Loading...
1a. Plans & Specs Lake Susan Hills West 4th Addition / a.... III CITY OF - 1 CHANHASSEN F 690 COULTER DRIVE •• P.O. BOX 147 •• CHANHASSEN, MINNESOTA 55317 ' (612) 937-1900 • FAX (612) 937-5739 Amex By City A3nrtrfstttt. I MEMORANDUM `�-r/VV �d+ �. _ TO: Gary Warren, City Engineer 8 ;" "---p: -, FROM: Charles Folch, Assistant City Engineer _ De-I DATE: September 5 , 1990 ;� ^ V SUBJ: Approve Plans and Specifications for I Lake Susan Hills West 4th Addition Project No. 90-14 (pvt) IA review has been conducted of the final plans and specifications submittal for Lake Susan Hills West 4th Addition. The public improvements will encompass the construction of sanitary sewer, I watermain and related services, storm sewer and street construction for the following areas: Lake Susan Hills Drive beginning at the existing southerly limits and extending south to I the proposed connection with Powers Boulevard (County Road 17) , the adjacent cul-de-sacs off of Lake Susan Hills Drive (Tern Court and Merganser Court) , Flamingo Drive extending from its I present southerly limits south to Pintail Court, and a small portion of Flamingo Drive off of Lake Susan Hills Drive extending west into Kingfisher Court. • ISANITARY SEWER I Sanitary sewer is proposed to be connected to the existing system on Lake Susan Hills Drive extending south approximately 900 feet along the new Lake Susan Hills Drive extension. It I should be noted that at this time, due to elevation limitations, gravity sewer will not be able to serve a small area at the south end of the Lake Susan Hills Drive, thus, these areas are platted as outlots . These outlots will likely be served by gravity sewer ' in the future from the subdivision on the east side of County Road 17. A small segment of gravity sewer is also proposed to be extended south from the existing Flamingo Drive and west into 1 Pintail Court. Based on the type of pipe, sizes, grades proposed and submitted calculated verification, the system appears to be adequately sized for capacity and minimum scour velocities . I I Gary Warren September 5, 1990 Page 2 ' WATERMAIN A 10-inch DIP watermain is proposed to be connected to the existing line at the southerly limits of Lake Susan Hills Drive and extended south approximately 900 feet to the last serviceable ' lot, at the present time, with gravity sewer . This 4th Addition watermain system is proposed to be looped with future additions via interconnects through Kingfisher Court and Pintail Court to ' provide additional flow sources in times of emergencies and breakage. The Fire Marshall has reviewed these plans for hydrant location requirements and other safety issues and is satisfied with the current submittal . STORM SEWER Storm sewer is proposed throughout the 4th Adddition. The majority of the storm sewer system has been designed to carry the rainfall runoff to a proposed ponding basin and sedimentation basin configuration in the park area. A small area on the southerly portion of Lake Susan Hills Drive will drain down to the County Road 17 ditch. Outlet velocities have been designed ' to yield discharge rates of less than three feet per second during design storms as recommended by staff. It should also be noted that a County utility permit will be required for the installation of the storm sewer within the County right-of-way along County Road 17 . The outlet for the detention pond has been designed to maintain the predeveloped runoff rate for the 100-year 24-hour storm. This has been verified with submitted calculations and mass diagrams . The proposed ponding outlet will discharge across a pipeline easement of Williams Brothers . It is the City' s desire to see this outlet extended approximately another 100 feet crossing the pipeline easement and outletting into a natural ' draw. I have previously met with the applicant' s engineer, Peter Molinaro, and have requested that information be obtained from Williams Brothers pipeline as to location and depth of the pipeline to determine whether extending the outlet through the ' pipeline easement is feasible. To date, this information has not been obtained. However, when it becomes available, the applicant has agreed to work with the City on implementing the best outlet ' location. 1 Gary Warren September 5 , 1990 Page 3 STREETS ' A 35-foot back-of-curb to back-of-curb street width is proposed for Lake Susan Hills Drive consistent with the previous construction. This street section will extend down approximately 1 , 000 feet where it will transition into a 28-foot temporary road section. The justification for the temporary road section results from the inability to serve the abutting properties along this segment of street via gravity sewer at the present time. When the sanitary sewer and watermain is provided for the abutting property in this area, the City will require that the street be reconstructed to the approved width of 35 foot back-of-curb to back-of-curb. A 5-foot concrete sidewalk is also proposed to be extended along the west boulevard area of Lake Susan Hills Drive and along the southerly portion of Flamingo Drive. The sidewalk is proposed to discontinue at the limit of serviceable lots. However, the City recommends constructing the walk out to C.R. 17 at this time. It is recommended that temporary construction barricades will be installed at the current limit of Lake Susan Hills Drive in order to eliminate any potential construction vehicles from accessing the site .from the residential area. Barricades will also be installed on Flamingo Drive just south of Pintail Court and south of Kingfisher Court as a temporary safety measure until these road segments are extended in the future. The parkland area is also proposed to be constructed at this time. Improvements will involve grading of the park area, installation of storm sewer and outlets and construction of the detention ponds . The 8-foot wide bituminous trails proposed for the park accesses will be constructed from the public streets through the easement areas to the back property lines of the residential lots under this contract. The trails will then be extended under a separate park improvement contract at a future date. ' RECOMMENDED CONDITIONS 1. Applicant shall work with and abide by staff recommendation in determining the most appropriate location for the detention pond outlet in relation to the William' s Brothers pipeline. 2 . Sidewalk on Lake Susan Hills Drive shall be extended to County Road 17. 1 ' Gary Warren September 5 , 1990 Page 4 3 . The name Pintail Court shall be changed as it has been previously assigned in the City. ' 4 . Upon final inspection and approval of the sanitary sewer, the applicant shall furnish the City with a television report and ' a copy of the VHS video. ktm ' Attachment: Plans pF�1�1R�ENGINEERING COPY Received ' Reviaior� No = � APpr0V2d by G iY Er:� e� I Date Appromdt0 Date I I I I I I