Loading...
2c. Plans & specs for Ersbo 2nd addition I 2e 1 CITYOF 4, 1 690 COULTER DRIVE • P.O. BOX 147• CHANHASSEN, MINNESOTA 55317 I �'"� (612)937-1900 • FAX(612) 937-5739 Action by City Administrator - Endo:sed ✓ 1)104 I MEMORANDUM M,cdif,aj k 3:.ts TO: Gary Warren, City Engineer p<i,,___z.p�_ 1 FROM: Dave Hemel Sr. En �_ s_t� .d to Ccmmssan Hempel, Engineering Technician fit„ DATE January 3, 1990 , Cete ...�...,,.:d t:‘. (f ur:ct! IISUBJ: Approve Plans and Specifications for Ersbo Second Addition Project No. 88-16 (pvt) 1 The construction plans and specifications for Ersbo Second 1 Addition dated December 19 , 1989 for street and utility improve- ments have been submitted by William Engelhardt & Associates . A grading and erosion control plan is also attached with the Iconstruction plans. The plans and specifications cover site grading, street, storm, 1 sewer, watermain and sanitary sewer construction for Ersbo Second Addition. The plans appear consistent with the conditions and stipulations covered in the preliminary and final plat approval. The final plat and development contract for Ersbo Second Addition IIwas previously approved by the City Council on December 18, 1989. It is therefore recommended that the construction plans and spe- I cifications prepared by William Engelhardt & Associates for Ersbo Second Addition be approved with the following conditions: 1 . The applicant shall enter into a -development contract with 1 the City .and provide the City with the :necessary financial sureties to guarantee proper installation of these improve- ments prior •to the commencement of any construction or site 1 grading. , . ., . r - -- 2. The applicant shall pursue °acquisition of a drainage easement 1 across the parcel to the west of the proposed plat for drainage purposes. <„ - 3. The applicant shall obtain and comply with all conditions of 1 the Watershed District. OFFICIAL ENGINEERING COPY Received, IRevision No. Approved by City Engin I Date D Approved by City Council 1 Gary Warren January 3, 1990 Page 2 1 4 . Drainage swales shall be provided between the proposed house pads and upstream slopes to provide adequate drainage around and away from the house pads. 5. Construction of site improvements shall not be permitted until weather conditions permit in the spring of 1990 . 1 Attachment: Plans and Specifications. 1 c: Bill Engelhardt Richard Ersbo i 1 i 1 i 1 1 1 1 • 1 1 I