Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1d. Contract Amendment No. 1 for Country Suites
I / c ._ I . 4: CITYOF ----- CHANHASSEN 1 _F I 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 • FAX (612) 937-5739 A‘ - by GI% A4t ori - Eidars I/ba'�( I MEMORANDUM ku.fi,i__-_.. Rejg::te^ TO: Don Ashworth, City Manager "' 7 3 FROM: Gary Warren, City Engineer 4....... _ MU Submnt4" : tea,1-3q1;1 k. a iri: d &tprrmitttt IDATE: July 18 , 1990 ata 7- , 3- u SUBJ: Approve Contract Amendment No. 1 for Country Hospitality 1 Suites Improvement Project No. 89-25 As noted in the attached July 16 , 1990 correspondence from BRW, I the developers of the Country Hospitality Suites site have requested that the City include subgrade excavation and the placement of select granular borrow material into the current 1 City contract for the hotel site. Poor soils were discovered on the site which has been compounded by the wet construction season and has necessitated the subgrade excavation. Although the original development contract required that all subgrade 1 correction work be performed by the developer, they requested that the City entertain including this work under the City improvement project and the cost to be assessed back against the Iproperty. A letter is on file stating this fact. The attached contract amendment has therefore been prepared to I include the subgrade excavation in the amount of $12 ,150 and select granular borrow in the amount of $20, 950 for a total additional of $35 ,100 . I find this change order is acceptable and consistent with the terms of the development contract between I the developer and the City. It is therefore recommended that Contract Amendment No. 1 to Improvement Project No. 89-25 be accepted in the amount of an add of $35 ,100 and an amended I contract ceiling amount be authorized at $324,037. 95. Further, the contract final completion date shall be revised to September 3 , 1990 . II ktm Attachments : 1. July 16 , 1990 letter from BRW. I2 . Contract Amendment No. 1. c: Gary Ehret, BRW 1 1 I ` NOV 17 '90 ©8:29 ERN INC° . P.2 I .I ...r.-171, PLANNING I TRANSPORTATION ENGINEERING IlltUY�� t1RBAN DESIGN BRW,INC • TNRnSrIER SGUAR£ • TOOTHIRO STREETSQJTH • MINNEAPOWS,MINNESOTA 6$415 PrIONE: 612%370-0700 FAX. 612%310.1378 IJuly 16, 1990 IMr. Gary Warren, PE City Engineer I City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 II RE: Country Hospitality Suites Site Improvements Contract Amendment No. 1 IDear Mr. Warren: Please find enclosed six (6) copies of Contract Amendment No. 1 for the above referenced project for your approval . The contract amendment has been prepared I as requested by the developer of the site to include subgrade excavation and the placement of select granular borrow material , as required for subgrade correc- tion, as a part of the site improvement contract. IThe original development contract required that all subgrade correction work would be performed by the Developer as a part of the site grading for the pro- • II ject. It is our understanding that at the request of the Developer, the City has agreed to include the subgrade excavation and select granular borrow work as a part of the site improvement contract with the costs being assessed back to the benefitting property. New bid items are created by this contract amendment Ito include the performance of this work. We will continue to provide you and the City Council with the appropriate infor- I mation subsequent to this contract amendment should any significant contract changes occur. If you have any questions, please do not hesitate to call. I Sincerely, • II BRW, - . - 0/ dr- G- A. P'hret, PE Project Manager 1 GAE/blp Enclosures • cc: File: 7-9007 AN AFFILIATE of NE GNNETT,A NGROSE,WOLSFCLO JAPVIS INC.,GROUP I Loy:t.)J bENNETT DoN LO w kINGROSt: RIChARD P WOLSFEL0 PETER E JARVIS It IOWA:F GAAOLL CAAIG A AMUNDSEN DONALD E HJNT MARK G SWENSON JOIN E M:tAWAt1A PIGtAR7 D.PILGRIIM DALE N BECKUANN DENNIS J S1J LIFT JEFFNO L.bEN;ON R.Q./44 tr,bLuI oAvo L.GRAmitho. c Ake'.!.DICKSON MINNEAPOLIS DENVER PHOENIX TUCSON ST PETERSBURG SAN DIEGO NOV 17 '90 08:29 ERN INC° F.3 r II M CITY OF CHANHASSEN CONTRACT AMENDMENT II • Project: Country Hospitality Suites Site Improvements City Project No. : 89-25 II Amendment No.: (1) One . Date: July 16, 1990 II Contractor: Alber Construction, Inc. The additions, revisions and corrections contained herein shall be made to the II documents for the project and shall become a part of the Scope of Work. Description of Changes: II A. The Contractor shall perform subgrade correction work in accordance with the recommendations of the geotechnical investigation for the site, and as I directed by the Engineer. The addition of the subgrade correction work has resulted in the creation of new bid items as follows: I Bid Schedule A - Site Work ORIGINAL QUANTITY AMOUNT il SEQ. NO.! UNIT CONTRACT INCREASE! ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY jDECREASE)_ (DEDUCT) 33/ Subgrade Excavation CY $ 4.50 0.00 2,700.00 $12,150.00 II 2105.501 34/ Select Granular CY $ 8.50 0.00 2,700.00 $22,950.00 II 2105.522 Borrow (LV) Total Addition $35,100.00 Net Addition $35,100.00 . I 1 1 • 1 1 II - NOV 17 '90 08:30 ERN INC. _ P.4- 11 SUMMARY II Current Contract Amount $ 288,937.95 Item A Net Add $ 35,100.00 • Contract Amendment No. 1 Add $ 35,100.00 1 Amended Contract Amount $ 324,037.95 IISCHEDULE I Due to delays which impacted the start of the project, the construction start date is hereby revised to June 25, 1990. Consistent with the contract docu- ments, the Contractor is given 70 calendar days to complete all work required by the project. The final completion date is, therefore, September 3, 1990. IInterim completion dates are currently being negotiated with the Contractor. II - APPROVALS . RECOMM DED BY: :R , . By: dil A.... . 1Ai, 1 _ Title Project Manager Date 747 *1 II IV / ACCEPTED BY: Alber Construction, Inc. IBy: Title Date IAPPROVED BY: City of Chanhassen By: Title Date II II 1 II 1 1