Loading...
2e. Contract amendment No. 2 for Public Works Storage Bldg CITYOF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 • FAX (612) 937-5739 MEMORANDUM ___ 5y C'd'r mr 1:gy"""p TO: Don Ashworth , City Manager Moe*" Z �' ' FROM: Gary Warren , City Engineer Dee. Si:•:,"?'t to Co^-n,ssbr. DATE: August 22 , 1990 SUBJ: Approve Contract Amendment No. 2 for Public Works '° tea, Auxiliary Storage Building Project No. 89-23B The attached Change Order No. 2 from W. H. Cates Construction Co. is for the installation of secondary power service to the Public Works auxiliary storage building. There has been some confusion and misunderstanding with the utility company relative to the ' location of the power drop for the service of this building. As a result, it is necessary to have our contractor run an additional 240 feet of underground wiring to connect to the service point for the building. The attached change order in the amount of $2 ,687 .43 is to cover this additional work which was beyond the original contract scope. ' I find the contractor 's cost to be appropriate and therefore recommend approval of Change Order No. 2 to the Auxiliary Storage Improvement Project for W. H. Cates Construction Co. in the amount of $2 ,687 .43 . ktm Attachment: August 7, 1990 letter from W. H. Cates Construction Co. c: Jack Anderson, EOS Corporation i -. ' AUG 8 ' 90 15: 35 FROM EOS CORPORATION PAGE . 002 COMMERCIAL 1 11 APARTMENTS W .varrYATES CONSTRUCTION CO. NuRS1NGHQME5 I — , TURN-KEY PROJECTS z:ze trip GENERAL CONTRACTING .i.1 300 HIGHWAY G.f4AMEL.MINNESOTA 55340 TELEPHONE 475.5050 • 1 August 7, 199Q CHANGE ORDER REQUEST NO. : 2 ARCHITECT: Jack Anderson EOS Corporation 470 Water Street Excelsior, MN 55331 JOB NAME: Chanhassen Public Works Auxiliary Storage Building Cost to add additional 240' underground wiring. 2" Pipe 240'0 S2.40/ft $ 336.00 3/0 Copper 750' 0 2.32/ft 990.00 Labor 15 hrs Q $40/hr 600.00 Trench 240' 0 $1 .05/ft 372.00 Subtotal G 2298.00 8% Overhead 183.64 7% Fee 173.73 Bond 31 .86 TOTAL. ADD $ 2697.43 Please advise us whether these changes are accepted. Sincerely, Jeff S. Cates Project Manager