Truth in Taxation Notice Published in the Chanhassen Villager.
Letter to Shafer Contracting dated November 2, 1990.
Letter to Kristen Heegard dated November 1, 1990.
Letter from City of Victoria dated October 31, 1990.
Letter to Paul Krauss dated November 2, 1990.
Memo from Don Ashworth dated November 1, 1990.
Letter to MnDOT dated November 6, 1990.
Letter from City of Shorewood dated November 7, 1990.
Letter to Mike Mason dated November 14, 1990.
Letter from Barton-Aschman Associates dated October 29, 1990.
Accounts Payable dated November 19, 1990.
1
I
1
I
I
I
1
I
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
adAn4A 1.47C-C
i/- /l- 9U
cc
NOTICE
This week, property owners will be mailed a
"Truth-in-Taxation" form. The notice is
required by a change in state statute. The
form will show that potential tax increases
may occur from the City (16% increase) , the
County (11% increase) and the school (9%
increase) . The form is misleading as:
0 The City Council has not adopted the tax
level shown. By contrast, the Council
has stated that there will not be a tax
increase in 1991; and
1 o The amount shown in the form is the
City's levy limit as set by the state.
Any city publishing a tax less than the
state maximum will have their taxes
reduced to that lower level for all
11 following years. However, in the past
ten years the City has never taxed to the
maximum level. The City will not tax to
this maximum for 1991; and
o The City's budget hearing dates have been
set for December 3 and 10, 1990. As of
this date, neither city staff nor the
City Council know what level of tax will
be set for 1991. However, a preliminary
budget has been drafted which reflects no
property tax increase.
The points presented in this notice pertain
11 solely to the City of Chanhassen, although we
believe that they are also true for the county
and school district. Persons interested in
additional information or who have additional
questions are encouraged to contact City Hall,
690 Coulter Drive, 937-1900.
•
I
I
I
11
J C c ,
CITY OF
iv CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937-1900 • FAX (612) 937-5739
November 2 , 1990
11 Shafer Contracting
Attn: Mr. Bud Mattson
Shafer , MN 55074
Re: County Road 17/West 78th Street Haul Road
Trunk Highway 5 Improvements , S.P. 2701-34 (TH 5 )
City Project No. 88-28A
Dear Bud:
This to acknowledge the conclusions reached at our meeting on
Friday, November 2 , 1990 concerning the traffic congestion with
' hauling vehicles at County Road 17 and West 78th Street. It was
concluded that the City would be willing to allow Shafer' s
vehicles to use eastbound West 78th Street and Market Boulevard
for their haul route from the bridge embankment fill site with
the understanding that your drivers will adhere to the 30 mile
per hour speed limit in this area and with the further
understanding that Shafer will see to it that the roadway is kept
11 clean of all haul material . Any damages to City utilities and
curbings and/or excessive amounts of debris deposited in our
storm sewer system resulting from the hauling activity will be
corrected by Shafer at the conclusion of the project at no
expense to the City. Similarly, on Lake Drive East the City is
happy to permit the continued use of this road by Shafer as a
haul road providing the road is kept clean and any damage
repaired including storm sewer debris removed.
You also agreed that County Road 17 and the intersection of West
78th Street would be swept clean. My recent inspection of the
site on Friday afternoon confirmed that this has already been
done. Thank you. Further, it was concluded that since the use
of water on your dirt haul road will in all likelihood aggravate
the transport of clay materials from the site, it was thought
best that a calcium chloride treatment be done on this haul road
to keep the dust down and solidify the haul road surface. This
should help to control mud during periods of precipitation as
well as dust. If this does not work, it may become necessary to
construct a construction access/runout area of gravel prior to
I
CITY OF
"eriskli - CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN,
�i � MINNESOTA 55317
(612) 937-1900 • FAX(612) 937-5739
November 1, 1990
Attn: Ms. Kristen Heegard
American Lung Association
490 Concordia Avenue
St. Paul, MN 55103-2441
RE: National Radon Action Week
Dear Ms. Heegard,
11 It is my pleasure to report to you that efforts by Chanhassen Public Safety &
Chanhassen Mayor Don Clmiel made National Radon Action Week an overwhelming sue-
t cess. The American Lung Association of Minnesota is to be commended for their
support of programming such as ours, and we certainly appreciate the personal
assistance provided by you.
Attached please find copies of newspaper articles that appeared during the week
of October 14-20.
Our Building Inspection Department then fielded calls that we received in
response to this publicity.
Both the City Council and the Public Safety Commission received their alpha
track detectors, along with t-shirts, bumper stickers, magnets, hats, etc. , and
Building Official Steve Kirchman will be following up with them when it is time
to have their radon detectors analyzed.
Information that you provided to us in the form of literature and other adver-
tising material was distributed aggressively by our staff.
I do believe it is fair to say that all of our 12,000 residents were exposed to
the informatio. 'n one form or another. For that, we all thank you! We look
forward t •. cipati ! in the educational program again next year.
Si ,
Sco t Harr
Acting Public Safety Director
SH:cd
cc: Don Chmiel, Mayor
Don Ashworth, City Manager
I
• £.d - CCNa-,
Crn' oFVlcroRIA
Wity cleede4 and gleht4 ' 00. 444.1 cl..1
AXM-St. .r .#(
• GC
)(Liao c.
I
I
I
October 31 , 1990
I
Don Ashworth, City Manager
City of Chanhassen
690 Coulter Drive
Chanhassen, MN 55317
Dear Mr. Ashworth:
In behalf of the City of Victoria, I would like to thank you and the City of
Chanhassen for providing animal control services to Victoria this past year.
The animal control services have been handled very professionally by your
staff. We have found this service to be delivered in a responsive and
effective manner. Interestingly, by taking a proactive stance through weekly
patrol , we have seen the number of animal complaints decrease in the past year.
I look forward to our Cities continued working relationship in the next year.
Sincerely,
Ag:4461/1f2-07*
Gerald Schmieg
Mayor
I
t
RECEIVED
NOV 0 6 1990
CITY Ur
7951 82424e
Viztadal tAt 4' 55.186
j
(6'12) 44.1-2.16.1
I CAMPBELL, KNUTSON, SCOTT & FUCHS, P.A. 4C. ''474&"
Attorneys at Law
IThomas J. Campbell RECEIVED
Roger N. Knutson
(612)456-9539
Thomas M. Scott NOV 0 5 1990 Fax(612)456-9542
1 Gary G. Fuchs
James R Walston
CITY OF Ln,„, 1„:rat.N
Elliott B. Knetsch
Gregory D. Lewis
IDennis J. Unger November 2, 1990
CONFIDENTIAL
1 Mr. Paul Krauss
Chanhassen City Hall
1 690 Coulter Drive, Box 147
Chanhassen, Minnesota 55317
RE: Moon Valley v. City of Chanhassen
IIDear Paul:
1 As you know, Moon Valley has commenced a declaratory judgment
action against the City contending that the City does not have the
right to regulate it. You asked me to outline the probable course
1 of the litigation.
1. Venue. The plaintiff has filed the suit in Hennepin
County. We are attempting to have it moved to Carver County. The
11 judge who has been assigned the case is out of town for three
weeks. We will probably have an answer to this issue in six weeks.
We will take no further action until this is resolved.
II2. Motion to Dismiss. We intend to file a motion to dismiss
arguing that the Complaint failed to state a cause of action. If
the motion is unsuccessful, discovery and a trial will follow.
I3. Counterclaim. The City's new mining ordinance gives
operating mines six months to apply for a permit. The six month
1 period will run out on November 25, 1990. Assuming they have not
applied for and received a permit by that time, we will file a
counterclaim seeking to close them down until they do receive a
IIpermit.
ery truly y. - s,
II PBELL, A.' SON, SCOTT
F'Usi- - , P.A.
•II BY:
Roger N. Knutson
RNK:srn
II cc: Don Ashworth
IIYankee Square Office III • Suite 202 • 3460 Washington Drive • Eagan, MN 55122
I
I
CITYOF
CHANHASSEN
I 690 COULTER DRIVE • P.O. BOX 147• CHANHASSEN, MINNESOTA 55317
(612)937-1900• FAX(612)937-5739
1
MEMORANDUM
TO: Dale Gregory, Chief, Chanhassen Fire Department
Al Wallin, Sheriff, Carver County Sheriff's Department
Daryl Radde, Waconia Ambulance Service
FROM: Don Ashworth, City Manager
DATE: November 1, 1990
SUBJ: Citizen Compliment
1 Councilman Workman recently had a conversation with one of the
family members of Mrs. Wegler who lives on Lake Minnewashta.
Apparently Mrs. Wegler has a lingering illness and had a severe
attack this past Saturday evening. Family members contacted 911
and were deeply concerned with her life. Response occurred within
2-3 minutes by the Carver County Sheriff's Department, Waconia
Paramedics and the Chanhassen Fire Department. The Wegler family
' was thoroughly impressed with the professionalism shown by all
three departments and the coordinated efforts that each provided.
Councilman Workman asked that I pass this compliment on to the
' Carver County Sheriff's Department, Chanhassen Fire Department and
Waconia Paramedics. In behalf of the City, we sincerely appreciate
your continued efforts in helping our citizens in times of need.
cc: Scott Harr, Acting Public Safety Director
11
ACLJ
I //y*
CITY OF
(044 ,
1 cHANHAssEN
690 COULTER DRIVE •• P.O. BOX 147•• CHANHASSEN, MINNESOTA 55317
I _
, �� (612) 937-1900• FAX (612)937-5739
I .
1 November 6 , 1990
1
1 Minnesota Dept. of Transportation
Attn: Mr. Mike Spielmann, P.E.
District Consultant Design Engineer
II Metropolitan District
Golden Valley Office
2055 North Lilac Drive
Golden Valley, MN 55422
1 Re: Consultant Proposal for Final Design Services
Trunk Highway 5 from CSAH 17 to Trunk Highway 41
II S.P. 8835-1102 (TH 5 )
City Project No. 90-17
Dear Mr. Spielmann:
IPlease find enclosed 3 copies of the October 29, 1990 proposal
submitted by Barton-Aschman Associates for the next phase of the
1 Trunk Highway 5 improvements. As noted therein, they have
provided a project schedule, organizational chart, fee summary
and appropriate summary detail. Upon your review, please advise
IIme as to the next steps in proceeding forward with this project.
I also have not yet received a copy of the revised Joint Powers
Agreement which was being completed by MnDOT. I would appreciate
II any assistance you could provide us in working with Mr. Bodoczy
or Sohlo to complete this document as soon as possible. As you
are aware, we have several community reviews which need to be
1 performed on this document. Now that we have the cost estimate
from the design consultant, hopefully we can proceed forward with
finalizing these documents and initiating the project.
r
II ,
I
11
Mr. Mike Spielmann
November 6, 1990
Page 2
In the meantime, if you have any questions, please call .
Sincerely,
CITY OF CHA ASSEN
I N
G y G. Warren, P.E.
' ity E • ineer
GGW:ktm
Attachment: October 29 , 1990 Proposal (3 copies)
c: Bob Lindall , Southwest Corridor Transportation Coalition
Roger Gustafson, Carver County Engineer
Al Pint, MnDOT
Gabe Bodoczy, MnDOT
Don Ashworth, City Manager'
1
i
1
1
1
1
1
1
I
I
I
1
I
I
I
1
1
1
1
I
1
I
1
I
I
I
1
il P
MAYOR
So/� Jan Hen
COUNCIL
I
Gv Kristi Stover
Robert Gagne
Barb Brancel
Vern Watten
' CITY OF
SHOREWOOD
1 5755 COUNTRY CLUB ROAD • SHOREWOOD, MINNESOTA 55331 • (612) 474-3236
IINovember 7, 1990
I Mr. Don Ashworth, City Manager
City of Chanhassen
690 Coulter Drive
II P.O. Box 147
Chanhassen, MN. 55317
RE: Continuation of Animal Control Services
II
Dear Don:
II want to officially advise you that the City of Shorewood has been
very pleased with the Animal Control services provided by your
II Public Safety Department over the past year. In fact, the service
has reduced complaints in City Hall considerably and solved several
long-standing animal control problems.
II The character and demeanor of your Officers is as much - or more -
of an asset as the patrol itself. The Shorewood City Council and
staff are 100% behind the program and sincerely hope the City of
II Chanhassen continues to provide the service through the contract
term, at least.
Shorewood is also interested in additional patrol should other
II cities want to reduce hours or your staff can support it.
Please advise me if additional patrol is possible and keep me
posted on your budget deliberations; so that we may fill in the
Ibottom line before our November 26 budget hearing.
Thank you very much. Please pass on our commitment to and
II satsifaction with the Animal Control services to your City Council
and staff!
IV y truly yours,
c ' RECEIVED
I Laurence E. Whittaker
City Administrator NOV 13 1990
ICITY Ut UinlvrtASSEN
A Residential Community on Lake Minnetonka's South Shore
CITYOF
1
1
t 690 COULTER DRIVE •• P.O. BOX 147•• CHANHASSEN, MINNESOTA 55317
I (612) 937-1900 • FAX(612) 937-5739
I
1 November 14, 1990
IIMr. Michael Mason, Councilmember-Elect
833 Woodhill Drive
1 Chanhassen, MN 55317
Dear Mike:
1 On behalf of the Chanhassen Park and Recreation Commission, I
would like to invite you to attend their next meeting on
November 27, 1990 at 7:30 p.m. in the City Council Chambers.
II will schedule the introduction of both you and Richard Wing as
the first item on the agenda. This invitation is being extended
for two reasons : to allow you to meet the seven members of the
1 Commission and to give the commissioners a chance to welcome and
speak with you.
The Park and Recreation Commission works hard to make recom-
1 mendations to the City Council which are fair and in the best
interest of the city and it' s residents. I can sincerely say
that the Commission looks forward to the opportunity to meet
1 you.
Please call me if you are able to attend on the 27th. For your
information, I have enclosed a .list of °the ;seven members currently
1 - serving on the Commission.
Sincerely,
I . t' efi,1 ::' I
ITodd Hoffman
Park and Recreation Coordinator
1 cc: City Council
Don Ashworth
I TH:nd
I . .
Barton-Aschman Associates, Inc.
I ' 111 Third Avenue South, Suite 350 Phone:(612)332-0421
Minneapolis, Minnesota 55401 Fax: (612) 332-6180
USA
IIad. _A ,. . Pic" of oil
IIOctober 29, 1990
IIMr. Gary G. Warren, P.E. +n.e LAS: Pte=
City Engineer f lx�''� �"
II City of Chanhassen „�
690 Coulter Drive or.- Ti+ 4C 11110AI
P.O. Box 147
Chanhassen, MN 55317 ea_ t 40 TH 41 .
(_:O
II Re: S.P. 8835-1002 TH 5 Trunk Hi hway 5(from)CSAH 17 to TH 41
II
9
Proposal to Provide Final Design Services
Dear Mr. Warren:
IIIn accordance with the City of Chanhassen's request, we have prepared for
consideration and review a revised fee estimate to extend the four-lane
section of TH 5 an additional 2.2 miles west.
IIThis financial proposal conforms to the format outlined in the Request for
Proposal and Scope of Services dated (revised) October 2, 1990. The major
scope changes from an earlier' edition lie in the areas of traffic signals,
landscaping, utilities, and CADD. For the purposes of this agreement,
computer-related costs have been applied to the overhead rate which is subject
Ito post-project audit.
Attached is a graphic which depicts the key personnel assigned to this
project. Many of the staff assigned to this project have been involved in the
I other TH 5 projects to the east. This team has been retained for continuity
purposes.
II Also attached is a critical path timeline for the project which identifies key .
milestones and checkpoints during the design phase. A review of this schedule
shows that approximately a 15 month time frame is required for preparation of
I the contract documents. It also itemizes key MnDOT responsibilities and
deliverables.
II CITY OF CHANHASSEN
MED
OCT 30 1990
ENGINEERING DEPT.
= i
INI 1 •
I .
• Barton-Aschman Associates, Inc.
October 29, 1990
Page 2
•
We appreciate the opportunity to continue to serve the communities along this
southwest corridor. If you need any further information or would like to
discuss our submittal please call .
Sincerely,
' A ON- CHMAN ASSOCIATES, INC.
' avid B. War la P.E.
Principal Asgciate
' DBW:kro
Attachments
•
1
i
I
I
I
DAVID B.WARZALA,
.
Project Manager/Administrator
■•■
SUPPORT SERVICES
STEVEN R. RUEGG, P.E. TECHNICAL
Signal Justification
DAVID R. KOSKI, P.E. ('"""'") AND
Signal Design
CLERiCAL
BARRY J. WARNER, R.L.A.
Landscape Design STAFF
CHARLES T. RICKART
Traffic Control/Staging
CIVIL
ENGINEERING
JAMES H. UNRUH, P.E.
Project Engineer
KENNE'TH W.HORNS,P.E.
Hydraulics Engineer
DAVID W.FILIPIAK,P.E.
Design Engineer
I .
T.H.5 FINAL DESIGN SERVICES
CITY OF CHANHASSEN
Consulting Team
MI • = NM • - NM = MI i NM - NM • ' • MN - -
Project Name: Trunk Highway 5 - CSAH 17 to TH 41
S.P. 88035-1002 Critical Path Timeline
• Prepared 8y: Barton-Fischman Associates, Inc. •
. October 24, 1990
• 91 92
Jan Feb Mar Apr Hay Jun Jul Rug Sep Oct Nov Dec Jan Feb Mar Apr
NOTICE TO PROCEED . -
•
•
1. PROJECT COORDINATION
2. PRELIMINARY TASKS (By Mn00T) . . . .
2.1 Computer basemapping (1) * .
2.2 Stereographic X-Sections . a . _
2.3 Soils Investigation . ammo . . _ . .
nv .
2.4 Preliminary Soils Letter . a _
2.5 Pavement Type Determination. . a
2.6 Final Soils Letter . . . a . . .
3. PROJECT DESIGN STAGE I DESIGN
3_1 Stage 1 Design . ------ REVIEW _ _
3.2 Preliminary Review - STAGE II DESIGN _
3.3 Stage II Design . . . . .-----------------� I REVIEW
3.4 Final Revive . . . . . . ------------- FINAL MOD
3.5 Final Plan Modifications . ---------.
4. DESIGN ACTIVITIES . . .
4.1 SJR/Signal Design �KKKKMNNNKKNNNNN i . . . .
4.2 Road Design .
4.2.1 Computer 8asemapping limmil■ . . . . . . . .
4.2.2 Noriz/Vert Alignments . . 1100111411 . . .
4.2.3 Typical Sections . . . 4 •_
- 4.2.4 Construction Plans . . . `mNNNNNNNNN
'110K14NKNKKKMNKK ,
4.2.5 X-Sections/Const Limits. .
4.2.6 Construction Staging . . . �wwwwmNNNNN� . . .
4.2.7 Utility Relocations . . . . eh . . . _ .
4.2.8 Drainage Design . . . . aaammaaiemw 1 '1N0NNNNNNNKNNNR
4.2.9 Traffic Control . . . . . maw w5NKammmmemmm....ea
4.2.10 Est Duantities/Cost Est. . . . . �wss+M
4.2.11 Special Provisions . . . . . . . . . NN�aaa� .mamma
4.3 Landscape Plan N
5.0 Design Team Meetings . . + + + + . + + + +
0012 Specific Task ... Ongoing Task --- Critical Path NNN Review and Approval Periods a NnOOT Deliverable + Design Team Meeting
(1) MnDOT to provide INTERGRAPH basemapping files to Barton-Fischman
(2) Signal design as warranted
•
- 1 1 1 1 1 1 1111 1 1 - - 1 1 i - -
CHANHASSEN H.R,A. A C C O U N T S P A Y A B L E 11-19-90 PAGE 1
CHECK M A M O U N T C L A I M A N T P U R P O S E
042117 45.28 DONALD ASHWORTH TRAVEL + TRAINING
042118 321.76 CAMPBELL, KNUTSON, FEES, LEGAL
042119 363.75 HOISINGTON GROUP, INC. FEES, SERVICE
042120 800.00 KRUGER PHOTOGRAPHY PROMOTIONAL EXPENSE
042121 5,950.13 STRGAR-ROSCOE-FAUSCH INC FEES, SERVICE
5 7,480.92 CHECKS WRITTEN