3f. Street & utility improvements in Lake Susan CITY OF ....7g
li iii
,,,,N,
1 CHANHASSEN
41/44, 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
Ir� (612) 937-1900 • FAX (612) 937-5739
kct
IMEMORANDUM
TO: Gary Warren, City Engineer
IFROM Dave Hempel , Sr. Engineering Technician‘jbe L' ._. «=5-9.°-
DATE: December 4 , 1990
ISUBJ: Accept Street and Utility Improvements in
Lake Susan Hills West 3rd Addition f -10-r9-0'
`__-
1 Project No. 89-12 (pvt) ci — fi -il
I Attached is a letter from the developer's engineer stating the
above-referenced subdivision has been completed and therefore
requests the City to accept the street and utility improvements
for ownership and perpetual maintenance. City staff has
I inspected this project and found it tot`ready for the City' s
acceptance.
I It is therefore recommended that the street and utility
improvements for Lake Susan Hills West 3rd Addition be accepted
for public ownership contingent upon receipt of an acceptable
maintenance bond from the contractor guaranteeing the street and
I
utility improvements for a two-year period commencing on the date
of this acceptance.
1 ktm
Attachments: 1. Location map.
I2. Letter from Ray Brandt dated December 3 , 1990 .
c: Brian Olsen, Argus Development
1
OFFICIAL ENGINEERING COPY
IReceived
Revision No
I Approved by City Engineer
Date 1 Zl(���a' - I
Approved by City Could
' Date
I
I rR
t I . Q S
e •A •
w • • j
••• r • • i
ice► ! kir
1
/ *Ip 1 •
c
. • .,6 G .
I N ,/I 4. ....... ..,, I ,- ; • - . ,A) _ ....,,, 4a ,,,,ty
1 1 v,... ,„, ,,.:. ,,... L c''
A PrAtil in a*t 4 40 cri
I A v.
QQ p,MiNG� $ fr r,2
e'
liii# Fl- DRIVE W
OUT,
r
-PROJECT o H
I ROJECT LOCATION a
f
■
I z
0 / ..
IN 0 i .)
„Q ! %•":" I \)
� ., A , A
� ti - 0
R ATTACHMENT 1
aII c 1 \! I I /
ng
a 2705 wood, trait
rninnesota 55557
(012) 4551960
I
i
December, 1S90
Mr. Wat'ren 1
City Engareer
City of Chanhassen
C:v1tet- Drive
PD bc.x 147
Ct-•r• h.? r, MN 55 317
Re!_R E Et.f;.:;-iN HILLS WEST THIRD ADDITION, Project No. S9-1E
Dear Mr. Warren:
;11 c f the streets, sanitary ewer, waterii i rr and storm
st_ E,r C>.b ye-r-•eferenceq project have been installed
acc :rri . the pars and sbecificatittrrs. Tre required 1
e t i e,o hJa been completed and has passed City requirements.
I t•._':_'.?d like to request that the City c.t Chanhassen
acccr': these streets and utilities.
Sin -e1y yours,,
CIII W. , A Ray H. randt, PE L
DEC 04 1990 1
MEM DEPT
ATTACHMENT 2