De: —6 — O
TO: Don Ashworth, City Manager Date Submitted to Commission
IFROM: Jo Ann Olsen, Senior Planner U Date Submitted to Coi*4
DATE: June 6, 1990 //—'/O
ISUBJ: Burdick Second Addition - Final Plat
IOn August 3, 1987, the City Council approved the Burdick Second
Addition final plat. If after two years from final plat approval,
the plat has not been filed with :Carver County, the City has the
I right to require the applicant to 'again go through the final plat
' review. The mylars for BurdickSecond Addition had been submitted
for City signatures but they did not contain the required
I easements. Until all of the easements required for approval had
been submitted, the City would not release the plat. The applicant
refused to revise the plat and the question of the validity of
Ieasement requirements was in the process of being litigated.
The applicant has now agreed to provide the required easements and
wishes to proceed with the filing of the plat. Since it has been
I well over two years since final plat approval, and the plat will
now show the required easements, staff requested that the applicant
submit new plat sheets with the requiredohaiged for staff review
I and City Council approval. The following easements are required to
be shown on the final plat:
1. Standard utility and drainage easements ,on each lot, being 10
foot easements on all exterior `lot`° "lines `linciuding the
southerly lot line) and 5 foot easements onpthe' interior lot
lines. A
2. A drainage easement over _ he proposed on-site storm water
retention pond. ..
. 3. A 15 foot utility easement -all along the West 78th Street
frontage centered over the existing sanitary sewer line as
1 shown on the attached plan sheets 2 and 3, Project No. 87-30.
4. A temporary and permanent trunk sewer easement as shown in
Attachment #1.
I
11
4
11 Burdick Second Final Plat
June 6, 1990
Page 2
' 5. A temporary cross-drainage easement encompassing the existing
drainage ditch on the subject property to accommodate drainage
from the property to the north until the West 78th Street
detachment improvements are completed.
The submitted plat provides for the easements requested under
' Condition #1, #3, and #4 and is consistent with the approved
preliminary plat. The drainage easement over the proposed on-site
storm water retention pond (#2) should reflect the future drainage
easement as shown on MnDOT plans (Attachment #4) . A second
1 document should be submitted for the cross drainage easement (#5) .
A final minor correction to the plat is to show the correct
easement arrows on Lot 2. '; °: =___:.__<_ = The plat also shows the
' street as C.S.A.H. 16. The County has vacated this and it is now
West 78th Street. The final plat should reflect this change.
Right-of-Way
' The Minnesota Department of Transportation (MnDOT) is in the
process of obtaining additional right-of-way from the subject site
for Hwy. 5 improvements. The negotiations are in the final stage
so that the right-of-way description is farily definite. Staff
requested the applicant to designate the right-of-way as an outlot
so that the outlot could be transferred to MnDOT and the remaining
lots would correctly reflect the property lines. The applicant
does not wish to designate the right-of-way as an outlot at this
time. Therefore, staff is recommending that the applicant enter
into a development contract which will require the applicant to
replat the property once condemnation is completed.
' RECOMMENDATION
Staff recommends the City Council adopt the following motion:
' "The City Council approves the final plat #86-6 for Burdick Second
Addition as shown on the plans dated June 4, 1990, subject to the
following conditions:
' 1. The drainage easement shown on the plat shall be amended to be
located over the future drainage easement as shown on the
MnDOT plan.
2. A separate document shall be submitted which provides a
' temporary cross drainage easement encompassing the existing
drainage ditch on the subject property to accommodate drainage
from the property to the north until West 78th Detachment
Improvements are completed.
3. The easement arrows shall be corrected on Lot 2.
i
1
Burdick Second Final Plat
June 6, 1990
Page 3
4. The C.S.A.H. 16 designation shall be removed from the plat and
instead designate the street as West 78th Street.
5. The applicant shall enter into a development contract with the 1
City which will require replatting the property once
condemnation of MnDOT right-of-way is completed."
ATTACHMENTS
1. City Council minutes dated August 3, 1987.
2. Letter from Barbara Dacy dated August 6, 1987.
3. Letter from Jo Ann Olsen dated May 29, 1990.
4.. Plan with MnDOT drainage easement. '
5. Final plat dated June 4, 1990.
1
i
1
1
1
1
1
1
1
1
1
1
•
r,
City Council Meeting - August 3, 1987
7. Fire hydrant placement shall be as follows:
[--
a. one at each entrance.
' b. Cne on the west side of the building in the alley around the
building, one-half the distance to the errs of the street.
I . 8. No signage will be allowed on the gas canopy.
9. All rooftop equipment shall be screened.
10. The trash enclosure shall be screened on three sides with a 100%
opaque screen one foot higher than the trash receptacle.
' 11. There shall be no unlicensed or inoperable vehicles stored on
premises and no repair, assembly or disassembly of vehicles.
12. No public address system shall be audible from any esidential
parcel and no sales, storage or display or used automobiles or
other vehicles such as motorcycles, snowmobiles, or all-terrain
vehicles.
13. 10 foot easement be placed over existing utilities in areas of
right-of-way to be vacated.
' 14. The "temporary" status of the storage pond on Lot 2, Block 1 is
subject to the feasibility study being completed by BRW, along with
the City Engineer's approval.
15. Submittal of a satisfactory Grading and Erosion Control Plan,
especially as it relates to fill and ponding areas.
16. The applicant shall come back for Planning Commission and City
Council review if the structure is constructed in phases.
17. A free right turn easement be made at the intersection of Powers
Blvd. and West 78th Street.
18. The applicant receive all the necessary permits from appropriate
agencies i.e. Watershed District, etc..
All voted in favor and motion carried.
REALIGNMENT OF WEST 78TH STREET: CONSIDERATION OF FINAL PLAT, BURDICK 2ND
ADDITION.
Barbara Dacy: This item was tabled from the June 29th Council meeting so
' that two issues could be resolved regarding the subject plat. One was the
permanent and temporary utility easement as needed by the city in regards to
the current sewer construction project that is occurring in West 78th
[E7
Street. The second issue was the drainage issue which again, was to be
. resolved prior to this evening in the feasibility study. The Council action
16
II
_ . 149
_ City Council Meeting - August 3, 1987 I/
! was to go for Alternate A which directs the drainage to the west to the
Eckankar site. Therefore, the second condition of approval on the plat
should be that a drainage easement should be indicated somewhere on the plat
with enough area to accomodate the run-off that would occur from just the II proposed five lots. The Attorney's office says the utility easements have
been instructed to work with the applicant on that issue. Therefore, Staff
is recommending approval of the final plat subject to retaining the II premanent utility easement as is shown in Attachment #1 and providing that
the applicant provide a temporary easement as requested in Attachment #1.
Secondly, reserving a drainage easement encompassing an are that meets the II storage requirements generated by final plat.
B.C. Jim Burdick: The final plat was approved two weeks ago. All of you
were nice enough to approve it unanimously. I was shocked when Brian saw II this in the newspaper and called it to my attention. I didn't know it was
coming up tonight. 13 months ago the preliminary plat was approved and two
weeks ago the final plat was approved unanimously so I don't even know what II we're talking about tonight. These easement things don't have anything to
do with the plat. I have some very interested people down there and all
this would be doing is holding it up. In other words, 2 weeks ago you
approved it unanimously and the only requirement was a formality that the
II
City Manager, the Mayor and we sign the plat and take it to Chaska.
Mayor Hamilton: I think Jim you're correct in saying two weeks ago on the '
agenda it did appear as though the final plat approval was on there. In
fact what that was was the extension of the one year period of time so the
time period would not lapse on your plat and I believe it may have been an II error in typing up that. We did extend for 6 months the plat approval
process so that this could be done without your having to go back through
the whole process again. There isn't any intent on anyone's part to hold
you up or to keep you from doing anything that you want to do with your I
property and I'm a little surprised that the utility easements haven't been
completed prior to this time since it was quite some time ago that we asked _
the City Attorney to work with you on getting those. I know that you have
I
given easements for going across your land to put in the utilities so that
doesn't appear to be a problem but I guess I don't understand the whole
process. Why that hasn't been completed especially when Jim has been more _
than willing to let the company on the land to do whatever they want to do.
II
Barbara Dacy: Just for an update, I did speak with Mr. Farrell on Wednesday
and he was going to give your attorney a call at the end of last week. I
did not hear back from Mr. Farrell about the utility easements. I just II
wanted to clarify for the record also that despite the dispute on the final
plat or when it was approved or whatever, the issues are that the utility
Ieasements and the drainage easement issues arise as a result of the projects
that have occurred within the last 6 to 12 month period. During the past
year we've authorized that sewer improvement. Mr. Burdick received
preliminary plat approval I believe it was May of 1986. That project was
I
authorized beyond that. The drainage issue arose from the Watershed
District study where we're without County stormwater management plan again
resulting in the need to go back and look at the function of that entire
area so the final plat is up for consideration tonight for official action
- 17
I
I
I
10V
City Council Meeting - August 3, 1987
by the Council. We believe the two conditions are reasonable and typical of
plat reviews.
B.C. Jim Burdick: But gentleman, if I can speak for another moment, I do
' not believe that this is the situation at all and I have been held up for a
month. I would like to give you the transcript of the last meeting.
' Mayor Hamilton: I don't think that's necessary Jim. We've had it. We've
read it.
' B.C. Jim Burdick: There's no question it was passed and I have no position
except this is just delaying me and I'm being harmed and if this had been
brought up because of the preliminary plat 13 months ago, fine but when the
plat is approved as Attorney William Frank Kelly said, the ballgame is over.
' It's just a formality from then on in and all I want to do is go ahead with
this formality of signing the plat and filing it.
' Mayor Hamilton: Well, as soon as we finish this evening you'll probably
have the opportunity to do that and I guess if you feel you've been harmed
or grieved in some way, then there are ways to remedy that.
' Councilman Johnson: Do you have a problem with the two conditions?
B.C. Jim Burdick: Absolutely. Completely.
' Mayor Hamilton: Why?
B.C. Jim Burdick Because it has nothing to do with the plat. I'm willing
' to sit down anytime and discuss those and discuss this easement with some
'responsible person but it has nothing to do with filing of the plat.
' Councilman Johnson: Easements have to be on the plat, do they not?
Barbara Dacy: I would suggest also that if we wouldn't have acted to extend
' preliminary plat approval and a recommendation could have easily have been
because of the changed conditions ,of the property, we could have required
the applicant to go through the preliminary plat process. Again, we have no
' intent to hold up the applicant. We're going through standard construction
procedures. I have nothing more to say.
Councilman Johnson: We took action two weeks ago to extend the preliminary
' plat in order not to delay this project any further than it had been
delayed. I know that was exactly what I was doing was two weeks before that
I wanted to extend it at that time thinking that two weeks may not have been
' enough but that didn't come up so.
Councilman Geving moved, Mayor Hamilton seconded to approve the final plat
for Burdick Second Addition subject to the following conditions:
I 1. Identifying the pe rmanent utility easement
as reflected in
Attachment #1, and provision of a temporary easement as reflected
in Attachment #1.
[E:
18
. City Council Meeting - August 3, 1987 I/
2. Reserving a drainage easement encompassing an area that meets the
storage requirements dictated in the feasibility study.
All voted in favor and motion carried. 1
Mayor Hamilton: Now we'll sign your plat.
Councilman Geving: You can take it to Carver County tomorrow.
B.C. Jim Burdick: I don't think we're going to under these circumstances. 1
Mayor Hamilton: Well, you're free to do what you want, let's put it that
way. 1
Councilman Geving: I think we've been very fair with you Jim. Look what
we've given you. If the vacation of the property on West 78th Street goes
through. If the right-in/right-out roadway onto Powers Blvd. goes through,
you've acquired an awful lot of property. We brought water all the way over
from the Industrial Park just to serve your property. We've done a lot for
Mr. Burdick. I think you have to recognize that. 1
B.C. Jim Burdick: Yes, I agree with this and there is wisdom in what you
say but I say it is not fair to require me to spend the month of September _
in Chicago to have my plat filed.
Councilman Geving: Let's put it this way, you can take your plat and file
it. 1
B.C. Jim Burdick: I don't understand that way but I respect what you're
saying. 1
REQUEST FOR DEANNEXATION, MERLE D. VOLK.
Mayor Hamilton: Merle Volk has sent us a letter and I've discussed this
with Barb and I talked with Merle today about it. I guess Barb, do you want
to go through this?
Barbara Dacy: Mr. Volk has requested to appear before the Council tonight
to discuss a proposal. to deannex 40 acres of his property that lies north of
CR 18 and Lyman Blvd.. This area is outlined in red. Mr. Volk owns the
property to the east and all the way to Galpin Blvd.. This area here is
where Gardeneer and Mr. Volk's existing contractor's yard is and R & W
Sanitation. This area in Chaska, this boot shaped parcel is now under
construction for industrial development. West 82nd Street and this area is
now under construction also by the City of Chaska. As the Council recalls,
a street agreement was approved with Chaska. Chaska is assuming the
apparent cost for this street construction. If included into the City of
t_- Chanhassen, unless we provide more street connection down to Lyman Blvd..
This area is also within the Watershed District and Drainage District in
Chaska in their watershed. Utilities would also likewise be moved.
•
19 1
1
. CITYOF
1 .1:..,,,,.i .,.,i;,f;- ...:- . ' l
.4
CHANHASSEN
it,,,,,,
.. „ ,.,. ., ..,..„
. _____. IW': . 7.*
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
•; (612) 937-1900
I .
August 6, 1987
Mr. B. C. Burdick
426 Lake Street
IExcelsior, MN 55331
Dear Mr. Burdick:
IThis is, to confirm that the City Council at the August 3, 1987,
meeting approved your final plat subject to:
Ii . Identifying the permanent utility easement as reflected in
Attachment #1 of the staff report and provision of a tem-
porary easement as reflected in Attachment #1.
' 2 . Reserving a drainage easement encompassing an area that meets
the storage requirements dictated in the feasibility study.
IAs you know, the Council approved Alternate A in the feasibility
study for the direction of a stormwater drainage. As a result,
I the stormwater ponding requirements on your property need to be
sized for the amount of runoff that is generated solely from
your property. Therefore, a drainage easement area should be
indicated somewhere on the plat sized to accommodate runoff from
I the property. It is suggested that your engineer provide calcu-
lations verifying the rate of runoff, amount of storage, and
ponding size to verify the dimensions of the drainage easement.
IShould you have further questions, please feel free to contact
me.
IISi ere ,
Bar ara Da y
City Planner
II BD:v
cc: Roger Knutson
Pat Farrell
Gary Ehret
Larry Hanson
II
II
z.- a . _
4_44., ..
0 , c CITYOF I/f ' . .
• 2P
,, y
. tHANBAssEN
r .:,
-.z_ 690 COULTER DRIVE• P.O.BOX 147• CHANHASSEN,MINNESOTA 55317
(612)937-1900•FAX(612)937-5739
•
. .'
Nay 29, 1990
1
- Mr. B.C. Burdick
426 Lake Street
I
Excelsior, MN 55331
Dear Mr. Burdick: -
I
This letter is to confirm what staff will be requesting as
conditions of approval for the Burdick Second Addition final plat.
These conditions were discussed at the May 29, 1990 meeting between I
yourself, Brian Burdick, Paul Krauss, Gary Warren and myself.
Staff will be requesting the following easements for final plat I
approval: =`
1. Standard utility and drainage � sements on each lot bein g 10
ft. easements on all fraxterior lot lines (including the II
southerly lot line) and 5 ft. a cements on the interior lot
lines.
- i
2. A drainage easement over the proposed on-site storm water
retention pond. -
ii
_,
3. A 15 ft. utility easement all al tr .g the West 78th Street
frontage centered over the existing. sanitary sewer line as
shown on the attached plan sheets 2 tad 3, Project No. 87-30.
1
4. A temporary-Sand e - - - , _war; - sems,n s shown in
Attachment No. 1 - --°°° I
5. A temporary cross-drainage easement enc. • sing the existing
drainage ditch on your-pre ccommodate drainage from
the property to the n 7 until the West 78th Street
detachment improvements a ompleted. I
Staff would prefer that the property be platted after condemnation
I
of the TH 5 right-of-way has been completed so that the plat
accurately reflects the property boundaries. Since you do not wish
to delay platting the property, staff will be conditioning approval
upon entering into a development contract which will require you to
replat the property once condemnation is completed.
I
• 1
•
-
11 Mr. B.C.. Burdick
May 29, 1990 .
Page 2
1 Ten paper copies of the amended final plat should be delivered to
me by the afternoon of June 1, 1990 for the item to be scheduled
for the June 11, 1990 City Council agenda.
1 If you have any questions regarding these conditions, please feel
free to contact me.
Sincerely,
1 Jo Ann Olsen
Senior Planner •
1 JO:k
1 cc: Don Ashworth, City Manager
Paul Krauss, Planning Director
Gary Warren, City Engineer
•
•
•
1
1 -
1
1
1
i
1
•1 -
1
1
1 - •
i1tfrI ii- Al I I -.71: ii
----. '.\. .......) •
Q. 1.:11 :':. :1 .
• r
r, 1p I I °
,...>• . Sk !lift* 1 li i.47!? . al,_
...... 1
Ears 0 -a
•
- r j k .
• ts., :‘ , .r) ao
c Z d It I
.T.fr(5..� • BYO,, .
c� lo ;ry ; ';1R
au
` l � O
h t i NA E a uTLTr l. � I o rAASE ENT ,
`
1 rift. • = N
• t
P2 - i 43 ir W. gi ?ar,
***sY 7"Diti
:: V J av s °. te.49-...... +�''ao, ' 1 4�t
;: 3G_ h OR NAGE e _ Z .
Silk
VI
J
.0 eo\ "fg. j.
ID�,
%.1..\ .
`� i • N •l•11•e3"pr •
COUNlsa.ao
STATE ,q
ID 1i. .
__
•
- _. ea 7,.
t :s�� • ��.I�i.l 1. 1 vii �T�to I
- ���� N87°41`44
/3
.,,,eg 414z)oreAt Rotity•C C . . .
• .,----1344.:6,V),,,k i
•
di,-
-_---, .
-
I.
I
I , '
', - • I
I I r
,
, % ....
RI .
ro,o;
id is'
, t • %.1.
• ■ ,..t. 04
.
-I-
J. 5):es. 1.si ,......„_-_-.
J iii t
I
..,..,......... -,1
— --- - • ••'- - /. ' - I% • \ 1: 1 /
-0.. ..c.• et__ i 4, ,-
I • — ', ii.,, 1 .
I ,41k
1 i
I
•'.I
/ ;1 . \11 ott
1 i , ..ii• -$
`--4.,..„...
I 1
_ ___ ___--- --- k-- ..... J-----,--- ,,,... ,•
4.
/ 7
t
I ..7. 1.• I, cs,
. . ,
, i•-j:l 'i'l b . 1 ..
. .„7-.1.1'16'1:- •
,.,
•,, .i„,
: /0 , , •
r
I ,
,.. • ,
. )
,. * . - :,i/P ' :'7a•rir Or,
pt y /
11W1 I.. . .
. '
.I., ,
foz ,
1.,:a ,,
d••••: // .,0/ ek .
•. ,i z .....
7 , °+ /./
11 ';
.. _ .
i
4• //
'•'t•\■ S
•.:1,1
/1(.••••"*„..•:•4114.z,, 47-.?„
• .1 ,
., / : y •,__=-
I L 1
/ /./f1,-1/ - •
-.....:. .
i
. ;
1!!'• -,
" 'Y 4•/ §R
I, i V , . i //11. . h i /
I i ,/, --.■'
.. # ; "'L..,
../,/ , .6 , Vi ±
‘.1 t1 / fi ,;,/, , , ,..
VS; / r,, I . c ,'>,„...,..
LI • , / ///142.,..z.11...::it.t:-._„' t;..0.•2*
I _e-_2,-- , I, .
.:-.,;.____
- , # / ,, ,. •‘...:::::---N-4-" le..• *"."---
.1)..7.- 0 f ,, ,.-.
, i ,, 0% `-.z.':::"..s....k.. , ,. -,
s - , • f I , 1 n .,. . , .,.
1
; , ,, ...... ...„, t 0 f
....
- be 1 '°.. 444D•C
I
''''\\.. 1$--
--..'■..
•
r. „.....,,,. ., : ..„ . ,„ • .0 , . ,,,
, „:„...\\ •,.. ,....: ,... ..__ 5-.4 1 i
t I .
I I , . . ••••...
‘ , ,.. --...;_.. ,. .._. „... .....,
k I i
I i 1 : ;if> --";;;:;" ,_ ..--:...- _-.4--„, -•=, -- ------/t .
...sZ„
I :I i 41 1 47, /' •••:"..zz, s„ - ......+ ..i••1 .;I ill
, / !
/ •t ..11 r`:,,',.'s••■-::::::"--_--- --•--ii.-- •
r / •,• : • ---::::-..z.,,,_.
I