2. Country Suites site improvements a C I TY OF -- CHANHASSEN , „ ,„f i 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 : (612) 937-1900 • FAX (612) 937-5739 MEMORANDUM TO: Don Ashworth, City Manager ' FROM: Gary Warren, City Engineer DATE: May 9, 1990 SUBJ: Award of Bids - Country Suites Hotel Site Improvements Project No. 89-25 As noted in the attached May 3, 1990 letter from BRW, bids were ' received on April 26, 1990 for the subject project. A meeting was held on Tuesday, May 8, 1990 with the owner' s construction manager, D. W. Hutt Consultants, to ascertain the status of the Hotel site improvements and to clarify that upon award, the ' City' s contractor would be able to aggressively pursue the construction on the site. Staff is satisfied based on commitments from Hutt that the site will be available by Tuesday, May 15. The developer's excavator, Al Smith Excavating, will be ' responsible for soil correction activity on the site. This cost will be billed to the City and assessed back to the owner. This logistically should help to keep this project start on schedule. As noted in the attached schedule, we are targeting an August 1 completion date consistent with the Hotel site' s grand opening. It is therefore recommended that the construction project for the ' Country Suites Hotel Site Improvements, Project No. 89-25, be awarded to the firm of Alber Construction in the amount of $288,937. 95. ' ktm Attachments: 1. May 3, 1990 letter from BRW. ' 2 . Bid Tabulation. c : Gary Ehret, BRW 1 I I 1 I 1 1 I I 1 I I I 1 I. 1 I 1 1 I P !%V I ENGINEERING ERI F- URBAN DESIGN IBRW.INC. • THRESHER SQUARE • 700 THIRD STREET SOUTH • MINNEAPOLIS,MINNESOTA 55415 PHONE: 612/370-0700 FAX. 612/370-1378 IIMay 3, 1990 CITY OF CHANHASSEN II Mr. Gary Warren, PE C E MGM City Engineer MAY 04 1990 II City of Chanhassen 690 Coulter Chanhassen, MN i55317 ENGINEERING DEPT. I RE: Award of Bids CP 89-25 IDear Mr. Warren: On Thursday, April 26, 1990, bids were received for the site improvements for the Country Suites Hotel project. The bids were for three separate elements of Iwork. They were: #1 Site Improvements for Country Suites Hotel I #2 Water Main Improvements - South Side of Chanhassen Dinner Theatre #3 Storm Sewer Improvements - Frontier Center IIThe bids are summarized below: #1 #2 #3 Contractor Hotel Water Main Storm Sewer Total IIAlber Const. $212,081.95 $45,100.00 $ 31,756.00 $288,937.95* Valley Paving 223,192.03 46,600.00 32,125.60 301,917.63 I Northdale Const. 228,222.60 41,420.00 36,175.50 305,818.10 GMH Asphalt 231,719.06 46,145.00 28,021.40 305,885.46* Alexander Const. 231,829.84 45,132.00 38,147.74 315,109.58 I Hardrives 232,727.23 51,720.00 34,520.60 318,967.83* Midwest Asphalt 234,666.25 57,783.35 37,432.40 329,882.00* Engineer's Est. 234,150.00 27,000.00 32,800.00 293,950.00 I *The bid totals reflect corrected bid amounts where minor tabulation errors were made by the bidder. II We have reviewed the bid of Alber Construction and have found it to be in compliance with the requirements of the bidding specifications. We, therefore, find their bid to be a bonafide bid. II AFFILIATE OF THE BENNETT.RINGROSE,WOLSFELD.JARVIS.INC.,GROUP IAN DAVID J.BENNETT DONALD W RINGROSE RICHARD P WOLSFELD PETER E.JARVIS THOMAS F CARROLL CRAIG A.AMUNDSEN DONALD E.HUNT MARK G SWENSON JOHN 8.McNAMARA RICHARD D.PILGRIM DALE N.BECKMANN DENNIS J.SUTLIFF JEFFREY L.BENSON RALPH C.BLUM DAVID L.GRAHAM GARY J.ERICKSON 1 MINNEAPOLIS DENVER PHOENIX TUCSON S .PETERSBURG SAN DIEGO Mr. Gary Warren May 3, 1990 Page 2 ' We do not have experience working with Alber Construction; however, we have had working experience with several of their subcontractors. There anticipated sub- contractors are: Utility Construction - Northdale Construction ' Electrical - Ridgedale Electric Concrete Work - Schmidt Construction Striping/Painting - Triple A All other work including removals, grading, aggregate base and bituminous work will be completed by Alber Construction. We recommend award of CP 89-25 to Alber Construction in the total amount bid of $288,937.95. We anticipate the project schedule to be as follows: Award Contract May 14, 1990 Preconstruction Conference May 16, 1990 Start Construction May 16, 1990 Complete Construction August 1, 1990 A tabulation of the bids is attached for your reference. ' If we can be of further assistance, please do not hesitate to contact me. Sincerely, , BRW, C. Gary A. Ehret, PE , Project Manager GAE/sk , Attachment File 7-8903 1 I 11 1 11111 1 1 1 1 1 1 1 1 r 1 1 1 1 1 ' 1 3PW FILE: 7-8903 5/01/<90 BID TAB SUMMARY SHEET CHANHASSEN COUNTRY HOSPITALITY SUITES SITE IMPROVEMENTS BID 1k CONTRACTOR SCHEDULE A SCHEDULE B SCHEDULE C SCHEDULE D SCHEDULE E SCHEDULE F 1 ALDER CONSTRUCTION, INC. 106179.70 37748.75 29271.00 12007.50 26875.00 45100.00 2 VALLEY PAVING, INC. 103629.75 38371.60 35853.38 13607.30 31730.00 46600.00 3 NORTHDALE CONSTRUCTION CO, INC 121292.10 35319.50 27335.00 11206.00 33070.00 41420.00 4 GMH ASPHALT CORPORATION 117007.01 37899.75 35448.40 13472.90 27891.00 46145.00 5 ALEXANDER CONSTRUCTION COMPANY 122831.70 38181.10 29544.40 12144.64 29128.00 45132.00 6 HARDRIVES, INC. 105974.43 40916.80 38479.00 14757.00 32600.00 51720.00 7 MIDWEST ASPHALT CORPORATION 115837.55 36261.00 34919.95 13422.75 34225.00 57783.35 BID It CONTRACTOR SCHEDULE G Grand Total 1 ALDER CONSTRUCTION, INC. 31756.00 288937.95 2 VALLEY PAVING, INC. 32125.60 301917.63 3 NORTHDALE CONSTRUCTION CO, INC 36175.50 305818.10 4 GMH ASPHALT CORPORATION 28021.40 305885.46 S ALEXANDER CONSTRUCTION COMPANY 38147.74 315109.58 6 HARDRIVES, INC. ' 34520.60 318967.83 7 MIDWEST ASPHALT CORPORATION 37432.40 329882.00 CITY OF CHANHASSEN MAY 04 1990 ENGINEERING DEPT. BID SCHEDULE A - SITE WORK ITEM NO./ CONTRACT ALPER CONSTRUCTION, I VALLEY PAVING, INC. NORTHDALE CONSTRUCTI0 MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ REMOVE WATER MAIN LF 40.00 9.50 380.00 5.50 220.00 9.00 360.00 2104.501 2/ REMOVE CONCRETE CURB ANDLF 130.00 2.50 325.00 6.00 780.00 4.00 520.00 2104.501 GUTTER 3/ REMOVE ISLAND EA 1.00 500.00 500.00 1400.00 1400.00 300.00 300.00 2104.509 4/ REMOVE CONCRETE WALK SF 40.00 1.00 40.00 5.00 200.00 1.00 40.00 2104.503 5/ REMOVE BITUMINOUS SY 300.00 1.50 450.00 3.00 900.00 2.00 600.00 2104.505 PAVEMENT 6/ SUGRADE PREPARATION SY 6700.00 0.25 1675.00 0.45 3015.00 1.20 8040.00 2112.501 7/ AGGREGATE BASE CL 5 TON 2950.00 7.60 22420.00 7.20 21240.00 8.00 23600.00 2211.501 100% CRUSHED LIMEROCK 8/ BASE COURSE MIXTURE TON 770.00 23.00 17710.00 22.80 17556.00 25.50 19635.00 2331.514 2331 TYPE 31B 9/ WEARING COURSE MIXTURE TON 735.00 25.00 18375.00 24.40 17934.00 27.50 20212.50 2341.508 2331 TYPE 41A 10/ BITUMINOUS MATERIAL FOR GAL 338.00 1.50 507.00 2.00 676.00 1.75 591.50 2357.502 TACK COAT • 11/ BITUMINOUS PATHWAY SF 600.00 1.00 600.00 ' 1.10 660.00 1.20 720.00 2521.511 12/ BITUMINOUS MIXTURE FOR SY 200.00 15.00 3000.00 15.40 3080.00 21.00 4200.00 2331.518 PATCHING 13/ CONCRETE CURB AND GUTTERLF 2695.00 7.50 20212.50 5.3B 14499.10 6.10 16439.50 2531.501 B612 14/ 7" CONCRETE DRIVEWAY SY 100.00 23.00 2300.00 20.80 2080.00 31.00 3100.00 2531.507 PAVEMENT 15/ 4" SOLID LINE (WHITE LF 2248.00 0.15 337.20 0.35 786.80 0.20 449.60 0564.603 PAINT) 16/ F & I TYPE C SIGN PANEL SF 3.50 42.00 147.00 40.00 140.00 42.00 147.00 2564.531 17/ PAVEMENT MESSAGE EA 3.00 25.00 75.00 75.00 225.00 100.00 300.00 0564.602 (HANDICAPPED) ' 18/ 4" CONCRETE WALK SF 6070.00 1.55 9408.50 1.53 9287.10 1.90 11533.00 2521.501 19/ B618M CONCRETE CURB & LF 80.00 13.50 1080.00 5.75 460.00 8.40 672.00 2531.501 GUTTER 20/ INSTALL SALVAGED EA 1.00 1000.00 1000.00 250.00 250.00 2500.00 2500.00 2564.602 BUSINESS SIGN 21/ EROSION CONTROL SILT LF 300.00 3.00 900.00 3.00 900.00 3.00 900.00 2573.503 FENCE 22/ HAYBALES EA 60.00 5.00 300.00 6.00 360.00 5.50 330.00 2573.501 23/ WATER 10008 10.00 30.00 300.00 20.00 200.00 50.00 500.00 2130.501 24/ CALCIUM CHLORIDE (GAL.) GAL 1000.00 1.50 1500.00 1.65 1650.00 1.00 1000.00 2181.502 • - 111111 111111 11111 MI TEM MOM 11111 IIII 11111 - 11111. 11111 111111 OM 11.11 - IIII Oa 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 25/ RELOCATE TREE EA 5.00 150.00 750.00 250.00 1250.00 200.00 1000.00 2571.541 26/ CLEARING TREE 16.00 25.00 400.00 100.00 1600.00 75.00 1200.00 ' 2101.502 27/ GRUBBING TREE 16.00 25.00 400.00 75.00 1200.00 75.00 1200.00 2101.507 28/ TRAFFIC CONTROL/SPECIAL SF 64.00 14.50 928.00 14.00 896.00 16.00 1024.00 2563.601 SIGNS 29/ TYPE 1 BARRICADE WITH U/DAY 10.00 1.00 10.00 1.10 11.00 1.50 15.00 2563.602 TYPE "C" STEADY BURN 30/ TYPE 3 BARRICADE WITH U/DAY 5.00 3.65 18.25 4.75 23.75 5.00 25.00 2563.602 ARROW AND TYPE "C" STEADY BURN 31/ TYPE 3 BARRICADE WITH U/DAY 30.00 3.90 117.00 4.50 135.00 4.00 120.00 2563.602 REGULATORY SIGN AND TYPE "A" FLASHERS 32/ REFLECTORIZED BARRELS U/DAY 15.00 0.95 14.25 1.00 15.00 1.20 18.00 2563.602 WITH ARROW SUBTOTALS: 106179.70 103629.75 121292.10 BID SCHEDULE A - BITE WORK (continued) ITEM NO./ CONTRACT GMH ASPHALT CORPORATI ALEXANDER CONSTRUCTIO HARDRIVES, INC. MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ REMOVE WATER MAIN LF 40.00 5.10 204.00 10.00 400.00 6.00 240.00 2104.501 2/ REMOVE CONCRETE CURB ANDLF 130.00 4.00 520.00 5.00 650.00 5.00 650.00 2104.501 GUTTER 3/ REMOVE ISLAND EA 1.00 500.00 500.00 500.00 500.00 200.00 200.00 2104.509 4/ REMOVE CONCRETE WALK SI 40.00 2.00 80.00 1.00 40.00 1.00 40.00 2104.503 5/ REMOVE BITUMINOUS SY 300.00 1.50 450.00 2.00 600.00 2.50 750.00 2104.505 PAVEMENT 6/ SUGRADE PREPARATION SY 6700.00 1.50 10050.00 1.00 6700.00 0.50 3350.00 2112.501 7/ AGGREGATE BASE CL 5 TON 2950.00 8.25 24337.50 10.00 29500.00 8.00 23600.00 2211.501 100X CRUSHED LIMEROCK 8/ BASE COURSE MIXTURE TON 770.00 22.00 16940.00 23.60 18172.00 21.75 16747.50 2331.514 2331 TYPE 318 9/ WEARING COURSE MIXTURE TON 735.00 24.00 17640.00 25.10 18448.50 24.80 18228.00 2341.508 2331 TYPE 41A 10/ BITUMINOUS MATERIAL FOR GAL 338.00 1.25 422.50 1.25 422.50 1.00 338.00 2357.502 TACK COAT 11/ BITUMINOUS PATHWAY SF 600.00 1.50 900.00 2.00 1200.00 1.10 660.00 2521.511 12/ BITUMINOUS MIXTURE FOR SY 200.00 17.50 3500.00 20.00 4000.00 20.00 4000.00 2331.518 PATCHING 13/ CONCRETE CURB AND GUTTERLF 2695.00 7.40 19943.00 7.40 19943.00 6.10 16439.50 2531.501 B612 14/ 7" CONCRETE DRIVEWAY SY 100.00 22.75 2275.00 20.00 2000.00 30.00 3000.00 2531.507 PAVEMENT 15/ 4" SOLID LINE (WHITE LF 2248.00 0.12 269.76 0.15 337.20 0.20 449.60 0564.603 PAINT) • 16/ F & I TYPE C SIGN PANEL SF 3.50 13.50 47.25 60.00 210.00 61.05 213.68 2564.531 • 17/ PAVEMENT MESSAGE EA 3.00 40.00 120.00 12.00 36.00 11.50 34.50 0564.602 (HANDICAPPED) 18/ 4" CONCRETE WALK SF 6070.00 1.60 9712.00 2.00 12140.00 1.70 10319.00 2521.501 19/ B618M CONCRETE CURB & LF 80.00 13.15 1052.00 20.00 1600.00 8.25 660.00 2531.501 GUTTER 20/ INSTALL SALVAGED EA 1.00 150.00 150.00 500.00 500.00 300.00 300.00 2564.602 BUSINESS SIGN 21/ EROSION CONTROL SILT LF 300.00 1.50 450.00 3.00 900.00 4.00 1200.00 2573.503 FENCE 22/ HAYBALES EA 60.00 6.00 360.00 5.00 300.00 6.00 360.00 2573.501 23/ WATER 1000G 10.00 20.00 200.00 15.00 150.00 10.00 100.00 2130.501 24/ CALCIUM CHLORIDE (GAL.) GAL 1000.00 1.50 1500.00 0.50 500.00 0.25 250.00 2181.502 25/ RELOCATE TREE EA 5.00 150.00 750.00 250.00 1250.00 150.00 750.00 2571.541 26/ CLEARING TREE 16.00 100.00 1600.00 50.00 800.00 62.50 1000.00 2101.502 27/ GRUBBING TREE 16.00 125.00 2000.00 25.00 400.00 62.50 1000.00 2101.507 28/ TRAFFIC CONTROL/SPECIAL SF 64.00 13.50 864.00 15.00 960.00 14.60 934.40 2563.601 SIGNS 29/ TYPE 1 BARRICADE WITH U/DAY 10.00 1.00 10.00 1.00 10.00 1.00 10.00 2563.602 TYPE "C" STEADY BURN 30/ TYPE 3 BARRICADE WITH U/DAY 5.00 5.00 25.00 4.00 20.00 3.65 18.25 2563.602 ARROW AND TYPE "C" . STEADY BURN 31/ TYPE 3 BARRICADE WITH U/DAY 30.00 4.00 120.00 4.25 127.50 3.90 117.00 2563.602 REGULATORY SIGN AND TYPE "A" FLASHERS 32/ REFLECTORIZED BARRELS U/DAY 15.00 1.00 15.00 1.00 15.00 1.00 15.00 2563.602 WITH ARROW SUBTOTALS: 117007.01 122831.70 105974.43 BID SCHEDULE A - SITE WORK (continued) ITEM NO./ CONTRACT MIDWEST ASPHALT CORPO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ REMOVE WATER MAIN LF 40.00 17.40 696.00 2104.501 2/ REMOVE CONCRETE CURB ANDLF 130.00 7.85 1020.50 2104.501 GUTTER 3/ REMOVE ISLAND EA 1.00 408.00 408.00 2104.509 4/ REMOVE CONCRETE WALK SF 40.00 10.20 408.00 2104.503 5/ REMOVE BITUMINOUS SY 300.00 1.00 300.00 2104.505 PAVEMENT 6/ SUGRADE PREPARATION SY 6700.00 0.10 670.00 2112.501 MO MI - - MI - - - 1111111 a - - MI MI - NM ¶ 1 11111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7/ AGGREGATE BASE CL 5 TON 2950.00 6.70 19765.00 2211.501 100% CRUSHED LIMEROCK 8/ BASE COURSE MIXTURE TON 770.00 30.00 23100.00 - 2331.514 2331 TYPE 318 9/ WEARING COURSE MIXTURE TON 735.00 35.00 25725.00 2341.508 2331 TYPE 41A 10/ BITUMINOUS MATERIAL FOR GAL 338.00 1.40 473.20 2357.502 TACK COAT 11/ BITUMINOUS PATHWAY SF 600.00 4.25 2550.00 2521.511 12/ BITUMINOUS MIXTURE FOR SY 200.00 7.60 1520.00 2331.518 PATCHING 13/ CONCRETE CURB AND GUTTERLF 2695.00 5.80 15631.00 2531.501 8612 14/ 7" CONCRETE DRIVEWAY SY 100.00 23.25 2325.00 2531.507 PAVEMENT 15/ 4" SOLID LINE (WHITE LF 2248.00 0.15 337.20 0564.603 PAINT) 16/ F & I TYPE C SIGN PANEL SF 3.50 26.00 91.00 2564.531 17/ PAVEMENT MESSAGE EA 3.00 5.00 15.00 0564.602 (HANDICAPPED) 18/ 4" CONCRETE WALK SF 6070.00 1.45 8801.50 2521.501 19/ 8618M CONCRETE CURB & LF 80.00 5.80 464.00 2531.501 GUTTER 20/ INSTALL SALVAGED EA 1.00 250.00 250.00 2564.602 BUSINESS SIGN 21/ EROSION CONTROL SILT LF 300.00 1.50 450.00 2573.503 FENCE 22/ HAYBALES EA 60.00 4.00 240.00 2573.501 23/ WATER 10008 10.00 12.25 122.50 2130.501 24/ CALCIUM CHLORIDE (GAL.) GAL 1000.00 4.10 4100.00 2181.502 25/ RELOCATE TREE EA 5.00 150.75 753.75 2571.541 26/ CLEARING TREE 16.00 110.00 1760.00 2101.502 27/ GRUBBING TREE 16.00 110.00 1760.00 2101.507 28/ TRAFFIC CONTROL/SPECIAL SF 64.00 15.35 982.40 2563.601 SIGNS • 29/ TYPE 1 BARRICADE WITH U/DAY 10.00 5.80 58.00 2563.602 TYPE "C" STEADY BURN 30/ TYPE 3 BARRICADE WITH U/DAY 5.00 21.30 106.50 2563.602 ARROW AND TYPE "C" STEADY BURN 31/ TYPE 3 BARRICADE WITH U/DAY 30.00 22.55 676.50 2563.602 REGULATORY SIGN AND TYPE "A" FLASHERS 32/ REFLECTORIZED BARRELS U/DAY 15.00 18.50 277.50 2563.602 WITH ARROW SUBTOTALS: 115837.55 BID SCHEDULE B - STORM SEWER ITEM NO./ CONTRACT ALDER CONSTRUCTION, I VALLEY PAVING. INC. NORTHDALE CONSTRUCTIO MNDOT NO, ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 12" RC PIPE SEWER DESIGNLF 234.00 26.20 6130.80 21.65 5066.10 24.50 5733.00 2503.541 3006 CL V 2/ 15" RC PIPE SEWER DESIGNLF 132.00 27.80 3669.60 24.35 3214.20 26.00 3432.00 2503.541 3006 CL V 3/ 18" RC PIPE SEWER DESIGNLF 275.00 34.25 9418.75 33.00 9075.00 32.00 8800.00 2503.541 3006 CL V 4/ CONSTRUCT MANHOLES DESIGBA 1.00 5350.00 5350.00 6875.00 6875.00 5000.00 5000.00 2506.506 84" TYPE II 5/ CONSTRUCT MANHOLES DESIGWF 59.20 128.00 7577.60 140.00 8288.00 120.00 7104.00 2506.506 48" TYPE I 6/ CONSTRUCT CATCH BASIN LF 10.40 180.00 1872.00 107.00 1112.80 170.00 1768.00 2506.507 CITY TYPE II 7/ F & I CASTING ASSEMBLY EA 4.00 140.00 560.00 168.00 672.00 130.00 520.00 2506.516 (R-1642) B/ F & I CASTING ASSEMBLY EA 5.00 215.00 1075.00 245.00 1225.00 200.00 1000.00 2506.516 (R-3246-B) 9/ CONNECT TO EXISTING STORM 1.00 800.00 800.00 1635.00 1635.00 750.00 750.00 2506.602 SEWER 10/ CONNECT TO EXISTING CATCSA 1.00 535.00 535.00 400.00 400.00 500.00 500.00 2506.602 BASIN 11/ 12" PIPE PLUS EA 2.00 80.00 160.00 ' 55.50 111.00 75.00 150.00 0503.602 12/ STABILIZING AGGREGATE TON 75.00 8.00 600.00 9.30 697.50 7.50 562.50 2105.543 SUBTOTALS: • 37748.75 38371.60 35319.50 BID SCHEDULE B - STORM SEWER (continued) ITEM NO./ CONTRACT GMH ASPHALT CORPORATI ALEXANDER CONSTRUCTIO HARDRIVES, INC. MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 12" RC PIPE SEWER DESIGNLF 234.00 21.50 5031.00 26.50 6201.00 23.10 5405.40 2503.541 3006 CL V 2/ 15" RC PIPE SEWER DESIGNLF 132.00 23.50 3/02.00 28.00 3696.00 25.30 3339.60 2503.541 3006 CL V 3/ 18" RC PIPE SEWER DESIGNLF 275.00 32.65 8978.75 34.60 9515.00 35.20 9680.00 2503.541 3006 CL V 4/ CONSTRUCT MANHOLES DESIGBA 1.00 6812.00 6812.00 5400.00 5400.00 7400.00 7400.00 2506.506 84" TYPE II 5/ CONSTRUCT MANHOLES DESIGNF 59.20 138.00 8169.60 130.00 7696.00 149.00 8820.80 2506.506 48" TYPE I 6/ CONSTRUCT CATCH BASIN LF 10.40 106.00 1102.40 184.00 1913.60 115.00 1196.00 2506.507 CITY TYPE II 7/ F & I CASTING ASSEMBLY EA 4.00 166.00 664.00 140.00 560.00 180.00 720.00 2506.516 (R-1642) - OM 1111111 MN 1111111 NM 11111 MO ME NIIIIIIMIIIINIIIIIINIIIIIIIIIIIINIINIIIIIIIIIIIIIIIIIIIII 1 ,1 1 1 1 1 1 1 1 1 1 1 I IIIII IIIII IIIII I 1 IIIII • 8/ F & I CASTING ASSEMBLY EA 5.00 245.00 1225.00 216.00 1080.00 262.00 1310.00 2506.516 (R-3246-B) 9/ CONNECT TO EXISTING STORMA 1.00 1620.00 1620.00 810.00 810.00 1750.00 1750.00 2506.602 SEWER 101 CONNECT TO EXISTING CATCBA 1.00 395.00 395.00 540.00 540.00 425.00 425.00 2506.602 BASIN 11/ 12" PIPE PLUG EA 2.00 55.00 110.00 81.00 162.00 60.00 120.00 0503.602 12/ STABILIZING AGGREGATE TON 75.00 9.20 690.00 8.10 607.50 10.00 750.00 2105.543 SUBTOTALS: 37899.75 38181.10 40916.80 BID SCHEDULE B - STORM SEWER (continued) ITEM NO./ CONTRACT MIDWEST ASPHALT CORPO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 12" RC PIPE SEWER DESIGNLF 234.00 24.75 5791.50 2503.541 3006 CL V 2/ 15" RC PIPE SEWER DESIGNLF 132.00 26.25 3465.00 2503.541 3006 CL V 3/ 18" RC PIPE SEWER DESIGNLF 275.00 30.65 8428.75 2503.541 3006 CL V 4/ CONSTRUCT MANHOLES DESIGBA 1.00 3460.00 3460.00 2506.506 84" TYPE II 5/ CONSTRUCT MANHOLES DESIGNF 59.20 135.00 7992.00 2506.506 48" TYPE I 6/ CONSTRUCT CATCH BASIN LF 10.40 145.00 1508,00 2506.507 CITY TYPE II 7/ F & I CASTING ASSEMBLY EA 4.00 215.00 860.00 2506.516 (R-1642) 8/ F & I CASTING ASSEMBLY EA 5.00 245.00 1225.00 2506.516 (R-3246-B) 9/ CONNECT TO EXISTING STORBA 1.00 2065.00 2065.00 2506.602 SEWER 10/ CONNECT TO EXISTING CATCHA 1.00 555.00 555.00 2506.602 BASIN 11/ 12" PIPE PLUG EA 2.00 63.50 127.00 0503.602 12/ STABILIZING AGGREGATE TON 75.00 10.45 783.75 2105.543 SUBTOTALS: 36261.00 BID SCHEDULE C - WATER MAIN ITEM NO./ CONTRACT ALPER CONSTRUCTION. I VALLEY PAVING, INC. NORTHDALE CONSTRUCTIO MNDQT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 6" WATER MAIN - DUCTILE LF 358.00 15.00 5370.00 22.70 8126.60 14.00 5012.00 0504.603 IRON CL 52 2/ 8" WATER MAIN - DUCTILE LF 114.00 18.00 2052.00 22.70 2587.80 16.75 1909.50 0504.603 IRON CL 52 3/ 10" WATER MAIN - DUCTILELF 456.00 19.00 8664.00 24.75 11286.00 17.75 8094.00 0504.603 IRON CL 52 4/ 6" GATE VALVE AND BOX EA 4.00 430.00 1720.00 385.00 1540.00 400.00 1600.00 0504.602 5/ 8" POST INDICATOR VALVE EA 1.00 900.00 900.00 1050.00 1050.00 850.00 850.00 0504.602 6/ 10" X 10" TEE EA 2.00 235.00 470.00 240.00 480.00 220.00 440.00 0504.602 7/ 10" X 8" TEE EA 1.00 225.00 225.00 215.00 215.00 210.00 210.00 0504.602 8/ 10" X 6" TEE EA 2.00 225.00 450.00 210.00 420.00 210.00 420.00 0504.602 9/ 10" X 6" REDUCER EA 2.00 150.00 300.00 125.00 250,00 140.00 280.00 0504.602 10/ 6" BEND, 90 EA 1.00 110.00 110.00 110.00 110.00 100.00 100.00 0504.602 11/ 10" BEND, 90 EA 2.00 185.00 370.00 185.00 370.00 175.00 350.00 0504.602 12/ CONNECT TO EXISTING EA 2.00 750.00 1500.00 548.00 1096.00 700.00 1400.00 0504.602 WATER MAIN 13/ 4" RIGID INSULATION SF 352.00 3.75 1320.00 2.74 964.48 3.50 1232.00 0503.605 14/ 8" MJ PLUG EA 1.00 80.00 80.00 60.00 60.00 75.00 75.00 0504.602 15/ F & I FIRE HYDRANT EA 4.00 1285.00 5140.00 1650.00 6600.00 1200.00 4800.00 0504.602 16/ STABILIZING AGGREGATE TON 75.00 8.00 600.00 9.30 697.50 7.50 562.50 2105.543 SUBTOTALSI 29271.00 35853.38 27335.00 BID SCHEDULE C - WATER MAIN (continued) ITEM NO./ CONTRACT GMH ASPHALT CORPORATI ALEXANDER CONSTRUCTIO HARDRIVES, INC. MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 6" WATER MAIN - DUCTILE LF 358.00 22.50 8055.00 15.15 5423.70 24.50 8771.00 0504.603 IRON CL 52 2/ 8" WATER MAIN - DUCTILE LF 114.00 22.50 2565.00 18.00 2052.00 24.50 2793.00 0504.603 IRON CL 52 3/ 10" WATER MAIN - DUCTILELF 456.00 24.50 11172.00 19.20 8755.20 26.50 12084.00 0504.603 IRON CL 52 4/ 6" GATE VALVE AND BOX EA 4.00 378.00 1512.00 432.00 1728.00 410.00 1640.00 0504.602 5/ 8" POST INDICATOR VALVE EA 1.00 1040.00 1040.00 918.00 918.00 1120.00 1120.00 0504.602 6/ 10" X 10" TEE EA 2.00 240.00 480.00 238.00 476.00 255.00 510.00 0504.602 7/ 10" X 8" TEE EA 1.00 212.00 212.00 227.00 227.00 230.00 230.00 0504.602 8/ 10" X 6" TEE EA 2.00 208.00 416.00 227.00 454.00 230.00 460.00 0504.602 9/ 10" X 6" REDUCER EA 2.00 125.00 250.00 151.20 302.40 135.00 270.00 0504.602 - MI 11111 - OM MO IMO IIIIIII MI ailli - MI MI Illil MN IIIII 11111. mil am 11111 11111 1 m 1 1 1 l 1 1 l 1 1 m 1 1 1 r lin 10/ 6" BEND, 90 EA 1.00 108.00 108.00 108.00 108.00 130.00 130.00 0504.602 11/ 10" BEND, 90 EA 2.00 180.00 360.00 189.00 378.00 195.00 390.00 0504.602 12/ CONNECT TO EXISTING EA 2.00 540.00 1080.00 756.00 1512.00 585.00 1170.00 0504.602 WATER MAIN 13/ 4" RIGID INSULATION SF 352.00 2.70 950.40 3.80 1337.60 3.00 1056.00 0503.605 14/ 8" MJ PLUG EA 1.00 58.00 58.00 81.00 81.00 65.00 65.00 0504.602 15/ F & I FIRE HYDRANT EA 4.00 1625.00 6500.00 1296.00 5184.00 1760.00 7040.00 0504.602 16/ STABILIZING AGGREGATE TON 75.00 9.20 690.00 8.10 607.50 10.00 750.00 2105.543 SUBTOTALS: 35448.40 29544.40 38479.00 BID SCHEDULE C - WATER MAIN (continued) ITEM NO./ CONTRACT MIDWEST ASPHALT CORPO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 6" WATER MAIN - DUCTILE LF 358.00 21.85 7822.30 0504.603 IRON CL 52 2/ 8" WATER MAIN - DUCTILE LF 114.00 26.15 2981.10 0504.603 IRON CL 52 3/ 10" WATER MAIN - DUCTILELF 456.00 25.90 11810.40 0504.603 IRON CL 52 4/ 6" GATE VALVE AND BOX EA 4.00 460.00 1840.00 0504.602 5/ 8" POST INDICATOR VALVE EA 1.00 985.70 985.70 0504.602 6/ 10" X 10" TEE EA 2.00 254.00 508.00 0504.602 7/ 10" X B" TEE EA • 1.00 220.50 220.50 0504.602 8/ 10" X 6" TEE EA 2.00 210.00 420.00 0504.602 9/ 10" X 6" REDUCER EA 2.00 155.00 310.00 0504.602 10/ 6" BEND, 90 EA 1.00 110.00 110.00 0504.602 11/ 10" BEND, 90 EA 2.00 200.00 400.00 0504.602 12/ CONNECT TO EXI8TING EA 2.00 522.00 1044.00 0504.602 WATER MAIN 13/ 4" RIGID INSULATION SF 352.00 2.10 739.20 0503.605 14/ 8" MJ PLUG EA 1.00 85.00 85.00 0504.602 15/ F & I FIRE HYDRANT EA 4.00 1215.00 4860.00 0504.602 16/ STABILIZING AGGREGATE TON 75.00 10.45 783.75 2105.543 SUBTOTALS: 34919.95 BID SCHEDULE D - SANITARY SEWER ITEM NO./ CONTRACT ALPER CONSTRUCTION, I VALLEY PAVING, INC. NORTHDALE CONSTRUCTIO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 8" PVC SEWER LINE LF 245.00 18.00 4410.00 23.70 5806.50 17.00 4165.00 (0'-10' DEEP) 2/ 8" PVC SEWER LINE LF 56.00 19.00 1064.00 23.70 1327.20 18.00 1008.00 (10'-12' DEEP) 3/ CONSTRUCT MANHOLE DESIGNLF 22.80 120.00 2736.00 140.00 3192.00 110.00 2508.00 2506.506 48" TYPE I 4/ F & I CASTING ASSEMBLY EA 3.00 160.00 480.00 168.00 504.00 150.00 450.00 2506.516 (R-1642) 5/ CONNECT TO EXISTING EA 1.00 1100.00 1100.00 600.00 600.00 1000.00 1000.00 2506.602 SANITARY SEWER MANHOLE 6/ STABILIZING AGGREGATE TON 75.00 8.50 637.50 9.45 708.75 8.00 600.00 2105.543 7/ FURNISH AND INSTALL EA 4.00 375.00 1500.00 360.00 1440.00 350.00 1400.00 MANHOLE CHIMNEY SEALS 8/ 8" PVC PLUG EA 1.00 80.00 80.00 28.85 28.85 75.00 75.00 2503.602 SUBTOTALS: 12007.50 13607.30 11206.00 BID SCHEDULE D - SANITARY SEWER (Fontinued) • ITEM NO./ CONTRACT GMH ASPHALT CORPORATI ALEXANDER CONSTRUCTI0 HARDRIVES, INC. MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 8" PVC SEWER LINE LF 245.00 23.50 5757.50 18.50 4532.50 26.00 6370.00 (0'-10' DEEP) 2/ 8" PVC SEWER LINE LF 56.00 23.50 1316.00 19.50 1092.00 26.00 1456.00 (10'-12' DEEP) . 3/ CONSTRUCT MANHOLE DESIGNLF 22.80 138.00 3146.40 118.80 2708.64 150.00 3420.00 506.506 48" TYPE I 4/ F & I CASTING ASSEMBLY EA 3.00 166.00 498.00 162.00 486.00 180.00 540.00 2506.516 (R-1642) 5/ CONNECT TO EXISTING EA 1.00 595.00 595.00 1080.00 1080.00 650.00 650.00 2506.602 SANITARY SEWER MANHOLE 6/ STABILIZING AGGREGATE TON 75.00 9.20 690.00 8.70 652.50 10.00 750.00 2105.543 7/ FURNISH AND INSTALL EA 4.00 360.00 1440.00 378.00 1512.00 385.00 1540.00 MANHOLE CHIMNEY SEALS 8/ 8" PVC PLUG EA 1.00 30.00 30.00 81.00 81.00 31.00 31.00 2503.602 SUBTOTALS: 13472.90 12144.64 14757.00 - MN - MI ME OM - - ME MO M r w - OM - MI MI PM 1 , 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 BID SCHEDULE D - SANITARY SEWER (continued) ITEM NO./ CONTRACT MIDWEST ASPHALT CORFO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 8" PVC SEWER LINE LF 245.00 18.00 4410.00 (0'-10' DEEP) 2/ 8" PVC SEWER LINE LF 56.00 19.00 1064.00 (10'-12' DEEP) • 3/ CONSTRUCT MANHOLE DESIGNLF 22.80 135.00 3078.00 2506.506 48" TYPE I 4/ F & I CASTING ASSEMBLY EA 3.00 215.00 645.00 2506.516 (R-1642) 5/ CONNECT TO EXISTING EA 1.00 1102.00 1102.00 2506.602 SANITARY SEWER MANHOLE 6/ STABILIZING AGGREGATE TON 75.00 10.45 783.75 2105.543 7/ FURNISH AND INSTALL EA 4.00 580.00 2320.00 MANHOLE CHIMNEY SEALS 8/ 8" PVC PLUG EA 1.00 20.00 20.00 2503.602 SUBTOTALS: 13422.75 BID SCHEDULE E - LIGHTING ITEM NO./ CONTRACT ALBER CONSTRUCTION, I VALLEY PAVING, INC. NORTHDALE CONSTRUCTIO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ SERVICE CONNECTION EA 1.00 1100.00 1100.00 1000.00 1000.00 550.00 550.00 2545.601 2/ H.P.S. LIGHT FIXTURE EA 8.00 1400.00 11200.00 1785.00 14280.00 1950.00 15600.00 2545.601 (13'-O" HGT) (COMPLETE) 3/ HPS LIGHTED BOLLARD EA 17.00 825.00 14025.00 850.00 14450.00 910.00 15470.00 2545.601 (COMPLETE) 4/ RELOCATE LIGHTING EA 1.00 550.00 550.00 2000.00 2000.00 1450.00 1450.00 0545.602 ASSEMBLY SUBTOTALS: 26875.00 31730.00 33070.00 BID SCHEDULE E - LIGHTING (continued) ITEM NO./ CONTRACT GMH ASPHALT CORPORATI ALEXANDER CONSTRUCTIO HARDRIVES, INC. MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ SERVICE CONNECTION EA 1.00 925.00 925.00 972.00 972.00 520.00 520.00 2545.601 2/ H.P.S. LIGHT FIXTURE EA 8.00 1630.00 13040.00 1728.00 13824.00 1900.00 15200.00 2545.601 (13'-O" HGT) (COMPLETE) 3/ HPS LIGHTED BOLLARD EA 17.00 748.00 12716.00 770.00 13090.00 910.00 18470.00 2545.601 (COMPLETE) 4/ RELOCATE LIGHTING EA 1.00 1210.00 1210.00 1242.00 1242.00 1410.00 1410.00 0545.602 ASSEMBLY SUBTOTALS: 27891.00 29128.00 32600.00 BID SCHEDULE E - LIGHTING (continued) ITEM NO./ CONTRACT MIDWEST ASPHALT CORPO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ SERVICE CONNECTION EA 1.00 545.00 545.00 2545.601 2/ H.P.S. LIGHT FIXTURE EA 8.00 1995.00 15960.00 2545.601 (13'-0" HGT) (COMPLETE) 3/ HPS LIGHTED BOLLARD EA 17.00 955.00 16235.00 2545.601 (COMPLETE) 4/ RELOCATE LIGHTING EA 1.00 1485.00 1485.00 • 0545.602 ASSEMBLY SUBTOTALS: 34225.00 BID SCHEDULE F - WATER MAIN REPAIR ITEM NO./ CONTRACT ALBER CONSTRUCTION, I VALLEY PAVING, INC. NORTHDALE CONSTRUCTIO MNDOT NO. ITEM U4IT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ ABANDON WATER MAIN LS 1.00 1600.00 1600.00 1250.00 1250.00 1500.00 1500.00 2104.525 2/ 8" WATER MAIN - DUCTILE LF 600.00 70.00 42000.00 74.20 44520.00 64.20 38520.00 0504.603 IRON CL 52 (BALL JOINT) 3/ CONNECT TO EXISTING WATEHA 2.00 750.00 1500.00 415.00 830.00 700.00 1400.00 0504.602 MAIN ' SUBTOTALS: 45100.00 46600.00 41420.00 BID SCHEDULE F - WATER MAIN REPAIR (continued) ITEM NO./ CONTRACT GMH ASPHALT CORPORATI ALEXANDER CONSTRUCT ID HARDRIVES, INC. MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ ABANDON WATER MAIN LS 1.00 1225.00 1225.00 1620.00 1620.00 1320.00 1320.00 2104.525 2/ 8" WATER MAIN - DUCTILE LF 600.00 73.50 44100.00 70.00 42000.00 80.00 48000.00 0504.603 IRON CL 52 (BALL JOINT) 3/ CONNECT TO EXISTING WATERA 2.00 410.00 820.00 756.00 1512.00 1200.00 2400.00 0504.602 MAIN r - E MO - MI S NM MN ■■■ NM - - r ME - - - S um , a me NE we mu = am 1111. Mil NM IIIIII 111111 MI OM NM ME NO lila SUBTOTALS: 46145.00 45132.00 51720.00 BID SCHEDULE F - WATER MAIN REPAIR (continued) ITEM NO./ CONTRACT MIDWEST ASPHALT CORPO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ ABANDON WATER MAIN LS 1.00 21.95 21.95 2104.525 2/ 8" WATER MAIN - DUCTILE LF 600.00 93.00 55800.00 0504.603 IRON CL 52 (BALL JOINT) 3/ CONNECT TO EXISTING WATERA 2.00 980.70 1961.40 0504.602 MAIN SUBTOTALS: 57783.35 BID SCHEDULE 8 - CHANHASSEN MALL STORM SEWER ITEM NO./ CONTRACT ALDER CONSTRUCTION, I VALLEY PAVING, INC. NORTHDALE CONSTRUCTIO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 12" RC PIPE SEWER DESIGNLF 519.00 24.00 12456.00 21.65 11236.35 22.50 11677.50 2503.541 3006 CL V 2/ 36" RC PIPE SEWER DESIBNLF 25.00 55.00 1375.00 72.50 1812.50 52.00 1300.00 2503.541 3006 CL II 3/ CONSTRUCT CATCH BASIN LF 11.70 150.00 1755.00 82.50 965.25 140.00 1638.00 2501.507 TYPE H (27") 4/ CONSTRUCT MANHOLES EA 1.00 850.00 850.00 2220.00 2220.00 800.00 800.00 2506.508 TYPE II A 5/ F & I CASTING ASSEMBLY EA 1.00 160.00 160.00 168.00 168.00 150.00 150.00 2506.516 (R-1642-B) 6/ F & I CASTING ASSEMBLY EA 2.00 215.00 430.00 225.00 450.00 200.00 400.00 2506.516 (R-2503-D) 7/ CONNECT TO EXISTING STORM 1.00 535.00 535.00 510.00 510.00 500.00 500.00 2503.602 SEWER • 8/ CRUSHED ROCK PIPE BEDDINQON 20.00 8.50 170.00 9.30 186.00 8.00 160.00 9/ REMOVE BITUMINOUS SY 850.00 1.50 1275.00 1.75 1487.50 2.00 1700.00 2104.505 PAVEMENT 10/ BITUMINOUS MIXTURE FOR SY 850.00 15.00 12750.00 15.40 13090.00 21.00 17850.00 2331.518 PATCHING SUBTOTALS: 31756.00 32125.60 36175.50 BID SCHEDULE S - CHANHASSEN MALL STORM SEWER (continued) ITEM NO./ CONTRACT GMH ASPHALT CORPORATI ALEXANDER CONSTRUCTIO HARDRIVES, INC. MNDOT NO. ITEM UNIT OUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 12" RC PIPE SEWER DESIGNLF 519.00 21.50 11158.50 24.30 12611.70 24.00 12456.00 2503.541 3006 CL V 2/ 36" RC PIPE SEWER DESIGNLF 25.00 71.50 1787.50 56.00 1400.00 77.00 1925.00 2503.541 3006 CL II 3/ CONSTRUCT CATCH BASIN LF 11.70 82.00 959.40 151.20 1769.04 88.00 1029.60 2501.507 TYPE H (27") 4/ CONSTRUCT MANHOLES EA 1.00 2200.00 2200.00 864.00 864.00 2400.00 2400.00 2506.508 TYPE II A 5/ F & I CASTING ASSEMBLY EA 1.00 166.00 166.00 162.00 162.00 180.00 180.00 2506.516 (R-1642-8) 6/ F & I CASTING ASSEMBLY EA 2.00 218.00 436.00 216.00 432.00 240.00 480.00 2506.516 (R-2503-D) 7/ CONNECT TO EXISTING STORM 1.00 505.00 505.00 540.00 540.00 550.00 550.00 2503.602 SEWER 8/ CRUSHED ROCK PIPE BEDDINGON 20.00 9.20 184.00 8.65 173.00 10.00 200.00 9/ REMOVE BITUMINOUS SY 850.00 1.50 1275.00 2.16 1836.00 3.00 2550.00 2104.505 PAVEMENT 10/ BITUMINOUS MIXTURE FOR SY 850.00 11.00 9350.00 21.60 18360.00 15.00 12750.00 2331.518 PATCHING SUBTOTALSi 28021.40 38147.74 34520.60 BID SCHEDULE 9 - CHANHASSEN MALL STORM SEWER (continued) ITEM NO./ CONTRACT MIDWEST ASPHALT CORPO MNDOT NO. ITEM UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1/ 12" RC PIPE SEWER DESIGNLF 519.00 25.10 13026.90 2503.541 3006 CL V 2/ 36" RC PIPE SEWER DESIGNLF 25.00 60.00 1500.00 2503.541 3006 CL II 3/ CONSTRUCT CATCH BASIN LF 11.70 145.00 1696.50 2501.507 TYPE H (27") 4/ CONSTRUCT MANHOLES EA 1.00 1485.00 1485.00 2506.508 TYPE II A 5/ F & I CASTING ASSEMBLY EA 1.00 212.00 212.00 2506.516 (R-1642-B) 6/ F & I CASTING ASSEMBLY EA 2.00 245.00 490.00 2506.516 (R-25O3-D) 7/ CONNECT TO EXISTING STORM 1.00 540.00 540.00 2503.602 SEWER 8/ CRUSHED ROCK PIPE BEDDINGON 20.00 10.35 207.00 9/ REMOVE BITUMINOUS SY 850.00 1.00 850.00 2104.505 PAVEMENT 10/ BITUMINOUS MIXTURE FOR SY 850.00 20.50 17425.00 2331.518 PATCHING SUBTOTALS: 37432.40 it ! r - - - MI ME ME - UM ME 1111111 - - - WM wa -