Loading...
G-1 2014 Street Reconstruction Project: PHCITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us G-1 MEMORANDUM D TO: Paul Oehme, Director of Public Works /City Engineer �t FROM: Alyson Fauske, Assistant City Engineer �l� 1(,�( /iii DATE: February 10, 2014 �7" SUBJECT: 2014 Street Reconstruction Project No. 14 -01: - Public Hearing for Minnewashta Shores Neighborhood - Authorize Preparation of Plans and Specs - Approve Construction Easement Agreement with Minnewashta Shores Homeowners Association PROPOSED MOTION "The City Council orders the public improvement, authorizes the preparation of plans and specifications and approves Easement Agreement with the Minnewashta Shores Homeowners Association (HOA) for the Minnewashta Shores portion of the 2014 Street Reconstruction Project No. 4 -01. City Council approval requires a super majority vote of the City Council present." BACKGROUND At the June 10, 2103 work session, staff reviewed with Council the proposed 2014 Street Reconstruction project. On June 10, 2013, the City Council authorized the preparation of the feasibility study. On November 6, 2013, an open house for the Kiowa neighborhood was held to discuss the proposed project, including the proposed street connection. On November 13, 2013, an open house for the Minnewashta Shores neighborhood was held to discuss the proposed project. On December 12, 2013, City staff met with the Springfield neighborhood to discuss the proposed permanent connection between Kiowa Trail/Springfield Drive. On January 27, 2014, a public hearing was held for the Kiowa Trail neighborhood. G:\ENG\PUBL1C\_20l4 PROJECTS \14 -01 Street Reconst=tion\02 -10 -2014 PH Mwta Shores.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2014 Street Reconstruction Project February 10, 2014 Page 2 Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2014 Street Improvement Project, staff is proposing to reconstruct approximately 1.1 miles of streets. The street segments within the proposed project were identified by the City's Pavement Management software, site investigations and known utility problems in the area. The project includes the Minnewashta Shores neighborhood in the northwest corner of the city, and Kiowa Trail west of Lake Riley. The Public Hearing for the Kiowa Trail area was held on January 27, 2014. G:\ENG\PUBLIC\-2014 PROJECTS \14 -01 Street Reconstruction \02 -10 -2014 PH Mwta Shom.doc Paul Oehme 2014 Street Reconstruction Project February 10, 2014 Page 3 Minnewashta Shores Proposed Improvements The streets in the Minnewashta Shores project area were constructed in 1971. With the exception of Barberry Circle, the streets were sealcoated in 1994 and 1999. The street conditions were surveyed in 2011 and the pavement condition indices (PCIs) ranged between 15 and 45. A PCI of 100 represents a new street. Streets with a PCI below 45 typically indicate distresses that require a full reconstruction, therefore it is no longer cost effective to repair the streets with minor maintenance or perform a bituminous overlay. The street widths vary between 23' and 27' within 40' or 50' wide right of way. The drivable portion of the streets (i.e. the bituminous surface and the concrete gutter) is proposed to the same as the existing widths. The proposed pavement section includes 18" of sand, 8" of Class 5 and 3.5" of bituminous as recommended by the soils engineer. High back, B -618 curb is proposed to be installed in this area. Water Main Improvements The water main in this area is cast iron pipe and has five documented breaks, as shown on the graphic below. Staff proposes to replace the water main with PVC water main. All services would also be replaced. Sanitary Sewer hnprovements Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately 170 feet of sewer is proposed to be replaced due to the condition of the pipe and is shown in red on the graphic below. No sanitary sewer backup problems have been recorded in this area however a number of pipe sags have been identified in this pipe segment. A letter has been sent to the affected property owners explaining the proposed work. Staff has not heard from either resident. Temporary easements will be needed to make these improvements. 8 a Iw w U G:\ENG\PUBLIC\-2014 PROJECTS \14 -01 Street Rmonstm Lion \02 -10 -2014 PH Mwta Shores.dm Paul Oehme 2014 Street Reconstruction Project February 10, 2014 Page 4 Storm Sewer Improvements The sanitary sewer services that access these sections of the pipes are also proposed to be replaced. The remaining sewer pipe is in good structural condition, although some require mineral removal, grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. Residents can have their sewer services televised from their home to the sewer lateral within the street to determine if there are any issues. So far two residents have requested the televising however these services could not be televised due to issues accessing the sewer clean outs. The project area is developed therefore there is minimal space to provide traditional storm water management, namely treatment ponds. The HOA owns a property southeast of Cypress Drive. Staff has contacted the HOA and discussed opportunities for storm water management facilities within this common area. The graphic below shows the proposed stormwater management in the HOA lot and has been distributed to residents within the HOA. The proposal includes the installation of a sump manhole with a St. Anthony Falls Laboratory (SAFL) Baffle for pretreatment of the runoff. Runoff from low intensity rain events would flow to the west, then through a series of filtration basins before discharging to Lake Minnewashta. The filtration basins are similar to those installed with the Laredo Drive improvements at Kerber Pond Park in 2007. Excess runoff from high intensity rain events would flow through an overflow pipe and discharge to the lake. The HOA lot will be regarded and the export material from the street section will be placed and regarded in the park. The park will be much more flat useable for part activities. Also the creek that cuts through the park will be eliminated. The HOA has granted the easements necessary to perform the work. Staff and HOA representative discussions will continue as the construction plans are finalized. When a draft construction plan for the HOA lot is complete, the City will contact the Minnehaha Watershed District to discuss funding opportunities. G:\ENG\PUBLIC\-2014 PROJECTS \14 -01 Street Reconstruction \02 -10 -2014 PH Mwta Shores.doc Paul Oehme 2014 Street Reconstruction Project February 10, 2014 Page 5 CYPRESS DRIVE V - 9IIFNATC IF.FL A.TIATM MYS� t/� /���� �F. 181. - cwmx uics rn0 oavAroxs (iw1 (Vr � •- pantie m ea oahE�unv j T sucm ro an xa owrvEwAV "- �T\ wD / l �i eimacJ SCHEMATIC LEVEL LAKE ASSOCIATION PROPERTY IMPROVBYB�ITB PROJECT FUNDING u+r R:z'1 Funding for the project is anticipated to come from several sources. Forty percent (40 %) of the street improvement costs would be assessed back to the benefiting property owners, per the City's assessment practice. The remaining 60% of the street cost would be a City cost. All of the sanitary sewer and storm sewer costs will be paid by the City. The City will pay 100% of the watermain replacement costs within Minnewashta Shores and the PRV station cost within Kiowa Trail. One- hundred percent of the watermain installation costs within Kiowa Trail will be assessed to the benefitting property owners. Feasibility Study Estimate Funding Source Minnewashta Kiowa Trail Total Budget Shores ST -012: Street $956,877.19 $442,359.08 $1,399,236.27 $1,400,000 Improvement $170,371.39 W -024: Water Main $416,594.39 poor mmsed> $434,744.39 $700,000 Replacement $18150.00 (100% City) GAENG\PUBLIC� 2014 PROJECTS \14 -01 Street Reconstruction \02 -10 -2014 PH Mwta Shore .doc Paul Oehme 2014 Street Reconstruction Project February 10, 2014 Page 6 SS -014: Sanitary Sewer Replacement $24,352.10 $6,318.62 $30,670.72 $300,000 SWMP -019: Stormwater $116,611.33 $196,549.98 $200,000 Management (Street to $79,938.65 to +$20,000 Improvement $129,273.98 $209,212.63 fium Watershed Projects) Totals $1,510,000 $718,000 $2,228,000 $2,600,000 The estimated costs include 10% contingency and 10% indirect costs Estimated Assessments, Minnewashta Heights: Total assessable street costs: $682,628.80 40% assessed: 40% of $682,628.80 = $273,051.52 40 assessable units $273,051.52 = 40 units = $6,826.29/unit Assessments will be based on the actual contract cost the City receives. Assessments can be financed through the City over a 10 -year period with an interest rate based on prime rate plus 2% at the time of contract award. Based on the feasibility study, this project is feasible, necessary and cost - effective from an engineering perspective. The proposed project schedule is as follows: Approve Plans & Specifications; Authorize Ad for Bids Assessment Hearing Project Begins Most Work Completed By Substantial Completion Attachments: 1. CIP pages 2. Resolution 3. Affidavit of Mailing of Public Hearing 4. Public Improvement and Easement Agreement G:\ENG\PUBLIC\-2014 PROJECTS \14 -01 Str Rmonstmction \02 -10 -2014 PH Mwta Shores.doc February 24, 2014 April 28, 2014 May, 2014 End of August, 2014 October, 2014 Capital Improvement Program 2014 thru 2018 City of Chanhassen, MN Project # ST -012 Project Name Annual Street Improvement Program Aecount01 601 -x -4751 Account #2 Account #3 Account#4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Total Project Cost: $21,145,000 Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2014 - Dartmouth Drive, Cypress Drive and Kiowa Trail 2015 - Carver Beach area (south and west of Carver Beach Road), Ches Mar Drive, Lone Cedar, Saddlebrook Pass neighborhood MSA - Bluff Creek Drive and Trail 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewashm Woods Drive MSA - Park Road, Park Court, Park Drive and Park Place 2017 - Flamingo Drive area and 96th Street MSA - Kerber Blvd and bituminous trails 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue and 64th Street MSA - Lake Drive The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a ing link in the City's trail system. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in the absence of a trail. This trail tent will be constructed alone with the 2015 MSA street rernncfn,rHnn Prior Expenditures 2014 2015 2016 2017 2018 Total 8,295,000 Construction 1,400,000 3,150,000 2,900,000 2,900,000 2,500,000 12,850,000 Total 4,600,00 Total 1,400,000 3,150,000 2,90,000 $900,000 2,500,000 12,850,000 Prior Funding Sources 2014 2015 2016 2017 2018 Total 8,295,00 Assessment/Revolving Assess 1,400,00 1,850,000 1,50,00 1,500,00 1,50,00 7,750,000 Total MSA 800,000 1,400,000 1,400,00 1,00,000 4,600,00 Park Dedication Fund 50,000 5000 Total 1,400,000 3,150,000 2,900,000 2,900,000 2,566,990 12,950,000 Budget Impactlother This project may decrease maintenance costs P97 Capital Improvement program City of Chanhassen, MN Project # W -024 Project Name Watermain Replacement Account #1 700 - 7025 -4751 Account #3 Account #2 Account #4 c,uem or existing water main lines in coordination with for street rehabilitation projects. 2014 thru 2018 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $3,875,000 street Projects or minor fixes of water Justification The City considers the condition of [he existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement h e ongoing project in the City. Prior 1,675,000 Expenditures Construction 2014 700,000 2015 125,000 2016 700,000 2017 2018 Total 75,000 600,000 2,200,000 Total Prior 1,675,000 Funding Sources Water Utility Fund Total 7110,000 2014 700,000 125,000 2015 125,000 700,000 2016 700,000 75,000 2017 75,000 600,000 2018 600,000 2,200,000 Total 2,200,000 Total Total 70D,OD0 125,000 700,000 75,000 600,000 2,200,000 will decrease maintenance costs. P117 Capital Improvement Program City of Chanhassen, MN Project # SS -014 Project Name Sanitary Sewer Replacement Amount MI 701 - 70254751 Account #3 Account #2 Account #4 cription acement or rehabilitation of existing sanitary sewer lines in ct 2014 thru 2018 Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: 51,590,000 reconstruction of the City street. City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by �olidating these projects. Prior 625,000 Total Prior 625,000 Total Sources ty Fund 2014 2015 2016 2017 2018 Total 300,000 75,000 300,000 40,000 250,000 965,000 Total 300,000 75,000 300,000 40,000 250,000 965,000 2014 2015 2016 2017 2018 Total 300,000 75,000 300,000 40,000 250,000 965,000 Total 300,000 75,000 300,000 40,000 250,000 965,000 will decrease maintenance costs. P88 Capital Improvement Program 2014 thru 2018 City of Chanhassen, MN Project SWMP -019 Project Name Street Improvement Projects - Storm Water Mgmt Account #1 720- 70254751 Account #2 Account #3 Account#4 annual amount set aside for storm water management infrt ertaken by the engineering and public works departments. Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Total Project Cost: $1,625,000 or expansion associated with street improvement projects Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2014 2015 2016 2017 2018 Total 900,000 1 Construction 200,000 50,000 200,000 75,000 200,000 725,000 Total Total 200,000 50,000 200,000 75,000 200,000 725,000 Prior 900,000 Total Sources 2014 2015 2016 2017 2018 Total ater Utility Fund _ 200,000 50,000 200,000 75,000 200,000 725,00 Total 2uu,uuu oo,uoo 200,000 75,000 200,000 725,000 maintenance of new P106 No map CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: February 10, 2014 RESOLUTION NO: 2014- MOTION BY: F41 3.11311191110 SECONDED BY: IMPROVEMENTS & AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2014 STREET RECONSTRUCTION (MINNEWASHTA SHORES AREA) PROJECT NO. 14 -01A WHEREAS, on December 9, 2013, the City Council received the feasibility report for the 2014 Street Reconstruction Project and called for the public hearing to be held on February 10, 2014 for the 2014 Street Reconstruction Project (Minnewashta Shores area), and AND WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given, and the hearing was held thereon on the 10`h day of February, 2014 which all persons desiring to be heard were given an opportunity to be heard thereon. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. Such improvement is necessary, cost - effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as proposed in the Council resolution adopted February 10, 2014. 3. Approves the feasibility study authorizes preparation of plans and specifications for the 2014 Street Reconstruction Project No. 14 -01A. Passed and adopted by the Chanhassen City Council this 100' day of February, 2014. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on January 29, 2014, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of 2014 Street Improvement Project 14 -01— Notice of Public Hearing — Minnewashta Shores Area to the persons named on attached Exhibit "A ", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me this.=P ' day o 2014. Notary Public KaAn J. E(!Jardtkoeputy Clerk 19 mmJEAN M. STECKLING Notary Public Minnesota Cpi,,ry Pu lic* M Jon 31,2018 PUBLIC HEARING NOTICE January 28, 2014 Re: Notice of Public Hearing forthe 2014 Street Reconstruction and Water Installation Project No. 14- 01(Minnewashta Shores area) Dear Property Owner A Public Hearing has been scheduled for 7:00 p.m. or as soon thereafter as possible on Monday February 10 2014 in the City Council Chambers at Chanhassen City Hall during a regularly scheduled council meeting. The hearing is your opportunity to voice your opinion directly to the City Council before they make their decision whether or not to authorize the preparation of plans and specifications. The assessment methodology or amounts are not determined at this City Council meeting; these issues will be addressed at the assessment hearing, which is tentatively scheduled for April, 2014. The feasibility study discusses the proposal to reconstruct the following streets in the Minnewashta Shores area: Arbor Lane, Barberry Circle, Cypress Drive, and Dartmouth Drive (Shore Drive to Arbor Lane). The proposed project also includes replacing the watermain within the streets, replacing the portion of the water services within the public right of way, miscellaneous sanitary sewer repairs and storm sewer improvements within the project area. The sanitary sewer within the street was televised to evaluate the condition of the pipe. If you would like the Chanhassen Utility Department televise your sewer service from your home to the sanitary sewer within the street, please contact me at afauske @ci.chanhassen.mn.us or 952- 227 -1164. Please note that this would require access to the interior of your house; therefore a representative age 18 or older must be present to let City personnel into your home. If you would like to submit written comments please email them to me at afauske @ci.chanhassen.mn.us or send them to my attention at City Hall by 3:30 p.m. on Thursday, February 6, 2014. Comments received will then be distributed to Councilmembers. If you do not want your comments included in the public record, please indicate so in your correspondence. The estimated cost of the street improvement is $956,877.19. Consistent with the City's practice, the feasibility study proposes to assess a portion of the street rehabilitation cost to the benefiting properties in the project area. The preliminary street assessment for your property is currently estimated to be $6,826.29. The watermain, sanitary sewer and storm sewer costs will be paid by City utility funds. If the project moves forward and construction bids are received, the actual construction cost will be used to calculate the assessment. If you have any questions or comments please contact me at 952- 227 -1164 or afauske @ci.chanhassen.mn.us. Sincerely, CITY OFF U_ CrH�ANNHHAS�SEN a ( "Cl�cFiL Alyson Fauske, P.E. Assistant City Engineer g: \eng \Pub1ic \_2014 projects \14 -01 street reconstruction \ph notice mwta shores.doc TIMOTHY T & MALINDA K TAMLYN NATHAN W STANGLER ROBERT & MARY LORENCE 6220 ARBOR LN 6221 ARBOR LN 6230 ARBOR LN EXCELSIOR, MN 55331 -8810 EXCELSIOR, MN 55331 -8811 EXCELSIOR, MN 55331 -8810 JAMES E HYRE MICHAEL & MARIE DETERMAN JOSEPH M & ANGELA Y WEAVER 6210 BARBERRY CIR 6211 BARBERRY CIR 6220 BARBERRY CIR EXCELSIOR, MN 55331 -8822 EXCELSIOR, MN 55331 -8822 EXCELSIOR, MN 55331 -8822 KIRK & LINDA DICKEY PETER T & MARGARET NALLICK DUANE D & MELISSA BUTENSCHOEN 6221 BARBERRY CIR 6200 CYPRESS DR 6201 CYPRESS DR EXCELSIOR, MN 55331 -8822 EXCELSIOR, MN 55331 -8839 EXCELSIOR, MN 55331 -8840 JULIE RAE HAGEN JOHN & KAROLYN SCHILTGEN CHARLES W & KATHLEEN M LECRONE 6210 CYPRESS DR 6211 CYPRESS DR 6220 CYPRESS DR EXCELSIOR, MN 55331 -8839 EXCELSIOR, MN 55331 -8840 EXCELSIOR, MN 55331 -8839 DEBRA J RICE ANDREA RAUK KEVIN J & JOSEY J JOHNSON 6221 CYPRESS DR 6230 CYPRESS DR 6231 CYPRESS DR EXCELSIOR, MN 55331 -8840 EXCELSIOR, MN 55331 -8839 EXCELSIOR, MN 55331 -8840 BRIAN N & NANCY LTICHY L WINSTON & ELAINE G HAGEN BRANDI VIRGIN 6240 CYPRESS DR 14012 WILEY CIR 6310 CYPRESS DR EXCELSIOR, MN 55331 -8839 MIDLOTHIAN, VA 23114 -5578 EXCELSIOR, MN 55331 -8841 WILLIAM J & CATHRYN L FOSSING LADD N & SIA B LANGUM ROBERT M & SUSAN S MACUNA 6330 CYPRESS DR 6331 CYPRESS DR 6340 CYPRESS DR EXCELSIOR, MN 55331 -8841 EXCELSIOR, MN 55331 -8842 EXCELSIOR, MN 55331 -8841 STEVEN G & JEAN K WOOD STEVEN E SCOTT DONALD K & CHERLYN SUEKER 6341 CYPRESS DR 3110 DARTMOUTH DR 3111 DARTMOUTH DR EXCELSIOR, MN 55331 -8842 EXCELSIOR, MN 55331 -7826 EXCELSIOR, MN 55331 -8843 SUSAN I FIEDLER MARY ZORA STAUDOHAR KNOLL REV THOMAS J MERZ REV TRUST 3121 DARTMOUTH DR 3131 DARTMOUTH DR 3201 DARTMOUTH DR EXCELSIOR, MN 55331 -8843 EXCELSIOR, MN 55331 -8843 EXCELSIOR, MN 55331 -8844 STEPHEN C & KAREN A MARTIN JOHN L & LORI A WEBER PETER B & PAMELA J STROMMEN 3211 DARTMOUTH DR 3220 DARTMOUTH DR 3221 DARTMOUTH DR EXCELSIOR, MN 55331 -8844 EXCELSIOR, MN 55331 -7828 EXCELSIOR, MN 55331 -8844 MARK L & ELIZABETH A NELSON GREGORYA & ROBIN M NIEMANN JONATHAN D & KRISTI K HARRIS 3230 DARTMOUTH DR 3231 DARTMOUTH DR 3241 DARTMOUTH DR EXCELSIOR, MN 55331 -7828 EXCELSIOR, MN 55331 -8844 EXCELSIOR, MN 55331 -8844 GARY C & KELLI R BHOJWANI 3301 SHORE DR EXCELSIOR, MN 55331 -7815 PAUL D QUARBERG 3311 SHORE DR EXCELSIOR, MN 55331 -7815 BARBARA DIANE WINTHEISER 3321 SHORE DR EXCELSIOR, MN 55331 -7815 RACHEL MARY LIVINGSTON PAUL D & ANNE M KAPSNER MICHAEL A HALLEEN 1R 3331 SHORE DR 3341 SHORE DR 3351 SHORE DR EXCELSIOR, MN 55331 -7815 EXCELSIOR, MN 55331 -7815 EXCELSIOR, MN 55331 -7815 PUBLIC IMPROVEMENT AND EASEMENT AGREEMENT THIS AGREEMENT, entered into by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation ( "City ") and MINNEWASHTA SHORES, INC., a Minnesota non - profit corporation ('MSI"). RECITALS WHEREAS, MSI is the fee owner of two parcels in the City of Chanhassen, Carver County, Minnesota legally described in Exhibit A attached hereto ( "MSI Property"); WHEREAS, the City is undertaking a road improvement project abutting the MSI Property in connection with City Improvement Project No. 14 -01 (the "Project') and finds it necessary to make certain storm water improvements as described in the plans and specifications for the Project ( "Storm Water Improvements "); WHEREAS, the City desires to construct a portion of the Storm Water Improvements within the MSI Property; WHEREAS, MSI has agreed to allow the City to construct the Storm Water Improvements within the MSI Property subject to the terms of this Agreement; NOW, THEREFORE, in consideration of the rights and obligations identified herein the parties hereby agree as follows: Easements. MSI will grant to the City the following easements: A. Drainage and Utility Easements attached hereto as Exhibit B; B. Temporary Construction Easement for roadway improvements in connection with the Project as provided in Exhibit C, to expire August 30, 2015. 2. City Obligations. A. The City will construct Storm Water Improvements as generally shown on the attached Exhibit D and consistent with the plans and specifications for the Project. B. The City will maintain the storm water feature in perpetuity. C. The City will construct a storm water sump and water quality manhole on the MSI Property as shown on Exhibit D and will maintain this manhole annually or as often as necessary. 174122v2 01/02/2014 D. The City will work on vacating the right of way area through the MSI Property in the area identified in Exhibit E, but will retain all necessary easements to: (i) work within the easements provided under paragraph 1 and (ii) provide all necessary access to Tracts I and L on Carver County Registered Land Survey No. 7. E. The City will plant up to eight (8) trees along Dartmouth Drive abutting the MSI Property. F. The City will fill and re -grade MSI Property as identified in the plans and specifications for the Project. G. The City will seed the MSI Property upon completion of the Storm Water Improvements within the easement areas after work is complete and weed and feed MSI Property for up to two years. THIS AGREEMENT, entered into by the undersigned parties this day of . 2014. CITY OF CHANHASSEN M UMPI STATE OF MINNESOTA ) (ss. COUNTY OF CARVER ) Thomas A. Furlong, Mayor Todd Gerhardt, City Manager The foregoing instrument was acknowledged before me this day of , 2014, by Thomas A. Furlong and Todd Gerhardt, the Mayor and City Manager, respectively, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. Notary Public 174122 01/0212014 MINNEWASHTA SHORES, INC. Its: -�, e o,✓T STATE OF MINNESOTA ) )ss. COUNTY OF L ) The foregoing instrument was acknowledged before me this ISV-� day of 2014, bye6�� l R. 11f4cuA7A ,the �- r,Jd„o 7` of tltewash a hores, Inc., a Minnesota non - profit corporation, on behalf of the corporation. tNoPublic JEAN M.STECKLING Notary Publb-Minneaota MY CWMry* nE"a --- -T,- -- 174122 01/02/2014 EXHIBIT A Legal description of MSI Property: TRACT H and TRACT Y, Carver County Registered Land Survey No. 7 174122 01/02/2014 EXHIBIT "B" to Public Improvement and Easement Agreement (Reserved for recording information) GRANT OF PERMANENT EASEMENT MINNEWASHTA SHORES, INC., a Minnesota non - profit corporation, "Grantor ", in consideration of One Dollar ($1.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, does hereby grant unto the CITY OF CHANHASSEN, a Minnesota municipal corporation, the Grantee, hereinafter referred to as the "City ", its successors and assigns, forever, a permanent easement for public drainage and utility purposes over, on, across, under, and through the land situated in the County of Carver, State of Minnesota, legally described as: TRACT H and TRACT Y, Carver County Registered Land Survey No. 7. INCLUDING the rights of the City, its contractors, agents, servants, and assigns, to enter upon the permanent easement premises at all reasonable times to construct, reconstruct, inspect, repair, and maintain said public drainage and utility system over, across, on, under, and through the permanent easement premises, together with the right to grade, level, fill, drain, and excavate the permanent easement premises, and the further right to remove trees, bushes, undergrowth, 174122 01/02/2014 and other obstructions interfering with the location, construction, and maintenance of said public drainage and utility easement. The above named Grantor, for itself, its successors and assigns, does covenant with the City, its successors and assigns, that it is well seized in fee title of the above described easement premises; that it has the sole right to grant and convey the easements to the City; that there are no unrecorded interests in the easement premises; and that it will indemnify and hold the City harmless for any breach of the foregoing covenants. IN TESTIMONY WHEREOF, the Grantor hereto has signed this document this 1<Z--1 ~ day o 2014. GRANTOR: MINNEWASHTA SHORES, INC. By: �wGb�%d Its: as 0] 174122 01/02/2014 STATE OF MINNESOTA ) ) ss. COUNTY OF CARVER ) The foregoing instrument was acknowledged before me thisj!j�j� day of 2014, by Z6er l Al. 01,4c-uao g the of unew ht Shores, Inc., as Minnesota non-profit corporation, on behalf of said corporation. tary Public S JEAN M. STECKLING NotW Pubib- hW05ota M,,cwmd..a�ew••.w 91.2019 THIS INSTRUMENT WAS DRAFTED BY: CAMPBELL KNUTsoN Professional Association 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, MN 55121 Telephone: 651- 452 -5000 AMP /jmo 174122 01/02/2014 EXHIBIT "C" to Public Improvement and Easement Agreement (Reserved for recording information) GRANT OF TEMPORARY EASEMENT MINNEWASHTA SHORES, INC., a Minnesota non -profit corporation, "Grantor ", in consideration of One Dollar ($1.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, does hereby grant unto the CITY OF CHANHASSEN, a Minnesota municipal corporation, the Grantee, hereinafter referred to as the "City ", its successors and assigns, a temporary construction easement over, across, on, under, and through the land situated in the County of Carver, State of Minnesota, and legally described as: All of TRACT H, Carver County Registered Land Survey No. 7. TO HAVE AND TO HOLD the same, unto the City, its contractors, agents, servants and assigns, commencing upon the execution of this agreement and expiring on August 30, 2015, together with the right of ingress to and egress from the temporary easement premises, for the purpose of constructing, reconstructing, inspecting, repairing, and maintaining the property of the City, at the will of the City, its successors and assigns. Grantor hereby grants the uses herein specified without divesting itself of the right to use and enjoy the above described temporary 174122 01/02/2014 easement premises, subject only to the right of the City to use the same for the purposes herein expressed. As a condition of said temporary construction easement grant, the City shall, upon completion of construction and prior to termination, restore the ground surface of the temporary construction easement premises to its original condition so far as is reasonably practicable with the exception of any grade changes, bank sloping, ditching, fills, slope construction, cuts and any removal of earth, other materials, trees and other vegetation. The above named Grantor, for itself, its successors and assigns, does covenant with the City, its successors and assigns, that it is well seized in fee title of the above described temporary easement premises; that it has the sole right to grant and convey the easements to the City; that there are no unrecorded interests in the temporary easement premises; and that it will indemnify and hold the City harmless for any breach of the foregoing covenants. IN TESTIMONY WHEREOF, the Grantor hereto has signed this document thiAl &I' day o 2014. GRANTOR: MINNEWASHTA SHORES, INC. By: �frwr 7'?i1� Its: Mari 174122 01/02/2014 STATE OF MINNESOTA ) ) ss. COUNTY OF CARVER ) The foregoing instrument was acknowledged before me thisi2`h" day of 2014, by �� T & IWAcK ,vA the ,7e., <-„3&.,o T of Min �,ewash a hores, Inc., a Minnesota non - profit corporation, on half of said corporation. %IVo Public M. STECKL�N1 Notary P E 3� 019 �yca""roa1°" THIS INSTRUMENT WAS DRAFTED BY: CAMPBELL KNUTSON Professional Association 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, MN 55121 Telephone: 651- 452 -5000 AMP /jmo 174122 10 01/02/2014 EXHIBIT D Attach Sketch of Storm Water Improvements �JpP / r 1 Ruwps[J Low Rare Gwn uwfrt /'( "p 5Pf NA]K. (EV! CKiRAUM PM LONiNR IlN[5 ANJ fILVAAq�S WV) _ TJJf} C'WRLSS URIVF_ V � n� -'Z" r . HEWA C LML 'ILL LRN G iry,PH LpNip�f LINE$ /�PNU FlEVP11g15 (:YP) 1EaISPI 11011iGCffI$ LWCS i �AVD fLClAT0U5 R,TI Mt ~ \ , '' - l Rp,ECi iPS / R'v [ —. 95 - 1 �EGSE F n.R' •• � , . /) •. / `.,° V -" Gq /JM/F➢ iA455 IAA. Fl: 'G 5 n1LE 6RIVEW 1 I� A L HC NINIICW49RI Aa W 2J' WCE pxmE " y�_ pll:x rj CI UR, HIGH 1 % PRG T RE `� rr cR9Pp EU 4R4dGE W .1fH LFViL�S<P i GIk j/1 RFMOK 6R�GE y P6 %E p £RR9W'VE LY 'A_ PAPYJNL / PJRII ARNIND \ SCHEMATIC LEVEL LAKE ASSOCIATION PROPERTY IMPROVEMENTS 174122 11 EXHIBIT E Sketch and Description of Vacation Area Portion of TRACT Z on Carver County Registered Land Survey 7 as highlighted: 174122 01/02!2014 o x �t®Z 'o c • � 83 �� a Qet � 235.E � � o 2 I � •J S � Bpi �' i.D , lot y, C till 0� X91 / s'vSr� y.0 �p xaA9 k a 1 •+ 90 p s 12