1m. Contract for Lake Drive East I , ,
CITYOF 1
CHANHASSEN
16,
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937-1900 • FAX (612) 937-5739
' MEMORANDUM
TO: Don Ashworth, City Manager
FROM: Gary Warren, City Engineer
DATE: July 18 , 1990
' SUBJ: Approve Contract Amendment No. 1 for Lake Drive East
Improvement Project No. 89-6
Soils encountered on the east 300 feet of the City' s Lake Drive
East project near Dell Road have been determined by our soils
1 consultant to be unsuitable for roadway construction. This is
somewhat compounded by the extremely wet conditions experienced
this spring and summer. In order to proceed with timely
' completion of the project and to assure the future integrity of
the roadway construction , it is necessary to subcut the easterly
300 feet of this project three feet and to install approximately •
600 square yards of geotextile fabric for soil stabilization.
1 The net increase in the cost for this contract amendment is
$27,177 .50 . An additional five working days has been allowed for
this effort.
1 The added cost for these improvements will be assessed
proportionately back to the properties in accordance with the
' original assessment policies as laid out in the feasibility
study.
It is therefore recommended that the attached Contract Amendment
1 No. 1 for the Lake Drive East Improvement Project No. 89-6 be
approved in the amount of $27 ,177.50 and a revised contract
ceiling established at $741 ,871.84. Similarly, an additional
' five working days shall be added to the contract time for a total
of 55 working days for the project.
' ktm
Attachment: Contract Amendment No. 1
1 c: Bud Osmundson , OSM
Jim Paulette, Datasery
*" I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
11 I Orr 2021 East Hennepin Avenue
Schelen Minneapolis,MN 55413 Engineers
I 0 Mayeron& 612-331-8660 surveyors
Associates,Inc. FAX 331-3806 Planners
CHANGE ORDER NO: 1
IPROJECT NO: Lake Drive East Utilities
and Street Improvements
IIOWNER: City of Chanhassen DATE OF ISSUANCE: July 23, 1990
CONTRACTOR: Northdale Construction Co. OWNER'S PROJECT NO: 89-6
I 14450 Northdale Blvd.
Rogers, MN 55374 ENGINEER: Orr-Schelen-Mayeron
& Associates, Inc.
t CONTRACT FOR: Utility & Street Construction
OSM COMM. NO: 4358.00
IYou are directed to make the following changes in the Contract Document:
Description: Furnish and install approximately 1,600 S.Y. of geotextile fabric
for soil stabilization at $1.60/S.Y. for a total of $2,560.00. F & I subgrade
IIcorrection materials as per the attached list for a total of $24,617.50.
Purpose of Change Order: Necessary for street construction due to unsuitable
IIsoil conditions.
Attachments: (List documents supporting change) Letter and estimated quantities
and quote list from Northdale.
I CHANGE IN CONTRACT PRICE: T
I CHANGE IN CONTRACT TIME:
I
IOriginal Contract Price 1 Original Contract Time
$714,694.34 1 50 Working Days
I —
Previous Change Orders No. to No._ 1 Net Change from Previous Change Order
$ None I
I _ 1
Contract Price Prior to this Change 1 Contract Time Prior to Change Order
Order 1
I $714,694.34 1 50 Working Days
Net Increase (decrease) of this 1 Net Increase (decrease) of Change
IChange Order 1 Order
$ 27,177.50 1 5 Working Days
IContract Price with all approved +1 Contract Time with Approved Change
Change Orders 1 Orders
I $741,871.84 1 55 Working Days
1
II RECOMMENDED: APPROVED: APPROVED:
by: 1Y-e-41,)
by: by:
IBud Osmundson, P.E. City of Chanhassen Northdale Construction
I
Mr. Bud Osmundson, P.E. Northdale Construction Co. , Inc.
ORR SCHELEN MAYERON & ASSOCIATES, INC.
2021 East Hennepin Avenue 14450 Northdale Blvd.
Minneapolis, MN 55413 Rogers, MN 55374 -
SUBJECT Re: Lake Drive East Utilities & Street Project No. 89-6 1 3
Northdale Job No. 9005 REGEty E D
Orr Schelen-Mayeron&Ass
Dear Bud: COMM.##
Per your letter dated June 29, 1990, enclosed please find the written `IU L i 1ggO II
quotes on the aforementioned project that you requested. ,r t
Yours truly,
NORTHDALE CONSTRUCTION COMPANY, INC. if;
SIGNED Thomas J. Schany DATE 7-10-90
TJS:sc
Enclosures -
1 ,
SIGNED DATE
SEND PARTS„a:AND 3-PART.3 WILL BE RETURNED WITH REPLY
REDIFORM 4W 463 carbonless 91".
.t
1
ILAKE DRIVE EAST
CITY PROJECT NO. 89-6
I CITY OF CHANHASSEN, MINNESOTA
OSM COMM. NO. 4358.01
I
ESTIMATED QUANTITIES AND CO ST OF SUBGRADE CORRECTION AND DRAIN SYSTEM.
IESTIMATE TOTAL
ITEM QUANTITY UNITS PRICE COST
I as
6" Perforated PVC SDR-35 427 L.F. $ 9°--e $&4& _,
II6" PVC SDR - 35 177 L.F. $ t $___
6g7" Thick Wait) �4D
Manhole ' & Casting 1 Each $ L52) — $ . .5Z) dD
I (13-12)
Extra CE - Muck 2,500 C.Y. $ & � $ 787.5 0
I Select Granular Material (LV) 2,900 C.Y. $ 6S $ 4/.706-06
I (incl. placement/compaction) ..67)
1 1/2" Clear Aggregate 260 Ton $ /D. -- $ al 7,g6 �D
I (180 C.Y.)
Filter Fabric 860 S.Y. $ $ �p/D�D
IChanges in Structures 2 Each $ I/O Od $ 0?AIJ d a
(13-8, 13-10)
I TOTAL $ozll 6/7'