a Planned Unit Development (PUD) for a religious campus.
The use of the PUD zone is to allow for more flexible design standards while creating a higher
quality and more sensitive proposal. All utilities are required to be placed underground. Each
building proposed for development shall proceed through site plan review based on the
development standards outlined below.
b. Permitted Uses
The permitted uses in this zone should be limited to uses appropriate within a religious campus
setting as defined below. If there is a question as to the whether or not a use meets the
definition, the Planning Director shall make that interpretation.
Institutional. Establishments that are public/semi-public in nature. Structures or places
where worship, ceremonies, rituals, and education pertaining to a particular system of
beliefs are held. Included in this use are administrative, cultural, storage facilities, and
internal studios or communication/electronic facilities associated with the belief system.
Administrative Offices
Archives
Assembly or worship halls
Chapels
Churches
Cultural facilities
Education facilities or services
Libraries
Museums
Temples
Ancillary Uses (in conjunction with and integral to a primary use)
Caretaker's Residence
Day care
Maintenance and support facility
Eckankar Religious Campus
Design Standards
Retail Sales (limited to three percent (3%) of a building's floor area
Telecommunication Antennas
Prohibited Uses
Overnight Camping
Permanent outdoor public address sY1'tems
c. Setbacks
In the PUD standards, there is the requirement for landscape buffering in addition to building and
parking setbacks.
The following setbacks shall apply:
UI Illg ar Ill!!
Powers Boulevard.: Buffer yard & Setback B,IOO' 100'
West 78th Street: Buffer yard & Setback B,IOO' 100'
West Perimeter Side Lot Line (adjacent to Lake B,IOO' 75'
Ann Park): Buffer yard & setback
North Perimeter Side Lot Line (adjacent to C,200' 100'
residential): Buffer yard & setback
Wetlands: buffer area & setback 20',75' 20',75'
Bluff: buffer area & setback 20',75' 20',75'
B 'Id'
P k'
Buffer yards are as specified in the City of Chanhassen Landscaping and Tree Removal
Ordinance, Article XXV.
The buffer area adjacent to wetlands and bluffs must be maintained in a natural state. Manicured
lawns and landscaping areas are not permitted within the 20 foot buffer area (sections 20-406 and
20-1403).
No permanent fences shall be permitted between the required perimeter landscape buffer and the
property line.
d. Development Site Coverage and Building Height
I. The standard for hard surface coverage is 20% for the overall development. Additionally,
approximately 30 percent of the site will be altered ITom its natural state, exclusive of
prairie restoration, wetland planting and habitat landscape areas.
2
Eckankar Religious Campus
Design Standards
2. More than one (I) principal structure may be placed on the parcel.
3. The maximum building height shall be three stories/40 ft., exclusive of architectural roof
features such as steeples, bell towers, etc.
4. The following table shall govern the amount of building area for the different uses:
Office (sa: ft.) Institutional TOTAL sa. ft.
(sa. ft.)
Existing 50,000 50,000
Phase I 110,000 10,000 120,000
Phase II 60,000 94,000 154,000
Phase III 0 105,000 105,000
TOTAL 170,000 259,000 429,000
5. Building square footages may be reallocated between phases subject to approval by the
Planning Director. Building square footages may be reallocated between uses subject to
approval of the Planning Director. In no instance shall more than 430,000 square feet of
building square footage be developed without an amendment to the PUD. However, the
development may include construction of up to a total of 2,000 square feet in
maintenance and equipment storage building(s) and one caretaker's residence of up to
2,500 square feet. Such a building(s) shall not be greater than;W 30 feet in height. If
constructed as a detached building, these square footages shall be excluded ITom building
area totals.
6. The developer shall update the traffic study done for the overall development after
development of an additional 90,000 square feet of building area being accessed ITom
Powers Boulevard at Saddlebrook Curve to determine if traffic mitigation measures will
be required on Powers Boulevard.
e. Building Materials and Design
I. The PUD requires that the development demonstrate a higher quality of architectural
standards and site design. The intent is to create a pedestrian friendly, religious campus
with cohesive and harmonious architecture, yet with variation in materials and design.
2. All materials shall be of high quality and durable. Major exterior surfaces of all walls shall
be face brick, stone, glass, architecturally treated concrete, cast in place panels, decorative
block, stucco, or approved equivalent as determined by the city. Color shall be introduced
through colored block or panels and not painted block, brick, or concrete panels.
3
Eckankar Religious Campus
Design Standards
Architectural wood may be used in the chapels. Wood may also be used for decorative
features such as arbors, fences, screens or trellises.
3. Block shall have an architectural face such as weathered face or be polished, fluted, or
broken face. Exposed cement ("cinder") blocks shall be prohibited.
4. Metal siding, poured in place gray concrete (unless retaining wall), EIFS, vinyl siding and
similar materials will not be approved except as support material to one of the above
materials, as accent materials, or as trim or as HV AC screen, and may not exceed more than
20 percent of a wall area.
5. All accessory structures shall be designed to be compatible with the primary structures.
6. All roof mounted equipment shall be screened by walls of compatible appearing material or
integrated into the building design. Wood screen fences are prohibited.
All exterior process machinery, tanks, etc., are to be fully screened by compatible materials.
All mechanical equipment shall be screened with landscaping berming, and/or material
compatible to the building.
7. The use oflarge unadorned, concrete panels and concrete block, or a solid wall unrelieved
by architectural detailing, such as change in materials, change in color, fenestrations, or
other significant visual relief provided in a manner or at intervals in keeping with the size,
mass, and scale of the wall and its views from public ways shall be prohibited. All walls
shall be given added architectural interest through building design or appropriate
landscaping.
8. Space for recycling shall be provided in the interior of all principal or accessory
structures. Trash enclosures shall be screened from public view.
9. All elevations shall receive nearly equal architectural treatment and visual qualities.
10. The materials and colors used for each building shall be selected in context with the
adjacent building and provide for a harmonious integration with them. Extreme
variations between buildings in terms of overall appearance, bulk and height, and colors
shall be prohibited.
II. Building roof forms shall be massed and detailed to add variety and articulation. These
forms include such elements as pitched roofs, towers, arches, vaults, entryway projections,
canopies, etc.
12. The following design elements are examples of different ways to accent a building:
Building Accents
4
Eckankar Religious Campus
Design Standards
Towers, arches, columns, bosses, tiling, cloisters, colonnades, buttresses, loggias,
marquees, minarets, portals, reveals, quoins, clerestories, pilasters.
RoofTvpes
Barrow, dome, gable, hip, flat.
Roof Accents
Cupolas, cornices, belfries, turrets, pinnacles, sky lights, gargoyles, parapets, and lanterns.
Accent elements such as towers, turrets, spires, etc., shall be excluded ITom the building
height limitation.
Window Tvpes
Bay, single paned, multi-paned, angular, square, rectangular, half-round, round, italianate.
Window Accents
Plant boxes, balconies, decks, canopies, awnings, recesses, embrasures, arches, lunettes.
13. WiaåErws sHall be fJra-:iàeà en a æiniffll:1m ef S9 f'ereeøt sftae -,vall faee perimeter efthe
Builàing.
f. Site Landscaping and Screening
1. All buffer landscaping, including boulevard landscaping, shall be installed when the
adjacent grading and construction is completed. Each building shall submit a separate
landscaping plan as a part of the site plan review process.
2. All open spaces and non-parking lot surfaces, except for plaza areas, shall be landscaped,
rockscaped, covered with plantings and/or lawn material, or left in a natural or restored
vegetative state. Tree wells and grates shall be included in pedestrian areas and plazas.
3. Loading areas shall be screened ITom public right-of-ways. Landscaped screening is the
preferred screen method. Wing walls may be required where deemed appropriate.
4. Native species shall be incorporated into site landscaping, whenever possible.
5. Parking lot landscaping must comply with the vehicular area landscaping requirements in
city code. Landscaping islands and peninsulas shall be a minimum of ten (10) feet in width.
5
Eckankar Religious Campus
Design Standards
6. At the time of site plan review and approval, the city and developer shall determine
where a conservation easement shall be established to permanently preserve
wetland, woodland, and bluff area in proximity to the area being proposed for
development.
g. Signage
.
Intent: The principal use of this site is for a religious campus, and therefore, identification
needs are different than for a commercial use. It is the intent of these sign standards to
provide direction and building identification, rather than advertising.
I. Three project identification signs shall be permitted for the development one at the
entrance on Powers Boulevard, one at the corner of Powers Boulevard and West 78th
Street, and one at the entrance on West 78th Street. Project identification sign( s) may be
located at the entrances to the development. Project identification signs shall not exceed
24 square feet in sign display area nor be greater than five feet in height. Pylon signs are
prohibited. The sign treatment is an element of the architecture and thus should reflect
the quality of the development. The signs should be consistent in color, size, and material
and height throughout the development. A common theme will be introduced at the
development's entrance monument and will be used throughout.
2. Wall signs shall be limited to the Eckankar symbol and/or the building name or function.
Such signs shall be integral to the building. Wall signs shall be limited to five (5) percent
of the wall area with a maximum sign area of 100 square feet.
3. The location ofletters and logos shall be restricted to the approved building sign bands or
building monuments. Building monuments shall be limited to a height of five (5) feet
and a sign area of 24 square feet. Signage shall be limited to one side of a building.
4. Signage shall be comprised of individual dimensional letters and logos.
5. Directory signs with ifldividllal Flaffleplate type direetieflal atT0WG may be located within
the development. (Section 20-1255 (2)
6. Directory signs shall not exceed 5 feet in height.
7. All wall or monument signs require a separate sign permit.
h. Lighting
I. Lighting for the interior of the religious campus should be consistent throughout the
development. The development is required to install street lights throughout the access
drive and parking lot system.
6
Eckankar Religious Campus
Design Standards
2. A shoe box fixture with decorative natural colored pole shall be used throughout the
development parking lot area for lighting. Decorative, pedestrian scale lighting shall be
used in plaza and sidewalk areas and may be used in parking lot areas.
3. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2
candle at the project perimeter property line. This does not apply to street lighting.
5. Light poles shall be limited to a heilÄt of 20 feet.
7
Eckankar Religious Campus
Design Standards
i. Parking
I. Parking shall be provided based on the shared use of surface parking areas whenever
possible.
2. The development shall be treated as a integrated religious campus and provide a
minimum of parking. The office/adÎninistrative component shall be treated as an
integrated office building and provide 4.5 spaces per 1,000 square feet for the first 49,999
square feet, four per thousand square feet for the second 50,000 square feet, and 3.5 per
thousand square feet thereafter. Churches and educational facilities shall comply with
city ordinance.
3. The development may provide up to 45 percent of anyone site's parking as proof of
future parking. The plan must show the location for all minimum parking requirements.
The city may require the installation of additional parking spaces whenever a need arises.
4. At least one landscaped pedestrian passageways shall be provided though each parking lot
area.
j. Alternate Access
I. Roadway geometrics for each site shall accommodate transit service.
2. Pedestrian access in the form of sidewalks or bituminous trails shall be provided from the
existing Temple parking lot and ITom the area of the religious office and museum and
library buildings in the interior ofthe site along the access drives to the public sidewalk
and trail system on Powers Boulevard and West 78th Street as adjacent development
within the project takes place.
3. The developer and site users shall promote and encourage Traffic Demand Management
Strategies.
4. Each building site shall provide areas for bicycle parking and storage.
Drafted by: Robert Generous, AICP
Senior Planner
8
"
CITY OF
CHANHASSEN
690 City Ctnler Drive, PO Box 147
Chanhl/$$"', Minnesota 55317
Phone 612.937.1900
Gtneral Fax 612.937.5739
EugÙ"eriug Fax 612.937.9152
Public Safety Fax 612.934.2524
\¥1>b www.ci.cbaIlIJflSsfJ/.nm.l/S
May 24, 2000
Mr. William C. Griffith, Jr.
Larkin, Hoffman, Daly & Lindgren, Ltd.
1500 Norwest Financial Center
7900 Xerxes Avenue South
Bloomington, MN 55431-1194
Re: Eckankar
Dear Mr. Griffith:
This letter is to confirm that on May 22, 2000, the Chanhassen City COJ,\ncil
approved the following motions:
'The City Council approved the Comprehensive Plan Land Use Amendment
from low density residential, medium density residential, public/semi-public, and
parks and open space to public/semi-public contingent upon Metropolitan Council
review; "
"'The City Council granted Conceptual and preliminary planned unit
development-office/institutional (PUD) approval ofPUD #00-1 subject to the
following conditions:
I. The Developer shall enter into a Planned Unit Development Agreement and
provide the necessary security required by the agreement.
2. The developer must comply with the Eckankar Religious Campus
Development Design Standards.
3. A conservation easement or other form of preservation mechanism shall be
established to permanently preserve the natural areas.
"The City Council approved site plan #00-5 for a 60,000 sq. ft. administrative
office and archive building and a 10,000 sq. ft. chapel, plans prepared by Korsunsky,
Krank Erickson Architects, Inc., dated May 11, 2000, subject to the following
conditions:
I. The applicant shall enter into a site plan agreement with the City and provide
the necessary security to guarantee erosion control, site restoration and
landscaping.
Mr. William C. Griffith, Jr.
May 24, 2000
Page 2
2. Increase parking lot landscaping to meet minimum requirements for trees and islands.
3. Provide 5-7 evergreens for buffering of the loading dock area. The plantings shall be located
on the west side of the NURP pond.
4. The proposed lighting will be consistent with the lighting used at Temple, dark brown
anodized with square heads. Lighting shall use shielded fixtures and be directed away from
public right-of-way. Sufficient lighting shall be provided to illuminate all areas of the
parking lot to provide adequate levels of safety.
5. A separate sign permit application will be required for signs
6. The developer is required to provide a landscaped pedestrian passageway though the parking
lot.
7. A sidewalk shall be installed from the access lane northwest of the building to the access lane
southeast of the building.
8. A sidewalk or trail shall be installed along the access drive leading from West 78th Street to
the interior of the site.
9. PIV (Post Indicator Valves) will be required for all buildings.
10. No parking fire lane signs and yellow curbing will be required. Contact Chanhassen Fire
Marshal for exact locations of signage and curbing to be painted yellow.
II. Additional information will be required to determine fire sprinkler classification for the two-
story high storage area. Contact Chanhassen Fire Marshal for additional information
regarding contents and room classification.
12. Fire apparatus access roads and water supplies for fire protection are required to be installed
and made serviceable prior to and during time of construction. Pursuant to Chanhassen Fire
Code Section 901.3.
13. Further discussion will be needed to determine building address numbers or if driveways
need private street names. Due to the large number of buildings and future expansions,
building address numbers and locations will need to be determined for rapid fire, police and
ambulance response. One suggestion could be a fire lane only to connect Phase I and Phase
II parking lots.
14. All buildings and facilities must be on an accessible route.
15. The concept utility plan was not reviewed by the Inspections Division at this time.
16. The office building must be protected with fire sprinklers.
Mr. William C. Griffith, Jr.
May 24, 2000
Page 3
17. The office building must comply with the high pile storage requirements of the Fire Code.
18. Seven accessible parking stalls must be provided.
19. Detailed occupancy related code requirements will be reviewed when complete plans are
provided.
20. Detailed occupancy related code requirements will be reviewed when complete plans are
provided.
21. The developer shall supply the City with a detailed haul route for review and approval by
staff for materials imported to or exported from the site. If material is required to be hauled
off-site to another location in Chanhassen, that property owner will be required to obtain an
earthwork permit from the City.
22. The applicant will need to develop a temporary sediment and erosion control plan in
accordance with the City's Best Management Practice Handbook. The plan shall be
submitted to the City for review and formal approval in conjunction with final plat submittal.
23. All areas disturbed as a result of construction activities shall be immediately restored with
seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each
activity in accordance with the City's Best Management Practice Handbook.
24. All utility improvements shall be constructed in accordance with the latest edition of the
City's Standard Specifications and Detail Plates. Detailed utility plans and specifications
shall be submitted for staff review and City Council approval prior to issuance of a building
permit. Open cutting of West 78th Street for the extension of utilities will not be permitted.
Upon completion the utilities located outside the city's right-of-way shall be owned and
maintained by the applicant. If the applicant desires for the city to maintain the private
utilities then a maintenance agreement and drainage and utility easements will need to be
prepared and recorded against the property. The watermain in Phase I shall be looped back
out to the watermain along Powers Boulevard with a future phase of development.
25. All private streets/driveways shall be constructed to support a minimum of7-ton per axle
design weight in accordance with the City Code 20-1118 "design of parking stalls and drive
aisles".
26. Type III erosion control fence shall be used adjacent to wetlands in lieu of Type I.
27. The applicant shall apply for and obtain permits ITom the appropriate regulatory agencies, i.e.
Minnesota Department of Transportation, Watershed District, Metropolitan Environmental
Service Commission, Minnesota Department of Health, and Minnesota Pollution Control
Agency and comply with their conditions of approval.
Mr. William C. Griffith, Jr.
May 24, 2000
Page 4
28. No berming or landscaping shall be permitted within the city's right-of-way. A 2%
boulevard grade must be maintained along the City's right-of-way. The applicant shall be
responsible for relocation of all utilities, streetlights and landscaping along West 78th Street
as a result of site construction activities.
29. The rock construction entrances shall be shown on the Erosion control plans at all
construction access points. The rock construction entrances shall be maintained until all
disturbed areas are revegetated or the driveway/parking lots paved with asphalt. All catch
basin inlets shall be protected with silt fence, rock filter dikes or hay bales.
30. Drainage easements shall be dedicated to the City over all ponds and wetlands up to the 100-
year flood level.
31. The applicant shall enter into a site plan agreement with the City and provide the necessary
financial security in the form of a letter of credit or cash escrow to guarantee compliance with
the terms of site plan approval. Detailed cost estimates for site restoration, erosion control,
grading for storm water ponds, sanitary sewer and watermain extension to the site shall be
supplied to city staff for review and approval. These cost estimates shall be incorporated into
the site plan agreement to determine the amount of security required by the City.
32. The maximum driveway access width at West 78th Street shall be 44 feet face to face unless the
applicant is proposing a center median at the entrance. Pedestrian ramps shall be installed
where the driveway intersects the trail along West 78th Street. The applicant shall work with
staff in modifying the parking lot layout to meet the Fire Marshal's turning radius requirements.
33. The applicant shall post signage stating that their trail system is open to the public."
'The City Council approved a resolution of Negative Declaration of the Need for an
Environmental Impact Statement for the Eckankar Religious Campus."
The Comprehensive Plan Land Use Amendment and Conceptual and preliminary planned unit
development-office/institutional approvals are only preliminary approvals. We will be
forwarding the Land Use Amendment to the Metropolitan Council for their review and approval.
Upon receipt of their comments, we will schedule the final readings on the amendment and
rezoning. In the interim, we can work on finalizing any changes to the PUD approval and design
standards.
Once your consultants have prepared the cost estimates for site restoration, erosion control,
grading for storm water ponds, sanitary sewer and watermain extension, the City of Chanhassen
will draft the site plan agreement for the construction of the first phase of the development. It
should be noted that the site plan agreement cannot be recorded nor may construction begin until
the City ofChanhassen has approved the final reading on the PUD.
Mr. William C. Griffith, Jr.
May 24, 2000
Page 5
If you have any questions or need additional information, please contact me at (952) 937-1900
extension 141.
~
Robert Generous, AICP
Senior Planner
c: David Hempel, Assistant City Engineer
Steve Torell, Building Official
g:\plan\bg\eckan kar.c .doc
07/26/00 08:33 FAX 651 602 1674
PLNG GROIITH
1i!I002
~ Metropolitan Council
\~ Working for the Region, Planning for the Future
July 14,2000
Robert Generous
City ofChanhassen
690 City Center Drive
P.O. Box 141
Chanhassen, MN 55311
Re: Comprehensive Plan Amendment - Land Use Revision - Eckankar Religious Campus
Metropolitan Council Referral File No. 18280-1
Metropolitan Council District 4
Dear Mr. Generous:
At its July 12, 2000 meeting the Metropolitan Council reviewed the comprehensive plan
amendment submitted for a Land Use Map revision for the Eckankar Religious Campus. The
amendment involves land use designation changes to the I 13-acre Eckankar Religious Campus
from low-density residential to medium-density residential, and public/semi-public and parks, to
public/semi-public. The Council found that the proposed amendment is in conformity with
metropolitan system plans, consistent with the Regional Blueprint and has no impact on the plans
of other units of local government. Therefore, the city can put the plan amendment into effect
and no plan modification is required.
The amendment and explanatory materials supplied will be appended to the city's plan in the
Council's files. If you have any questions regarding this review, please contact Linda Milashius,
Principal Reviewer, at 651-602-1541.
Sincerely,
~~
Richard Thompson, Supervisor
Comprehensive Planning
cc: Julius Smith, Council District 4
Phyllis Hanson, Sector Representative