Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
E-6 Lyman Boulevard Wetland Alteration Permit
CITY OF 7700 Market Boulevard PC Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Terry Jeffery, Water Resources Coordinator DATE: March 24, 2014 SUBJ: Lyman Blvd (CSAH 18) Wetland Alteration Permit and Wetland Replacement Plan PROPOSED MOTION "The Chanhassen City Council approves Wetland Alteration Permit #2014- 05 and WCA Permit Number 2013 -01 for the purpose of the reconstruction of County State Aid Highway (CSAH) 18 (Lyman Boulevard) Roadway Improvements Project, Phase 3; and authorizes the Water Resources Coordinator to sign the joint notification application for approval of wetland replacement as shown in application dated February 11, 2014 subject to conditions within this staff report. And, Adoption of the attached Findings of Fact and Recommendation." City Council approval requires a simple majority vote. EXECUTIVE SUMMARY The proposed project consists of reconstruction of Lyman Boulevard (CSAH 18) between Audubon Road (CSAH 15) and Powers Boulevard (CSAH 17) within the City of Chanhassen. The Carver County Public Works Department is proposing to improve the existing roadway by increasing roadway capacity and constructing safety improvements to the roadway and its condition including access management and a multi-use pedestrianibicycle trail. Construction for the proposed project is expected to begin in April 2014, with substantial completion and cleanup to be in late November 2014. Senior Center This project will require that 2.0 acres of wetland are impacted. These impacts will Phone: 952.227.1125 be mitigated for by wetland credits from the Board of Soil and Water Resources Road Fax: 952.227.1110 Replacement Program and the purchase of wetland banking credits from a privately held wetland bank #1392. Web Site www.Gi.chanhassen.mn.us Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt Lyman Boulevard WAP — Planning Case 2014 -05 March 24, 2014 PLANNING COMMISSION SUMMARY The Planning Commission held a Public Hearing on March 4, 2014 to review the proposed road improvement project. The commission voted five to zero on a motion recommending approval of the wetland alteration permit and wetland replacement plan. One individual spoke at the public hearing. Mark Anderson, P.E. of MFRA asked the Planning Commission to add a condition directing the County to work with PBB Holdings to address a concern about the proposed upsizing of an existing culvert under Lyman Boulevard. These were considered outside the scope of the wetland alteration permit and wetland replacement plan. RECOMMENDATION Staff recommends adoption of the following motion approving the Wetland Alteration Permit and Wetland Replacement Plan: "The Chanhassen City Council approves Wetland Alteration Permit #2014 -05 and WCA Permit Number 2013 -01 to impact 2.0 acres of wetland and the replacement plan under MN Rules Chapter 8420 which utilizes the purchase of 3.34 acres of wetland credit from bank #1392 and 0.66 acres from the BWSR Road Replacement Program for the purpose of the reconstruction of County State Aid Highway (CSAH) 18 (Lyman Boulevard) Roadway Improvements Project, Phase 3; and authorizes the Water Resources Coordinator to sign the joint notification application for approval of wetland replacement as shown in application dated February 11, 2014 subject to conditions within this staff report. ®' Adoption of the attached Findings of Fact and Recommendation ". ATTACHMENTS Planning Commission Staff Report Dated March 4, 2014. g1plan12014 planning cases\2014 -05 lyman boulevard wap \executive sum nary 03242014.doc < ,A y 9yH ASS PROPOSED MOTION: PC DATE: March 4, 2014 CC DATE: March 24, 2014 REVIEW DEADLINE: April 1, 2014 CASE #: 2014 -05 BY: KS City Council approves Wetland Alteration Permit #2014 -05 and WCA Permit Number 2013 -01 to impact 449 2.0 acres of wetland and the replacement plan under MN Rules Chapter 8420 which utilizes the purchase of 4-35 3.34 acres of wetland credit from bank #1392 and 9.33 0.66 acres from the BWSR Road Replacement Program for the purpose of the reconstruction of the pfepesed County State Aid Highway (CSAH) 18 (Lyman Boulevard) Roadway Improvements Project, Phase 3; and authorize the Water Resources Coordinator to sign the joint notification application for approval of wetland replacement as shown in plans application dated jafmafy 13 February 11, 2014 subject to conditions within this staff report. MI Adoption of the attached Findings of Fact and Recommendation. SUMMARY OF REQUEST: Request for a Wetland Alteration Permit for the construction of the County State Aid Highway (CSAH) 18 (Lyman Boulevard) Roadway Improvements Project. LOCATION: Lyman Boulevard (CSAH 18) between Audubon Road (CSAH 15) and Powers Boulevard (CSAH 17). APPLICANT: Carver County Public Works Attn: Lyndon Robjent, P.E. 11360 Highway 212, Suite 1 Cologne, MN 55322 lrobjentkco.carver.mn.us 952 -466 -5200 PRESENT ZONING: Agricultural Estate (A2), Planned Unit Development - Residential (PUD -R) and Bluff Creek Primary Corridor. 2030 LAND USE PLAN: Parks and Open Space, Mixed Use, Residential Low - Density, Residential Medium - Density, Residential Large -Lot, and Office /Commercial ACREAGE: N/A DENSITY: N/A Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 2of19 SUMMARY OF PROPOSAL Request for a Wetland Alteration Permit under Chanhassen City Code, Chapter 20, Article VI, Wetland Protection,_and approval of a wetland replacement plan under the MN Wetland Conservation Act-for the construction of the proposed Lyman Boulevard (CSAH 18) Roadway Improvements Project. LEVEL OF CITY DISCRETION IN DECISION - MAKING The City has limited discretion in approving or denying a wetland alteration permit, based on whether or not the proposal meets the wetland alteration permit standards outlined in the Zoning Ordinance. If the City finds that all the applicable wetland alteration permit standards are met, the permit must be approved. This is a quasi-judicial decision. APPLICABLE REGUATIONS • Chapter 20, Article IV, Conditional Uses: Wetland Alteration Permits follow the Conditional Use Permit criteria • Chapter 20, Article VI, Wetland Protection • MN Rules Chapter 8420.0500 through 8420.0526 PROPOSAL SUMMARY The Carver County Public Works Department is requesting a wetland alteration permit for wetland impacts as a result of the proposed Lyman Boulevard (CSAH 18) Roadway Improvements Phase 3 Project. The proposed project consists of reconstruction of Lyman Boulevard (CSAH 18) between Audubon Road (CSAH 15) and Powers Boulevard (CSAH 17) within the City of Chanhassen. The Carver County Public Works Department is proposing to improve the existing roadway by accommodating capacity and safety improvements to the roadway and its condition including access management and a multi -use pedestrian/bicycle trail. Construction for the proposed project is expected to begin in April 2014, with substantial completion and cleanup to be in late November 2014. Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 3 of 19 ,.e a 8 CHASKA ( *� kA HAI�[ Lo NA4 car run .� M41n PIONnR i PARR pw/ VIA O POMP -- * Kt PAaR J ' "lAa Mum I CHANHASS[N y ' Ia15 PARR -t Location y RANRIRII . �` MIIIDAI RI )t t'JI HiCVB -A u BARWARI CO MM;1\ PARR CHANHASSEN I � / aun - -- -- can cou COURV IIIIIIIIIIIIIIIIIIIIIIIIIIIPPrgec[Location Trail _ SUearn Proiect Location CSAH 18 (Lyman Blvd) Reconstruction from CSAH 15 to CSAH 17 Carver County, Minnesota Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 4 of 19 In order to accommodate the reconstruction, the applicant is proposing to impact five existing wetlands (W -IA, Wl -B, W- 2,W -14, and W -19), as well as Bluff Creek, a Minnesota Department of Natural Resources (DNR) protected watercourse (see Figures 1 -3 below). 1 ' 'I 1' 0 W /.C. NPICT 9 PIkCT Own W 0,3ACEEN W -12 / MU /ff, am AC. iRPACT / w c- 013AC.19,PETT) i ! o9t Ae rtmR.sAPnv1 i CS.A.H. 18 (LYMAN BOULEVARD) �Ij U - - - • E.m G - wrruRRz /y I STORNNATER ' I yNCC.RAFENI !'_J C O.T, PC. IRON Vi ' » oreAC.m W1 ! LEGEND it g/Yyr METE Ml� M'✓J'rF}ENF M dM O }% Q n9LLVD Mi"A M" P.Y k 1'Mµ11Y 0 ,13 if}FCPAPf AtTANI NPKR �� xDIAVD &'lIM3V1Y t LYpQCf CRBIRLT(k UM y uwvRa Rwmm W.q vhIWD wIHP ®, SP.q titdN KW RA14d RL91CSAH 18 FROM AUO BON ROAD TO POWERS BOULEVARD Figure 3A 6N�rOgRYn SP.01M1M131SP. Oi"17 301 SP. 194 430009 Jb�Rq+3 CARNER COUNTY iLq']p1110.31�q Figure 1. Proposed wetland impacts as indicated in Figure 3A from application Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 5 of 19 LEGEND raiuro iMxns mn wK.v wEn wrn acv urmacurs O sus caa: euv.+o w+u.Ts J ®w�'»vrtnrns�L a c�E�arc �/ . reurgwirc eEMV^ IBeG15 Q�� xEnnxo _- =aarcr cvxnwicRx+ aWs ❑ y cwwcE oraTas w-a nEnuw w.rfin I SP -p STCRY PoNP MA6FF W z U z W14(SEE 3A7 C.SA.H. lh ,L"MAPJ UOCLEVAFC} NETLMID3 i _ � 1 `fir______ V ti WET LMD to d 0.1411C.(NONSIFEiI� J ML41_ WETLANDIMPACTS Figure 3B CSAH iS FROM AUDUBON ROAD TO POWERS BOULEVARD C.-ffihedT &P. 01061E 013 /SPAW 174201 EP,194020 -009 Jv°... CARVER COUtM an WM_Iw PEMSEDLI 4 Figure 2. Proposed wetland impacts as indicated in Figure 3B from application. This is an updated plan sheet received February 26, 2014 at 12:29PM. This updated plan shows that wetland ]A will be impacted in its entirety due to grade changes adjacent to the wetland. The permanent, non - safety related impacts increased from 0.02 acre to 0.14 acre. These changes are reflected in the updated table in Figure 4 of this report. Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 6 of 19 ���� WETLANDIHPACTS Figure CSAH 18 FROM AUDUBON ROAD TO POWERS BOULEVARD 410.. lmw S.P.01"I"1318.P. 0IM11 4401 S. P. 1S/d4POW VN ER00UMY �vaamla. mx:w Figure 3. Proposed wetland impacts as indicated in Figure 3A from application The proposed wetland impacts resulting from the roadway improvements are divided into two categories: safety -driven impacts (impacts that result from the roadway construction and creation of the stormwater ponds) (.33 acres), and non -safety related impacts (impacts resulting from trail creation and other non - safety roadway improvements including increased capacity) (1.55 acres). Safety- related wetland impacts are eligible to be replaced using credits from the Board of Water and Soil Resources (BWSR) roadway replacement bank. Because the impacts for this portion of the proposed project are eligible for BWSR replacement credits, the required replacement ratio for the roadway and stormwater pond impacts are 2:1. Thus, .66 acres will be withdrawn from the BWSR Road Replacement Bank. The additional 1.55 acres of wetland impact associated with the multi -use recreational trail and non - safety related and increased capacity impacts will be mitigated for using wetland bank credits purchased by the County from account #1392. This wetland bank is located in the same Bank Service Area (BSA 9) and Major Watershed (33- Minnesota) as the proposed project. Therefore, the impacts are required to be mitigated for at a 2:1 ratio, resulting in the purchase of 3.1 acres of wetland credit from bank #1392. This is consistent with Chapter 8420.0522 of the Wetland Conservation Act (WCA) Rules (see Figure 4 below). LEi_U r, �, r Idi, .] L. m• ®KiI 1)f FflIJL4'WFM { �1 �I` �I•W ,T M'. YML iOOO PC- IMOgCi Y 1 H LE R' 1 } MATCH LINE INSET i •': 1 i'ppI i s 1 II$I •1 •,,• VII¢ I'.l { MATCH LINE INSET A if : ?11.1 ���� WETLANDIHPACTS Figure CSAH 18 FROM AUDUBON ROAD TO POWERS BOULEVARD 410.. lmw S.P.01"I"1318.P. 0IM11 4401 S. P. 1S/d4POW VN ER00UMY �vaamla. mx:w Figure 3. Proposed wetland impacts as indicated in Figure 3A from application The proposed wetland impacts resulting from the roadway improvements are divided into two categories: safety -driven impacts (impacts that result from the roadway construction and creation of the stormwater ponds) (.33 acres), and non -safety related impacts (impacts resulting from trail creation and other non - safety roadway improvements including increased capacity) (1.55 acres). Safety- related wetland impacts are eligible to be replaced using credits from the Board of Water and Soil Resources (BWSR) roadway replacement bank. Because the impacts for this portion of the proposed project are eligible for BWSR replacement credits, the required replacement ratio for the roadway and stormwater pond impacts are 2:1. Thus, .66 acres will be withdrawn from the BWSR Road Replacement Bank. The additional 1.55 acres of wetland impact associated with the multi -use recreational trail and non - safety related and increased capacity impacts will be mitigated for using wetland bank credits purchased by the County from account #1392. This wetland bank is located in the same Bank Service Area (BSA 9) and Major Watershed (33- Minnesota) as the proposed project. Therefore, the impacts are required to be mitigated for at a 2:1 ratio, resulting in the purchase of 3.1 acres of wetland credit from bank #1392. This is consistent with Chapter 8420.0522 of the Wetland Conservation Act (WCA) Rules (see Figure 4 below). Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 7 of 19 T`lsle 2: Sutuoary of Proposed Welland Mitigation for Each Wetland Impact c=hin Project Area Wetland 10 Salo t+ related Reqtired Wigation Non Satetq- Related Requited Wigton Welland Impactor t2:1]tram ltwSR wetland Impacts 12:1) tom private Rnad Rep larement Outside Satett Wetland Bank Credit program hit prof amcuts purchase (acre) here) tderel Were) W-LA 0.00 0.11 J r 14 0 28 `M -8 o 0E 0 1 000 Self•mitigatin- ihi W -2 0.09 0.18 0 71 142 W14 0.06 01 0 81 1.62 _- \419 J.OL u.l:: L u1 L U2 uff Creek 0.1 u : 0 00 rnl F?fafy-ReI.� d Non ' afrty - Related Aland �,9$110ras 016 1 Ora 1 1.67 ane 9.94 serair I .,pa rtz (a =re 7 f7 This existing war atilt mee s the Me a oaro era ol webs n s. Thebroo osed roa wauimntiwerrir:r>t will re- establish a similar ditch th etwill be re -seed ad with an appropriate wetland seed ink. Figure 4. Summary of impacts from application as revised February 26, 2014 including full impact to wetland I (W -17). Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 8 of 19 It has been discussed whether wetland basin lA will continue to maintain wetland characteristics after the project. The plans call for a cut of up to eight (8) feet at a point north of the wetland boundary. This is approximately four (4) feet below the elevation of the wetland bottom (see Figure 5 below). If it cannot be shown that the remnant portion of this wetland is viable, additional mitigation will be required for the secondary impacts associated with the road. The consulting engineer for Carver County is has evaluatinged this and will has provided a follow - up addendum. This addendum has net been reeeived at the ti-°l° included in the appendices of this staff report. Figure 5. Cross Section at wetland IA BACKGROUND Carver County is experiencing a high level of population growth, with most of the growth taking place in the central and eastern portions of the county. The cities of Chaska, Chanhassen, Victoria and Waconia are estimated to account for over half of the total county population by 2030. Due to the current and expected future population growth, congestion in areas of central and eastern Carver Country is expected to rise on county facilities, occurring frequently during peak traffic hours. The Lyman Boulevard (CSAH 18) Roadway Improvements Project was deemed necessary in order to ease projected congestion, improve safety, and address future traffic growth. The need for the project is also identified in the Carver County Transportation Plan (2007). Fed, Prof. - BLYMAN 21.:2..... rtEB vywiW I :r. Existing - Grade Rrrr . INF Htiy I Proposed Grade �o 28 9 20 AG 5C R9 1W EBLYMAN " ML 5. E8INPY .: .. Rf1� {�1RIW Figure 5. Cross Section at wetland IA BACKGROUND Carver County is experiencing a high level of population growth, with most of the growth taking place in the central and eastern portions of the county. The cities of Chaska, Chanhassen, Victoria and Waconia are estimated to account for over half of the total county population by 2030. Due to the current and expected future population growth, congestion in areas of central and eastern Carver Country is expected to rise on county facilities, occurring frequently during peak traffic hours. The Lyman Boulevard (CSAH 18) Roadway Improvements Project was deemed necessary in order to ease projected congestion, improve safety, and address future traffic growth. The need for the project is also identified in the Carver County Transportation Plan (2007). Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 9 of 19 DISCUSSION The Lyman Boulevard (CSAH 18) Roadway Improvements Project involves reconstruction of the segment of Lyman Boulevard (CSAH 18) from approximately 800 feet east of Audubon Road (CSAH 15) to approximately 700 feet east of Powers Boulevard (CSAH 17), within the City of Chanhassen. The proposed project will accommodate capacity and safety improvements by reconstructing the current roadway from a two -lane undivided highway to a four -lane divided highway with medians and designated left turn lanes. The presence of the proposed medians will reduce the potential for head -on vehicle collisions. Additional crash data and safety information can be found in Appendix E and F of the Supplemental Information for the WCA/ Corps Joint Permit Application, dated January 13, 2014. Other proposed safety improvements include improving sight lines by flattening grades and relocating dangerous approaches, as well as creating dedicated left turn lanes from eastbound Lyman Boulevard to northbound Audubon Road, an additional left turn lane from northbound Powers Boulevard to westbound Lyman Boulevard to accommodate increased traffic levels resulting from the new Chanhassen High School, and at the reconstructed intersection of Sunset Trail and Lyman Boulevard. A pork chop island is also proposed in the southwest quadrant of the intersection of Lyman Boulevard and Powers Boulevard in order to allow trail users refuge from heavy traffic as they cross Lyman Boulevard. Traffic signals will be push -button actuated for the benefit of pedestrians and trail users trying to cross Lyman Boulevard. The pork chop island will also serve to channelize heavy vehicular traffic turning from eastbound Lyman Boulevard to southbound Powers Boulevard. This channelization and the dedicated right turn lanes will decrease the potential for rear end crashes which result from conflicts between turning traffic and through traffic. Wetlands within the proposed project area were delineated in August of 2007 and approved by the City of Chanhassen. An e -mail chain (2010) appended to the WCA/ Corps Joint Permit Application approved the use of the Wetland Delineation Report, dated August 2007, completed by Barbara Walther of SRF Consulting Group (Appendix D of the WCA/ Corps Joint Permit Application, dated October 23, 2012), for the Lyman Boulevard reconstruction. In 2013 the wetland delineation was updated by SRF Consulting Group Inc. and Houston Engineering Inc. Both boundary and type application updates were approved. The delineation identified 18 wetland areas within the proposed project areas, as well as Bluff Creek. The original Joint Permit Application was submitted in December of 2012. The current application and supplemental information has been submitted in order to clarify and respond to ongoing discussions since the original submittal. The proposed improvements will result in permanent impacts to five wetlands including a small area peripheral to Bluff Creek, described and shown as follows: Wetlands I and 113: These wetlands were identified as wetland W -17 in the original SRF report but were re- delineated for a third time by Houston Engineering where they were identified as wetland 1A and 113. They were found to be historically one wetland basin, and are now separated by a constructed berm. Both are classified as Manage 2 wetlands under the city's wetland classification system. Wetland lA is classified as a Type 3, Shallow Marsh wetland according to Fish and Wildlife Service Circular 39. Wetland 1B is classified as a Type 2, Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 10 of 19 Fresh (wet) Meadow according to Fish and Wildlife Service Circular 39. Wetland lA and 1B are located immediately south of Lyman Blvd within the right -of -way at 1551 Lyman Boulevard. The proposed permanent impact to Wetland IA will be approximately .Q 0. 14 acre, and the proposed impact to Wetland 1B will be approximately .06 acre (see aerial photograph in Figure 6 below). Wetland 2: This wetland was identified as W -15 and W -16 in the original SRF report but became wetland 2 when Houston re- delineated the basin. This wetland is classified as a Manage 2 wetland under the city's wetland classification system. It is classified as wetlands Type 2, Fresh (Wet) Meadow according to Fish and Wildlife Service Circular 39. Wetland 16 is located immediately south of Lyman Boulevard (CSAH 18), and east of Bluff Creek. This wetland is a tributary wetland to Bluff Creek. The predominant vegetation species in the impacted area are Reed canary grass (Phalaris arundinacea), Cattails (Typha angustifolia), and Willow species (Salix spp.). The proposed impact area in this wetland is approximately .8 acres (see aerial photograph in Figure 7 below). Lyman Boulevard (CSAH Planning Case #2014 -05 March 24, 2014 Page 11 of 19 18) Roadway Improvement Project Wetland Alteration Permit Wetland 14: This wetland is classified as a Manage 2 wetland under the city's wetland classification system, and a Type 2, Fresh (wet) Meadow according to Fish and Wildlife Service Circular 39. It is a flow - through wetland, located north and east of the intersection of Audubon Road (CSAH 15) and Lyman Boulevard (CSAH 18), which receives water from, and outlets to, Bluff Creek. The predominant vegetation in the impacted area is Reed Canary Grass (Phalaris arundinacea), green bulrush (Scirpus atrovirens), and Sedge species (Carex spp.). The proposed permanent impact to this wetland will be approximately .94 acres (see aerial photograph in Figure 8 below). Wetland 19: This wetland is classified as a Type 1L, Seasonally Flooded Basin wetland according to Fish and Wildlife Service Circular 39. It is not classified under the city's wetland classification system. Wetland 19 is located immediately southeast of the intersection of Lyman Boulevard (CSAH 18), and Powers Boulevard (CSAH 17). The predominant vegetation species in the impacted area is Green Ash (Fraxinus pennsylvanica).The proposed impact area to this wetland is approximately .01 acres (see aerial photograph in Figure 9 below). Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 12 of 19 Bluff Creek: Bluff Creek is a Minnesota Department of Natural Resources Protected Watercourse. The predominant vegetative species in the impacted area is Reed Canary Grass (Phalaris arundinacea). The applicant is proposing .17 acres of permanent impact to Bluff Creek, associated with culvert replacement, grading, and rip -rap to be installed with the culvert. The applicant has obtained the necessary permits and approvals from the Minnesota Department of Natural Resources for the proposed work within Bluff Creek (Department of Natural Resources Public Waters Work Permit 2014 -0526 can be found in Appendix D of the Supplemental Information for the WCAI Corps Joint Permit Application, dated January 13, 2014). ALTERNATIVES The Wetland Conservation Act requires the applicant to list at least two alternatives to the proposed project that would avoid or minimize impacts to wetlands or waters; one of which may be "no build" or "do nothing ". The applicant then must list and explain why the option described in the application was chosen over these alternatives. The following alternatives were presented in the Joint Notification Application submitted by the applicant: A No -Build alternative would entail making no changes or improvements to the existing roadway, and would result in no impacts to wetlands. Maximum capacity, and the associated safety issues, could be reached within only a few years at the current rate of growth within the vicinity of the proposed project. The traffic forecasted for 2034 indicates 26,500 vehicles per day (vpd) in the project area. This alternative does not feasibly meet the proposed project goals of safety improvement and congestion ease within the corridor. The No -Build alternative does not address the purpose and need for the project. Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 13 of 19 Alternative road alignments were evaluated to determine if impacts to the wetlands and Bluff Creek could be avoided and to identify minimization opportunities. Wetlands to be impacted as a result of the proposed project are located within the right -of -way, near or at the toe -of -slope of the existing roadway. Bluff Creek also flows under the existing Lyman Boulevard (CSAH 18) corridor, thus complete avoidance is not feasible. Trail Alternative The No Build Trail Alternative was considered and rejected because it would not serve to provide continuity in the regional trail system. The location of the trail on the north side of Lyman Boulevard (CSAH 18) was largely driven by the location of the trail segment constructed during Phase 1 of this roadway improvement, also on the north side of Lyman Boulevard. The construction of the new Chanhassen High School in 2009 on the north side of Lyman Boulevard also influenced trail location. Impact Minimization The Wetland Conservation Act requires that if avoidance is not an option, the unavoidable impacts are minimized to the greatest extent practicable. Efforts have also been made by the applicant to minimize the proposed wetland impacts by creating steeper side slopes through the highway sections that are adjacent to wetlands, thereby minimizing the roadway footprint through these areas. The multi -use trail was designed to minimize wetland impacts to the greatest extent practicable without compromising project goals. Stormwater Management Stormwater runoff from the newly created impervious surface associated with the western portion of the project will be treated utilizing the Bluff Creek stormwater pond located immediately southeast of the intersection of Audubon Road (CSAH 15) and Lyman Boulevard (CSAH 18), which was constructed in previous phases of the Lyman Boulevard reconstruction. Runoff in the eastern portion of the project area will connect to an existing stormwater pipe that drains to an existing stone pond east of Powers Boulevard. Therefore, there will be no additional wetland impact due to creation of stormwater management facilities. Wetland Replacement Wetland replacement for this project will be accomplished via a number of methods; restoration for temporary impacts, BWSR roadway replacement bank, and wetland bank credits purchased from wetland bank #1392. The revised replacement plan proposes that .66 acres (.33 ac at a 2:1 ratio) resulting from the roadway safety improvements would be replaced with BWSR roadway replacement credits, and 3.1 acres (1.55 ac at a 2:1 ratio) resulting from non - safety - related wetland impacts be replaced by the County, using wetland bank credits purchased from wetland bank account #1392, located in the same Bank Service Area 9, and Major Watershed 33. Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 14 of 19 A total of. 14 acres of temporary impacts will be made in areas where wetlands are immediately adjacent to the existing roadway toe -of- slope, due to muck removal and soil stabilization. These temporary impacts will be restored to preconstruction conditions by re- grading to original contours, and stabilized with a combination of Types 1, 2, and 3 Rapid Stabilization methods. OTHER AGENCIES The applicant is responsible for obtaining any permits or approvals from the appropriate regulatory agencies and compliance with their conditions of approval. FINDINGS The Planning Commission shall recommend a wetland alteration permit and the Council shall issue such wetland alteration permit only if it finds that: a. The proposed project will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. FINDING: The proposed wetland impacts that will occur with the Lyman Boulevard (CSAH 18) Roadway Improvements Project have not been found to pose danger to public health, safety, comfort, convenience or general welfare. The goal of the proposed project is to address existing safety deficiencies and to provide for the present and future traffic needs of the area, improving safety and convenience for residents and recreationalists. b. The proposed project will be consistent with the objectives of the city's Comprehensive Plan and the zoning chapter of the City Code. FINDING: The proposal is consistent with the objectives of the city's Comprehensive Plan and City Code. It complies with all city, state and federal requirements. The proposed roadway improvements and trail construction is shown in the City's Future Park & Recreation Initiatives map and are consistent with City and regional trail plans. The roadway improvements and trail construction will improve safety and ease congestion within the project area. c. The proposed project will be designed, constructed, operated and maintained so to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. FINDING: The appearance and character of the general vicinity will not change. The applicant has made a reasonable effort to minimize impacts to wetlands through steepening side slopes and use of existing stormwater treatment structures. Currently, the proposed project is located within an area that includes single - family residential neighborhoods, agricultural land, Chanhassen High School and the Bluff Creek Primary Corridor. The proposed project would provide safety improvements for residents, drivers, and recreationalists, as well as providing a connection to existing and future trails and Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 15 of 19 neighborhoods and Chanhassen High School, thus remaining compatible with and enhancing the existing and intended character and appearance of the area. d. The proposed project will not be hazardous or disturbing to existing or planned neighboring uses. FINDING: The surrounding uses are zoned for Parks and Open Space, Mixed Use, Residential Low- Density, Residential Medium- Density, Residential Large -Lot, and Office /Commercial. The wetland impacts proposed as a result of the project are not foreseen to cause hazards or disturbance to existing or planned neighboring uses. The proposed project is considered an enhancement to neighboring uses, as well as providing increased safety for residential neighborhoods and schools, by providing a safer roadway and pedestrian and non - motorized recreational route. e. The proposed project will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. FINDING: Any changes to drainage structures or additional drainage structures needed as a result of the proposed wetland impacts will be designed and constructed by the applicant's contracted consultant in compliance with city design standards. Proposed roadways will continue to be maintained by Carver County, and trails will continue to be maintained by the City of Chanhassen. Both proposed roadways and trail will be designed and constructed according to city standards. f. The proposed project will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. FINDING: The proposed wetland impacts associated with the Lyman Boulevard (CSAH 18) Roadway Improvement Project will not create excessive need for public facilities and services. The roadway improvements project requires some additional services required by the city associated with trail maintenance. In addition, the proposed roadway improvements project are foreseen as an enhancement to economic community welfare, by providing safety improvements and accessibility for residents and recreationalists to local businesses. g. The proposed project will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. FINDING: The proposed wetland alterations are not expected to be detrimental to any persons, property or the general welfare. Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 16 of 19 h. The proposed project will have vehicular approaches to the property which do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. FINDING: The proposed wetland impacts will not create nor interfere with traffic and surrounding public thoroughfares. When completed, the proposed roadway improvements will result in eased congestion, improved sight lines, safer approaches, increased accident reduction potential, and will provide safer conditions for both pedestrian and vehicular traffic. i. The proposed project will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. FINDING: The proposed wetland impacts associated with the project will have no impact on solar access, natural, scenic or historic features of major significance. j. The proposed project will be aesthetically compatible with the area. FINDING: The applicant has made a reasonable effort to minimize wetland impacts and retain aesthetical compatibility within the area. In addition, the proposed roadway improvements project will complement the area. k. The proposed project will not depreciate surrounding property values. FINDING: The proposed wetland impacts have been minimized to the greatest extent feasible, while still allowing for the roadway improvements project to occur. The proposed roadway improvements project will create a safer setting and will be an asset to the surrounding properties. 1. The proposed project will meet standards prescribed for certain uses as provided in the City code. 20 -410 (b) When a permit is issued allowing wetland alteration, the following standards shall be followed: (1) The alteration will not have a net adverse effect on the ecological and hydrological characteristics of remaining wetland. FINDING: The applicant must meet the included conditions for the proposed wetland impacts in order to avoid an adverse effect on the ecological and hydrological characteristics of remaining wetland. Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 17 of 19 (2) It shall be located as to minimize the impact on vegetation. FINDING: Efforts have been made by the applicant to minimize the impact on wetlands and vegetation through a variety of measures, which included steepening side slopes and use of existing stormwater treatment facilities. (3) It shall not adversely change water flow. FINDING: The applicant must meet the included conditions for the proposed wetland impacts in order to avoid an adverse effect on the hydraulic and hydrological characteristics of remaining wetland. The applicant has obtained the necessary permits from the Minnesota Department of Natural Resources for any necessary work within Bluff Creek. (4) The size of the altered area shall be limited to the minimum required for the proposed action. FINDING: The applicant has made a reasonable effort to limit the proposed wetland impacts to the minimum amount required in order to complete the roadway improvements project. During construction the contractor is required to follow approved plans to limit alterations to the minimum the project necessitates. (5) The disposal of any excess material is prohibited within remaining wetland areas. FINDING: The applicant and their contractor are prohibited from disposing of excess material within remaining wetland areas as well as any other activities which may negatively impact the remaining wetland areas. (6) The disposal of any excess material shall include proper erosion control and nutrient retention measures. FINDING: The applicant and their contractor must submit a satisfactory erosion and sediment control plan, and comply with all applicable sections of Chanhassen City Code, the city's Surface Water Management Plan, and the Minnesota Pollution Control Agency. (7) Alterations to any wetland area are prohibited during waterfowl breeding season or fish spawning season, unless it is determined by the city that the wetland is not used for waterfowl breeding or fish spawning. Lyman Boulevard (CSAH 18) Roadway hnprovement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 18 of 19 FINDING: The applicant and their contractor are required to refrain from any wetland altering activity during waterfowl breeding and fish spawning season. (8) Alterations to wetland areas shall be mitigated in accordance with the requirements of this article if the activity results in a loss of wetland area and /or function and value of the wetland. FINDING: The applicant has submitted a replacement plan as part of the Joint Notification Application for Wetland Replacement which was received on December 20, 2012. The applicant is proposing to replace the impacted area using wetland bank credits. The required replacement ratio is 2:1. This is consistent with Chapter 8420.0522. of the Wetland Conservation Act (WCA) Rules, and City Code, Chapter 20, Article VI. (9) Dedicated buffers in accordance with sections 20 -411. FINDING: The applicant must comply with the City's Wetland Protection Ordinance. In order to accommodate the reconstruction, the plan proposes impacts to four wetlands totaling 1.88 acres of permanent wetland impact. The applicant, Carver County, is proposing to replace the permanently impacted area resulting from safety - related roadway improvements (.33 acres) using wetland bank credits from the Board of Water and Soil Resources (BWSR) roadway replacement bank, and the impacted area resulting from non - safety - related impacts (1.55 acres) using credits from wetland bank #1392. In both cases the requirement calls for a 2:1 replacement ratio. This is consistent with Chapter 8420.0522. of the Wetland Conservation Act (WCA) Rules. The applicant must receive the City's approval of a wetland replacement plan prior to any wetland impact occurring. RECOMMENDATION Staff recommends that the Planning Commission adopt the following motion: "The Chanhassen Planning Commission recommends that City Council approve Wetland Alteration Permit #2014 -05 and WCA Permit Number 2013 -01 to impact 1.88 acres of wetland and the replacement plan under MN Rules Chapter 8420 which utilizes the purchase of 1.55 acres of wetland credit from bank #1392 and 0.33 acres from the BWSR Road Replacement Program for the purpose of the reconstruction of the proposed County State Aid Highway (CSAH) 18 (Lyman Boulevard) Roadway Improvements Project, Phase 3; and authorize the Water Resources Coordinator to sign the joint notification application for approval of wetland replacement as shown in plans dated January 13, 2014 subject to the following conditions: Lyman Boulevard (CSAH 18) Roadway Improvement Project Wetland Alteration Permit Planning Case #2014 -05 March 24, 2014 Page 19 of 19 Wetland replacement shall occur in a manner consistent with the Minnesota Wetland Conservation Act (MR 8420). The applicant shall receive the City's approval of a wetland replacement plan prior to any wetland impact occurring. 2. An appeal has been filed on behalf of Mr. Rick Dorsey. This is an appeal of staff decision to deny a request for a No -Loss determination for Wetland IA. Any approval of mitigation quantities shall be contingent upon the outcome of this appeal. The county may hold any additional credits and apply those credits to future phases of the Lyman (CSAH 18) reconstruction project. If it is determined that secondary impacts will occur to wetland 1 as a result of the proposed improvements, these impacts will need to be mitigated for at a 2:1 ratio. 4. Wetland buffer areas shall be preserved, maintained, and/or created around all existing wetlands in compliance with Sections 20 -401 — 20 -421 of Chanhassen City Code. 5. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, e.g. Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, Minnesota Department of Transportation, Minnesota Board of Soil and Water Resources and Army Corps of Engineers and comply with their conditions of approval. 6. The applicant must submit a Bill of Sale for Wetland Banking Credits to the Minnesota Board of Water and Soil Resources signed by both the buyer and seller of designated wetland credits. The applicant must obtain, and the city must have received copy of, an Application for Withdrawal of Wetland Credits from the Minnesota Wetland Bank signed and approved by the Minnesota Board of Water and Soil Resources prior to any wetland impacts. 8. A signed Landowner Statement and Contractor Responsibility form shall be provided to city prior to commencement of activity. ATTACHMENTS 1. Findings of Fact and Recommendation. 2. Development Review Application. 3. Joint Notification Application for Wetland Replacement, Attachments and Supplements. 4. Public Hearing Notice. 5. Memorandum from SRF dated 2/26/14 — Wetland Permitting Update for Wetland 1A 6. Memorandum from MFRA dated 3/4/14 and appurtenant documentation. G:\PLAN\2014 Planning Cases\2014 -05 Lyman Boulevard WAP CITY OF CHANHASSEN CARVER COUNTY, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: The application of Carver County Public Works for a Wetland Alteration Permit for wetland replacement for proposed impacts to five wetlands totaling 1.88 acres, as a part of the proposed Phase 3 of the CSAH 18 (Lyman Boulevard) Roadway Improvements project — Planning Case 2014 -05. On March 4, 2013, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Carver County for a wetland alteration permit to impact five wetlands. The total area proposed to be impacted is 1.88 acres. The Planning Commission conducted a public hearing on the wetland alteration permit which was preceded by published notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Agricultural Estate, Rural Residential, and Planned Unit Development - Residential, and Bluff Creek Primary Corridor. 2. The property is guided in the Land Use Plan for Residential Large -Lot, Residential Medium - Density, Residential Low - Density, Office Industrial, Office Commercial, and Parks and Open Space. The proposed project is located within the CSAH 18 (Lyman Boulevard) corridor between Audubon Road and Powers Boulevard (CSAH 17) within the City of Chanhassen. 4. City code directs that a wetland alteration permit shall not be issued without having been first reviewed by the Planning Commission and approved by the City Council following the review and hearing procedures set forth for conditional use permits and the additional requirement of Minnesota Rules Chapter 8420.0230. Wetland alteration and Conditional Use Criteria: The Planning Commission shall recommend a wetland alteration permit and the Council shall issue such wetland alteration permit only if it finds that: a. The proposed project will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. The proposed wetland impacts that will occur with the Lyman Boulevard (CSAH 18) Roadway Improvements Project have not been found to pose danger to public health, safety, comfort, convenience or general welfare. The goal of the proposed project is to address existing safety deficiencies and to provide for the present and future traffic needs of the area, improving safety and convenience for residents and recreationalists. b. The proposed project will be consistent with the objectives of the city's Comprehensive Plan and the zoning chapter of the City Code. The proposal is consistent with the objectives ofthe city's Comprehensive Plan and City Code. It complies with all city, state and federal requirements. The proposed roadway improvements and trail construction is shown in the City's Future Park & Recreation Initiatives map and are consistent with City and regional trail plans. The roadway improvements and trail construction will improve safety and ease congestion within the project area. c. The proposed project will be designed, constructed, operated and maintained so to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The appearance and character of the general vicinity will not change. The applicant has made a reasonable effort to minimize impacts to wetlands through steepening side slopes and use of existing stormwater treatment structures. Currently, the proposed project is located within an area that includes single family residential neighborhoods, Agricultural land, Chanhassen High School and the Bluff Creek Primary Corridor. The proposed project would provide safety improvements for residents, drivers, and recreationalists, as well as providing a connection to existing and future trails and neighborhoods, as well as Chanhassen High School, thus remaining compatible with and enhancing the existing and intended character and appearance of the area. d. The proposed project will not be hazardous or disturbing to existing or planned neighboring uses. The surrounding uses are zoned for Parks and Open Space, Mixed Use, Residential Low - Density, Residential Medium - Density, Residential Large -Lot, and Office /Commercial. The wetland impacts proposed as a result of the project are not foreseen to cause hazards or disturbance to existing or planned neighboring uses. The proposed project is considered an enhancement to neighboring uses, as well as providing increased safety for residential neighborhoods and schools, by providing a safer roadway and pedestrian and non - motorized recreational route. e. The proposed project will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. Any changes to drainage structures or additional drainage structures needed as a result of the proposed wetland impacts will be designed and constructed by the applicant's contracted consultant in compliance with city design standards. Proposed roadways will continue to be maintained by Carver County, and trails will continue to be maintained by the City of Chanhassen. Both proposed roadways and trail will be designed and constructed according to city standards. f. The proposed project will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. The proposed wetland impacts associated with the Lyman Boulevard (CSAH 18) Roadway Improvement Project will not create excessive need for public facilities and services. The roadway improvements project requires some additional services required by the city associated with trail maintenance. In addition, the proposed roadway improvements project are foreseen as an enhancement to economic community welfare, by providing safety improvements and accessibility for residents and recreationalists to local businesses. g. The proposed project will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. The proposed wetland alterations are not expected to be detrimental to any persons, property or the general welfare. h. The proposed project will have vehicular approaches to the property which do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. The proposed wetland impacts will not create nor interfere with traffic and surrounding public thoroughfares. When completed, the proposed roadway improvements will result in eased congestion, improved sight lines, safer approaches, increased accident reduction potential, and will provide safer conditions for both pedestrian and vehicular traffic. i. The proposed project will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. The proposed wetland impacts associated with the project will have no impact on solar access, natural, scenic or historic features of major significance. The proposed project will be aesthetically compatible with the area. The applicant has made a reasonable effort to minimize wetland impacts and retain aesthetical compatibility within the area. In addition, the proposed roadway improvements project will complement the area. k. The proposed project will not depreciate surrounding property values. The proposed wetland impacts have been minimized to the greatest extent feasible, while still allowing for the roadway improvements project to occur. The proposed roadway improvements project will create a safer setting and will be an asset to the surrounding properties. 1. The proposed project will meet standards prescribed for certain uses as provided in the City code. 20 -410 (b) When a permit is issued allowing wetland alteration, the following standards shall be followed: (1) The alteration will not have a net adverse effect on the ecological and hydrological characteristics of remaining wetland. The applicant must meet the included conditions for the proposed wetland impacts in order to avoid an adverse effect on the ecological and hydrological characteristics of remaining wetland. (2) It shall be located as to minimize the impact on vegetation. Efforts have been made by the applicant to minimize the impact on wetlands and vegetation through a variety of measures, which included steepening side slopes and use of existing stormwater treatment facilities. (3) It shall not adversely change water flow. The applicant must meet the included conditions for the proposed wetland impacts in order to avoid an adverse effect on the hydraulic and hydrological characteristics of remaining wetland. The applicant is in process of obtaining the necessary permits from the Minnesota Department of Natural Resources for any necessary work within Bluff Creek. (4) The size of the altered area shall be limited to the minimum required for the proposed action. The applicant has made a reasonable effort to limit the proposed wetland impacts to the minimum amount required in order to complete the roadway improvements project. During construction 0 the contractor is required to follow approved plans to limit alterations to the minimum the project necessitates. (5) The disposal of any excess material is prohibited within remaining wetland areas. The applicant and their contractor are prohibited from disposing of excess material within remaining wetland areas as well as any other activities which may negatively impact the remaining wetland areas. (6) The disposal of any excess material shall include proper erosion control and nutrient retention measures. The applicant and their contractor must submit a satisfactory erosion and sediment control plan, and comply with all applicable sections of Chanhassen City Code, the city's Surface Water Management Plan, and the Minnesota Pollution Control Agency. (7) Alterations to any wetland area are prohibited during waterfowl breeding season or fish spawning season, unless it is determined by the city that the wetland is not used for waterfowl breeding or fish spawning. The applicant and their contractor are required to refrain from any wetland altering activity during waterfowl breeding and fish spawning season. (8) Alterations to wetland areas shall be mitigated in accordance with the requirements of this article if the activity results in a loss of wetland area and /or function and value of the wetland. The applicant has submitted a replacement plan as part of the Joint Notification Application for Wetland Replacement which was received on December 20, 2012. The applicant is proposing to replace the impacted area using wetland bank credits. The required replacement ratio is 2:1. This is consistent with Chapter 8420.0522. of the Wetland Conservation Act (WCA) Rules, and City Code, Chapter 20, Article VI. (9) Dedicated buffers in accordance with sections 20 -411. The applicant must comply with the City's Wetland Protection Ordinance. In order to accommodate the reconstruction, the plan proposes impacts to five wetlands totaling 1.88 acres of permanent wetland impact. The applicant, Carver County, is proposing to replace the permanently impacted area resulting from safety - related improvements (.33 acres) using wetland bank credits from the Board of Water and Soil Resources (BWSR) roadway replacement bank, and the impacted area resulting from non - safety - related improvements (1.55 acres) using credits from wetland bank #1392. In both cases the requirement calls for a 2:1 replacement ratio. This is consistent with Chapter 8420.0522. of the Wetland Conservation Act (WCA) Rules. The applicant must receive the City's approval of a wetland replacement plan prior to any wetland impact occurring. The Planning Commission recommends that the City Council approve the application of Carver County for a Wetland Alteration Permit for wetland replacement for proposed impacts to five wetlands totaling 1.88 acres, as a part of the proposed Phase 3 of the CSAH 18 (Lyman Boulevard) Roadway Improvements project. ADOPTED by the Chanhassen Planning Commission this 4th day of March 2014. CHANHASSEN PLANNING COMMISSION ME Its Chairman COMMUNITY DEVELOPMENT DEPARTMENT Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227 -1300 / Fax: (952) 227 -1110 CITY OF CHANAASSEN APPLICATION FOR DEVELOPMENT REVIEW Date Filed: 1/11 /20114 60 -Day Review Deadline: 3 Z 1 qLL 2©l'i Planner: A i ZJ 6Ekkb& Case #: '20H-Os Section 1: Application Type (check all that apply) ❑ Comprehensive Plan Amendment ......................... $600 ❑ Subdivision ADDITIONAL REQUIRED FEES: ❑ Notification Sign .................... ............................... $200 (City to install and remove) ❑ Property Owners' List within 500' ........ $3 per address (City to generate —fee determined at pre - application meeting) ❑ Escrow for Recording Documents.. $50 per document (CUP /SPRNACNAR/WAP /Metes & Bounds Subdivision) ❑ ❑ Minor MUSA line for failing on -site sewers..... $100 ❑ Conditional Use Permit ❑ Metes & Bounds .........................$300 ❑ Single - Family Residence . ............................... $325 ...........................$150 ❑ All Others .......................... ............................... $425 ❑ Interim Use Permit ...........................$250 ❑ In conjunction with Single - Family Residence.. $325 applications through the ❑ All Others .......................... ............................... $425 ❑ Grading t 1,000 cubic yards ........................... UBC ❑ Rezoning ❑ Planned Unit Development (PUD) .................. $750 ❑ Minor Amendment to existing PUD ................. $100 ❑ All Others .......................... ............................... $500 ❑ Sign Plan Review .................... ............................... $150 ❑ Site Plan Review ❑ Administrative ....................... ...........................$100 ❑ Commercial /Industrial Districts * ......................$500 Plus $10 per 1,000 square feet of building area *Include number of existing employees: and number of new employees: ❑ Residential Districts .......... ............................... $500 Plus $5 per dwelling unit ADDITIONAL REQUIRED FEES: ❑ Notification Sign .................... ............................... $200 (City to install and remove) ❑ Property Owners' List within 500' ........ $3 per address (City to generate —fee determined at pre - application meeting) ❑ Escrow for Recording Documents.. $50 per document (CUP /SPRNACNAR/WAP /Metes & Bounds Subdivision) ❑ Create 3 lots or less ......... ............................... $300 ❑ Create over 3 lots .......................$600 + $15 per lot ❑ Metes & Bounds .........................$300 + $50 per lot ❑ Consolidate Lots ................... ...........................$150 ❑ Lot Line Adjustment .............. ...........................$150 ❑ Final Plat * ............................. ...........................$250 *Requires additional $450 escrow for attorney costs. Escrow will be required for other applications through the development contract. ❑ Vacation of Easements / Right -of- way ................... $300 (Additional recording fees may apply) ❑ Variance ....... ............................... ❑r Wetland Alteration Permit ❑ Single - Family Residence...... ❑ All Others .............................. ❑ Zoning Appeal ................. .................. $200 ............ $150 ............ $275 ......................... $100 ❑ Zoning Ordinance Amendment ............................ $500 NOTE: When multiple applications are processed concurrently, the appropriate fee shall be charged for each application. (Refer to the appropriate Application Checklist for required submittal information that must accompany this application) TOTAL FEES: Received from: Date Received: Check Number: Section 2: Required Information Project Name: Lyman Boulevard Roadway Improvements Project, Phase 3 Property Address or Location: Lyman Boulevard (CSAH 18) from Powers Blvd to Audubon Road North Parcel #: Total Acreage: Legal Description:. Wetlands Present? ® Yes ❑ No Present Zoning: Agricultural EsWte,PUaR, and Bluff C •k Primary Corridor. Requested Zoning: No Change Present Land Use Designation: ""' °' "' " °` °" ` "' "" ° "" Requested Land Use Designation: No Change Ri"10,9.Nrtgt.turAyPxc6ra94kYln c-�,kNP oap��Y� /raM�wtW&Jn- Existing Use of Property: Description of Proposal: Attached. ❑Check box if separate narrative is attached Section 3: Property Owner and Applicant Information APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Address: Contact: Phone: City/State /Zip: Cell: Email: Fax: Signature: Date: PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Lyndon Robjent, P.E., Carver County Public Works Department Contact: Lyndon Robjent Address: 11360 Hwy 212, Suite 1 Phone: (952) 466 -5200 City /State /Zip: Cologne, MN 55322 Cell: Email: CarverCountyPW @co.carver.mn.us Fax: Signature: Date: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: SRF Consulting Group, Inc. Address: One Carlson Parkway North, Suite 150 City /State /Zip: Minneapolis, MN 55447 Contact: Phone: Cell: Email: Fax: Section 4: Notification Information Who should receive copies of staff reports? *Other Contact Information: © Property Owner Via: ❑r Email ❑ Mailed Paper Copy Name: ❑✓ Applicant Via: Z Email ❑ Mailed Paper Copy Address: ❑ Engineer Via: ❑ Email ❑ Mailed Paper Copy City /State /Zip: ❑ Other* Via: ❑ Email ❑ Mailed Paper Copy Email: Mum IENclv[[s5 P t n N N t a 5 I) F51(;N r as Consulting Group, Inc. To: Terrance Jeffery, Water Resources Coordinator City of Chanhassen From: Matthew Meyer, Senior Environmental Scientist Nathen Will, Senior Associate Date: January 13, 2014 Subject: CSAH 18 (Lyman Boulevard) Phase 3 Wetland Permitting Introduction Memorandum SRF No. 0076098 3040 This memorandum transmits updated information and attachments to replace the previous Wetland Conservation Act (WCA) /U.S. Army Corps of Engineers (COE) Joint Permit Applications for the CSAH 18 (Lyman Boulevard) Phase 3 project. Appendix A (attached) contains an amended WCA /COE joint permit form with updated information resulting from delineation and design revisions, as well as incorporated Technical Evaluation Panel (TEP) comments from previous submittal efforts (December 2012). CSAH 18 Wetland Delineation Approvals Wetland delineations used for this permit application — Phase 3 portion of the CSAH 18 (Lyman Boulevard) roadway improvements between Audubon Road (North) and CSAH 17 (Powers Boulevard) — were updated by SRF Consulting Group, Inc. and Houston Engineering Inc. in 2013. The Minnesota Wetland Conservation Act (WCA) Notice of Decision for Boundary and Type are located in Appendix B. CSAH 18 WCA/COE Permit Submittal Update Permit Status Update Carver County Public Works previously submitted the Minnesota Local /State /Federal Application Forms for Water /Wetland Project Qoint Permit) in December 2012. Since that submittal, there have been ongoing discussions and coordination with the TEP regarding updates to the Wetland Delineation Reports, jurisdiction of wetlands and use of BWSR safety credits. This WCA /COE joint permit application (Appendix A) and supplemental information is intended to clarify information in response to TEP comments and to group all previous submittals into one document for processing. www.srfconsuIting.com One Carlson Parkway North, 5ui1e '150 1 Minneapolis, MN 55447 -4443 1 763.475.01110 pas: 763.4752429 An Egaal Opporhmiey Eniph,y,, Terrance Jeffery City- of Chanhassen Permit Submittal January 13, 2014 Page 2 On behalf of the Career County Public Works, we request the WCA LGU to notice the revised WCA /COE permit (Appendix A) and supplemental safety information, including the updated safety information contained in Appendix F to justify use of the BWSR Road Replacement Program, to the members of the TEP including the U.S. Army Corps of Engineers. Appendices List: Appendix A — Minnesota Local /State /Federal Application Form for Water /Wetland Projects (WCA /COE Joint Permit) Appendix B — WCA Boundary/ Type Approvals Appendix C — Figures Appendix D — MnDNR Public Waters Work Permit Appendix E — BWSR Safety Justification Information — January 13, 2013 Information Appendix F — BWSR Safety Justification Information — Follow -up Information Appendix G — CRU and FHWA Letters Appendix H — Draft BWSR Withdrawal Form H. \P,Vje,t,\ 6098- P3 \EP \IP/nlavb \Ph.3 1Lr1midPrr roi1ing \1VvdDormme,r1\ 131226_nm_roip -penury 140113_W CA_C,,phmh nrnirrdih.dan Appendix A: Minnesota Local /State /Federal Application Form for Water /Wetland Projects (WCA /COE Joint Permit) NA- 026620 -03C Minnesota Local /State /Federal Application Forms for Water/Wetland Projects PUBLIC TRANSPORTATION AND LINEAR UTILITY PROJECTS LOCAL AND STATE STANDARD APPLICATION Application for Local Government Unit approval Pursuant to Minnesota Wetlands Conservation Act (WCA) Project Specific Report and Notification for Work on Existing Public Roads Pursuant to Minnesota WCA Application for Minnesota Department of Natural Resources Permit to Work in Public Waters Application for Minnesota Pollution Control Agency Clean Water Act (CWA) Section 401 Certification FEDERAL: for the Use this form to notify and apply for authorization of any proposed water /wetland project affecting lakes, rivers, streams or wetlands that may fall within the jurisdiction of 1) the appropriate Local Government Unit (LGU), 2) the Minnesota Department of Natural Resources (DNR), or 3) the U. S. Army Corps of Engineers (COE). If a 401 certification is required from the Minnesota Pollution Control Agency (MPCA), the COE will forward this application to the MPCA for processing. You do not need to send this application to the MPCA. This application packet includes the following: STANDARD APPLICATION. Fill out (Pages 1 -6) and submit along with the required attachments. Instructions for completing the form are attached. APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT. Generally, in addition to state and local authorization, projects in wetland or water areas also require Federal authorization from the Corps of Engineers (COE) under Section 404 of the Clean Water Act. To apply to the COE using this application packet, complete the modified one page Federal application form found on Page 5, and mail it to the COE along with a copy of the local/state application. NOTE CONCERNING COE JURISDICTION: You do not need to notify or obtain further authorization from COE if all proposed work is covered by either a Clean Water Act Section 404 exemption, or if no work is in an area subject to COE jurisdiction under Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act of 1899. Contact the COE if you have questions. A separate form (PUBLIC ROAD MAINTENANCE SHORT FORM NOTICE) is available for use for existing public road maintenance projects only if they qualify as either: (1) Minor or emergency work impacting less than 10,000 square feet of wetlands subject to the WCA; OR (2) Minor or emergency work impacting less than 10,000 square feet of certain DNR Public Water Wetlands (i.e., those not assigned a shoreland classification, not classified as lacustrine wetlands or deepwater habitats, or not having state or federal land ownership); OR (3) Work impacting DNR Public Water Wetlands and wetland areas of DNR Public Water basins when the DNR has received a copy of the Public Road Maintenance Short Form Notice and has waived the requirement for a DNR Public Water Work Permit to either the LGU responsible for WCA or the public road authority responsible for reporting wetland impacts to the Board of Water and Soil Resources; OR (4) Work involving existing public road crossings of DNR Public Waters. If your project qualifies for this category, use this separate Public Road Maintenance Short Form Notice. See the instructions accompanying this Form Notice. Public Transportation and Utility Projects Introduction, Page 1 (August 2007) INSTRUCTIONS to assist you with completion and mailing of these applications. Before beginning work on your project, you must receive all required approvals from the appropriate LGU, the DNR and the U.S. Army Corps of Engineers (COE). If you have not received a reply after 45 days, or if you wish to confirm the status of your application at any time, contact the agencies directly (see Instructions, Page 4). Proceeding with work before all required authorizations are obtained may result in fines or other penalties, and may include a requirement to restore the project site to original condition. If you have questions or need assistance with filling out this application, contact your LGU, your DNR Waters Area Hydrologist, or your COE regulatory field office (see Instructions Page 4). Note: If you believe that your project may be subject to Watershed District Regulations, local Planning and Zoning jurisdiction, or any other locally implemented or enacted controls beside those of your LGU, contact the appropriate office(s) directly in addition to your LGU, the DNR, and the COE. For more information, contact your local Soil and Water Conservation District (SWCD) or refer to www.bwsr.state.mn.us. A QUICK LOOK AT THE PROJECT APPLICATION PROCESS Forms can be downloaded from the BWSR or DNR web sites and filled out using Microsoft Word. Your input will be restricted to fill -in fields where users can enter text or check boxes. These areas appear gray on the screen, but not on the printed document. Send copies of your completed application forms to your LGU, area DNR office, and your COE regulatory office. LOCAL government road projects that qualify for replacement of wetland impacts via the BWSR Road Replacement Program must also send a copy to the BWSR Road Replacement Program (see Instructions, Page 3). When your application is considered complete and the appropriate fees have been received (if requested by the regulating agencies) it will be distributed for review and comment. In the case of the Corps, the DNR and the LGU, you will be notified if it is accepted as proposed, approved with changes or conditions, withdrawn, or denied. You will also be informed of any appeal rights relating to the decision. WEB SITES Refer to the following web sites for more information regarding regulations of water and wetlands: BWSR: www.bwsr.state.mn.us Corps St. Paul District: www.mvp.usace.army.mil DNR: www.dnr.state.mn.us MPCA: www.pca.state.mn.us For information on the appeals process, contact the appropriate agency (see Instructions, Page 4). Public Transportation and Utility Projects Introduction, Page 2 (August 2007) NA -026620 -03C Minnesota Local /State /Federal Application Forms for Water/Wetland Projects PUBLIC TRANSPORTATION AND LINEAR UTILITY PROJECTS STANDARD APPLICATION For Internal Use Only Application No. Field Office Code Date Initial Application Received Date Initial Application Deemed Complete INV: "See HELP" for important additional information and assistance in Instructions section IS THIS AN ORIGINAL OR AMENDED NOTICE? (check one) This is an original notice ❑, dated This is an amended notice ®, dated January, 13, 2013 1. APPLICANT ROAD AUTHORITY INFORMATION: Road authority applicant: Carver County Public Works Department Contact person (name and title): Lyndon Robjent, P.E. (Public Works Director, County Engineer) Complete mailing address: 11360 Hwy 212, Suite 1, Cologne, MN 55322 Business phone: 9l 52) 466 5200 e-mail: CarverCountvPWna co.carver.mn.us 2. PROJECT IDENTIFICATION County: Carver Road name and/or number: CSAH 18 (Lyman Boulevard) Phase 3 Project termini: west terminus: 800 feet e. of CSAH 15 (Audubon Road): east terminus: 700 feet east of CSAH 17 (Powers Boulevard) Project number: SP 010 - 618 -013 ® attach PROJECT LOCATION MAP (Appendix C) 3. ❑ attach SOILS MAP (if available) Located in wetland delineation report submittal 4. PROJECT CATEGORY (check all that apply): ® Repair rehabilitation, reconstruction or replacement of existing roads that impact wetlands (including wetland areas of DNR Public Waters). If so, indicate size of impact (check one of the choices below): ❑ Less than 10,000 square feet of wetlands (see HELP 4). ® Greater than 10,000 square feet of wetlands. ❑ New road or modification of an existing road solely to increase traffic capacity impacting any amount of wetland area, river, lake or stream impact (excluding wetland areas of DNR Public Waters). ❑ Placement, maintenance or repair of linear utility projects. 5. PROPOSED TIMELINE: Approximate project start date: Spring 2014 Projected end date: Fall 2014 See Item 5 in Memorandum Public Transportation and Utility Projects, Page l (August 2007) 6. PROJECT DESCRIPTION: Check all that apply. Include a detailed overhead view of your plan that clearly depicts the work to be undertaken. See What To Include on Plans (Instructions Page 2). ❑ Guardrail improvement ® Turn lane: improvement of existing ❑ Guardrail improvement w /slope flattening ❑ Turn lane: new construction ❑ Resurfacing ❑ Slope flattening ® Culvert work; repair, extension or replacement ❑ Bridge work: repair ❑ Stream diversion ❑ Bridge work: replacement ® Shoulder work: repair widening ® Reconstruction (existing roads) ® Shoulder widening with ditch grading ❑ Other ❑ New road construction ❑ Additional lanes solely for traffic capacity ❑ Linear utility Projects Space above is not adequate — project description is outlined in Item 6 — appended, and in Figures 3A — 3C (Appendix C). 7. ESTIMATED PROJECT COST: $5 million Funding Sources ( %): Federal 80 State Local 20 8. SEQUENCING CONSIDERATIONS: What alternatives to this proposed project have you considered that could have avoided or minimized impacts to wetlands or water? For new construction only - list at least two alternatives (one of which may be "no build" or "do nothing "), and explain why you chose to pursue the option described in this application over these alternatives. ® Space above is not adequate - sequencing considerations are described in Item 8 — appended. 9A. IMPACT SUMMARY: Impacts to lakes and watercourses only. Indicate total amount of impact in square feet or acres for water body area(s) to be filled, drained, inundated or excavated. For watercourses indicate length of stream or river affected in linear feet (see HELP 9A). Location of Impact Section, Twp, Range County Name and Watershed No. Public Waters Name and ID Number Impact(s) for Lakes (square feet or acres Impact(s) for Watercourse(s) (in linear feet) See Item 9A - appended AFFIRMATION For Public Waters impacts: ® I am applying for state and local authorization to conduct the work described in this application. DNR permit is located in Appendix D. ® I am familiar with the information contained in this application. ® To the best of my knowledge and belief, all information in this application is true, complete and accurate. ® I possess the authority to undertake the work described, or I am acting as the duly authorized agent of the applicant IF your project will impact ONLY DNR Public Waters, proceed directly to the Applicant Signature Block on Page 5. Public Transportation and Utility Projects, Page 2 (August 2007) 9B. IMPACT SUMMARY: For impacts to wetlands only: when attaching information on a separate sheet — use this same format ID of Wetland acted Impacted Major Watershed Name or No. County Section, Twp, Range Wetland Circ. 39 Type / Wedand Plant Community Type (see HELP 9B) Size of Wetland Impact Size of Wetland Basin See 913 - app ended Shrub carr Hardwood or Open or flooded forest meadow (wet) mesic marsh marsh Open or alder coniferous coniferous basin meadow prairie Water thicket swamp bog T1 TIL T2 T2 T2 T3 T4 T5 T6 T7 T8 0.0lac 1.85 ac TOTALS OF AREA (S) IMPACTED for each wetland vegetative community / wetland type in acres or square feet: Seasonally Floodplain Sedge Fresh Wet to wet Shallow Deep Shallow Shrub carr Hardwood or Open or flooded forest meadow (wet) mesic marsh marsh Open or alder coniferous coniferous basin meadow prairie Water thicket swamp bog T1 TIL T2 T2 T2 T3 T4 T5 T6 T7 T8 0.0lac 1.85 ac 0.02 ac TOTAL IMPACT FOR THE PROJECT: 1.88 ac 9C. Are any of these impact sites within 1000 feet of a lake or 300 feet of a river? ❑ No ®Yes If YES, please explain. Portions of the project area are within 300 feet of Bluff Creek, a DNR Protected Watercourse. 10. TYPE and AMOUNT OF FILL MATERIAL: e.g., rock, sand, clay or concrete (indicate amount of cubic yards.) 100,000 CY 11. ADJOINING PROPERTY OWNERS: For projects that require a COE standard individual permit, attach a list of ADJOINING PROPERTY OWNERS that includes complete names and mailing addresses of adjacent property owners whose property also adjoins the wetland or water body where the work is being proposed. N/A 12. PORTION OF WORK ALREADY COMPLETED: Is any portion of the work already completed? ®No ❑Yes If YES, attach DESCRIPTION OF WORK COMPLETED and provide permit numbers if applicable. 13. STATUS OF OTHER APPROVALS: Attach STATUS OF OTHER APPROVALS LIST, include any other permits, reviews, or approvals related to this proposed project that are either pending, or have already been approved or denied (see HELP 13). (See Item 13 — appended) STATE EAW AND EIS REQUIREMENTS: Are state Environmental Assessment Worksheets or Environmental Impact Statements required for this project (see HELP 13)? ❑ no, not required ® yes, indicate status below (See Item 13 — appended) ARCHEOLOGICAL OR CULTURAL RESOURCES DETERMINATIONS: Are you aware of any archeological or cultural resource determinations or surveys completed concerning the project or replacement site that are already completed or in process by the State Historical Society Preservation Office (SHPO) or others? ❑No ®Yes. If YES, please explain below or attach a copy of any determinations or surveys. (MnDOT CRU Section 106 letter, dated April 19, 2012) — Appendix G Public Transportation and Utility Projects, Page 3 (August 2007) IF the project will use federal funds, please check the following boxes: ® The Section 106 (of the National Historic Preservation Act) review for this Federal Aid Highway Program funded project has been completed by the Federal Highway Administration (FHWA) per the 2005 Section 106 Programmatic Agreement. (Appendix G) ® The Section 7 (of the Endangered Species Act) review for this Federal Aid Highway Program funded project has been completed by the Federal Highway Administration (FHWA) per the letter dated April 11, 2007 to the U.S. Army Corps of Engineers and Fish and Wildlife Service (No Federal Species in Carver County) 14. SPECIAL CONSIDERATIONS: Are you aware of any special considerations that apply directly or indirectly to either the impact sites(s) or the replacement sites(s)? Examples may include the presence of endangered species, special fish and wildlife resources, sensitive surface waters, calcareous fens, or waste disposal sites. (see HELP 14). ❑ Not aware of any special considerations ® Yes, attach a list of SPECIAL CONSIDERATIONS and include brief descriptions of each consideration listed. 15. ON -SITE MITIGATION CONSIDERATIONS. List any important site - specific wetland functions and describe options considered for mitigation of these functions onsite. 16. HOW WILL PROPOSED REPLACEMENT BE ACCOMPLISHED: Wetland Banking only? ❑No ®Yes (if Yes, proceed to Question 17) Project - specific replacement only? ®No ❑Yes (if YES, check all that apply below and proceed to Question 19) Project — specific replacement and Wetland Banking? ®No ❑Yes (If Yes, check all that apply below, and proceed to Questions 18 and 19) For projects involving any project — specific replacement Part A: The replacement wetland (affirm all statements): Was not previously restored or created under a prior approval replacement plan or permit; AND Was not drained or filled under an exemption during the previous 10 years, AND Was not restored with financial assistance from public conservation programs; AND Was not restored using private funds, other than those of the landowner, unless the funds are paid back with interest to the individual or organization that funded the restoration; and the individual or organization notifies the local government unit in writing that the restored wetland may be considered for replacement. Part B: Additional assurances (check all that apply); ❑ The wetland will be replaced before or concurrent with the actual draining or filling of a wetland. ❑ An irrevocable bank letter of credit, performed bond, or other acceptable security has been provided to guarantee the successful completion of the wetland replacement. ❑ The wetland losses will be replaced via withdrawal from an account in the State Wetland Bank. Part C: For projects involving any project- specific replacement: I will record the Declaration of Restrictions and Covenants of the deed for the property of which the replacement wetland(s) will be located; and I will at the same time submit proof of such recording to the LGU. Public Transportation and Utility Projects, Page 4 (August 2007) 17. IF REPLACEMENT CONSISTS OF WETLAND BANKING, check appropriate option(s) below: ® BWSR Road Replacement Program: this option is available only for repair, rehabilitation, reconstruction or replacement of existing county, township or city roads. (Note: the TEP must certify that the project qualifies for this option — page 6.) If all of your replacement qualifies for this option - you do not need to answer the remaining questions, please skip to the Applicant Signature Blocks (,Pages 5 and 7). ® State Wetland Bank - proceed to Question 21. (You must also complete the Application for Withdrawal of Credits Form and include with your application, see HELP 17). 18. FOR PROJECTS INVOLVING REPLACEMENT BY WETLAND BANKING: I affirm that to the best of my knowledge and belief that all information in this application is true, complete and accurate. I affirm that the wetland losses will be replaced via withdrawal from an account in the State Wetland Bank. I affirm that a completed withdrawal form has been submitted to the BWSR Wetland Bank Coordinator for replacing losses through the State Wetland Bank. 19. DESCRIPTION OF REPLACEMENT WETLAND (S) CONSTRUCTION: (Complete this section only if you are conducting project- specific replacement). See HELP 19 and attach this description on a separate sheet of paper labeled DESCRIPTION OF REPLACEMENT WETLAND CONSTRUCTION. (N /A) 20. SURPLUS WETLAND CREDITS: If using project - specific replacement, will the replacement result in any surplus wetland credits that you wish to have deposited in the State Wetland Bank for future use? ❑No ❑Yes. If Yes, submit a Welland Banking Application directly to your LGU. Copies are available from your LGU, or you may download a copy from www.bwsr.state.mn.us 21. DESCRIPTION OF REPLACEMENT WETLANDS: Complete the chart below for all wetland replacement sites (including bank sites) except for replacement to be completed through the BWSR Road Replacement Program. If your project has more than one wetland replacement site, reference your overhead view to this chart and see HELP 21. Name of Major County Predominant Wetland Circ. 39 New Wetland Public Value Restored or Wetland Watershed Section Vegetation Type / Plant Credits Credits created? Replacement number Township Proposed Community Type' (NWC) (PVC) Indicate Site Range R or C #1392 Carver Co. N/A FFlloww Through 3.1 SWC R Minnesota 3 TOTALS: 3.1 ac SWC (See Appendix H for draft withdrawal form) Signature Block To the best of my knowledge and belief, all information in this application is true, complete and accurate. I possess the authority to undertake the work described, or I am acting as the duly appointed agent of the applicant. z?,,.. �- . January 13, 2014 Signature Date Public Transportation and Utility Projects, Page 5 (August 2007) LGU USE ONLY For projects involving construction of new roads, increased traffic capacity or linear utility of projects, the replacement plan is (Check one): ❑ Approved ❑ Approved with conditions (conditions attached) ❑ Denied LGU official signature Date LGU has received evidence of title and proof of recording of Declaration of Restrictions and Covenants for Replacement Wetland: County where recorded LGU official signature Date Recorded Document # assigned by Recorder Date FOR TEP USE ONLY This section must be completed for projects affecting more than 10,000 sq. ft. of wetland involving repair, rehabilitation, reconstruction, or replacement of a currently serviceable existing state, city, county, or township public road necessary to meet state or federal design or safety standards or requirements, and for which the impacts are proposed to be replaced by BWSR through the Public Road Replacement Program. No debit of wetland banking credits shall occur until a majority of the TEP members recommend approval by signing below. As indicated below, TEP members recommend the BWSR debit the State Wetland bank to provide replacement for wetland impacts identified on this form, and certify the following: • The public road authority has provided project- specific reports to TEP members at least 30 days prior to beginning construction, or within 30 days after an emergency repair resulting in less than 10,000 ftZ of impact; and • The TEP has reviewed minimization and delineation decisions made by the public road authority and determined the decisions to be satisfactory. ❑ Agee ❑ Disagree SWCD Representative (Date) ❑ Agree ❑ Disagree LGU Representative (Date) BWSR Representative (Date) ❑ Agree ❑ Disagree ❑ Agree ❑ Disagree DNR Representative (if applicable) (Date) Public Transportation and Utility Projects, Page 6 (August 2007) I e pursue burden far has contents ofrnformmioo is estimated to average 10 hours per resposes, although tM majority ofapplicatiore should require 5 hours or less. This includes the time fmreviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection ofinformatiun. Send comments regarding this burden estimate or any other aspect of this collection ofioformation, including suggestions for reducing this burden, to Department ofDaf use, Washington Headquarters Service Directorate oRvfomufcn Operations and Report, 1215 reaction Davis Highway, Suit 1204, Arlington, VA 222024302: and to the Otgns ofMenagemerf end Budget, Paperwork Raducfion Nwt(0710.0003),Washingto DC20503. Respovdcnts shmdd be aware that notwithshndiog soy other prosvion oflew, no pmaou shout he subjmtto my penalty for failing to comply with a collection of information if it does mat displays cmremly valid OMB annual number. Please DO NOT RETURN you fsma to either ofthew addresses. Completed application must he submitted to the District engineerhaviogjurisdictiov over the location ofthe proposed activity. PRIVACY ACT STATEMENT: Authorities: Rivers and Hafims Act. Section t0, 33 USC 403; Clem Water Mt, Section404, 33 USC 1344; Marine Protection, Research and Sencnwics Act 33 USC 1413, Sccdon 103. Principal purpose: Information provided on this faun will be caved in evaluating the application fora permit. Routine urea: This information may be shared with the Department of Justice and other Federal, same, and local govemment agencies. Submission of requested information is voluntary; however, if information is not 1. APPLICATION NO. 1 2. FIELD OFFICE CODE 1 3. DATE RECEIVED 1 4. DATE APPLICATION COMPLETED I YOU DO NOT NEED TO COMPLETE ITEMS 6 -10 and 12 -26 in the SHADED AREAS. I All applicants need to complete non - shaded items 5 and 26. If an agent is to be used, also complete items S and 11. This optional Federal form is valid for use onfv when included as cart of this entire state aoolication packet 5. APPLICANT'S NAME �,,1J 8. AUTHORIZED AGENT'S NAME AND TITLE (an agent is not required) .)jot rnt `7�ArJi�!"rrelyc Matthew Meyer(WDCP 41234) 6 APPLICANT'S ADDRESS 11360Ilwy 212 Suite 1, 9. AGENT'S ADDRESS OneCarlson Parkway Nor$, 'a `,MN 55447 Cologne, MN 55322- - - 7 APPLICANT'$. PHONENO 952 - 466 -5200- 10. AGENTS PHONF'NO -763-475-0010 11. STATEMENT OF AUTHORIZATION (if applicable; complete only ffauthorieing au fiscal) I hereby authorize Matthew Meyer to act on my behalf as my agent in the processing of this application and to famish, upon request, supplemental information in support of this permit application. , A1'Tf 1>".:4PII ;�S4fr4,A111s(1 ra!= .,�f`""°—"2-v '4`.e'.pf"°'°• ° V° i tl N -t✓I. 4sJr'i it5t",r3PhY`f if 4: 1' '9JiF x° :unhis, 1, dFirlaut7 3 'v`IitPn" .ln III w,yy,i' fwlrllLbjW.i1 ' 1's w <RC"a�Tia2Yo S1 #'Pkkf�ledma - ". � a tiU ,4ili°'.t911_.,tle*lx,.E l[RJf aw. i� t79td a`9 -des Jr vu:vi+ts,1 '.._ A 0 19HEhk.'G9iJd'r,11w 11.40 {J 4, Nn,#Jl'9 6, ,vn"i r4 d"r Ir Ia 0:4AM of.,9t('rP'("at s`�u ,:� ` 'I dl ilg° v� „ 4. u1 {,wr tr0 e, ISiiQ J *s `, 0 "41b 1.11A AtAr'p J fat" ,a+ ds 1 ii_ IN 's 19 a f'<rdly, a. f Er v, VTI rile }N sell as =H X`L'U,4s°i °....• °" .., .•,• •,• 127 ',ee1'.""!ttfGr 1R #'A '7. uA di};*, a: ii Wimp r'-J ... -. � .. 26.Applieation is hereby made for a permit or permits to authorize the work described in this application. I certify that the information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. /7 / Signature of applicarif Dall I January 3 -201 Signature of agent (if my) Date The application most be signed by the person who desires to undertake the proposed activity (applicant), or it may be signed by a duly authorized agent if the statement in Block I 1 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or coven up with any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, Jul 97 EDITION OF FEB 94 IS OBSOLETE. (Proponent: CECW -OR) Public Transportation and Utility Projects, Page 7 (August 2007) Public Transportation and Utility Projects, Page 8 (August 2007) Public Transportation and Utility Projects, Page 9 (August 2007) Instructions for the Standard Anulication HELP 3: Attach a copy of the County Soil Survey map for the project area. HELP 4: Please note that a PART II: PUBLIC ROAD MAINTENANCE SHORT FORM has been developed for use with maintenance projects that qualify as either minor or emergency work impacting: minor or emergency work impacting less than 10,000 square feet of wetlands subject to the WCA, OR ❑ minor or emergency work impacting less than 10,000 square feet of certain DNR Public Water Wetlands (i.e., those not assigned a shoreland classification, not classified as lacustrine wetlands or deepwater habitats, or not having state or federal land ownership), provided a copy of this form is sent to the DNR Waters area office prior to initiation of the project, OR ❑ DNR Public Water Wetlands and wetland areas of DNR Public Waterbasins when the DNR has received a copy of the Public Road Maintenance Short Form Notice and has waived the requirement for a DNR Public Water Work Permit to either the LGU responsible for WCA or the public road authority responsible for reporting wetland impacts to the Board of Water and Soil Resources, OR ❑ Existing public road crossings of DNR Public Waters. Contact the DNR Waters Area Hydrologist if assistance is needed on shoreland, lacustrine or deep -water determinations. HELP 9A: See www.dnr.state.mn.us /watersheds /map.html for a state map with watershed names and numbers. HELP 9B: For wetland type /classification, refer to Wetland Plants and Plant Communities of Minnesota and Wisconsin (Eggers and Reed, 1997) as modified by the Board of Water and Soil Resources, United States Army Corps of Engineers. Seasonally flooded basin SF1B Type 1 Floodplain forest Ffor Type 1L Sedge meadow SeMe Type 2 Fresh (wet) meadow WM Type 2 Wet to wet -mesic prairie WmP Type 2 Shallow marsh Sh Ma Type 3 Deep marsh DpMa Type 4 Shallow open water OPW Type 5 Shrub swamp ShWw Type 6 Wooded swamp WoSw Type 7 Bog BOG Type 8 HELP 13: Other permits, reviews or approvals related to the project may include the following: conditional use permit; National Pollutant Discharge Elimination System permit; state disposal system permit (includes dredged material disposal: watershed district/watershed management organization permit (storm water, erosion, floodplain); groundwater appropriation permit; or county /township driveway /road permit. If you do not know whether your project requires state Environmental Assessment Worksheets or Environmental Impact Statements, contact the Environmental Quality Board, 658 Cedar Street, St. Paul, MN 55155. Phone 651- 297 -1257. e- mail: eqb @,nrnplan.state.mn.us. Web site: www.mnplan.state.mn.us /cab /review.html. Contact the State Historic Preservation Office for a determination. Phone: 651- 296 -5434. email: mnshpo@mnhs.org HELP 14: If you wish to obtain information on state - listed threatened and endangered species and other natural resource elements contact the DNR Natural Heritage Program at 651- 296 -7963. HELP 17: Copies of the Application for Withdrawal of Credits forms are available from your LGU, or you may download a copy from www.bwsr.state.mn.us Public Transportation and Linear Utility Projects Instructions, Page 1 HELP 19: Describe, in detail, how mitigation wetland(s) will be constructed. If several methods will be used describe each method. Details should include: 1) type of construction (such as excavated in upland, restored the file break, restored by ditch block or revegetated); 2) type size and specifications of outlet structures; 3) elevations relative to Mean Sea Level or established benchmarks of key features (such as sill, emergency overflow or structure height); 4) what best management practices will be implemented to prevent erosion or site degradation; 5) proposed project start and end dates; and 6) a vegetation management plan. Attach this description on a separate sheet of paper labeled DESCRIPTION OF REPLACEMENT WETLAND CONSTRUCTION. For projects involving at least some project- specific replacement, include the following additional information: ❑ Two drawings to scale of the replacement wetland. Include both overhead view and profile view (side view or cross - sectional view). Without drawings, your application will be considered incomplete. ❑ For created replacement wetlands, include additional soils information (if available) that indicates the capability or the site to produce and maintain wetland characteristics. ❑ Note 1: For replacement wetlands located on pipeline easements, you need to receive endorsement of your project from both the easement holder and the Minnesota Department of Public Safety's Office of Pipeline Safety. Before state of construction, the owner of any utilities involved must be notified. The landowners or contractor is responsible for giving this notice by calling Gopher State One -Call at 651 454 -0002 (Twin Cities Metro Area) or 1- 800 - 252 -1166 (all other locations). ❑ Note 2: For extensive or complex projects, supplementary information may be requested at a later date from one or more of the responding agencies. Such information may include (but not be limited to) the following topographic map, water table map, soil borings, depth soundings, aerial photographs, and environmental assessment and/ or engineering reports. HELP 21: If you do not have access to some of the information requested, or if you do not know your replacement ratio, call your LGU or SWCD office for assistance. Refer to Wetland Plants and Plant Communities of Minnesota and Wisconsin (Eggers and Reed, 199 7) as modified by the Board of Water and Soil Resources, United States Army Corps of Engineers. What to include on Plans for the Standard Annlication Detailed overhead views of impact site(s) and replacement site(s), as well as profile view(s) of replacement site(s) may be hand drawn, computer generated or professionally prepared, as long as they contain all necessary information clearly, accurately, and in adequate detail. Please include specific dimensions whenever possible. You may also include photos, if you wish. Overhead views of impact site(s) and replacement site(s) should include the following items that pertain to your project: I. Location and extent of shoreline, wetlands and water. 2. Section, township and range of site(s). 3. Location and dimensions of proposed project, structure or activity. Include length, width, elevation and other measurements, including old and new alignments, as appropriate. 4. For bridge and culvert projects, include hydrology and hydraulic reports as applicable. 5. Points of reference (such as existing bridges, culverts, landscape features). 6. Location of inlet and outlet structures. 7. Indication of north. 8. Location of spoil and disposal sites (if applicable). 9. Location of photo reference points for future monitoring of replacement site(s). Public Transportation and Linear Utility Projects Instructions, Page 2 Profile views (side or cross sectional views) of replacement site(s) should include the following items that pertain to your project: 1. Location and dimensions of proposed project, structure or activity. Include elevation, depth, soil profile, side slope, and other measurements as appropriate. 2. Proposed water level elevation. 3. Areas of wetland and upland plants established on replacement site(s). Other information 1. Property boundaries. 2. Location and extent of shoreline and water. 3. Location and dimensions of proposed project, structure or activity include length, width, elevation and other measurements as appropriate. 4. Points of reference (such as existing bridges, culverts or landscape features). 5. Location of inlet and outlet structures. 6. Indication of north. 7. Location of spoil and disposal sites (if applicable). Final Checklist Attachments must include: Project Locator Map Description of Work Completed (Question 12; if answered "Yes ") Overhead View of Project Adjoining Property Owners (for projects that require a COE individual permit) Status of Other Approvals List Signed application for the Department of the Army Permit (Page 5) to seek Federal authorization of your project? Attachments may also include: Sequencing Considerations (Question 8; if additional space is needed) Listing of Special Consideration (Question 14; if answered "yes ") SHPO archaeological or cultural resource determinations or surveys (Question 13; if required and if completed) If project includes any wetland banking, attachments must include: Application for Withdrawal of Wetland Credits If project includes any project specific replacement, attachments must include: 1) Description of Replacement Wetland Construction; 2) Vegetation Management Plan (HELP 19); and 3) Two drawings to scale (HELP 19) Preparing Your Application for Mailing. To apply for both state and Federal authorization, your application must include Pages 1 -5, the Federal application (Page 7) and attachments as indicated on final Checklist (Instructions Section). Make three copies of the entire application and all attachments. Keep the original, and mail the three copies to the appropriate local, state, and Federal agencies (see below). Mailing your application. Mail a complete copy of your application to each of the local state, and Federal entities listed below. If you are using the Public Road Maintenance Short Form Notice include required attachments. LOCAL: Send to the appropriate Local Government Unit (LGU). Contact your county Soil and Water Conservation District (SWCD) office or the Board of Water and Soil Resources (BWSR) web site (www.bwsr.state.mn.us) for this information. SWCD offices are also listed on the BWSR web site. Public Transportation and Linear Utility Projects Instructions, Page 3 For local road projects that qualify for wetland replacement under the BWSR Public Road Replacement Program, also send a complete copy of the application and Page 6 with the TEP member signatures to BWSR Public Road Replacement Program 520 Lafayette Road North St. Paul, MN 55155 (phone 651- 297 -7965) STATE: Send to your area DNR Waters office, attention Area Hydrologist. Contact your county Soil and Water Conservation District (SWCD) office or the DNR web site (www.dnr.state.mn.us) for this information. Area offices can also be determined by contacting the applicable Regional DNR office: NW Region: 2115 Birchmont Beach Road N.E. NE Region: 1201 East Highway 2 Bemidji, MN 56601 Grand Rapids, MN 55744 Phone: 218-755-3973 Phone: 218 -327 -4416 Central Region: 1200 Warner Road Southern Region: 261 Highway 15 South St. Paul, MN 55106 New Ulm, MN 56073 Phone: 651- 772 -7910 Phone: 507 359 -6053 FEDERAL: Send to the appropriate U.S. Army Corps of Engineers regulatory field office: Brainerd: U.S. Army Corps of Engineers, Regulatory Branch 10867 E. Gull Lake Drive N.W. Brainerd, MN 56401 -9051 Phone: 218 -829 -8402 St. Paul: U.S. Army Corps of Engineers, Regulatory Branch Army Corps of Engineers Centre 190 5a' Street East, Suite 401 St. Paul, MN 55101 -9051 Phone: 651- 290 -5375 La Crescent: U.S. Army Corps of Engineers, Regulatory Branch 1114 South Oak Street La Crescent, MN 55947 -1338 Phone: 507-895-8059 Two Harbors: U.S. Army Corps of Engineers, Regulatory Branch 1554 Highway 2, Suite 2 Two Harbors, MN 55616 Phone: 218-834-6630 Public Transportation and Linear Utility Projects Instructions, Page 4 WCA /COEJoint Permit Questions Item 5. Proposed Timeline Bids will be received in February 2014. Construction is expected to begin in April 2014. Substantial completion and cleanup will be in late November 2014. Project closeout is summer of 2015. Item G. Project Description The purpose of the project is to improve safety, ease projected congestion, and address necessary improvements to accommodate the future traffic growth related to the existing Chanhassen High School and other adjacent developments in the area. The need for the project is identified in the Carver County Transportation Plan (2007). Carver County is experiencing a high level of population growth, with most of the growth taking place in the central and eastern portions of the county. The cities of Chaska, Chanhassen, Victoria and Waconia are estimated to account for over half of the total County population by 2030. The 2030 County population forecast is almost triple the year 2000 population. Due to the current and expected future population growth, congestion in areas of central and eastern Carver County is expected to rise on County facilities, occurring frequently during the peak hours. Without the proposed project, the CSAH 18 corridor will continue to experience increasingly unacceptable levels of congestion and associated safety issues. Safety information, including crash data, is presented in Appendix F. The purpose of the specific impacts to the wetlands, as previously described, includes roadway fill impacts. Proposed Imorovements This project involves reconstruction of the segment of CSAH 18 from approximately 800 feet east of CSAH 15 (Audubon Road) to approximately 700 feet east of CSAH 17 (Powers Boulevard), in the City of Chanhassen (see Figure 2a Appendix C). This project will accommodate safety and capacity improvements to the roadway facility, as well as drainage and stormwater management, access management and a pedestrian /bicycle facility. The construction plans have been developed to minimize impacts to wetlands, water and other natural resources. Several existing stormwater management ponds will be utilized to accommodate runoff from the additional pavement within the project area. Wetlands that are proposed to be impacted are located within the right of way and at the toe of slope of the existing roadway. Impacts are directly related to the proposed improvements. Item 8. Sequencing Considerations Wetland Impact Avoidance The No Build Alternative is the only alternative that would completely avoid wetland impacts. However, the No Build Alternative would not address current safety and capacity issues in the project area. Therefore, the No Build Alternative was considered to be not feasible. Alignments slightly to the north and to the south of the existing alignment were assessed; however, the least wetland impacts were found with the proposed alternative. Wetland Impact Minimization Remaining unavoidable impacts were minimized to the extent practicable with steeper side slopes through the highway sections that are adjacent to wetlands, thereby minimizing the roadway footprint through these areas. Side slopes for the proposed road improvement were generally 1:3 in the vicinity of wetlands and 1:4 elsewhere. Slopes steeper than 1:3 present vehicular safety issues and can require installation of guard rail. Guard rail can make snow removal more difficult. Retaining walls were considered early in the planning process; however, the costs of installing them were prohibitive. Retaining walls would have required additional excavation of unstable soils and more surcharge than with a sloped design. Appropriate silt fencing and its proper installation will be specified on plan sheets for areas of the road improvement that are within 50 feet of wetlands. Anti- erosion measures will include rapid re- vegetation of side slopes with cover crops and eventually with appropriate MnDOT seed mixes. The widths of road lanes, medians, dedicated turning lanes and clear zones were designed according to State Aid Design Standards. While design exceptions from standards and guidelines in this Manual are sometimes possible, such exceptions incrementally diminish roadway safety. The two -way bicycle /pedestrian trail was designed according to standards and guidelines listed in the Minnesota Administrative Rules 8820.9995 State Aid Minimum Bicycle Path Standards and the MnDOT Bikeway Facility Design Manual. Design exceptions from standards and guidelines are sometimes possible, but such exceptions can diminish the safety of the trail. The trail alignment is adjacent and contiguous with the road. This design minimizes wetland impacts as a portion of the trail embankment is shared with the road embankment. The boulevard width between the trail and proposed curb was reduced through the wetlands in order to further minimize wetland impacts. Mitigation for Unavoidable Wedand Icipacts Onsite wetland mitigation was considered early in the planning process; however, the costs of acquiring right -of -way for a relatively small amount of required wetland mitigation was prohibitive. Purchasing existing credits from a suitable wetland mitigation bank within the same Major Watershed and Bank Service Area as the wedand impacts was cost - effective and would result in wetland mitigation that is already known to be functioning acceptably. Unavoidable permanent wetland impacts will be mitigated through the BWSR Road Replacement program (Item 17 Appendix A) and through an approved State Wetland Bank (Item 21 Appendix A). In areas where wetlands are immediately adjacent to the existing roadway toe -of- slope, temporary impacts due to muck removal to stabilize foundation soils, will be restored to preconstruction conditions by re- grading to original contours. These temporary impacts are quantified in Item 9B below. It is anticipated that temporary wetland impacts would not require mitigation other than restoration to pre - construction conditions. Temporary impacts will be stabilized with a combination of Types 1, 2, and 3 Rapid Stabilization methods. Type 1 is disk anchoring. Type 2 is application of mulch and hydraulic application of a tackifier. Type 3 is application of Seed Mix #190 in combination with fertilizer and tackifier. Item 9a. Impact Summary: Impacts to Lakes and Watercourses A Minnesota Department of Natural Resources (DNR) Public Waters Work Permit (Permit Number 2014-0526) has been issued for work within Bluff Creek (M- 055 -014) — Appendix D. Item 9b. Description of Wetland Impacts The proposed wetland impacts are located in Carver County, in the Minnesota River — Shakopee (33) Major Watershed and Bank Service Area 9 — Metro Area. Table 1 below lists the proposed impacts to wetlands located within the project area. The proposed wetland impacts are shown on Figures 3A through 3C (Appendix Q. Refer to Item 6 for a complete description of the proposed project. A total of 1.88 acres of permanent wetland impact and 0.16 acres of temporary impact are proposed as a result of the roadway reconstruction. Of the 1.88 acres of impact, 0.33 acres are permanent and safety - related and 1.55 acres are not eligible for safety credits (See Appendix E and F for Safety information). The permanent safety - related impacts include 0.13 acres of impact to Bluff Creek, a DNR Protected Watercourse, and are associated with culvert replacement, grading, and rip -rap for culvert outfall within the channel north and south of Lyman Boulevard. As described in Item 8. Sequencing Considerations above, a total of 0.16 acres of temporary impacts will be restored to pre - construction conditions. Table 1: Wetland Impacts Located In Chanhassen Wetland ID, 1/4 1/4 Sec. Type: Eggers & Predominant Total Permanent Temporary Topographic (T116N, Reed/ Vegetation wetland Roadway Roadway Setting R23W) Circ 39 area (ac) Impacts Impacts W -1A NE SW Shallow Cattail 0.14 0.02 ac 0.01 ac 23 marsh /3 W -1B NE SW Wet Reed canary 0.06 0.06 ac 0.00 ac 23 meadow /2 grass W -2 NE SE Wet Reed canary 0.8 0.8 ac 0.06 ac 22 meadow /2 grass, willow, NW SW common buckthorn, 23 W -10, SW NE 22 Wet Reed canary >20 0.00 ac 0.00 ac tributary meadow /2 grass, cattail W -11, Flow- SE NE 22 Shallow Reed canary >5 0.00 ac 0.00 ac through marsh /3 grass, cattail W -12, SE NE 22 Wet Diverse 0.2 0.00 ac 0.00 ac Isolated meadow /2 sedges, grasses,forbs W -13, SE NE 22 Wet Cattail, <0.1 0.00 ac 0.00 ac Isolated meadow /2 sedges, forts Bluff Creek SE NE, NE N/A Reed canary >20 0.13ac * 0.00 ac SE 22 grass W -14, Flow- SE NE Wet Reed canary >5 0.86 ac 0.09 ac through 22 meadow /2 grass, green bulrush, sedge W -18, SW NW Seasonally Box elder, 0.2 0.00 ac 0.00 ac tributary 23 flooded maple, basin /11- buckthorn W -19 NE SW Seasonally Green ash >0.3 0.01 0.00 ac 23 flooded basin /SL Total Total Permanent Temporary impacts impacts (1.88 ac) (0.16 ac) 0.16 ac Restored to pre - construction conditions Proposed impacts at the edge of Bluff Creek consist of replacing culverts, grading, rock rip rap lining for outfall of culverts within actual channel north and south of Lyman Boulevard. Channel cross-section characteristics will be modified to accommodate the realigned culverts. Item 13. Status of Other Approvals The Environmental Assessment Worksheet (EAW) was published in the Environmental Quality Board (EQB) Monitor on November 19, 2007. Public comments were accepted through December 19, 2007. A Negative Declaration was issued by the Carver County Board at the regularly scheduled meeting on January 22, 2008. In addition to the approved EAW, and negative Declaration other permits in -hand are: a National Pollutant Discharge Elimination System (NPDES) permit, MnDOT work permit, MnDNR Public Waters Work permit (Appendix D), and a Minnesota Department of Health (MDH) permit. Appendix B: WCA Boundary/ Type Approvals Minnesota Wetland Conservation Act Notice of Decision Local Government Unit (LGU) Address City of Chanhassen 7700 Market Boulevard, PO Box 147 Chanhassen, MN 55317 1. PROJECT INFORMATION Applicant Name Project Name Date of Application Carver County, William CSAH 18 (Lyman Boulevard) Application Number Weckman, P.E. Roadway Improvements Phase 3 10/31/2013 2013 -01 Project #: SP 010- 618-013 Attach site locator map. Type of Decision: ® Wetland Boundary or Type ❑ No -Loss ❑ Exemption ❑ Sequencing ❑ Replacement Plan ❑ Banking Plan Technical Evaluation Panel Findin a and Recommendation if any): ® Approve ❑ Approve with conditions ❑ Deny Summary (or attach): 2. LOCAL GOVERNMENT UNIT DECISION Date of Decision: November 26, 2013 ® Approved ❑ Approved with conditions (include below) ❑ Denied LGU Findings and Conclusions (attach additional sheets as necessary): SRF Consulting, on behalf of Carver County, has performed a wetland determination and boundary delineation for Lyman Blvd (CSAH 18) within the right of way between Audubon Road North (CSAH 15) and Powers Boulevard (CSAH 17) (Phase 3), within the City of Chanhassen. This report serves as an update to the 2007 Wetland Delineation Report (August 2007). The delineation excludes wetlands 15, 16, and 17, which have been re- delineated by a third party in a separate application. Wetlands W1 0 through W1 3 were also not assessed in this report. There were three wetland basins re- delineated as part of this report. W -14 has been identified as a Type 2, fresh wet meadow wetland. W- 18 and W -19 have been identified as Type IL, seasonally flooded basin wetlands. Based upon our review, the City of Chanhassen, as the LGU responsible for administration of Minnesota R. 8420, concurs with the delineated boundary and types as identified in the 2007 wetland determination and delineation report prepared by SRF Consulting, and the update to the report dated October 2, 2013. The Application for Wetland Boundary and Type was noticed on October 10, 2013. No additional comments were received from the Technical Evaluation Panel members or from the public. This concludes our review, Upon the provision of the electronic representation of the delineated boundaries ( *.shp or *.dwg), this delineation will be considered approved. BWSRForms 11 -25 -09 Page 1 of For Replacement Plans using credits from the State Wetland Bank: Bank Account # Bank Service Area County Credits Approved for Name Title Terrance Jeffery WDC Withdrawal (sq. ft. or nearest .01 Signat u Date Phone Number and E -mail acre) Replacement Plan Approval Conditions. In addition to any conditions specified by the LGU, the approval of a Wetland Replacement Plan is conditional upon the following: ❑ Financial Assurance: For project - specific replacement that is not in- advance, a financial assurance specified by the LGU must be submitted to the LGU in accordance with MN Rule 8420.0522, Subp. 9 (List amount and type in LGU Findings). ❑ Deed Recording: For project - specific replacement, evidence must be provided to the LGU that the BWSR "Declaration of Restrictions and Covenants" and "Consent to Replacement Wetland" forms have been filed with the county recorder's office in which the replacement wetland is located. ❑ Credit Withdrawal: For replacement consisting of wetland bank credits, confirmation that BWSR has withdrawn the credits from the state wetland bank as specified in the approved replacement plan. Wetlands may not be impacted until all applicable conditions have been met! LGU Authorized Signature: Signing and mailing of this completed form to the appropriate recipients in accordance with 8420.0255, Subp. 5 provides notice that a decision was made by the LGU under the Wetland Conservation Act as specified above. If additional details on the decision exist, they have been provided to the landowner and are available from the LGU upon request. Name Title Terrance Jeffery WDC Water Resources Coordinator Signat u Date Phone Number and E -mail � 7 V 11/26/2013 952.227.1168 t t"effe ci.chanbassen.mn.us THIS D� ONLY APPLIES TO THE MINNESOTA WETLAND CONSERVATION ACT Additional approvals or permits from local, state, and federal agencies may be required. Check with all appropriate authorities before commencing work in or near wetlands. Applicants proceed at their own risk if work authorized by this decision is started before the time period for appeal (30 days) has expired. If this decision is reversed or revised under appeal, the applicant may be responsible for restoring or replacing all wetland impacts. This decision is valid for three years from the date of decision unless a longer period is advised by the TEP and specified in this notice of decision. 3. APPEAL OF TMS DECISION Pursuant to MN Rule 8420.0905, any appeal of this decision can only be commenced by mailing a petition for appeal, including applicable fee, within thirty (30) calendar days of the date of the mailing of this Notice to the following as indicated: Check one: L9 Appeal of an LGU staff decision. Send LJ Appeal of LGU governing body decision. Send petition and $50_00 fee (if applicable) to: petition and $500 filing fee to: Chanhassen City Council Executive Director c/o Todd Gerhardt, City Manager Minnesota Board of Water and Soil Resources 7700 Market Blvd, PO Box 147 520 Lafayette Road North Chanaassen, MN 55317 St. Paul, MN 55155 BWSR Forms 11 -25 -09 Page 2 of 3 A. LIST OF ADDRESSEES ® SWCD TEP member: Chip Hentges ® BWSR TEP member: Lynda Peterson ❑ LGU TEP member (if different than LGU Contact): ® DNR TEP member (notice only): John Gleason ❑ DNR Regional Office (if different than DNR TEP member) ® WD or WMO (if applicable): Claire Bleser, Riley- Purgatory-Bluff Creek Watershed District ® Applicant (notice only) and Landowner (if different): William Weckman, P.E., Carver County ® Members of the public who requested notice (notice only): Jeff Olson, SRF Consulting Nathen Will, SRF Consulting ® Corps of Engineers Project Manager (notice only) Melissa Jenny ❑ BWSR Wetland Bank Coordinator (wetland bank nlan armlicatinns nnlv) 5. MAHdNG INFORMATION ➢For a list of BWSR TEP representatives, see: www.bwsr.statc.mn.us /aboutbwsr /workareasAVCA_areas ndf ➢For a list of DNR TEP representatives, see: www. bwsr .state.mn.us /wetlands/wea/DNR TEP contacts. pd ➢Department of Natural Resources Regional Offices: NW Region NE Regiom Central Region: Southern Region: Reg. Env. Assess. Ecol. Reg. Env. Assess. Ecol. Reg. Env. Assess. Ecol. Reg. Env. Assess. Ecol. Div. Ecol. Resources Div. Ecol. Resources Div. Ecol. Resources Div, Ecol. Resources 2115 Birchmont Beach Rd. 1201 E. Hwy. 2 1200 Warner Road 261 Hwy. 15 South NE Grand Rapids, MN 55744 St. Paul, MN 55106 New Uhn, MN 56073 Bemidji MN 56601 For a map of UNK Administrative Regions, see: b!V: // files .dnr.state.mn.us /aboutdnr /dnr regions ➢For a list of Corps of Project Managers, see: www.=.usace,army.mil/regulatory/default.asl??pageid 687 or send to: Dept. of the Army, Corps of Engineers, St. Paul District ATTN.- CO -R, 190 Fifth Street East St. Paul, MN 55101 -1638 ➢For Wetland Bank PIan applications, also send a copy of the application to: Minnesota Board of Water and Soil Resources Wetland Bank Coordinator 520 Lafayette Road North St. Paul, MN 55155 6. ATTACHMENTS In addition to the site locator map, list any other attachments: ® MN WCA Application for Approval of Wetland Type and Boundary ® Update to the 2007 Wetland Delineation Report prepared by SRF Consulting, dated October 2, 2013. BWSR Forms 11 -25-09 Page 3 of Minnesota Wetland Conservation Act Notice of Decision Local Government Unit (LGU) Address City of Chanhassen 7700 Market Boulevard, PO Box 147 Chanhassen, MN 55317 1. PROJECT INFORMATION Applicant Name Project Name Date of Application Carver County, William CSAH 18 (Lyman Boulevard) Application Number Weckman, P.E. Roadway Improvements: 1551 Lyman 11/20/2013 2013 -01B Blvd ROW Project #: SP 010 -619 -013 Attach site locator map. TMLe of Decision: ® Wetland Boundary or Type ❑ No -Loss ❑ Exemption ❑ Sequencing ❑ Replacement Plan ❑ Banking Plan Technical Evaluation Panel Findings and Recommendation if any): ® Approve ❑ Approve with conditions ❑ Deny Summary (or attach): 2. LOCAL GOVERNMENT UNIT DECISION Date of Decision: January 2, 2014 ® Approved ❑ Approved with conditions (include below) ❑ Denied LGU Findings and Conclusions (attach additional sheets as necessary): Houston Engineering, Inc., on behalf of Carver County Public Works and Richard Dorsey, has performed a wetland determination and boundary delineation for Lyman Blvd (CSAH 18) at 1551 Lyman Blvd within the Lyman Blvd right of way, within the City of Chanhassen. This review identified and delineated three wetland basins. Wetland IA and 1B have been identified as Type 3, shallow marsh wetlands, and are separated by a berm. Wetland 2 has been identified as a Type 2, fresh (wet) meadow and is indicated on the National Wetland Inventory map as a PEMCd wetland. None of the wetlands are indicated on the Public Waters Inventory map. Based upon our review, the City of Chanhassen, as the LGU responsible for administration of Minnesota R. 8420, concurs with the delineated boundary and types as identified in the report prepared by Houston Engineering, Inc„ dated October 21, 2013. This decision ONLY applies to the area within the Right -of -Way of 1551 Lyman Blvd, and only to wetlands 1A, 1B, and wetland 2, which were identified and delineated in the wetland delineation report dated October 21, 2013. The Application for Wetland Boundary and Type was noticed on November 20, 2013. The Technical Evaluation Panel (TEP) met and reviewed the site in the field on October 25, 2013. A TEP Meeting was held on December 10, 2013, in which Mr. Richard Dorsey (resident) and Ms. Emmy Baskerville of Houston Engineering Inc. were present. The TEP concurred with the Wetland Boundary & Type Application, dated November 20, 2013. The Findings of Fact from that TEP meeting are attached. This concludes our review. Upon the provision of the electronic representation of the delineated boundaries ( *.shp or *.dwg), this delineation will be considered auoroved. BWSR Forms 11 -25-09 Pagel of3 For Replacement Plans using credits from the State Wetland Bank: Bank Account # Bank Service Area County Credits Approved for Name Title Terrance Jeffery, C Withdrawal (sq. f. or nearest .01 Signs Date Phone Number and E-mail acre Replacement Plan Approval Conditions. In addition to any conditions specified by the LGU, the approval of a Wetland Replacement Plan is conditional upon the following: ❑ Financial Assurance: For project - specific replacement that is not in- advance, a financial assurance specified by the LGU must be submitted to the LGU in accordance with MN Rule 8420.0522, Subp. 9 (List amount and type in LGU Findings). ❑ Deed Recording: For project - specific replacement, evidence must be provided to the LGU that the BWSR "Declaration of Restrictions and Covenants" and "Consent to Replacement Wetland" forms have been filed with the county recorder's office in which the replacement wetland is located. ❑ Credit Withdrawal: For replacement consisting of wetland bank credits, confirmation that BWSR has withdrawn the credits from the state wetland bank as specified in the approved replacement plan. Wetlands may not be impacted until all applicable conditions have been met! LGU Authorized Signature: Signing and mailing of this completed form to the appropriate recipients in accordance with 8420.0255, Subp. 5 provides notice that a decision was made by the LGU under the Wetland Conservation Act as specified above. If additional details on the decision exist, they have been provided to the landowner and are available from the LGU upon request. Name Title Terrance Jeffery, C Water Resources Coordinator Signs Date Phone Number and E-mail 1/2/2013 952.227.1168 tjeffery@ci.chanhassen.mn.us Additional approvals or permits from local, state, and federal agencies may be required. Check with all appropriate authorities before commencing work in or near wetlands. Applicants proceed at their own risk if work authorized by this decision is started before the time period for appeal (30 days) has expired. If this decision is reversed or revised under appeal, the applicant may be responsible for restoring or replacing all wetland impacts. This decision is valid for three years from the date of decision unless a longer period is advised by the TEP and specified in this notice of decision. 3. APPEAL OF THIS DECISION Pursuant to MN Rule 8420.0905, any appeal of this decision can only be commenced by mailing a petition for appeal, including applicable fee, within thirty (30) calendar days of the date of the mailing of this Notice to the following as indicated: Check one: N Appeal of an LGU staff decision. Send U Appeal of LGU governing body decision. Send petition and $50_00 fee (if applicable) to: petition and $500 filing fee to: Chanhassen City Council Executive Director c/o Todd Gerhardt, City Manager Minnesota Board of Water and Soil Resources 7700 Market Blvd, PO Box 147 520 Lafayette Road North Chanaassen, MN 55317 St. Paul, MN 55155 BWSR Forms 11 -25 -09 Page 2 of 3 4. LIST OF ADDRESSEES ® SWCD TEP member. Chip Hentges BWSR TEP member. Lynda Peterson LGU TEP member (if different than LGU Contact): DNR TEP member (notice only): John Gleason DNR Regional Office (if different than DNR TEP member) WD or WMO (if applicable): Claire Bleser, Riley- Purgatory -Bluff Creek Watershed District Applicant (notice only) and Landowner (if different): William Weckman, P.E., Carver County Members of the public who requested notice (notice only): Emmy Baskerville, Houston Engineering Inc. Richard Dorsey Corps of Engineers Project Manager (notice only) Melissa Jenny BWSR Wetland Bank Coordinator (wetland bank Dian aDDhcations onlv) 5. MAILING INFORMATION ➢For a list of BWSR TEP representatives, see: www.bwsr.state.mn.us/aboutbwsr/workareastWCA areas ndf ➢For a list of DNR TEP representatives, see: www.bwsrstate.mn.us /wetlands /wea/DNR TEP contacts.Ddf ➢Department of Natural Resources Regional Offices: NW Region: NE Region: Central Region: Southern Region Reg. Env. Assess. Ecol Reg. Env. Assess. Ecol. Reg. Env. Assess. Ecol. Reg. Env. Assess. Ecol. Div. Ecol. Resources Div. Ecol. Resources Div. Ecol. Resources Div. Ecol. Resources 2115 Birchmont Beach Rd. 1201 E. Hwy. 2 1200 Warner Road 261 Hwy. 15 South NE Grand Rapids, MN 55744 St Paul, MN 55106 New Ulm, MN 56073 Bemidji, MN 56601 For a map of DNR Administrative Regions, see: h"://files.dnr.state.Tnn.us/aboutdnr/dnr regions ndf ➢For a list of Corps of Project Managers, see: www.myp.usace.gmM.mil/regalatory/default.asp?pawid=687 or send to: Dept, of the Army, Corps of Engineers, St. Paul District ATTN: CO -R, 190 Fifth Street East St. Paul, MN 55101 -1638 ➢For Wetland Bank Plan applications, also send a copy of the application to: Minnesota Board of Water and Soil Resources Wetland Bank Coordinator 520 Lafayette Road North St. Paul, MN 55155 6. ATTACHMENTS In addition to the site locator map, list any other attachments: ® MN WCA Application for Approval of Wetland Type and Boundary ® Wetland Delineation Report, prepared by Houston Engineering Inc., dated October 21, 2013. ® TEP Meeting Findings of Fact, dated 12110/2013. BWSR Forms I1 -25 -09 Page 3 of 3 I :1211012013 LGU: City dChanhassen County: QMr LOU Contactfforry Jeffery Project Name/ #: 1551.Lymma Blvd ROW Phone #: 651 -227 -1168 LocationofProjeet: — 23 116N 23W_ ROW 1551 Lyman Blvd Y4 y y Sec. Twp. Range Lot/Block City: Chanhassen County: Carver TEP Members (and others) who reviewed project: ((]leek ifviewed projeatane) ® LOU :Try lyffay. Krista Sproitor ® BWSR:Lvnda Peterson ®SWCD ChioHentaes ❑MRCtapplicAlce _ Other Welland Experts Prescott Melissa Jenny, ACOB TEP requested by: 1. Type of TEP determination requested (check those than apply): Exemption (WCA Exemption #_� No -Loss X Wetland Boundary and Type Replacement Plan 2. Description of Winland(s) with proposed impact: & Weiland Type (Circular 39)_.(Cowardin)_Wot1and Plant Community Typal _ b. Welland Size — c. Size ofProposed Impact (acres and square feet)_ 3. Have sequencing requirements been met? Attach Sequencing Finding ofFaet as supporting information, ® Yea b No (if no, list whys 4. is the project consistent with the intent of the comprehensive local water plan and/or the watershed district plan, the metropolitan surface water management plan and metropolitan groundwater management plan, and local comprehensive plan and zoning ordinance? ®Yas ❑ No (if no, list why): 5. What is the net result of the project on the following wetland functions: Functions DMmde ]Y€llh'al imomve Floodwater Storage _ Nutrient Assimilation _ d SedimentEmrapment Groundwater Recharge — Low Flow Augmentation AesthetiosMecreation Shoreland Anchoring Witdlifo Habitat _ Fisheries Habitat Rom Plant/AnimalHabitat T Commercial Uses 61 For replacement plan or no -kiss determinations, are wetland functions maintained at an equal or greater level? ❑ Yes ❑ No (if no, list why) 7. Does Technical Evaluation Panel recommend �a mroval of the activity proposed in item 17 ® Yes ❑ Yes, with Conditions LI No (if no, list why): a. List TEP findings to support recommendation in question 7 above. (Please attach document if necessary), The TEP reviewed the site in the field on 10/25/2013 and found the site to be consistent with the delineation report dated 101/2013. 9. SIGNATURES (i%7'h'P reaosanv dacha is not a mnwasm, n wh_h�j averlst and explain on die hack gOhis pgge) ;��C. �� - l ;)— y a WCDReprmentathm (fate) MRRepreaentative (Date) LOU Ropwa tetire (Data) DNR ReprewnLem (Date) I See Welland Plants and Plant Contrrrnoldes of Mlanesota and Wisconsin (Eggers and Reed, 1997) as modified by the Board of Water and Soil Resources, tfnited States Army Corps of Engineers. Psgc 1 of 1 12_l0 TEP F(H+ Type &Bcundarydocx (August 2007) Date :12110/2013 LGU:CityofChanhassen County: Carver LGU Contact:Terry Jeffery Project Name/ #:1551 Lyman Blvd ROW Phone #-.-W-227-1168 Location ofProjem 23 116N 23W ROW 1$51 Lyman Blvd 'l. V. y. Sec. Twp. Range Lot/Block City: Chanhassen County: Carver TEP Members (and others) who reviewed project: (Check if viewed project sire) ® LGU.Terry Jeffery Kri to SM*I r ® BWSR:LLvnda Peterson ® SWCD: Chip Heinees ❑ DNR (if appikable):_ Other Weiland Experts present: Melissa Jenny, ACOE TEP requested by;_ 1. Type of TEP determination requested (check those that apply): _ Exemption (WCA Exemption #___) No -Loss $ Weiland Boundary and Type Replacement Plan 2. Description of Wedand(s) with proposed impact: a. Wetland Type (Circular 39)_ (Cowardin)Wetland Plant Community Type'_ b. Wetland Size _,,,_ c. Size of Proposed Impact (acres and square feet)_ 1 Have sequencing rG uirements been met? Attach Sequencing Finding of Fact as supporting information. ® Yes J No (if no, list why): 4. Is the project consistent with the intent of the comprehensive local water plan and/or the watershed district plan, the metropolitan surface water management plan and metropolitan groundwater management plan, and local comprehensive plan and zoning ordinance? ®Yes ❑ No (if no, list why): 5. What is the net result of the project on the following wetland functions: Functions Degrade Neutral Improve Floodwater Storage — Nutrient Assimilation _ Sediment Entrapment T Groundwater Recharge — Low Flow Augmentation Aesthetica/Recmation _ Shoreland Anchoring Wildlife Habitat Fisheries Habitat Rare Plant/Animal Habitat Commercial Uses 6. For replacement plan or no -loss determinations, are wetland functions maintained at an equal or greater level? ❑ Yes ❑ No (if no, list why) 7. Does Technical Evaluation Panel recommend approval of the activity proposed in item 1? ® Yes ❑ Yes, with Conditions ❑ No (if no, list why): 8. List TEP findings to support recommendation in question 7 above. (Please attach document if necessary). The TEP Wawed the site in the field on 10/25/2013 and found the site to be consistent with the delineation report dated 10/21/2013. A ZES (if TEP recommendation is not a consensas, note with an asterisk and explain on fhe bock of this page) Representative (Date) DNR Representative (Date) ' See Wetland Pints and Plant CommunlBes of Minnesota and Mrsconsin (Eggers and Reed, 199 7) as modified by the Board of Water and Soil Resources, United States Army Corps of Engineers. P%e I of I 12 _10_TEP_FOF_Type &Boundety.docx (August 2007) Appendix C: Figures • Figure 1- Project Area Map • Figure 2a - Project Location Map • Figures 3A - 3C Plan Sheets with Wetland Impacts • Figure 4 - Typical Sections - Minimum Build, Safety Only Improvements & Plan Project Area Carver County, MN MINNESOTA WISCONSIN IOWA IT w r • / a . 0 • `V w •4 ANOKAr T ^ L, ,HENNEPIN .. ' Jf 1 t ) Z► _ I t 3, � ' • - cna�n «ieo `CARVER J a SCOTT , I r S1 B4 Y •::+ r •' L 1 S I E Ei R r .� Project Area CSAH 18 (Lyman Blvd) Reconstruction from CSAH 15 to CSAH 17 S.P. 010-618-013 Carver County, Minnesota .r MS Yi t DAKOTA tWASHINGTON Y •� ti k�. L♦ 0 5 10 ® Miles Figure 1 OLVfL I.RCCC, JL -1' RECREATION CENIV [ER m,giynn ` "°•. ,L°`; wawn 1 y, if (�rr���1�/yu\ � E Partly Dr N a A RE .Pdlna lake, USA G� gwa Kbae e`r, ry /-�SypSAN, + " \RK: ST- r�r. _ SHNSH 3 RIUGh PARK Mns. GCt I� ...1 ..er.• ib PRAIRIL �� W "y`JJQ'tl s1A10 P e, PARK BLUIF � VISIRVI Chan6a� HIU PARK _ y+� LAKE SUSAN 1. �\ High / PRESERVE school I CHANHASSEN P`L HILLS PARK ' l O LAka HaeePina��� ' Project Location BANDIMER NATURAL RESERVE HEIGHTS PA• SANDIMERE g " COMMUNITY PARK q t x ggive ° ? s CHASKA g m� ^m@ 212 ag CHANHASSEN o HAZELTINE T°1r IN 960, S1 / a 4 NATL 2 F i GOLFCLUB % F O" . IS 3 Hwnestaatl< � r - -- �, Dr SURD© ¢Tj `£ I WOODP snadtlt 2 I BLUFF CREEK GOLF PIONEER COURSE Project Location PARK A Trail w, Stream Vnr. ran9e. / rtlIION.�a" I _. 4� �r ' 000 2.000 Nr,,,l Pes'aµ Lc{z. II Haiei� Hasse Fans RU ®Feet0 $�lF a Project Location CSAH 18 (Lyman Blvd) Reconstruction from CSAH 15 to CSAH 17 S.P. 010 - 618 -013 Carver County, Minnesota Figure 2a REATION CENTER oam V N �" HASSE' ATURE" 2t e A'h 0) A., LAKE ESERVE 0 SUSAN 7 L PARK STOi%ii"' Z,�� CREEK' SUNSET' PARK RIDGE PARK T W. V, PRAIRIE wdo KNOLL, BLUFF 06th sA REEK POKIER IHILL PARK SUSAN PRESERVE P p A ;EN I K, &VO LIT '71 BANDIMEI . . . . . . HEIGHTSI BANDIMERE 5 Lo V -`.CONIMUNITY,' 4 -P.A RK - 5K C J Im 11Fti z HAZELTINE 0 NAIL J GOLrCLU Q , tZ QiL 27 �J �J D K % PHANHAS H LLS PAR BLUFF • CREEK GOLF PIONEER J COURSE 0 PARK --- :2 71 Project Location i 0 1,000 2,000 p Feet Project Location — USGS CSAH 18 (Lyman Blvd) Reconstruction from CSAH 15 to CSAH 17 S.P. 010-618-013 Carver County, Minnesota Figure 2b W -10 0.00 AC. IMPACT 0.00 AC. IMPACT W -12 0.00 AC. IMPACT VVA3 / 0.00 AC. IMPACT �' C.S.A.H. 18 (LYMAN BOULEVARD) WETLAND IMPACTS FOR MINIMUM BUILD SAFETY ONLY IMPROVEMENTS 0 BLUFF CREEK WETLAND IMPACTS WETLAND IMPACTS FOR TRAIL & CAPAC ® NON— SAFETY IMPROVEMENTS TEMPORARY WETLAND IMPACTS WETLAND BOUNDARY _ - - - - -_ PROJECT CONSTRUCTION LIMITS —0- DRAINAGE DIRECTION W -## WETLAND NUMBER SP -## STORM POND NUMBER v W -14 Li EXISTING STORMWATER / / I, POND 1/ -- SP -A / �A- ?40 Q J Qy BLUFF CREEK 0.13 AC. . # . 0.09 . WETLAND 2 0.08 AC. (SAFETY) 0.71 AC. (NON - SAFETY) 0.06 AC. (TEMP) 0 100 200 scale m +eel WETND IMPACTS Figure 3A 1188 FROM AUDUBON ROAD TO POWERS BOULEVARD Comuk111g croup, Im S.P. 010 - 618.0131 S.P. 010- 617 -020 / S.P. 194 - 024009 ,bb #6098.P3 12/30,2013 - 10:24AM CARVER COUNTY BOULEVARD) ' / / / WETLAND 2 (SEE 3A) u ooao ooao 3 i o WETLAND 18 — 0.06 AC. (SAFETY) G L� 1 I of N WETLAND 0.02 AC. (NONSA FETY) 0.01 AC. (TEMP) LEGEND mom WETLAND IMPACTS FOR MINIMUM BUILD SAFETY ONLY IMPROVEMENTS 0 BLUFF CREEK WETLAND IMPACTS WEIAND IMPACTS FOR TRAIL & CAPACITY ® NON — SAFETY IMPROVEMENTS TEMPORARY WETLAND IMPACTS WETLAND BOUNDARY - - - - -- - PROJECT CONSTRUCTION LIMITS --b- DRAINAGE DIRECTION W - #F WETLAND NUMBER SP-## STORM POND NUMBER I r' i� 1 W Z J 0 00 200 scale in sae+ gal �\ I Figure 3B CSAH 181FROM AUDU ON ROAD TO POWERS BOULEVARD ConwltlFls o.oup, Im S.P. 010- 618-013 / S.P. 010.617.020 / S.P. 194-020-009 Job # 6098 -P3 12/302013 - 10:25AM CARVER COUNTY WETNDIMPACTS 1188 FROM AUDUBON ROAD TO POWERS BOULEVARD Figure 3C Comolgng Gmp Inc. S.P. 010 -61 &0131 S.P. 010- 617 -0201 S.P. 194 -020 -009 JoC 0 6098-P3 CARVER COUNTY 121302013 - 10:25A YMAN BLVD. LYMAN BLVD. (C.S.A.H. 18) MINIMUM BUILD, SAFETY ONLY IMPROVEMENTS LYMAN BLVD. (C.S.A.H. 18) I PLAN I I I I I I I I 1 I I I I I I TRAIL M CAPACITY MINIMUM BUILD NON-SAFETY SAFETY IMPROVEMENT IMPROVEMENT WETLAND IMPACTS WETLAND IMPACTS Typical Sections - Minimum Build, Safety Only Improvements & Plan CSAH 18 (Lyman Blvd) Reconstruction from Audubon Road to Powers Blvd Figure 4 S.P. 010-618-013/ S.P. 010 - 617 -020 / S.P. 194020-0D9 Carver County, Minnesota Appendix D: MnDNR Public Waters Work Permit MINNESOTA DEPARTMENT OF NATURAL RESOURCES Public Waters Work Permit Expiration Date: 10/29/2018 Permit Number 2014-0526 Pursuant to Minnesota Statutes, Chapter 103G, and on the basis of statements and information contained in the permit application, letters, maps, and plans submitted by the applicant and other supporting data, all of which are made part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant to perform actions as authorized below. Project:Name: County: Watershed: Resource: .CSAH 18 (Lyman Boulevard] Carver ... 'Lower Minnesota River Stieam/River. BlufiCreek .. - Mt55 -014) Purpose of Permit Authorized Action: Culvert ConstnrctfoNMOdifiratiortlReplacement Reconstruct culvert according to Plans received and the Conditions of this permit.' " Perrnittee. Authorized, Agent: , CARVER :COUNTY PUBLIC. WORKS SRF CONSULTING GROUP'INC CONTACT: LYNDORROB,IENT CONTACT.-NATHAN WILL 11.360H1GHWAY.212- ': -<. -� ".: :ONE:CARLSON.PARKWAYNORTH' SUITE 1 -: SUITE 150 COLOGNE, MN 55322 - - MINNEAPOLIS, MN 55447-4443 (952)466 - 5200: .: : ,. ; ('763) 470- 0010: This permit is granted subject to the following CONDITIONS: APPLICABLE FEDERAL, STATE, OR LOCAL REGULATIONS: The permittee is not released from any rules, regulations, requirements, or standards of any applicable federal, state, or local agencies; including, but not limited to, the U.S. Army Corps of Engineers, Board of Water and Soil Resources, MN Pollution Control Agency, watershed districts, water management organizations, county, city and township zoning. NOT ASSIGNABLE: This permit is not assignable by the permittee except with the written consent of the Commissioner of Natural Resources. NO CHANGES: The permittee shall make no changes, without written permission or amendment previously obtained from the Commissioner of Natural Resources, in the dimensions, capacity or location of any items of work authorized hereunder. SITE ACCESS: The permittee shall grant access to the site at all reasonable times during and after construction to authorized representatives of the Commissioner of Natural Resources for inspection of the work authorized hereunder. TERMINATION: This permit may be terminated by the Commissioner of Natural Resources at any time deemed necessary for the conservation of water resources of the state, or in the interest of public health and welfare, or for violation of any of the conditions or applicable laws, unless otherwise provided in the permit. COMPLETION DATE: Construction work authorized under this permit shall be completed on or before the date specified above. The permittee may request an extension of the time to complete the project, stating the reason thereof, upon written request to the Commissioner of Natural Resources. ItvlPARS momw 10/07120 1,', Pe . 6 lm i.a: 10 IM6. printed 10123'2012 CO,n,,DltfONS mm"nued en next page._. CONDITIONS (Continued from previous page) WRITTEN CONSENT: In all cases where the permittee by performing the work authorized by this permit shall involve the taking, using, or damaging of any property rights or interests of any other person or persons, or of any publicly owned lands or improvements thereon or interests therein, the permittere, before proceeding, shall obtain the written consent of all persons, agencies, or authorities concerned, and shall acquire all property, rights, and interests needed for the work. PERMISSIVE ONLY / NO LIABILITY: This permit is permissive only. No liability shall be imposed by the State of Minnesota or any of its officers, agents or employees, officially or personally, on account of the granting hereof or on account of any damage to any person or property resulting from any act or omission of the permiftee or any of its agents, employees, or contractors. This permit shall not be construed as estopping or limiting any legal claims or right of action of any person other than the state against the permittee, its agents, employees, or contractors, for any damage or injury resulting from any such act or omission, or as estopping or limiting any legal claim or right of action of the state against the permittee, its agents, employees, or contractors for violation of or failure to comply with the permit or applicable conditions. EXTENSION OF PUBLIC WATERS: Any extension of the surface of public waters from work authorized by this permit shall become public waters and left open and unobstructed for use by the public. WETLAND CONSERVATION ACT: Where the work authorized by this permit involves the draining or filling of wetlands not subject to DNR regulations, the permittee shall not initiate any work under this permit until the permli tee, has obtained official approval from the responsible local government unit as required by the Minnesota Wetland Conservation Act. CONTRACTOR RESPONSIBILITY: The permittee shall ensure the contractor has received and thoroughly understands all provisions of this permit. Contractors must obtain a signed statement from the property owner stating that permits required for work have been obtained or that a permit is not required, and mail a copy of the statement to the regional DNR Enforcement office where the proposed work is located. The Landowner Statement and Contractor Responsibility form can be found at: http: /Avww.bwsr. state. mn. us /wetiandstwcarindex.html#general. INVASIVE SPECIES - EQUIPMENT DECONTAMINATION: All equipment intended for use at a project site must be free of prohibited invasive species and aquatic plants prior to being transported into or within the state and placed into state waters. All equipment used in designated infested waters, shall be inspected by the Permittee or their authorized agent and adequately decontaminated prior to being transported from the worksite. The DNR is available to train inspectors and/or assist in these inspections. For more information refer to the "Best Practices for Preventing the Spread of Aquatic Invasive Species" at hftp:ltfiles.dnr. state. mn. us / publications /ewrfinvesives /ais/ best _practioes_for —prevenbon_ais.pctf. Contact your regional Invasive Species Specialist for assistance at www. mndnr .govfrnvasives /contacts.html. A list of designated infested waters is available at http:!/ files. dnr.state.mn.us /ecafinvasivesfinfested waters.pdf. A list of prohibited invasive species is available at www. mndnr. gov/ ecofinvasivesAaws .html#prohibfted. EROSION AND SEDIMENT CONTROL: In all cases, methods that have been determined to be the most effective and practical means of preventing or reducing sediment from leaving the worksite shall be installed in areas that slope to the water and on worksite areas that have the potential for direct discharge due to pumping or draining of areas from within the worksite (e.g., coffer dams, temporary ponds, stormwater inlets). These methods, such as mulches, erosion control blankets, temporary coverings, silt fence, sift curtains or barriers, vegetation preservation, redundant methods, isolation of flow, or other engineering practices, shall be installed concurrently or within 24 hours after the start of the project, and will be maintained for the duration of the project in order to prevent sediment from leaving the worksite. DNR requirements may be waived in writing by the authorized DNR staff based on site conditions, expected weather conditions, or project completion timelines. FISHERY PROTECTION - EXCLUSION DATES: No activity affecting the bed of the protected water may be conducted between April 15 and June 15, to minimize impacts on fish spawning and migration. If work during this time is essential, it shall be done only upon written approval of the Area Fisheries Manager. See contact list at: http: //files. dnr. state. mn. us / fisheries/ managenienVdnr _fisheries_managers.pdf. Should work begin elsewhere in the project area within these dates, all exposed soils that are within 200 feet of Public Waters and drain to those waters must complete erosion control measures within 24 hours of its disturbance to prevent sediment from entering Public Waters. MAINTENANCE: Maintenance of this project to originally authorized conditions may be authorized by amendment to this permit. Page 2 -Parma Number M pq.p =2g COND ?%IONS gnvnued en real Page_. cc: Moline, Paul Thephong Le, Conservation Officer, Mound Terry Jeffery, City of Chanhassen Brooke Haworth, DNR Regional Environmental Assessment Ecologist, Region 3 Diana Regenscheid, DNR Wildlife, South Metro Daryl Ellison, DNR Fisheries, West Metro Area Claire Bleser, Watershed District, RILEY PURGATORY BLUFF CREEK WD Melissa Jenny, Corps of Engineers, Carver Mike Wanous, SWCD, Carver SWCD Pape 3 - Pertnfl Number 2014 -0526 Appendix E: BWSR Safety Justification Information • January 14, 2013 Safety Information Supplemental Information for the WCA/ Corps Joint Permit Application Lyman Boulevard (CSAH 18) - Phase 3 January 14, 2013 Safety Discussion According to the MnDOT's crash data from January 1, 2005 through December 31, 2007 and locally- collected data, there have been a total of 55 crashes on CSAH 18 within the project area. These crashes include 15 personal injury crashes and 40 property damage crashes. According to MnDOT's crash data from January 1, 2007 through December 31, 2011 and locally- collected data, there have been a total of 42 crashes on CSAH 18 within the project area. These crashes include 14 personal injury crashes and 28 property damage crashes. Thus, a total of 97 crashes have occurred on the subject road improvement between January 1, 2005 and December 31, 2011. Additional crash data are appended to this supplement and demonstrate that the crash rate in the subject road improvement is considerably higher than similar roadway in the Twin Cities Metropolitan Area. See Attachment 1.In addition, unsafe conditions for pedestrians result from the lack of a pedestrian facility along CSAH which has a 50 -mph speed limit and high traffic volumes along the corridor. Existing (2010) traffic volumes along CSAH 18 in the project area are approximately 8,800 vehicles per day (vpd). Future (2030) traffic volumes are forecast to be approximately 23,000 vpd (Lyman Boulevard Phase III Traffic Analysis Update, SRF Consulting, dated January 12, 2012). This includes traffic generated from the new Chanhassen High School. Traffic operations were analyzed for existing (2010) conditions and for future forecast No Build conditions (2030). Capacity analysis (level of service (LOS)) was used to examine the operational characteristics for key intersections within the project area. LOS is a relative comparison of the ability of an intersection to function and accommodate traffic flow. The LOS of an intersection is generally presented as a rating from A through F, with A having the least delays and F having substantial delays. In the metropolitan area, an intersection with an LOS of D or better is considered to be operating at an acceptable level. Congestion results in safety issues. The following text describes safety improvements along the proposed Phase 3 reconstruction Lyman Boulevard (CSAH 18). In general the roadway will be reconstructed from a 2 -lane undivided highway to a 4 -lane divided highway with medians. The presence of the proposed medians will reduce the potential for head -on vehicle collisions. Audubon Road (north) and Lyman Boulevard (CSAH 18) Currently, eastbound traffic on Lyman Boulevard waiting to turn left onto northbound Audubon Road stacks up, forming a queue that blocks the left turn bypass lane. Thus, motorists who wish to travel past Audubon Road are often caught in the left turn queue and tend to make abrupt turns into the through lane leading to rear -end or side swipe crashes. The proposed dedicated left turn lanes from eastbound Lyman Boulevard to northbound Audubon Road allow turning traffic to seek refuge without interfering with eastbound through traffic, thus reducing the potential for crashes. Eastbound traffic on Lyman Boulevard turning north onto Audubon Road can use the median width and the westbound dedicated left turn lanes as refuge as drivers gauge gaps in the westbound traffic before they traverse the westbound through lanes to complete their turn. Powers Boulevard (CSAH 17) and Lyman Boulevard (CSAH 18) The regional recreational trail runs alongside the west side of Powers Boulevard where it crosses Lyman Boulevard (CSAH 18). A porkchop island will be constructed in the southwest quadrant of this intersection in order to allow trail users refuge from heavy traffic as they cross Lyman Boulevard. Traffic signals will be push button actuated for the benefit of pedestrians and trail users trying to cross Lyman Boulevard. The porkchop island will also serve to channelize heavy vehicular traffic turning from eastbound Lyman Boulevard to southbound Powers Boulevard. This channelization and dedicated right turn lanes will decrease the potential for rear -end crashes which result from conflicts between turning traffic and through traffic. An additional left turn lane from north bound Powers Boulevard to westbound Lyman Boulevard is proposed because heavy left turning traffic at this intersection tends to stack an unacceptable distance south on Powers Boulevard. This long queue interferes with the north bound through lanes on Powers Boulevard and tends to increase the potential for rear -end crashes. The heavy traffic needing to turn from northbound Powers Boulevard to westbound Lyman Boulevard is partly the result of the new Chanhassen High School built in 2009. Sunset Trail and Lyman Boulevard (CSAH 18) The intersection of Sunset Trail and Lyman Boulevard (CSAH 18) is at the top of a relatively steep hill. Thus, vertical sight lines are dangerous and there is a high potential for side - impact crashes as vehicles enter CSAH 18 from a current driveway. This driveway will be relocated to a side street and the approach grades on CSAH 18 will be flattened to increase the vertical sight distance and reduce the potential for side impact crashes. The reconstruction of this intersection will have dedicated left turn lanes on CSAH 18. This will greatly reduce the potential for rear -end crashes resulting from conflicts between turning traffic and through traffic. Trail Alternatives The No Build Trail Alternative was considered and rejected because it would not serve to provide continuity in the regional trail system. The location of the trail on the north side of Lyman Boulevard (CSAH 18) was largely driven by the location of the trail segment constructed during Phase 1 of this roadway improvement — also on the north side of Lyman Boulevard. The construction of the new Chanhassen High School in 2009 on the north side of Lyman Boulevard also was a driver for trail location. Attachment 1 - Crash Data for Intersection of Lyman Boulevard and Audubon Road Crash Type Summary kl�k Lyman Blvd Crash Analysis 2007 -2011 LAND Report Version 1.0 March 2010 Analysis Years: 2007, 2008, 2009, 2010, 2011 Crash Summary: Number of Vehicles Surface Condition Summary: Diagram Summary: 1 2 3+ K. Fatal 0 0 0 0 A - Incapacitating 0 0 0 0 B - Non - Incapacitating 5 0 4 1 C- Possible 9 1 7 1 N - Property Damage 28 4 21 Miscoded X- Not Reported 0 0 0 0 Miscoded 0 0 0 0 Total 42 5 32 5 Diagram Summary: 01 -Dry 33 1 03 -Left Turn 02 -Wet 2 04 - Ran Off Road - Left Side 0 03 -Snow 3 8 06 -Right Turn 04 -Slush 0 07 - Ran Off Road - Right Side 2 05- Ice /Packed Snow 4 6 09- Sideswipe - Opposing Dir Other 0 Other 21 Unknown /Not Specified (' 0 Miscoded Miscoded Diagram Summary: 02 - Sideswipe - Same Dir 1 03 -Left Turn 4 04 - Ran Off Road - Left Side 0 O6 - Right Angle 8 06 -Right Turn 0 07 - Ran Off Road - Right Side 2 08 -Head On 6 09- Sideswipe - Opposing Dir 0 Other 21 Unknown /Not Stated 0 Miscoded (' Total 42 Accident Type Summary 01 -Motor Vehicle in Transport 36 02 - Parked Vehicle 1 03.04 - Road Equipment 0 05 -Train 0 06 -Bike 0 07 - Pedestrian 0 08 -09 - Deer /Animal 2 10 -14. Other/Unknown Collision 1 2112 - Fixed Object 2 51 - Overturn 0 52-65 - Other Non - Collision 0 Other 0 Unknown /Not Stated 0 Miscoded 0 Total 42 Selection Filter: Total 42 Intersection Relation Summary: 01 -Not at Intersection 9 02 - T Intersection 6 03 - Y Intersection (' 04 - 4 Legged Intersection 15 05 - 5 or more Leg Intersection 1 O6 - Roundabout/Traffic Circle 0 07 - Intersection Related 7 08 - Alley or Driveway 0 09 - School Crossing (' 10 - RR Crossing 0 11 - Recreational Crossing (' 20 -22 - Interchange 0 Other 0 Unknown /Not Stated 4 Miscoded (' Total 42 Light Condition Summary: 01- Daylight 32 02 - Before Sunrise 3 03 - After Sunset 0 04 - Dark (Street Lights On) 5 06 - Dark (Street Lights Off) 0 O6 - Dark (No Street Lights) 1 07 - Dark (Unknown Lighting) 1 Other 0 Unknown /Not Stated 0 Miscoded 0 Total 42 WORK AREA: COUNTY_CODE('10') -FILTER: CRASH_YEAR('2007'; 2008'; 2009;'2010;'2011') -SPATIAL FILTER APPLIED Analyst: Notes: Jeff Bodnar 0111412013 MnCMAT 1.0.0 Page 1 of 1 or Driver and Time Summary /L Lyman Blvd Crash Analysis 2007 -2011 ('11110 Report Version 1.0 March 2010 Crash Time of Day Summary From 00:00 02:00 04:00 06:00 08:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 To 01:59 03:59 05:59 07:69 09:59 11:59 13:59 16:59 17:59 19:59 21:59 23:59 NR Total % SUN 0 0 0 0 0 2 0 0 0 0 0 0 0 2 4.8 MON 0 0 1 1 2 2 1 1 1 0 0 0 0 9 21.4 TUES 0 0 0 4 2 0 1 5 0 0 0 0 0 12 28.6 WED 0 0 1 1 1 1 0 2 1 0 1 0 0 8 19 THU 0 0 0 0 0 0 0 0 1 1 0 1 0 3 7.1 FRI 0 0 0 1 1 0 0 3 0 0 0 0 0 5 11.9 SAT 0 0 1 0 0 1 0 0 0 0 1 0 0 3 7.1 NV 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 3 7 6 6 2 11 3 1 2 1 0 42 102 % 0 0 7.1 16.7 L4.3 14.3 4.8 26.2 7.1 2.4 4.8 2.4 0 102 100 Driver Age /Gender Summary Driver Condition Summary Total % 01 - Normal - No Drugs or Drinking 02 - Under the Influence 3A 0 50. 5 0.0 Age M F NR MC Total % < 14 0 0 0 0 0 0 14 0 0 0 0 0 0 03 - Had Been Drinking 0 0.0 15 0 0 0 0 0 0 04 - Commercial Driver Over .04 BAC 0 0.0 16 2 4 0 0 6 14.3 05 - Had Been Taking Drugs 0 0.0 17 1 2 0 0 3 7.1 06- Aggressive 0 0.0 18 0 1 0 0 1 2.4 07 - Asleep 0 0.0 19 0 0 0 0 0 0 08- Physical Disability 0 0.0 20 0 0 0 0 0 0 09 - Illness 0 0.0 21.24 4 3 0 0 7 16.7 Not Specified 4 9.5 25.29 2 0 0 0 2 4,8 Other 0 0.0 3034 0 0 0 0 0 0 Not Applicable 0 0.0 35 -39 2 3 0 0 5 11.9 Unknown 0 0.0 40-44 3 1 0 0 4 9.5 Miscoded 0 0.0 1 Total 42 100 4539 3 2 0 0 5 11.9 50 -64 2 3 0 0 5 11.9 Location First Harmful Event Summary Total % 56 -59 1 1 0 0 2 4.8 60-64 0 2 0 0 2 4.8 66-69 0 0 0 0 0 0 01 - On the Roadway (Alley, Drive, etc.) 30 85.7 70.74 0 0 0 0 0 0 02 - Off the Roadway, On the Shoulder 2 4.8 75.79 0 0 0 0 0 0 03 - Off the Roadway, On the Median 0 0.0 80-84 0 0 0 0 0 0 04 - Off the Roadway, On the Roadside 0 0.0 85-89 0 0 0 0 0 0 06 - Off the Roadway, On the Separator 0 0.0 90.94 0 0 0 0 0 0 06 - Parking Lot 0 0.0 95+ 0 0 0 0 0 0 07 - Private Property 0 0.0 NR 0 0 0 0 0 0 08 - Outside Right -Of -Way 0 0.0 MC 0 0 0 0 0 0 Not Specified 4 9.5 Other Unknown 0 0 0.0 0.0 Total 20 22 0 0 42 100 % 47.6 52.4 0 0 100 100 Miscoded 0 0.0 Total 42 i00 Selection Filler: WORK AREA: COUNTY_CODE('10') -FILTER: CRASH_YEAR('2007'; 2008 ;'2009 ;'2010'; 2011') -SPATIAL FILTER APPLIED Analyst: Notes: Jeff Bednar 01/14/2013 MnCMAT 1.0.0 Page 1 of 1 LYMAN BLVD CORRIDOR (Audubon Rd to Powers Blvd) CRASH ANALYSIS Table 1: Summary of Segment Crashes on LYMAN BLVD (Audubon Rd to Powers Blvd) Input Analysis Period (in years) Input # of Fatal Crashes on Segment 5 Crash Data from MnCMAT 0 2007 through 2011 Input # of 'A' Severity Crashes on Segment 0 Input # of 'B' Severity Crashes on Segment 5 Input # of 'C' Severity Crashes on Segment 9 Input # of Property Damage Crashes on Segment 28 Total Segment Crashes = 42 Segment Length in miles 0.6 Input Segment Average Daily Traffic Volume* 8,800 Based on 2010 Mn /DOT Traffic Volume Maps *Average number of vehicles traveling the segment can be calculated by multiplying the ADTs for each of the sub segments by the percent of total segment length and then summing the sub segment products. Table 2: Comparison of Lyman Blvd Segment Crash Rates with Mn /DOT Metro District Crash Rates for Rural 2 -Lane Segments Lyman Blvd Corridor Segment Crash Rate Data Mn /DOT Crash Rates Metro Rural 2 -Lone* Segment Crash Rate = 4.36 crashes per million vehicle miles 0.80* (1.33) ** Segment Severity Rate = 6.33 1.20* Segment Crash Density = 14.00 crashes per mile per year 4.40* Segment Crash Cost" = $232,734 per mile per year * The Mn /DOT Metro District average crash and severity rates and crash density are based on the 2007 -2011 Average Crash Rates for Rural 2 -Lane roadways in the Metro District crash rate data. ** The Crash Rate shown in parentheses is the (Critical Crash Rate) based on and calculated using the related average crash rate. The critical crash rate provides a statistically relevant crash rate benchmark. ^ Note that crash cost is based on the following costs by crash severity: F: $560,000, A: $280,000, B: $61,000, C: $30,000, PD: $4,400 The value used for fatal crashes in the crash cost is 2 times the value of an 'A' severity crash. See HES documentation for information on when it may be appropriate to use full cost for a fatal crash of $3,600,000. Conclusions: 1. The crash rate for the Lyman Blvd Segment is above the average crash rate and above the critical crash rate based on the Mn /DOT Metro District average crash rates for similar segments. 2. Segments with crash rates above the critical crash rate are considered to be in need of further safety review since there is a high probability (95 %) that roadway conditions along the segment are contributing to the crashes and the crashes are not occurring by chance circumstance. 3. The severity rate and crash density for the Lyman Blvd Segment are above the Mn /DOT Metro District average severity rate and crash density for similar segments. tr Crash Detail Report CAB CSAH 18 8 Audubon Rd Sol 043450198 10/15/2004 1935 County:Carver City:CHANHASSEN Severity: PROPERTY DAMAGE - NO Roadway Type:2 LANES - -1 EACH WAY Type of Crash:OTHER TYPE OF COLLISION Surface Conditions: WET Light Conditions: DARK - STREET LIGHTS ON Weather Cord 1:RAIN Weather Cord 2:RAIN Number of Vehicles:02 Init Trav Dir. Veh Action Configuration. Driver Age Driver Gender. Driver Cord'. Drivr Contr 1 Drivr Contr 2' Sys: 04 Route:10000018 (004 +00.791) First Harmul Event:ON THE ROADWAY (ALLEY, Relation to Junction '.r - INTERSECTION Traffic Cont. Device:TRAFFIC SIGNALS Speed Limit:50 Diagram Location:REAR END Investigating Officer:SHERIFF Reliability of Info:CONFIDENT Unit 1 Unit 2 Unit 3 EAST EAST - PASSENGER CAR SPORT UTILITY VEHICLE - 017 031 F M NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR - FOLLOWING TOO CLOSELY NO CLEAR CONTRIBUTING DRIVER INATTENTION OR NO CLEAR CONTRIBUTING - 043550166 10/23/2004 0241 County:Carver CIty:CHANHASSEN Severity: PROPERTY DAMAGE - NO Roadway Type:2 LANES - -1 EACH WAY Type of Crash:OVERTURN / ROLLOVER Surface Conditions: WET Light COnditions:DARK - NO STREET LIGHTS Weather Cond 1:CLOUDY Weather Cond 2:RAIN Number of Vehicles: 01 Init Trav Dir: NORTH - Veh Action: VEHICLE - GOING STRAIGHT - Configuration: PASSENGER CAR - Driver Age: 024 Driver Gender: M Driver Cond: NORMAL - NO DRUGS OR - Ddvr Contr 1: OTHER - Drivr Contr 2: CHEMICAL IMPAIRMENT - Sys: 04 Route:10000018 (004 +00.791) First Harmul Event:OFF THE ROADWAY ON THE Relation to Junction:NOT AT INTERSECTION OR Traffic Cont. DeviceNOT APPLICABLE Speed Limit:45 Diagram Location:RAN OFF ROAD - -RIGHT SIDE Investigating Officer:SHERIFF Reliability of Info:BEST GUESS 8/10/2007 Mapping Analysis Tool 3.7.0 Page: 1 of 5 Crash Detail Report n,16 CSAH 18 8 Audubon Rd So tall 050380100 12/14/2004 2023 Sys:04 County:Carver City:CHANHASSEN Route:10000018 (004 +00.791) Severity: PROPERTY DAMAGE - NO Roadway Type:2 LANES - -1 EACH WAY Type of Crash:COLLISION WITH MOTOR VEHICLE Surface Conditions: DRY Light Conditions:DARK - STREET LIGHTS ON Weather Cond 1:CLEAR Weather Cond 2:NOT SPECIFIED Number of Vehicles: 02 ]nit Trav Dir Veh Action Configuration Driver Age Driver Gender Driver Cond Drivr Contr 1 Drivr Contr 2 First Harmul Event:ON THE ROADWAY (ALLEY, Relation to Junction:T- INTERSECTION Traffic Cont. DevlceTRAFFIC SIGNALS Speed Limit:50 Diagram LOcatlon:REAR END Investigating Officer:SHERIFF Reliability of Info:CONFIDENT Unit 1 Unit 2 Unit 3 NORTHEAST NORTHEAST - '.VEHICLE - MAKING RIGHT VEHICLE - MAKING RIGHT - PICKUP PASSENGER CAR - 040 040 M F NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR - FOLLOWING TOO CLOSELY NO CLEAR CONTRIBUTING DRIVER INATTENTION OR NOT SPECIFIED - 050610394 03/02/2005 1856 County:Carver City: CHANHASSEN Severity: PROPERTY DAMAGE - NO Roadway Type:2 LANES - -1 EACH WAY Type of Crash:COLLISION WITH DEER Surface Conditions: DRY Light Conditions: DARK - UNKNOWN LIGHTING Weather Cond 1:CLEAR Weather Cond 2:NOT SPECIFIED Number of Vehicles: 01 ]nit Trav Dir Veh Action Configuration Driver Age Driver Gender Driver Cond Drivr Contr 1 Drivr Contr 2 Sys: 04 Route:10000018 (004 +00.791) First Harmul Event:ON THE ROADWAY (ALLEY, Relation to JunctionVOT AT INTERSECTION OR Traffic Cont. Device:NOT APPLICABLE Speed Limit: 50 Diagram Location:OTHER Investigating (Kficer:SHERIFF Reliability of Info:CONFIDENT Unit 1 Unit 2 Unit 3 EAST - - VEHICLE - GOING STRAIGHT - - PICKUP - - 052 M NORMAL - NO DRUGS OR - - NO CLEAR CONTRIBUTING - NOT SPECIFIED - - 8/10/2007 Mapping Analysis Tool 3.7.0 Page: 2 o'5 Crash Detail Report CSAH 18 & Audubon Rd So 051230276 03/25/2005 1200 Sys:09 COUnty:Carver City:CHANHASSEN Route:10000018 (009 +00.791) Severity: PROPERTY DAMAGE - NO First H2rmul Event:ON THE ROADWAY (ALLEY, Roadway Type:2 LANES - -1 EACH WAY Relation to Junction:INTERSECTION- RELATED Type of Crash:COLLISION WITH MOTOR VEHICLE Traffic Cont. DevlceNOT SPECIFIED Surface Conditions: DRY Speed Limlt:95 Light Condltlons:DAYLIGHT Diagram LOcatlon:RIGHT TURN Weather Cond 1:CLEAR Investigating OfflcerSHERIFF Weather Cond 2:NOT SPECIFIED Reliability Of Info:CONFIDENT Number of Vehlcles:02 Unit 1 Unit 2 Unit 3 Init Trav Dir: SOUTHWEST SOUTHWEST - Veh Action: VEHICLE - MAKING LEFT TURN VEHICLE - MAKING RIGHT - Configuration: SPORT UTILITY VEHICLE PASSENGER CAR - Driver Age: 058 099 Driver Gender M M Driver Cond: NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR - Drivr Contr 1:IMPROPER TURN NO CLEAR CONTRIBUTING Drivr Contr 2: NOT SPECIFIED NOT SPECIFIED - Sys:09 051390102 09/22/2005 1050 COUnIy:Carver City:CHANHASSEN Route: 10000018 (009 +00.791) Severity: PROPERTY DAMAGE - NO First Harmul Event:ON THE ROADWAY (ALLEY, Roadway Type:2 LANES - -1 EACH WAY Relation to Junction:INTERSECTION- RELATED Type of Crash:COLLISION WITH MOTOR VEHICLE Traffic Cont. DevlceSTOP SIGN - OTHER Surface Conditions:DRY Speed Limit:45 Light Conditions: DAYLIGHT Diagram LOCatlon:SIDESWIPE -- SAME DIRECTION Weather Cond 1: CLOUDY Investigating OfflceCSHERIFF Weather Cond 2:NOT SPECIFIED Reliability of Info:CONFIDENT Number of Vehicles: 02 Unit 1 Unit 2 Unit 3 Init Trav Dir: SOUTHEAST SOUTH - Veh Action: VEHICLE - MAKING LEFT TURN VEHICLE - MAKING U TURN - Configuration :TRUCK TRACT. SEMITRAILER PASSENGER CAR - Driver Age: 097 056 Driver Gender: M F Driver Cond: NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR - Drivr Contr 1:NO CLEAR CONTRIBUTING DRIVER INATTENTION OR Drivr Contr 2: NOT SPECIFIED NOT SPECIFIED - 8/10/2007 Mapping Analysis Tool 3.7.0 Page: 3 of 5 Crash Detail Report CSAH IS 8 Audubon Rd So LBO 062850262 10/12/2006 1524 SyS:04 County:Carver City:CHANHASSEN Route:10000018 (004 +00.797) Severity: PROPERTY DAMAGE - NO Roadway Type:4 -6 LANES UNDIVIDED (2 TO 3 Type of Crash:COLLISION WITH MOTOR VEHICLE Surface Condltions:WET Light CondItions:DAYLIGHT Weather Cond 1:CLOUDY Weather Cond 2:CLOUDY Number of Vehicles:02 Init Trav Dir Veh Action Configuration Driver Age Driver Gender Driver Cond Drivr Contr 1 Drivr Contr 2 First Harmul Event:ON THE ROADWAY (ALLEY, Relation to Junction T- INTERSECTION Traffic Cont. DevlceTRAFFIC SIGNALS Speed Limit:50 Diagram LOCation:REAR END Investigating Gfflcer:SHERIFF Reliability of Info:CONFIDENT Unit 1 Unit 2 Unit 3 EAST EAST - - VEHICLE - SLOWING IN - PICKUP PASSENGER CAR - 022 042 F M M NORMAL - NO DRUGS OR - NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR - DRIVER INATTENTION OR NO CLEAR CONTRIBUTING NOT SPECIFIED I- NO CLEAR CONTRIBUTING NO CLEAR CONTRIBUTING - 0063030172 10/13/2006 0740 Sys:04 ,n Y.. City:CHANHASSEN Route:10000018 (004 +00.791) Severity: INJURY - POSSIBLE INJURY Roadway Type:4 -6 LANES UNDIVIDED (2 TO 3 Type of Crash:COLLI SION WITH MOTOR VEHICLE Surface Conditions: DRY Light Condltions:DAYLIGHT Weather Cond 1:CLOUDY Weather Cond 2:NOT SPECIFIED Number of Vehicles:02 First Harmul Event:ON THE ROADWAY (ALLEY, Relation to Junction NOT AT INTERSECTION OR Traffic Cont. Device:TRAFFIC SIGNALS Speed Limit50 Diagram Location:REAR END Investigating OfficecSHERIFF Reliability of Info:CONFIDENT Init Trav Dir: WEST WEST - Veh Action: VEHICLE - STOPPED IN VEHICLE - GOING STRAIGHT - Configuration: PASSENGER CAR PASSENGER CAR - Driver Age: 020 017 Driver Gender: F F Driver Cond: NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR - Drivr Contr 1: NO CLEAR CONTRIBUTING DRIVER INATTENTION OR Drivr COntr2:NOT SPECIFIED NOT SPECIFIED I- 8/10/2007 Mapping Analysis Tool 3.7.0 Page: 4 of 5 rCrash Detail Report ORB CSAH 18 & Audubon Rd So Dunty:Carver City:CHANHASSEN Severity:PROPERTY DAMAGE - NO Roadway Type:2 LANES - -1 EACH WAY Type of Crash:COLLISION WITH SIGN Surface Conditions: DRY Light Conditions: DAYLIGHT Weather Cond 1:CLEAR Weather Cond 2:OTHER Number of Vehicles:01 [nit Trav Dir Veh Action Configuration Driver Age Driver Gender Driver Cond Drivr Contr 1 Drivr Contr 2 Sys: 04 Route:10000018 (004 +00.790) First Harmu) Event:OFF THE ROADWAY ON THE Relation to Junction NOT AT INTERSECTION OR Traffic Cont. Device21DT APPLICABLE Speed Limit: 50 Diagram Location:OTHER Investigating Officer:SHERIFF Reliability of Info:CONFIDENT Unit 1 Unit 2 Unit 3 EAST - VEHICLE - GOING STRAIGHT - - PASSENGER CAR - - 016 M NORMAL - NO DRUGS OR - - ILLEGAL OR UNSAFE SPEED - DRIVER INEXPERIENCE - - 170380272 12/31/2006 1500 County:Carver City:CHANHASSEN Severity: PROPERTY DAMAGE - NO Roadway Type:NOT SPECIFIED Type of Crash:COLLI SION WITH SIGN Surface CondiOons: WET Light Conditions:UNKNOWN Weather Cond 1:CLOUDY Weather Cond 2:NOT SPECIFIED Number of Vehicles: 01 Init Trav Din UNKNOWN OR NOT APPLICABLE - Veh Action: - - :onfigurat[on: PASSENGER CAR - Driver Age: 071 Inver Gender: F Driver Cond: NOT SPECIFIED - DrivrContrl:NOT SPECIFIED - DrivrContr2:NOT SPECIFIED - Sys: 04 Route:10000018 (004 +00.791) First Harmul Event:NOT SPECIFIED Relation to Junction NOT SPECIFIED Traffic Cont. Device' NKNOWN Speed Limit:50 Diagram LOcation:OFFICER REPORTED THAT Investigating Officer:NOT SPECIFIED Reliability of Info:CONFIDENT 8/10/2007 Mapping Analysis Tool 3.7.0 Page: 5 of 5 Crash Detail Report lops CSAH 18 8 Audubon Rd No .. T. .� COunty:Carver Clty:CHANHASSEN Severity: PROPERTY DAMAGE - NO Roadway Type: OTHER Type of Crash:COLLI SION WITH MOTOR VEHICLE Surface Conditions: ICE / PACKED SNOW Light Conditions: DAYLIGHT Weather Cond i:CLOUDY Weather Cond 2:SLEET, HAIL, OR FREEZING Number of Vehicles: 02 Init Trav Dir: WEST NORTH Veh Action: VEHICLE - GOING STRAIGHT VEHICL. Configuration: PASSENGER CAR PICKUP Driver Age: 050 023 Driver Gender F M Driver Cond: NORMAL - NO DRUGS OR NORMAL Drivr Contr t: NO CLEAR CONTRIBUTING SKIDDI: Drivr Contr2: NOT SPECIFIED WEATHE'. 142510286 06/29/2004 1826 County:Carver City:CHANHASSEN Severity:INJURY - POSSIBLE INJURY Road Way Type:2 LANES - -I EACH WAY Type of Crash: OTHER TYPE OF COLLISION Surface Conditions: DRY Light Conditions:DAYLIGHT Weather Cond VCLEAR Weather Cond 2: CLEAR Number of Vehicies:03 Sys: 04 Route:10000018 (005 +00.214) First Harmul Event:ON THE ROADWAY (ALLEY, Relation to Junction:INTERSECTION- RELATED Traffic Cont. DeviceTRAFFIC SIGNALS Speed Limit:50 Diagram LOCation:OTHER Investigating OfficeCSHERIFF Reliability of Info:CONFIDENT - MAKING RIGHT - - NO DRUGS OR 11- Sys: 04 Route:10000018 (005 +00.233) First Harmul Event:ON THE ROADWAY (ALLEY, Relation to Junction:T- INTERSECTION Traffic Cont. Device.TRAFFIC SIGNALS Speed Limit:50 Diagram Location:REAR END Investigating OfficeCSHERIFF Reliability of Info:CONFIDENT Init Trav Dir: WEST WEST Veh Action: VEHICLE - STOPPED IN VEHICLE - STOPPED IN Configuration: PASSENGER CAR PASSENGER CAR Driver Age: 017 021 Driver Gender M M Driver Cond: NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR Drivr Contr 1: OTHER OTHER Drivr Contr 2: NOT SPECIFIED NOT SPECIFIED VEHICLE - STOPPED IN VAN OR MINIVAN 016 F NORMAL - NO DRUGS OR OTHER 8/10/2007 Mapping Analysis Tool 3.7.0 Page: I of Crash Detail Report r CSAH 18 & Audubon Rd No w 061990264 07/18/2006 1200 Sys:04 County:Carver City:CHANHASSEN Route:10000018 (005 +00.214) Severlty:PROPERTY DAMAGE - NO Road Way Type:2 LANES - -1 EACH WAY Type of Crash:COLLISION WITH MOTOR VEHICLE Surface Conditions: DRY Light Conditions: DAYLIGHT Weather Cond 1: CLEAR Weather Cond 2:NOT SPECIFIED Number of Vehicles: 02 First Harmul Event:ON THE ROADWAY (ALLEY, Relation to Junction:T- INTERSECTION Traffic Cont. DeviceTRAFFIC SIGNALS Speed Limit:50 Diagram Location:REAR END Investigating Officer:SHERIFF Reliability of Info:CONFIDENT Init Trav Dic EAST EAST - Veh Action: VEHICLE - GOING STRAIGHT VEHICLE - STOPPED IN - Configuration :SPORT UTILITY VEHICLE PASSENGER CAR - Driver Age: 038 047 Driver Gender F F Driver Cond: NORMAL - NO DRUGS OR NORMAL - NO DRUGS OR - Drivr Contr l: FOLLOWING TOO CLOSELY NO CLEAR CONTRIBUTING Drivr Contr 2: NOT SPECIFIED NOT SPECIFIED - 8/10/2007 Mapping Analysis Too] 3.7.0 Page: 2 of 2 Appendix F: BWSR Safety Justification Information January 2013 Follow -up Safety information in Response to TEP comments Supplemental Information for the WCA/ Corps Joint Permit Application Lyman Boulevard (CSAH 18) - Phase 3 January 2013 TEP Follow -up Information BWSR Safety Justification The following information addresses the comments received during the TEP meeting held in January 2013, regarding the calculation of wetland impacts for Board of Water and Soil Resources (BWSR) mitigation (safety related) versus the wetland impacts resulting from the proposed trail and roadway improvements related to future capacity. Safety - Related Wetland Impacts and Non Safety - Related Trail Impacts Typically, wetland impacts resulting from safety - related roadway improvements are mitigated through the BWSR Road Replacement Program. Those wetland impacts that result from improvements to address future roadway capacity or recreational trails are not mitigated through the BWSR Road Replacement program; rather, they are often mitigated through the purchase of credits from existing suitable wedand banks or on -site mitigation. In order to separate wetland impacts into relevant categories such as safety, capacity, and, trail- related, SRF created a hypothetical depiction of the subject roadway that would be recommended to address safety related issues, based on estimated 2014 traffic volumes. Based upon previous 2010 traffic counts, historical data and a straight -line estimation method, we estimate the 2014 volumes on CSAH 18 as follows: • West Segment (CSAH 15 to Audubon Road North) — 13,000 ADT • East Segment (Audubon Road North to CSAH 17) — 10,800 ADT Refer to revised Figures 3A -3C in Appendix C. Figures 3A -3C show the revised construction limits for the proposed roadway improvements and a hypothetical minimum build road configuration within those construction limits. Based upon the estimated 2014 traffic volumes, the hypothetical minimum build roadway would consist of a 2 -lane (1 lane eastbound and 1 lane westbound) rural section with no median and dedicated left and right turn lanes at the Audubon Road North / CSAH 18 intersection. Refer to Figure 4 in Appendix C for comparison of the hypothetical versus proposed typical sections. The proposed roadway is a 4-lane (2 lanes eastbound and 2 lanes westbound) urban section with a median and dedicated left and right turn lanes. The hypothetical roadway configuration does not include a recreational trail whereas the proposed roadway improvements include a recreational trail. The design of both the minimum build and proposed roadway section, as described above, follow the minimum design standards set forth by Minnesota Rules 8820.9936 URBAN, 8820.9926 RURAL, 8820.9995 BIKEWAY STANDARDS and State Aid requirements. Wetland impacts resulting from the minimum build configuration not associated with trails or capacity improvements would be considered safety impacts to be mitigated through BWSR Program. Wetland impacts outside of the minimum build estimated construction limits resulting from the proposed roadway improvements would be considered non safety- related impacts. Table 1 and 2 below summarize the wetland impacts resulting from the minimum safety - related improvements, the proposed wetland impacts beyond the minimum safety - related improvements and proposed mitigation strategies for each wetland identified along this project. Table is Summary of Wetland Impact Areas Related to Safety, Non - Safety, and Temporary Improvements Wetland ID Safety - Related Wetland Impacts (acre) Non Safety - Related Wetland Impacts (Outside Safety Improvements] (acre) Temporary Wetland Impacts (acre) W -1A 0.00 0.02 O.Oi W1 -B 0.06 0.00 0.00 W -2 0.09 0.71 0.06 W -14 0.05 0.81 0.09 W -19 0.00 0.01 0.00 Bluff Creek 0.13 0.00 0.00 Total Wetiand Impacts (ac) Safety - Related: 0.33 acres Non Safety - Related: 1.55 acres Temporary 0.16 acres Table 2: Summary of Proposed Wetland Mitigation for Each Wetland Impact within Project Area Wetiand ID Safety - related Required Mitigation Non Safety- Related Required Mitigation Wetland Impacts (2:1) from BWSR Wetland Impacts (2:1) from Private Road Replacement Outside Safety Wetland Bank Credit Program Improvements Purchase (acre) (acre) (acre) (acre) 14� -1A 0.00 0.00 0.02 0.04 W1 -B 0.06 0.12 0.00 Self- mitigating ditch�') W -2 0.09 0.18 0.71 1.42 W -14 0.05 0.1 0.81 1.62 W -19 0.00 0.00 0.01 0.02 Bluff Creek 0.13 026 0.00 0.00 Total Safety - Related: Non Safety - Related. Wetland 0.33 acres 0.66 acres 1.55 acres 3.10 acres Impacts (acre) (1) This existing wetland ditch meets the three parameters of wetlands. The proposed roadway improvement will re- establish a similar ditch that will be re- seeded with an appropriate wetland seed mix. Appendix G: CRU letter �NNFSpl9 $O bra 3m �OF TP Minnesota Department of Transportation Office of Environmental Services Mail Stop 620 395 John Ireland Boulevard St. Paul, MN 55155 -1899 April 19, 2012 Cynthia Warzecha SRF Consulting Group, Inc. One Carlson Parkway North, Suite 150 Minneapolis, MN 554474443 Office Tel: (651) 366 -3604 Fax: (651) 366 -3603 Re: S.P. 010 - 618 -013 (CSAH 18 reconstruction, CSAH 15 to CSAH 17) T116N R28W Sects. 22 & 23, Chanhassen, Carver County Dear Ms. Warzecha: We have reviewed the above - referenced undertaking pursuant to our FHWA - delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act, as amended (36 CFR 800), and as per the terms of the 2005 Section 106 Programmatic Agreement between the FHWA and the Minnesota State Historic Preservation Office. Carver County plans to reconstruct a segment of CSAH 18 (Lyman Blvd.) between CSAH 15 (Audubon Rd. South) and CSAH 17 (Powers Blvd.) in Chanhassen. The roadway here is currently a rural, undivided two -lane section. Reconstruction will upgrade the roadway to a divided four -lane section. West of CSAH 15, CSAH 18 has already been upgraded to a divided four -lane section. There will be minor horizontal and vertical adjustments to the roadway. Work will include the widening of traffic lanes and construction of a two -way ped/bike trail along the north side of CSAH 18. Narrow strips of additional right of way will be needed for the project. The project area of potential effect (APE) for direct effects to cultural resources is defined by the project construction limits, including temporary and permanent easements. The APE for indirect effects includes the first tier of properties adjacent to the project that are not screened from the project by vegetation, topography or other features. There are no known cultural resources within the APE. The APE has low potential for containing unidentified intact archaeological resources due to disturbance caused by previous roadway and utilities construction. The architecture/history properties within the APE are less than 50 years of age and are not eligible for the National Register of Historic Places. The finding of this office is that there will be no historic properties affected by the project as currently proposed. If the project scope changes, please provide our office with the revised information and we will conduct an additional review. Sincerely, Elizabeth J. Abel State Programs Administrator Coordinator Cultural Resources Unit cc: Teresa Martin, MnDOT CRU MnDOT CRU Project File Appendix H: Draft BWSR Withdrawal Form Application for Withdrawal of Wetland Credits from the Minnesota Wetland Bank 1. Credit User To be completed by the person or entity proposing to use the wetland credits. Name: Lyndon Robjent, P.E. Organization (if applicable): Carver County Public Works Department Street Address: 11360 Hwy 212, Suite 1, Cologne, MN 55322 City, State, Zip: Cologne, MN 55322 Phone: 952 - 466 -5200 E -Mail Address: CarverCountyPW @co.carver.mn.us This space is for BWSR use only Debit Date: 2. Wetland Impact Information To be completed for the project with wetland impacts that this withdrawal is intended to replace. Project Name: CSAH 18 (Lyman Boulevard) Phase 3 Wetland Impact Size (acres): 1.5500 County of Impact: Carver Replacement Ratio: 2:1 Impact Major Watershed #: 33 Total Replacement Required (acres): 3.1000 Impact Bank Service Area: 9 LGU File # (if applicable): U.S. Army Corps Permit # (if applicable): Comments: By signature below, the proposed user of credits attests that he /she owns or has purchased the credits identified in this application and has received approval from the applicable regulatory authority(ies). Credit User Signature: Date: 3. Regulatory Approval /Authorization By signature below, the Identified agency and authorized representative hereby certify that they have: a) verified that the subject wetland credits are deposited in the account of the owner /seller, b) approved a wetland replacement plan or similar agreement under their jurisdiction, and c) approve the proposed use of the wetland bank credits described herein. WCA LGU /Agency: E -mail address*: LGU Representative: Signature! Date: (for NRCS, USACE, etc. if applicable) Agency Name /Location: E -mail address*: Representative: Signature: Date: *Confirmation will be e- mailed when transaction is complete. BW SR Application for Withdrawal of Wetland Credits Form Rev 10/3/2013 Page 1 of 2 Application for Withdrawal of Wetland Credits MAI from the Minnesota Wetland Bank t 4. Withdrawal Information To be completed by seller of credits (account holder). Bank Service Area: 9 Account Number: 1392 County: Carver Credit Subgroup Letter Plant Community Type Cost per Credit (acre) Number of Credits to be Withdrawn (acre) acre= ft2/43560 Cost of Purchased Credits (cost per credit z number of credits) C Flow- through $38322.80 3.1000 $118800.68 $0.00 $0.00 $0.00 TOTAL 3.1000 $118800.68 Enter County Fee Table: www.bwsrstate.mn.us /wet1ands /2013 Fee Schedule odf from Table (county of o I �ouor,. K.n4t 6.5 /o of sale price Transaction Fee (choose either amount) County Fee $7,722.04 $ 0.00 Attach check payable to Minnesota Board of Water and Soil Resources. By signature below I seller and holder of the aforementioned account in the State of Minnesota Wetland Mitigation Bank certify that: 1) The credits described in this application have been sold to the credit user or will be used for my own project, 2) 1 have received payment in full from the buyer (if applicable); 3) The credits described in this application have not been sold or used in any way to mitigate wetland losses other than for the project and location identified in the wetland impact information block on the previous page; 4) The credits described in this application should be withdrawn from my account; and 5) 1 will not have a negative balance of credits after the subject credits are debited from my account Seller Name (print): Seller Signature: Seller e- mail *: Date: 1. The account holder of the credits is responsible for submittal of this form, containing signatures, to the BWSR Wetland Bank Administrator so the affected account can be properly debited. 2. No impacts to any wetland or other water resource may commence until the credits have been debited and a copy of this form with stamped debit date has been received by the regulatory authority(ies), the account holder, and the credit user. When this form is completed and all required signatures are obtained, send with the fee check to: Wetland Bank Administration Minnesota Board of Water and Soil Resources 520 Lafayette Road North Saint Paul, MN 55155 BWSR Application for Withdrawal of Wetland Credits Form Rev 10/3/2013 Page 2 of 2 CITY OF CHANHASSEN CARVER & HENNEPIN COUNTIES NOTICE OF PUBLIC HEARING PLANNING CASE NO. 2014-05 NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a public hearing on Tuesday, March 4, 2014, at 7:00 p.m. in the Council Chambers in Chanhassen City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a request for a Wetland Alteration Permit for proposed roadway reconstruction and improvement project of the segment of CSA14 18 (Lyman Boulevard) between CSAH 15 (Audubon Road) and CSAH 17 (Powers Boulevard). Applicant: Carver County. A plan showing the location of the proposal is available for public review on the City's web site at www.ci.chanhassen.mn.us /2014 -05 or at City Hall during regular business hours. All interested persons are invited to attend this public hearing and express their opinions with respect to this proposal. Krista Spreiter, Natural Resources Technician Email: kVreiLer@ci.chanhassen.mn.us Phone: 952- 227 -1173 (Publish in the Chanhassen Villager on February 20, 2014) �� ,� I ENGINEER 5 PLANNERS D F51 f.NFRS Consulting Group, Inc. To: Terrance Jeffery, Water Resources Coordinator City of Chanhassen From: Matthew Meyer, Senior Environmental Scientist Nathen Will, Senior Associate Date: February 26, 2014 Subject: CSAH 18 (Lyman Boulevard) Phase 3 Wetland Permitting Update for Wetland lA Introduction Memorandum SRF No. 0076098 3040 This memorandum transmits updated information and attachments to address the Technical Evaluation Panel's (I'EP) comments related to the secondary impacts associated with Wetland IA, and to provide supportive evidence for the maintenance of hydrology, including the avoidance of secondary impacts to the remaining project wedands. Wetland 1A Secondary Impacts As part of this project, the existing CSAH 18 roadway profile is being lowered approximately 6 feet to improve sightlines and safety at the intersection of Sunset Trail which includes the private driveway adjacent to Wetlands W -lA and W -113. This profile adjustment is reflected in the attached cross sections, which show the proposed grading along entire CSAH 18 project Refer to cross sections from Station 216 +50 to Station 217 +50 (Plan Sheets 204 and 205 — Appendix B) for the proposed grading impacts and driveway profile as compared to the existing ground line. The proposed grade changes associated with the driveway approach at Station 216 +70 RT (eastbound CSAH 18) has the potential to reduce hydrology to the remaining 0.12 acres of Wetland W -1A; creating a secondary impact. As a result of grade changes on the south -side of Wetland W- 1A, the basin is considered to be impacted in entirety due to hydrology alterations that will likely drain the remaining portion of Wetland W -lA. Impacts have been revised in Table 1 (below). The additional mitigation is not necessitated by safety, and will be purchased from wetland bank number 1392 by Carver County. Hydrologic Maintenance of Project Wetlands Wetland 2 — The existing hydrology will be maintained to this wetland by perpetuating flow from the existing drainage area north of CSAH 18 and west of Sunset Trail under CSAH 18 through a cross culvert pipe at Station 209 +60 constructed to match the existing culvert invert elevations. Surface flow to this wetland will continue from the adjacent farm field south of CSAH 18. Wetlands W -14, Bluff Creek and W -19 — The existing hydrology at these wetlands will be mostly unaffected by the project other than the proposed fill needed to construct the roadway which is impacting the wetlands. Refer to the attached construction plan sheets and cross sections for grading impacts. www.srfconsulting.com One Carlson Parkway North, Suite 150 1 Minneapolis, MN 554474443 1 763.475.01110 Fax; 763.475.2429 An Eguul Opportunity Engrloyer Table 1: Revised Wetland Impacts Wetland ID, 1/4 Type: Total Permanent Temporary Topographic 1/4 Sec. Eggers & Predominant wetland Roadway Roadway Setting (T116N, Reed/ Vegetation area (ac) Impacts Impacts R23W) Chic 39 W -SA NE SW Shallow Cattail 0.14 0.1d -c 0.00 ac 23 marsh /3 W -16 NE SW Wet Reed canary 0.06 0.06 ac 0.00 ac 23 meadow /2 grass W -2 NE SE Wet Reed canary 0.8 0.8 ac 0.06 ac 22 meadow /2 grass, willow, NW SW common buckthorn, 23 W -10, SW NE 22 Wet Reed canary >20 0.00 ac 0.00 ac tributary meadow /2 grass, cattail W -11, Flow- SE NE 22 Shallow Reed canary >5 0.00 ac 0.00 ac through marsh /3 grass, cattail W -12, SE NE 22 Wet Diverse 02 0.00 ac 0.00 ac Isolated meadow /2 sedges, grasses,forbs W -13, SE NE 22 Wet Cattail, <0.1 0.00 ac 0.00 ac Isolated meadow /2 sedges, forbs Bluff Creek SE NE, NE N/A Reed canary >20 0.13ac * 0.00 ac SE 22 grass W -14, Flow- SE NE Wet Reed canary >5 0.86 ac 0.09 ac through 22 meadow /2 grass, green bulrush, sedge W -18, SW NW Seasonally Box elder, 02 0.00 ac 0.00 ac tributary 23 flooded maple, basin /11- buckthorn W -19 NE SW Seasonally Green ash >0.3 0.01 0.00 ac 23 flooded basin /1L Total Total Permanent Temporary impacts impacts (2.00ac) (0.15 ac) 0.15 ac Restored to pre - construction conditions Proposed impacts at the edge of Bluff Creek consist of replacing culverts. grading, rock rip rap lining for outfall of culverts within actual channel north and south of Lyman Boulevard. Channel cross - section characteristics will be modified to accommodate the realigned culverts. Note: Shading = revised numbers from previous submittal. Wetland Mitigation Update A total of 2.00 acres of permanent wetland impact and 0.15 acres of temporary impact are proposed as a result of the roadway reconstruction. Of the 2.00 acres of impact, 0.33 acres are permanent and safety- related and 1.67 acres are not eligible for safety credits. Table 2 below summarizes the proposed mitigation strategies for each wetland identified along this project. Table 2: Summary of Proposed Wetland Mitigation for Each Wetland Impact within Project Area Wetland ID Safety - related Required Mitigation Non Safety - Related Required Mitigation Wetland Impacts (2:1) from BWSR Wetland Impacts (2:1) from Private Road Replacement Outside Safety Wetland Bank Credit Program Improvements Purchase (acre) (acre) (acre) (acre) W -1A 0.00 0.00 0.14 0.28 W1 -B 0.06 0.12 0.00 Self - mitigating ditch(') W -2 0.09 0.18 0.71 1.42 W -14 0.05 0.1 0.81 162 W -19 0.00 0.00 0.01 0.02 Bluff Creek 0.13 0.26 0.00 0.00 Total Safety - Related: Non Safety - Related: Wetland 0.33 acres 0.66 acres 1.67 acres 3.34 acres Impacts (acre) (1) 1 ms existing wetiana aacn meets the tnree parameters of wetianas. i ne proposea roaaway improvement will re- establish a similar ditch that will be re- seeded with an appropriate wetland seed mix. On behalf of the Carver County Public Works, we request the WCA LGU to notice the rexised wetland impacts, and associated information to the members of the TEP including the U.S. Army Corps of Engineers. Appendices List: Appendix A - Revised Wetland Figures Appendix B - Plan sheets and Cross Sections Appendix A: Revised Wetland Figures Figure 3B Plan Sheet with Wetland Impacts LEGEND WETLAND IMPACTS FOR MINIMUM BUILD SAFETY ONLY IMPROVEMENTS 0 BLUFF CREEK WETLUND IMPACTS WETLAND IMPACTS FOR TRAIL & CAPACITY ® NON— SAFETY IMPROVEMENTS TEMPORARY WETLAND IMPACTS WETLAND BOUNDARY - - - - -- PROJECT CONSTRUCTION LIMBS ❑ _ — —0- DRAINAGE DIRECTION r w_ #9 WETLAND NUMBER SP -## STORM POND NUMBER W Z W-14 (SEE J �J S ( V1 ULEVARD) C.S.A.H. 18 (LYMAN BO ri0000 0000 000 1\ it __ O 310 ----- -'2- 3 50 4 -- - -- --- -- -_- __- _-_-____ _ -------- S_t- i.� n5_V- 5� ______________ __ ____________ -------------------------------- _________- ________________________ _________ 31H _2Il5 _________ 21Il _ ________ _ __ -___ __________ _______ 2Ta ___ _________ - -- ------ --- --- -- ----- ---- -- -- ---- - - --- -- ` _% ------- WAD2 -_ _ --- ii (SEE 3A) - - ' o WETLAND IB III 1 �- 0.06 AC, (SAFETY) II U WETLAND 1A Q 0.14 AC. (NON - SAFETY) 0 100 zoo SCale If, 48B� gal IN IMPACTS Figure 3B CSAH 18 FROM AUDUBON ROAD TO POWERS BOULEVARD Conmltlng cLlw N IM. S.P. 010 - 618-013 / S.P. 010- 617 -020 / S.P. 194-M-009 Job #6096 -P3 CARVERCOUNTY 2/11=14 - 1:54PM REVISED 2111114 Appendix B: Plan Sheets and Cross Sections / /I/ ENWtONMEN2AI1� ��/ j I SENSIFNE PRE4 ® I\ / rL WBLYMA� \\ 1 �EE EBLYMAN \—___ 285 LEGEND - IH OPOE 7,a� ROPOSEFaovosE l✓ \O y / T OV 1, h ®/d AUDVBON BENSRNE. v:STRUCTERN e Min -- __ - -_50 A n / — INPME MODULAR MOON NPLL ,— CWSTPUCFKKi uxns (L TRAIL GENERAL NOTES ROADWAY OIMENSNINS ARE TO FACE OF CURB UNLESS NOTED OMERNSE SEE INTERSECTION DETAILS FOR FACILE POINT LOGTONS AND SPOT ELEMipN NOT COVERD IN THE OCNSTRUCLION PLANS AND EUR9 AND PAUL ALIGNMENTS Mq PROFILES. plO PROv NOTES: xP R/w Q CONCRETE MPPO4=X NOSE OESKJi 7113. Q PPONDE 10 CORE & OUOER TRANSITION © CONSTI CCNC= OPNEW/.v APRON (CNOHXASSEN $t0. PLATE 520)) OD =ONSTRUCI ...ES.ION CURB R.MP QE CONSTRUCT BrtUMINWS DRKw (RISE, E) © CONSTRUCT P MECATE DRIVEWAY (6' PC=. EASE CL 51 © 10' WFF; TRM'sllpx QH BARBED At FENCE © WIRE FENCE CESON E -8322 O CONSTRUCT DANT'XAY ENTRANCE (CxANHA SEN Si U. MT= 5209) O = STA= CONCRETE DRWMY APRM (CHANHASSEN STD. PLATE 5206) P vR� \ 120 � g 12.0 r �C D+�} 550 ' R 550' P I Iw R/W i - ' PROP �v — PROP TE iL o; / — BLLFE / / Poro I / Q TRAIL B PR x PROP n O CONSTRUCTION LIMITS loo• TRIAL — 9 SHE I` ? whom I ENGINEEU CARVER COUNTY 576E F IAx NF116 CONSTRUCTION PLANS Deelcxefs C. S. A.N. ST fLYMAN BLVD. )-PHASE 3 OF CaeRltlrq Enaury N2 EBLTNex STA. 1E0A00 t0 STe. I99+00 220 Y em 8941 AUDUBON ROAD lE SEE SHEET 76 FOR GENERAL NOTES )P 0U CWSIRVLIpN UNI15 �b vROV rE PAVENEN: SECTI0.Y M TRAL CROSSING. PROP RW NORB.1 ..., R.ENSIGNS. A TOro6wPNY Du n}YMIx SIA . LI SEE SHEET 76 FOR GENERAL NOTES FURNISH A IN94L FEW EMIRM'CE. TRESS CURB REM PMMDE STURUM LEGEND PAVENEN: SECTI0.Y M TRAL CROSSING. NORB.1 ..., R.ENSIGNS. A TOro6wPNY PAIERILLE MB EN3xEER IN 11E RELD. 8851 AUDUBON ROAD 1 ENUBORMENTALLY SENSRIYE MFA A/ •R 'rL WBLYMAN - EBLYMAN NOTES, QA CONCRETE APPROACH NOSE DESIGN 7113. QD -R.. ID' CURS k CUTTER 1RANS11. © CONSTRULT C CRETE DRNEWAY APRON (CNANNASSEN STD. PLATE 5207) O CM NUCI PEDESTRWN CURB RAMP QF CONSTRUCT BITUMINOUS DRIRZ T (INSET E) © CONSTRUCT AGGREGATE DWYEWAY (a' AUG. BASE Cl_ 5) QN BARBED WEE EENLE © WRE RNCE RESIGN 6M -9322 Q CONSTRUCT ORNEWAY ENTRANCE (CMANNASSEN STD. PLATE 5209) Q CONSRNCT CONCRETE DWANAY A AVN (GNGNNASSEN SED PLATE EMS) �w I / L Zh i �1 1 LYfIRV �1 r( II rr nWaR>a 11 � r_b9>35.4 PROP PRJP E mo LT j PRDP flW E PRGP OJ PROP RW RG.O LT. z_.. G SCINME NMTAFLA LY U MIM,,,NTNE PROP D� PRRP CF 4 R / 4 NN TE - e D- SEE SHEET 76 FOR GENERAL NOTES J P LEGEND TOro6wPNY RNPoSED '(( RETN ETB U M GRDFOSED pN HALL ■{Ineq'(( T. P LA HH OF D EFICHEeR CARVER COUNTY SHTET OF CANSTRUCTI ON PLANS C, 5. A. H. 18 (LYMAN BLVD.) -PHASE 3 FRI.RR .1 EBLYMAN ETA. 199-00 TO STA. 213-25 220 Ll 0 ryl[0 i 3 C I all N _1 LRATC Y1LiIM f5.0 �\ _ ' R \ LaM15 ROR MY I I \ \ 1 ENNRON �LY _`\ I SENSRNE SO SO E CONST BER N- - LINRS NOTES o CONCRETE APPROACH NOY DESIGN 1113. \ \ ISo\ � \ O PRWIOE 10 CURB k 6MIER iWWSTd l © CONSTRUCT CONCRETE DRIVEWAY APACN (CWWIW4EN SR1. PIAIE 5201) O CONSTU GT PERESTRNN CUR2 RAMP QE CONSTRUCT BRURMOUS 9RK— (ASE, E) © CONSTRUCT ACCROBARE ENCIEWAY (5- MX. EASE CL 5) © Iti MAN TRNNLTON 1Q1 BRI NINE EEN2 QI WIRE EEN IE DESIGN EW -9322 QJ CONSTRICT DRVEMMY ENTRM'CE (CNWINSSEN 51D. PLATE 5209) Q CONSTRUCT CONCRETE DRIVEWAY APRON (CHANHASSEN SDI. PLATE 5208) SEE SHEET 76 FOR GENERAL NOTES LEGEND MW10E TCPo ARMY PR ICSED CON51RUCfIOH INNINGS ED RETAKING WALL r i 1 I I l'a I I I � l 1330 1300 WKS ®E J BEIpD ENO DI TAR D E. II _ / / / ORMMY IO Tlmo CIRAORALS PLR PRIG flW / IXSEi [. fM11nG WE MFIHGL SMLL / BE LOT In ONCE. SEE RMNK PW15. CONSTRUCTION !'a PRIG iE LM5 7.0 ' LVO.� I4.0 ' F 6.0' NEOWI IN& f NSET E �asw SUNSE89 55 SUNSET TRAIL a 1 225 12.o .O y J/ L TRNL L 1_ _ J BRUMINOVS CVRB B424 CAG J AB.B n,-i L�� I `'y'' R10 IIrrIrrIPR Ll 0 ryl[0 i 3 C I all N _1 LRATC Y1LiIM f5.0 �\ _ ' R \ LaM15 ROR MY I I \ \ 1 ENNRON �LY _`\ I SENSRNE SO SO E CONST BER N- - LINRS NOTES o CONCRETE APPROACH NOY DESIGN 1113. \ \ ISo\ � \ O PRWIOE 10 CURB k 6MIER iWWSTd l © CONSTRUCT CONCRETE DRIVEWAY APACN (CWWIW4EN SR1. PIAIE 5201) O CONSTU GT PERESTRNN CUR2 RAMP QE CONSTRUCT BRURMOUS 9RK— (ASE, E) © CONSTRUCT ACCROBARE ENCIEWAY (5- MX. EASE CL 5) © Iti MAN TRNNLTON 1Q1 BRI NINE EEN2 QI WIRE EEN IE DESIGN EW -9322 QJ CONSTRICT DRVEMMY ENTRM'CE (CNWINSSEN 51D. PLATE 5209) Q CONSTRUCT CONCRETE DRIVEWAY APRON (CHANHASSEN SDI. PLATE 5208) SEE SHEET 76 FOR GENERAL NOTES LEGEND MW10E TCPo ARMY PR ICSED CON51RUCfIOH INNINGS ED RETAKING WALL r i 1 I I l'a I I I � l 1330 1300 WKS ®E J BEIpD ENO DI TAR D E. II _ / / / ORMMY IO Tlmo CIRAORALS PLR PRIG flW / IXSEi [. fM11nG WE MFIHGL SMLL / BE LOT In ONCE. SEE RMNK PW15. CONSTRUCTION !'a PRIG iE LM5 \ PTE Q 7.0 ' LVO.� I4.0 ' F 6.0' NEOWI IN& f i� a 1 225 12.o .O y ENDI N EUS I GG i6 R10 RESIGNER LONSILYMIDN PLANS �N A, C, $, A.H, ILYMAN BL )2PHASE 3 OF flB PROP RW STA EBLTMI.N STA. 213.25 i0 STA. ZZiP50 ST 220 ra EBLYMAN \ PTE Q ENDI N EUS CARVER COUNTY SBERE RESIGNER LONSILYMIDN PLANS DESIGNER C, $, A.H, ILYMAN BL )2PHASE 3 OF C^mWtl't E'I°PIM STA EBLTMI.N STA. 213.25 i0 STA. ZZiP50 ST 220 DIN W 1 Izo �- _ ♦06.a NOTES; Qp CONCRETE MM H NOSE DESICN 7113, QB PBWIDE 10 CURB k GUTTER TEMENTION © CONSTRUCT CONCRETE DRNEW4Y APRON (LHPNNASEEN St O. FIPTE 52D7) Q CONSTRJCT PEGESIRMN CURB RAMP QE CONSTRJCT BIIUMMWS DRNEWA7 (nt E) © CONSTRUCT CGRECATE ORWEWAY I6' F G, BOY CC 5) © 10' WEE TWJ15Rg. QN WEED WIRE FENCE QI WIRE FENCE DEEM GOV -9322 OJ CONSTRUCT DRIVEWAY ENTRANCE (CIANINSSEN 510. PI-ATE 52G9) © CONSTRUCT CONCRETE MR EAY APRON (CWWSEN STD. PLATE 5208) 4 1 0 ®eD Enm NEEWS CARVER COUNTY SHEET P lA N MBR6 CONSTRUCTION PLANS T9 D EsLONENS C.S.A.H. IB (LYMAN BLVD.1 -PHASE 3 OF BLYMAN STA. 227.50 TO STA. 235-6D.6 /POWERS BLVD. 220 D�OmCm:1 4 1 0 ®eD Enm NEEWS CARVER COUNTY SHEET P lA N MBR6 CONSTRUCTION PLANS T9 D EsLONENS C.S.A.H. IB (LYMAN BLVD.1 -PHASE 3 OF BLYMAN STA. 227.50 TO STA. 235-6D.6 /POWERS BLVD. 220 Additional profiles submitted with this addendum are available online at www.ci.chanhassen.mn.us /2014 -05 engiw ing sone9' �fra in March 4, 2014 Mr. Todd Gerhardt, City Manager Mr. Terry Jeffery, Water Resources Coordinator City of Chanhassen 770 Market Blvd., PO Box 147 Chanhassen, MN 55317 Subject: PPB Holdings, LP Lyman Boulevard (CSAH 18) Wetland Mitigation Plan MFRAs19951 Dear Mr. Gerhardt and Mr. Jeffery: We have reviewed the Lyman Boulevard wetland mitigation plan prepared by SRF Consulting on January 15, 2014. The following comments should be included in a revised mitigation plan: 1) Wetland 1A should be noted as fully impacted and included in the mitigation plan since the wetland will be drained with the proposed street and storm sewer improvement project. This has been previously discussed at the Technical Evaluation Panel meeting on February 19, 2014. a. Action required: Revise the wetland permit to fully impact wetland 1A and include in the mitigation requirements. 2) The Lyman Boulevard construction documents show a 24" culvert crossing (near plan Station 209 +50) that conveys water from the north side of Lyman Boulevard to the south side where the PPB Holdings property is located. Public water that will be conveyed through the 24" culvert will discharge on private property without an easement or a defined ditch at a minimum 1% slope to convey the water toward Bluff Creek along the south side of Lyman Boulevard. The construction plans should be revised to connect this flow of water to the Lyman Boulevard storm sewer system rather than discharging the water on private property. Alternativety, the water could be conveyed in a pipe to the northwest corner of the PPB Holding property and discharged to the ditch located west of the PPB Holdings property. If the current plan were constructed with the 24" culvert in the current location, without a defined ditch, the project would have a negative impact on the PPB Holdings property and cause potential flooding on the PPB property. There will potentially be more water discharging through a 24" pipe rather than the existing 18" culvert crossing, as well the original roadway culvert was only a 15" culvert. The proposed toe of scope elevation is also 0.5 to 1.0 ft. higher than the existing road toe of scope, this will as well negatively impact the PPB Holdings property with potential flooding in the area. a. Action required: Revise the 24" culvert crossing eliminating the discharge of public water on private property. Page 2 of 2 3) The mitigation plan does not identify the complete wetland impact area in the area of Wetland n2 for the construction project. Along the north line of the PPB Holdings property, the impact area aligns with the toe of slope for the proposed roadway. The impact area needs to be expanded to account for the full area of wetland impact that results from the grading operations that will occur beyond the toe of slope where a ditch will be needed to convey the water. A ditch cross section, similar to the ditch shown from 206 +50 and 207 +00, is required to convey the flow to the west toward Bluff Creek. The current plan does not show the ditch with a minimum 1% ditch slope to convey the water from the PPB Holdings property to Bluff Creek. a. Action required: Revise the mitigation plan to show the complete wetland impact area required for grading to construct at ditch at the toe of slope with a minimum 1% slope. The easement area needs to be revised to accommodate the grading of the ditch to provide positive drainage from the PPB Holdings property. Thank you for the opportunity to comment on the impact/mitigation plan. We look forward to reviewing the revised plan that addresses our comments. Sincerely, --TZA ui.-- ; ;%. a Todd Ullom, WDC Mark Anderson, PE LEED AP Environmental Scientist Director of Commercial Services February 25, 2014 Carver CCouno Pub fir Words Rdwhtistratioa 4'a* 113609ftgftway 212 Engineering Suite 1 .3figfnuay Wafntenance Cofogne, WX 55322-8016 Equipme tWainteuance 'Pfwne(952)466 -5100 TFax(952)466 -5223 Surtrj*(g TWappvW Mr. Mark Anderson, PE, LEED AP mfra Engineering 14800 28th Ave. N, Ste 140 Plymouth, MN 55447 Re: CSAH 18 (Lyman Boulevard) Reconstruction from Audubon Road to Powers Boulevard Letter dated February 24, 2014 — Request for Lyman Boulevard Construction Document Revisions Dear Mr. Anderson: In response to your requests in your letter of February 24, 2014: 1) Add a right turn lane and right in /out access point near the northwest corner of the PPB property. The center of the access should be approximately 50 ft. from the northwest corner of the PPB parcel. Response Upon discussion with the City of Chanhassen, the City is willing to permit the right in /right out future access and construction of the right turn lane upon completion of the City permitting /review process. The cost for the permitting /review process and turn lane construction would be borne by the property owner /developer. The County will not be generating turn lane cross section information until the application process is started and the location of the right turn lane is more defined. 2) Eliminate the 24" culvert crossing near the northwest corner of the PPB property so that additional permanent easement is not required to convey the public water across the PPB property. As we discussed, the pipe alignment draining water from the north side of Lyman Boulevard should be connected to the Lyman Boulevard storm sewer system. Response Upon further discussion with the City of Chanhassen it was determined that the centerline culvert provides runoff water to the potential wetland to the south. We cannot divert this water as part of this project. We are reviewing the need for additional permanent drainage easement as part of the County project to accommodate this culvert outlet drainage to the west. We also reviewed the storm sewer design calculations. The storm sewer pipe and the stormwater pond as designed cannot accommodate this additional drainage without a complete redesign and re- permitting of the western 700 feet of the storm sewer pipe and storm water pond. 3) The swale at the toe of slope on the south side of Lyman Boulevard on the PPB property must be at the same elevation as the existing swale so that existing drainage patterns are maintained from the PPB property. Response Positive surface water flow to the west will be maintained as part of the County Road 18 construction. 4) The wetland mitigation plan should be updated to reflect the draining and impact of wetland 1A. Response The County is submitting a revision to our wetland mitigation permit that provides for mitigation of all of wetland W -1A. 5) The plan should be revised to fully impact the residual sliver of Wetland 2 area on PPB property so the future street connection to the right in /out can be constructed without impacting wetland areas. See Exhibit A. Response The County wetland permit application does not include any additional mitigation in wetland W -2. See response No. 1. At our January 31St meeting you had a question about the run -off on the east side of the project past the Fox property. Upon review of the construction plan it was confirmed that storm water that goes east past the Fox property outlets into the storm sewer system on Lyman Blvd east of Powers Blvd. This storm sewer system outlets to a storm water pond further east that was built as part of the TH 212 DB project. The original design of this storm water pond included adequate sizing for additional future runoff considerations. The storm water pond will accommodate this additional runoff. We have taken bids on the County Road 18 project and are in the process of reviewing and awarding the project. Construction is scheduled to begin on April 15th. Work by Mr. Dorsey's property could begin in early May. If a plan for a right turn lane and right in/ right out entrance is developed, we will try to accommodate that turn lane project into our County Road 18 construction project if we are able. Sincerely, Lyndon tent Public Works Director CC: Richard Dorsey Paul Oehme, City of Chanhassen Terry Jeffery, City of Chanhassen M f ra.;. 1 P February 24, 2014 Mr. Lyndon Robjent, PE Division Director, County Engineer Carver County Public Works 11360 Highway 212, Suite 1 Cologne, MN 55322 REFQEFf VE7 FEB 25 2014 CARVER C; pU pUBlICWpRKS, Subject: PPB Holdings LP Chanhassen, MN Request for Lyman Boulevard Construction Document Revisions MFRA #19951 Dear Mr. Robjent: As a follow up to our meeting with you on January 312014, on behalf of PPB Holdings, I would like to formally request the following plan changes be incorporated into the Lyman Boulevard construction documents: 1) Add a right turn lane and right in /out access point near the northwest corner of the PPB property. The center of the access should be approximately 50 ft. from the northwest corner of the PPB parcel. 2) Eliminate the 24" culvert crossing near the northwest corner of the PPB property so that additional permanent easement is not required to convey the public water across the PPB property. As we discussed, the pipe alignment draining water from the north side of Lyman Boulevard should be connected to the Lyman Boulevard storm sewer system. 3) The Swale at the toe of slope on the south side of Lyman Boulevard on the PPB property must be at the same elevation as the existing swale so that existing drainage patterns are maintained from the PPB property. 4) The wetland mitigation plan should be updated to reflect the draining and impact of wetland 1A. 5) The plan should be revised to fully impact the residual sliver of Wetland 2 area on PPB property so the future street connection to the right in /out can be constructed without impacting wetland areas. See Exhibit A. Page 2 of 2 PPB Holding LP agrees to pay the costs associated with the right turn lane and right in /out access based on the unit bid prices for the appropriate construction items related to the access construction. We realize the project bid documents have been prepared, and so we request a separate supplemental agreement be prepared for the access construction. Please let me know if you have any questions. We would like you implement our requests in a timely manner so they can be efficiently included in the construction project. Sincerely, °'` Mark Anderson, PE MFRA, Inc. CC: Richard Dorsey Enclosure — Exhibit A / N-MR ow 99., AOOVSON ROM Moo.) BmB 9951 AO m POND 1 EeLYUAN — rw Bi� EGENO aos Bna - MIPUCE 1CPWPMMY 1e,o' N 205 Ie.O J ^} NOTES. Q CYKR[t[ NPNRO,M NONE OENNM 7113. ® AiP.IOE 10' CNPB C 4NIER tNYL4IIM © ww.= WN m wB , MM.W (EIWBMi3EN St. F,n aw) wxsBlx7 sm,mcw M a ® OOWSTWU Mp n OAVEVAY (r AN. BANE a N) Qc lo• wRe mw9naN pp Bwmo MK riHCE ® "RE FENCE CE4GN . -9333 © wNsmu OBNE EMR.wCF ICMUBUREN 510. MtE ]309) Q Mt. "INO VN0 % 1BM11 1E61j�� EYM41I 111 l l 11 II II II Go< Mw W, i h.. e D s <_ w ... t a, 4 -r N a.rey- CpSS SEE SHEET 79 FOR OENER& NOTES X EGENO - MIPUCE 1CPWPMMY F(gP09A IXINSfI111CN011 BROBONEO R[fMN10 tl4L J ^} ~OSFD 3' flLlT9U1 W WYT � f I EACINU9: CAR VEfl CDUN - SHEET usl PEAx xi9s FANSYNIETION BLBNS T6 j D nwNUN 0.5. A. H. 18 ILYMAN BLVD.) -PHASE 3 OF m- 9P15 -- camNw, c—, .c EELYMMI STA. 199W0 i05TA. =13525 32 CITY OF CHANBASSEN 7700 Market Boulevard March 5, 2014 PC Box 147 Mr. Todd Ullom Chanhassen, MN 55317 MFRA Phone: 952.2271130 Environmental Scientist Administration 14800 281h Avenue N., Ste. 140 Phone: 952.227.1100 Plymouth, MN 55447 Fax: 952.227.1110 email. 7901 Park Place Mr. Mark Anderson Building Inspections MFRA Phone: 952.227.1130 Dir. Of Commercial Services Fax: 952.227.1190 14800 28th Avenue N., Ste. 140 Engineering Plymouth, MN 55447 Phone: 952.227.1160 without an easement or a defined ditch at a minimum I% slope to convey the Fax: 952.227.1170 Re: Lyman Boulevard (CSAH 18) Wetland Mitigation Plan, PPB Holdings Web Site City Project No. 10 -08 Finance Boulevard storm sewer system rather than discharging the water on private Phone: 952.227.1140 Dear Mr. Ullom & Mr. Anderson: Fax: 952.2271110 Park & Recreation I have received your comments in the letter dated March 4, 2014. This letter is in Phone: 952.2271120 response to those comments. Fax: 952.227.1110 1) Wetland IA should be noted as fully impacted and included in the mitigation plan Recreation Center since the wetland will be drained with the proposed street and storm sewer 2310 Coulter Boulevard improvement project. This has been previously discussed at the Technical Phone: 952.227.1400 Evaluation Panel (TEP) meeting on February 19, 2014. Fax: 952.227.1404 Planning & R: On February 26, 2014, SRF submitted a memorandum of revision to Natural Resources their January submittal. This revision included the full impact of Phone: 952.2271130 wetland 1A as identified in the Houston Engineering delineation report Fax: 952.227.1110 and commensurate mitigation. This update was emailed to your client Mr. Rick Dorsey of PPB Holdings on February 26, 2014 at 1:56 PM via Public Works email. 7901 Park Place Phone: 9522271300 2) The Lyman Boulevard construction documents show a 24" culvert crossing (near Fax: 952.227.1310 plan Station 209 +50 that conveys water from the north side of p ) y Lyman Boulevard Senior Center to the south side where the PPB Holdings property is located. Public water that Phone: 952.227.1125 will be conveyed through the 24" culvert will discharge on private property Fax: 952.227.1110 without an easement or a defined ditch at a minimum I% slope to convey the water toward Bluff Creek along the south side of Lyman Boulevard. The Web Site construction plans should be revised to connect this flow of water to the Lyman www.ci.chanhassen.mn.us Boulevard storm sewer system rather than discharging the water on private property. Alternatively, the water could be conveyed in a pipe to the northwest Chanhassen is a Community for Life . Providing forToday and Planning forTomorrow Lyman Boulevard Wetland Mitigation Plan PPB Holdings March 5, 2014 Page 2 corner of the PPB Holding property and discharged to the ditch located west of the PPB Holdings property. If the current plan were constructed with the 24" culvert in the current location, without a defined ditch, the project would have a negative impact on the PPB Holdings property and cause potential flooding on the PPB property. There will potentially be more water discharging through a 24" pipe rather than the existing 18" culvert crossing, as well the original roadway culvert was only a 15" culvert. The proposed toe of slope elevation is also 0.5 to 1.0 ft. higher than the existing road toe of slope, this will as well negatively impact the PPB Holdings property with potential flooding in the area. R: The County adequately addressed this concern in their response letter dated February 25, 2014. This is a design issue and is outside of the purview of the Wetland Conservation Act and the City administered Wetland Alteration Permit. 3) The mitigation plan does not identify the complete wetland impact area in the area of Wetland #2 for the construction project. Along the north line of the PPB Holders property, the impact area aligns with the toe of slope for the proposed roadway. The impact area needs to be expanded to account for the full area of wetland impact that results from the grading operations that will occur beyond the toe of slope where a ditch will be needed to convey the water. A ditch cross section, similar to the ditch shown from 206 +50 and 207 +00, is required to convey the flow to the west toward Bluff Creek. The current plan does not show the ditch with a minimum 1 % ditch slope to convey the water from the PPB Holdings property to Bluff Creek. R: The objective of the MN Wetland Conservation Act and Chanhassen Wetland Protection as indicated in Section 20 -403 of the Chanhassen City Code is to achieve no net loss of wetland. There is no compelling sequencing argument for additional wetland impacts that has been offered. The applicant has made efforts to minimize wetland impacts to the greatest extent practicable. If additional impacts are proposed by the County for any reason, those impacts and the subsequent replacement plan will be reviewed and judged on their own merits. If you have any additional questions, I can be reached at 952.227.1168. Regards, CITY OF CHANHASSEN Terry Jeffery Water Resources Coordinator c: Todd Gerhardt, City Manager gAplan\2014 planning casm\2014 -05 lyman boulevard wap\tnfra response - lyman blvd.doc