1c. Contract amendment No. 2 for northside parking lot CITY O F . 10444,3. CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147• CHANHASSEN, MINNESOTA 55317 I4".1111r (612) 937-1900• FAX (612) 937-5739 Manager's Comments: It should be noted ' MEMORANDUM that the construction costs referred to were assessed to benefitting properties 10: Don Ashworth, City Manager otiLi as a part of the assessment hearings this past month. Approval is recommended. FROM: Gary Warren, City Engineer0)3\ DWA DATE: October 31, 1990 (11-1-90) ' SUBJ: Approve Contract Amendment No. 2 for North Side Parking Lot Improvement Project No. 87-17 The North Side Parki ng project incorporates Lot 'ect which rates the area between the � Riviera Restaurant and Great Plains Boulevard was authorized under one feasibility study. This project, like other projects in the downtown, has been held hostage by the various development proposals such as the Medical Arts building, Pauly property, Riviera improvements and the improvements to Colonial ' Center. As a result, the project was initially authorized to incorporate only the east half improvements of the project site with the west half waiting for construction of Phase II of the Medic al Arts building. As is not uncommon in this development environment, it became prudent as the project evolved to address the parking needs and concerns of the Phase I Medical Arts building and the Riviera. ,To do this it was necessary to proceed with ' construction of as much of the westerly half of the project improvements as possible at this time. The attached Contract Amendment No. 2 reflects the work which was directed by the City to be undertaken in the westerly half (Phase II) portion of the project scope. These project elements were included in the original feasibility study and, due to the satisfactory unit Pr icess and the timing of the project, it was deemed prudent -to expand the Shafer Contracting contract to include this Phase IT work. . __The majority of this work is now 1 complete although no payments have been made to the coAtractoe. <: It is therefore recommended that the attached Contract Amendment No. 2 to the ' West 78th Street North Side Public Parking Lot project'=be approved in the amount of $117,786.80 and that a revised contract amount be established for the project at $669,536.65. Further, the project schedule shall be extended due to the extended scope to a November 9, 1990 cxEp1etion date. ktm ' Attachments: 1. October 31, 1990 letter frod BRW. 2. Contract Amendment No. 2. ' c: Gary Ehret, BRW 1 L, II1VIv PLANNING TRANSPORTATION ENGINEERING �_ URBAN DESIGN BRW INC - THRESHER SQUARE - 700 THIRD STREET SOUTH MINNEAPOLIS.MINNESOTA 55415 PHONE 612/370-0700 FAX 612/370-1378 IIOctober 31, 1990 IIMr. Gary Warren, PE City Engineer 1 City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 RE: NORTH SIDE PARKING LOT C.P. 87-17 1 CONTRACT AMENDMENT NUMBER TWO Dear Mr. Warren: 1 Attached for your review and approval are six copies of Contract Amendment Number Two for the above project. This amendment will serve to reimburse the contractor 1 for a significant amount of work completed within the project area in coordination with the adjacent businesses, developers, and/or City, as directed by staff. IIEach of the items is fairly self-explanatory. 1 Please note that this work was included in the assessment calculations for the project, which we recently completed. All items of work, which are assessable, were included in the assessment roll consistent with this contract amendment. 1 Some portions of the work included in this contract amendment are not assessable, but are in accordance with agreements between the Chanhassen H.R.A. and the developers or businesses. 1 If we can be of further assistance, please let me know. 1 Sincerely, BR C. CITY OF CHANHASSEN 1 8-0124- REER113 ak# NOV 011990 .. y A. p`ret, PE 1 Project anager ENGINEERING DEPT. 1 cc: File 7-8915 AN AFFILIATE OF THE BENNETT.RINGROSE.WOLSFELD.JARVIS.INC GROUP IDAVID J BENNETT DONALD W RINGROSE RICHARD P WOLSFELD PETER E JARVIS THOMAS F CARROLL CRAIG A AMUNDSEN DONALD E HUNT MARK G SWENSON JOHN B McNAMARA RICHARD D PILGRIM DALE N BECKMANN DENNIS J SUTLIFF JEFFREY L BENSON RALPH C BLUM DAVID L GRAHAM GARY J ERICKSON MINNEAPOLIS DENVER PHOENIX TUCSON ST.PETERSBURG SAN DIEGO CM �✓ 1I CITY OF CHANHASSEN cowman 1R CC CONTRACT AMENDMENT CITY I!I! BI I logolyirga Project: West 78th Street North Side Public Parking Lot II Ryisb 11990 City Project No. : 87-17 Amendment No. : (2) Two Date: October 26, 1990 ENGINEERIKG DEPT. II Contractor: • Shafer Contracting Co. , Inc. `I�t� G li i� The additions, revisions and corrections contained herein shall be made to the II Contract Documents for the project, and shall become a part of the Scope of Work. Description of Changes: II A. The Contractor shall provide all materials and labor for bituminous pave- ment, lighting, and landscaping improvements to the western portion of the project area as shown in attached Plan Sheets 12A, 13A and 14A. These improvements have been added to the scope for the project as requested by City staff. I The additional work has resulted in the creation of three new bid schedules and a number of new pay items for the performance of the work. The new bid II schedules created by this Contract Amendment are as follows: NORTH SIDE PUBLIC PARKING LOT CONTRACT AMENDMENT NO. 2 - WEST PROJECT AREA SCHEDULE A ADD ORIGINAL QUANTITY AMOUNT II SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 1/ Mobilization LS $4,000.00 0.00 1.00 $4,000.00 I 2021.501 2/ Subgrade Preparation SY 1.00 0.00 6,000.00 6,000.00 I 2112.602 3/ Remove & Shape LS 6,000.00 0.00 1.00 6,000.00 II Aggregate Base 4/ 2104.501 Remove RC Pipe LF 10.00 0.00 8.00 80.00 II5/ 2104.501 Remove Catch Basin EA 150.00 0.00 1.00 150.00 6/ Remove Concrete II 2104.501 Curb LF 2.00 0.00 35.00 70.00 7/ Remove Concrete I 2104.503 Driveway SF 0.50 ' 0.00 54.00 - 27.00 CA2-1 I II ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ 11 Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) ' 8/ Remove Concrete I2104.503 Valley Gutter LF 2.00 0.00 10.00 20.00 9/ I 2104.513 Sawcut Bituminous LF 3.00 0.00 60.00 180.00 10/ 7" Concrete 2531.507 Driveway Pavement SY $ 30.00 0.00 6.00 180.00 II11/ Concrete Valley 2531.501 Gutter LF 10.00 0.00 10.00 100.00 1 12/ Construct Catch 2501.507 Basin Cty Std 3'x4' EA 1,000.00 0.00 1.00 1,000.00 I 13/ Concrete Curb and 2531.501 Gutter Design B612 LF 6.00 0.00 1,660.00 9,960.00 II 14/ Concrete Edge Strip (6" wide) SF 3.50 0.00 110.00 385.00 ' 15/ Concrete Edge II Strip (36" wide) SF 2.70 0.00 750.00 2,025.00 16/ 4" Concrete I2521.501 Sidewalk SF 1.90 0.00 1,194.00 2,268.60 17/ Bituminous Material I2357.502 for Tack Coat GAL 1.00 0.00 273.00 273.00 18/ Bituminous Material 2331.504 for Mixture 2331 TON 125.00 0.00 29.90 3,737.50 I19/ Base Course 2331.514 Mixture 2331 TON 12.00 0.00 711.00 8,532.00 I20/ Bituminous Material 2341.504 for Mixture 2341 TON 125.00 0.00 41.90 5,237.50 21/ Wearing Course 2341.602 Mixture 2341 TON 14.00 0.00 736.00 10,304.00 1 22/ Lot Striping - 4" 2564.603 Solid White Paint LF 0.40 0.00 2,243.00 897.20 I 23/ Pavement Message - 2564.602 Type II, Handicapped EA 30.00 0.00 3.00 90.00 24/ Furnish and Install I2564.531 Type C Sign Panel SF 35.00 0.00 20.50 717.50 ICA2-2 Total Add $62,234.30 • I NORTH SIDE PUBLIC PARKING LOT. CONTRACT AMENDMENT NO. 2 - WEST PROJECT AREA SCHEDULE B ADD ORIGINAL QUANTITY AMOUNT II SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) - , 1/ Marshall 's Ash 2571.502 3" Cal . B & B Tree $225.00 0.00 15.00 $ 3,375.00 I 2/ Red Oak 31" Cal. 2571.502 B & B Tree 395.00 0.00 2.00 790.00 II3/ Compact American 2571.505 Cranberry 36" Dia. Shrub 27.00 0.00 33.00 891.00 Cont. 1 4/ Jackman Potentilla 2571.505 18" Dia. Cont. Shrub 20.00 0.00 34.00 680.00 II 5/ Scandia Juniper 2571.504 24" Dia. Cont. Shrub 27.00 0.00 29.00 783.00 6/ Colorado Spruce II 2571.501 10' High B & B Tree 325.00 0.00 2.00 650.00 7/ Winged Euonymus I 2571.505 4' High B & B Shrub 60.00 0.00 24.00 1,440.00 8/ Daylily - Gold I 2571.507 Flow. #1 Pot Plant 10.00 0.00 62.00 620.00 9/ Pagoda Dogwood II 2571.502 7' High B & B Tree 210.00 0.00 2.00 420.00 10/ Korean Dwarf Lilac II 2571.505 30" Dia. Cont. Shrub 25.00 0.00 11.00 275.00 11/ Gold Drop 2571.505 Potentilla Shrub 20.00 0.00 47.00 940.00 II 18" Dia. Cont. 12/ Seagreen Juniper II 2571.504 24" Dia. Cont. Shrub 27.00 0.00 55.00 1,485.00 13/ Amur Maple 2571.502 6' High B & B Tree 250.00 0.00 16.00 4,000.00 II 14/ Imperial Tree 300.00 0.00 3.00 900.00 Honeylocust 3" II Cal . B & B CA2-3 II II • NORTH SIDE PUBLIC PARKING LOT 11 CONTRACT AMENDMENT NO. 2 - WEST PROJECT AREA SCHEDULE B ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) I15/ Shredded Hardwood SF $ 0.25 0.00 $ 3,330.00 $ 832.50 2575.511 Mulch with Fabric ' 16/ Sod SY 1.60 0.00 680.00 1,088.00 2575.505 ' 17/ Irrigation SF 0.40 0.00 6,150.00 2,460.00 ' Total Add 21,629.50 1 CA2-4 1 NORTH SIDE PUBLIC PARKING LOT I CONTRACT AMENDMENT NO. 2 - WEST PROJECT AREA SCHEDULE C ADD 1 ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ II Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 1/ Lighting Assembly - I 2545.602 A3 (Complete) EA $1,945.00 0.00 7.00 $13,615.00 2/ 2" Rigid Steel I 2545.521 Conduit (Installed) LF 7.15 0.00 705.00 5,040.75 Total Add $18,655.75 I Net Add $102,519.55 I B. The Contractor shall perform landscaping for the east project area as shown II in attached revised Plan Sheet 13 and new Plan Sheet 13B. The plan has been modified to include changes along the north side of the project site behind the Colonial Center, landscaping around the perimeter of the Medical Arts Building and landscaping for the Heritage Park Apartments. The landscaping II changes and additions have been made as directed by City staff. The changes and additions have resulted in new contract quantities for a I number of existing pay items, as well as the creation of additional pay items. Modifications to the existing landscaping bid schedule are as follows: I NORTH SIDE PUBLIC PARKING LOT BID SCHEDULE F - LANDSCAPING ADD II ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ II Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 1/ Marshall 's Ash I 2571.502 3" Cal . B & B Tree $225.00 21.00 6.00 $1,350.00 2/ Colorado, Green I 2571.501 Spruce 6' High Tree 180.00 4.00 1.00 180.00 B & B 3/ Colorado, Green 2571.501 Spruce 8' High Tree 210.00 4.00 6.00 1,260.00 B & B II CA2-5 II II' NORTH SIDE PUBLIC PARKING LOT ilBID SCHEDULE F - LANDSCAPING I SEQ. NO./ ORIGINAL QUANTITY AMOUNT UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 11 5/ 2571.503 Nannyberry Viburnum Tree 125.00 5' High B & B 4.00 (4.00) (500.00) I 6/ 2571.501 Welch Juniper 41/2' High B & B Tree 100.00 14.00 1.00 100.00 I 8/ 2571.505 A.W. Spirea 18" Shrub 20.00 24.00 32.00 Dia. Cont. 640.00 9/ Korean Dwarf I 2571.505 Lilac 30" Dia. Shrub 20.00 19.00 21.00 420.00 Cont. I 10/ 2575.511 Shredded Hardwood SF Mulch with Fabric 0.25 1,815.00 5,450.00 1,362.50 I 11/ Sod SY 1.60 2,100.00 680.00 1,088.00 2575.505 12/ Irrigation SF 0.40 20,715.00 6,140.00 2,456.00 I13/ Scandia Juniper Shrub 27.00 0.00 62.00 1,674.00 2571.504 24" Dia. Cont. I14/ Colorado Green 2571.501 Spruce 10' High Tree 325.00 0.00 7.00 2,275.00 B & B II15/ Daylily - Gold Plant 10.00 0.00 100.00 1,000.00 - 2571.507 Flow. #1 Pot II16/ Winged Euonymus Shrub 60.00 0.00 16.00 960.00 2571.505 4' High B & B I 171 2571.502 Norway Maple 3" Cal B & B Tree 350.00 0.00 8.00 2,800.00 I 18/ Miss Kim Lilac Shrub 25.00 0.00 60.00 1,500.00 2571.505 36" High B & B II 19/ 2571.503 Red Splendor Crab Tree 250.00 3" Cal . B & B 0.00 5.00 1,250.00 20/ Seagreen Juniper Shrub • 27.00 0.00 34.00 918.00 I 2571.504 24" Dia. Cont. IICA2-6 1 I ORIGINAL QUANTITY AMOUNT II SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 21/ Compact American Shrub 27.00 0.00 8.00 216.00 II 2571.505 Cranberry 36" High Total Add $ 20,949.50 1 Net Add $ 20 949.50 II C. The Contractor shall furnish and install wood posts in substitution for steel posts for stop signs at the entrances to the parking lot, as requested II by City staff. The wood posts will match existing signing along West 78th Street. The substitution has resulted in the creation of a new pay item for sign I panels with wood posts, and a deduction in the contract quantity for Type C Sign Panels with steel posts. The changes are detailed below: NORTH SIDE PARKING LOT II BID SCHEDULE B - ROADWAY/PARKING LOT ADO I ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) I 26/ Furnish and • II 2564.531 , Install Type C SF $ 35.00 63.75 (12.00) $ (420.00) Sign Panel 30/ Furnish and I Install 24° Stop EA 325.00 0.00 3.00 975.00 Sign with Wood Post I Total Add $ 555.00 Net Add $ 555.00 t D. The Contractor shall furnish and install steel handrail for the existing steps along the east side of City Hall as requested by the City Building Inspector. The handrail shall be of the type shown in the attached II railing details. . The additional work has resulted in an increase in the contract quantity for II the existing metal railing pay item as detailed below: CA2-7 11 1 I CITY OFFICES IMPROVEMENTS ilBID SCHEDULE B - ROADWAY/PARKING LOT ADD ORIGINAL QUANTITY AMOUNT II SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) II 13/ • 2741.603 Metal Railing LF $ 50.00 65.00 16.50 $ 825.00 1 Total Add $ 825.00 Net Add $ 825.00 II E. The Contractor has performed work to recondition the existing upper east I parking lot at City Hall as requested by City staff. The reconditioning work included milling and preparation of the existing bituminous surface, and a 2" bituminous overlay for the parking lot. 1 Milling, cleanup and preparation of the existing bituminous surface was per- formed on a time and materials basis. Hourly rates for equipment and per- sonnel were obtained from the Contractor and approved by the Engineer prior II to beginning the additional work. The total cost of the time and materials work was $1,500.00. All work associated with the placement of the bituminous overlay was per- ' formed at existing unit bid prices. The addition of the City Hall parking lot reconditioning work has resulted I in the creation of a new bid schedule and a number of new pay items. The new bid schedule created by this Contract Amendment is as follows: II CITY OFFICES IMPROVEMENTS CONTRACT AMENDMENT NO. 2 - UPPER EAST PARKING LOT ADD II ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) II1/ Milling & Surface LS $1,500.00 0.00 1.00 $ 1,500.00 Preparation 2/ Bituminous Material TON 125.00 0.00 6.27 783.75 I 2341.504 for Mixture 2341 3/ Wearing Course TON 20.00 0.00 110.00 2,200.00 2341.602 Mixture 2341 I 4/ 2357.502 Bituminous Material GAL for Tack Coat 3.00 0.00 100.00 300.00 5/ Lot Striping - 4" LF 0.70 0.00 220.00 154.00 1 2564.603 Solid White Paint Total Add $ 4,937.75 INet Add $ 4,937.75 CA2-8 r SUMMARY Current Contract Amount $ 551,749.85 Item A Net Add $102,519.55 Item B Net Add 20,949.50 Item C Net Add 555.00 Item D Net Add 825.00 Item E Net Add 4,937.75 Contract Amendment No. 1 Add 129,786.80 Amended Contract Amount $ 681,536.65 1 PROJECT SCHEDULE The original final completion date for this project of June 15, 1990, shall 1 be extended due to the numerous revisions and additions made to the contract documents as a part of this Contract Amendment. The completion date for all work required by this project is hereby established as November 9, 1990. , I i CA2-9 r APPROVALS: RECOMMENDED BY: BRW, Inc. By: i4 Title: Project Manager Date: % -7 06 I I ACCEPTED BY: Shafer Contracting Company, Inc. 1 By: \ - Title: S- Date: eQ/30/90 I I APPROVED BY: City of Chanhassen By: Title: Date: ' I 1 CA2-10 1 •