Loading...
1f. Accept Utility Improvements in Vineland Forest CITY T CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 -1°4#r klbf (612) 937-1900 • FAX (612) 937-5739 } Er _ _✓ MEMORANDUM M" '`' Rem` Q,. .3 0 TO: Gary Warren, City Engineer , k,1 Date S'� , _ . ' FROM: Dave Hempel , Sr. Engineering Technician / f't? � , DATE: July 2 , 1990 '___7/�_! SUBJ: Accept Utility Improvements in Vineland Forest Addition Project No. 89-27 Attached is a letter from Merila & Associates certifying that Y g the utility construction has been completed in general ' conformance with the plans and specifications and is therefore ready for the City' s acceptance. ' A condition of approval for this development was that the developer obtain and dedicate to the City all street, utility and drainage easements required as a part of this development. The ' City has not received all of the necessary easements and therefore final acceptance should be conditioned upon the City receiving these easements prior to formally accepting the utility improvements. The specific easements referred to is a 20 foot ' utility and drainage easement over the existing storm sewer on Lot 22, Block 2 Fox Chase which this development connected to. ' Therefore, it is recommended that the City accept the utilities for Vineland Forest Addition, Project No. 89-27 conditioned on the developer supplying the City with a mylar set of as-built plans, a two-year maintenance bond and a 20 foot utility and drainage easement across Lot 22, Block 2 Fox Chase. Formal acceptance of the public utilities shall be effective from the date the City receives the easement documents for drainage and ' utility purposes across Lot 22, Block 2 Fox Chase. jms ' Attachment: Letter from Merila & Associates dated July 3 , 1990 c: Chuck Van Eeckhout, Van Eeckhout Building Corporation I I JUL YJ'7.77,3 I'IJRiLH 8c H 'L)L.., JAIL.. h''.a/L' e1il 7 a rr Associates 8401 er d Avenue ci North,Suite 63 A Merila Brooklyn Park,Minnesota 55428-1508 Telephone(612)533-7595 Fax(612)533-1937 July 3, 1990 ' 1 Mr. Gary Warren City of Chanhassen 670 Coulter Drive Chanhassen, MN 55317 Re: Vineland Forest Merila project 89-077 Dear Mr. Warren: Based on the construction observation performed by BRW, Inc. for the city, the material testing performed by GME Consultants Inc., -the construction observed by the owner, and my visual review of the site. following construction it is my belief that the Vineland Forest project was constructed in general conformance with the approvid*:prgj.ect •plans and specifications prepared by-ourZf , .under my direct supervision. , I recommend that the city accept the utility and grading portion of the project, allowing the retainage to be reduced to zero percent (0%) on these line items, and upon receipt of a warranty bond, from the contractor Machemes Construction begin the actual warranty period. Please take action on this matter at your next regularly scheduled city council ' meeting. Sincerely, I Merila & Associates, Inc. "4:Z.10/1. 1"-- Stephen M. Johnson, P.E. Project Engineer Minnesota Regixtrattbnn..18914'. SMJ:mlm 1 I ENGINEERING SURVEYING PLANNING