1g ChgOrder Lift Station No. 2 CITY OF CHANHASSEN 7700 Market Bou levard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227.1100 Fax 952.227.1110 Building Inspections Phone: 952.227.1180 Fax 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site \'I\'II'I.ci .chanhassen.mn. us ~. MEMORANDUM TO: Todd Gerhardt, City Manager '7°" Paul Oehme, City Engineer/Dir. of Public W orks ~ ( FROM: DATE: O~Þ' ~ Approve Change Order for Lift Station No, 2 Contract Project No. 01-lIC March 16,2005 SUBJ: REQUESTED ACTION Approve Change Order NO.1 for Lift Station No.2 Contract. BACKGROUND On October 25,2004, Council awarded a contract to EBI Drilling, Inc. for installation of a new forcemain for Lift Station No.2. Lift Station No.2 is located on Frontier Trail just south of Frontier Court. The forcemain was installed using a directional boring technique or no dig method. This type of installation is used to minimize the excavation of the pavement surface and reduce the inconvenience to the residents and traveling public. This type of installation uses high density polyethylene pipe which is very strong and will not deteriorate in corrosive soils. The Lift Station No.2 project final cost was approximately $5,000 less than the contract amount. The forcemain for Lift Station No. 22 has broken several times in the past year and twice in the past three weeks. Due to the continuing breaks, a portion of this forcemain is recommended to be replaced as soon as possible and the work change ordered into the Lift Station No.2 contract. Lift Station No. 22 is located at the comer of Dell Road and Quattro Drive. The lift station services the industrial park along 77th street and Quattro Drive. The lift station has a 4-inch forcemain that is approximately 1800 feet long. The forcemain is installed in the right-of-way of Dell Road under the sidewalk and under the pavement of 77th Street. The forcemain is made out of ductile iron pipe and was installed in 1985. In the past, the portion of the forcemain along Dell Road had broken seven times and in the last year alone has broken six times. The portion of forcemain along 77th has broken seven times in the past and in the last year has broken once. These breaks can be attributed to highly corrosive (hot) soils that were backfilled around the pipe. Inspection of the forcemain at the recent breaks indicated that more breaks can be expected due to the highly deteriorated pipe. Staff had planned to replace the entire 1800-foot forcemain in 2008,2005 CIP #018, in conjunction with a street improvement project along 7ih Street; however, due to the recent amount of forcemain breaks and inspection of the forcemain pipe, staff is requesting to replace approximately 400 feet of the force main along Dell Road as soon as possible. Staff is proposing to use the The City 01 Chanhassen · A growing community wilh clean lakes, quality schools, a channing downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Todd Gerhardt March 17, 2005 Page 2 contractor from the Lift Station No.2 work to directional bore a new forcemain, hire a local contractor to make the pipe connections to the existing forcemain on 77th Street and have public works staff perform the pavement patches and sidewalk restoration work. No additional sidewalk is proposed to be removed with the directional bore work; however, the last few breaks have caused a significant amount of sidewalk to be removed. It is estimated that for each forcemain break, it costs the City approximately $4,000 for a contractor to dig the break, staff overtime, and restoration costs. The cost estimate for the directional bore work is $10,100. The estimate for the pipe connection work is $5,000. The other material costs needed for the miscellaneous restoration work to be done by City staff is approximately $2,000. The total estimated out-of-pocket cost for the forcemain replacement is $17,100. Staff is proposing to use funds from the Sanitary Lift Station Rehabilitation Program, 2005 CIP #SS-017, to pay for the work. The forcemain replacement work is within the costs allocated for this year's sanitary lift station rehabilitation program of $45,000. The total expenditure from this CIP line item is estimated to be $34,498.91. This includes the lift station pumps being considered for replacement also on the March 28, 2005 Council agenda. At this time, staff recommends approving Change Order No. 1 for the Lift Station No.2 contract to replace 400 feet of forcemain for Lift Station No. 22 for an amount of $10,100. Attachments: Exhibit A. Directional Bore Work Estimate. c: Kelley Janes, Utility Superintendent G:\ENGIPUBLICIOI-I1Clbkg 031605 co#l for dell rd fm.doc Exibit A Lift Station 22 ..<\ _.//./ I 0 .-..f CD -- - ./ - -.--.\---^ -- .-.......-/.---..-.- , -- \ ...-'\......-'/ \ ....__.-_/L \ - , \ /~ ./ \ ____~-----~~~ L.S. 22 \-;,.~..---------- ~ / )V Ð / ~(¿0 Iíí ,/ 'tc.~ ///çj>fb.~ [J ~ _---// /,/ : ::u ~ 0 ~ ~ tJ :~ III ì Proposed Location for ...' It Forcemain Replacement ~'--::~1Itt -f1~- BT1ff1"'!!)r œ mill!! ..k m! -. I ~ ::u o m a. " iii b "0 co o a::: Q) o MAR.16.2005 12:24PM EBI NO.57l P.l L)fUUn! toe, ff'~f . Ðl--/ ( C c~~ ~:~I SPECIALISTS IN HORIZONTAL DIRECTIONAL DRILLING 5910 FREMONT STREET DULUTH, MN 55807 218.628.0454 PHONE 218.628.0455 FAX March 16,2005 Matthew S. Saam, P.E. Assistant City Engineer City of Chanhassen 7700 Market Blvd, Chanhassen, MN 55317 RE: Change Order Lift Station #2 Improvements Project No. OI-IIC Dear Mr. Saam: After a review your fax dated March 15, 2005 pertaining to a change order for the above referenced project EBI agrees to perform the following; TASK EST. UNITS UNIT PRICE EST. TOTAL 6" HDPE DIPS force main HDD 400 feet $24.00/ft $9,600.00 F &1 6'1 MJ adaptors with plugs for testing 2 $250.00/ea $500.00 The total anticipated cost for the change order is $10,100.00. Please do not hesitate to call me at (218) 628-0454 if you have any questions conceming this change order. Sincerely, (J.AAAR_ ¡q tJ~ a:;::~~arrcn Office Manager YOUR COMPLETE CONTRACTOR SERVICES COMPANY Directional drjlling . Sewer, \IIaref &. gas syst.Cms. Demolition. Wetland S0Niccs