Loading...
1i Powers Blvd Office Bldg I- lZ ~ u :J Cl. r c::( - ~ J.J -- P.C.DATE: May 7, 2002 .1.-i, C.C. DATE: May 28, 2002 REVIEW DEADLINE: 6/29/02 CASE: 02-3 Site Plan CITY OF CHANHASSEN BY: AI-Jaff STAFF REPORT PROPOSAL: Site Plan Review for a 28,980 square foot Office Building to be constructed in two phases (phase I with an area of 20,525 square feet and Phase IT with an. area of 8,455 square feet), Powers Boulevard Office Building LOCATION: South of Hwy. 5, East of Powers Boulevard, Lot 2, Block 3, Park Two Mount Properties (J ~ 7808 Creekridge Circle, #305 Bloomington, MN 55439 Steve Michaels (952) 941-1383 APPLICANT: PRESENT ZONING: Industrial Office Park 2020 LAND USE PLAN: OfficelIndustrial ACREAGE: 122,859 Square Feet (2.8 Acres) DENSITY: SUMMARY OF REQUEST: Site Plan Review for a 28,980 square foot office building. Notice of this public hearing has been mailed to all property owners within 500 !eet. LEVEL OF CITY DISCRETION IN DECISION-MAKING: :¡:; The City's discretion in approving or denying a site plan is limited to whether or not the proposed project " ~ complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the site plan. This is a quasi-judicial decision. ) 1 KIMBERLY LANE 2 Kelly Court 3 Nicholas Way ~ ~ W 78' ~ ('I) Streei i nte~E @ÐJLJ º C State Hw ~ . Powers Boulevard Office Building May-+, 28, 2002 Page 2 BACKGROUND On April 5, 1981, the City Council approved the final plat to Park Two. PROPOSALfflUMMARY The applicant is requesting site plan approval for the construction of a 28,980 square foot office building to be constructed in two phases. Phase I, which is a one story building, is proposed to have an area of 20,525 square feet. Phase IT is proposed to be constructed as a second story and will have an area of 8,455 square feet. The site is zoned lOP, Industrial Office Park and bordered by Highway 5 to the north, Powers Boulevard to the west, and industrial sites to the east and west. The lot area is 2.8 acres. The Hwy. 5 Overlay District applies to the site. The site is visible directly from Highway 5. It has full access from a private street to the south off of Powers Boulevard. The site plan is for an office building situated on the northwest comer of the site. The exterior materials are comprised of face brick and stucco, E.F.LS., precast stone, and prefinished metal. A stucco canopy supported by two columns adorns the main entrance into the building. The roofline is staggered providing architectural relief to the building. Windows are proposed on all four elevations. The building height (for Phase 1) is 22 feet to the top of the parapet on the east and south elevations and 19 feet on the west and north elevations. Phase IT will bring up the total height of the building to 32.4 feet. One issue raised at the Planning Conunission meeting dealt with the Phase II elevator shaft. The walls lack detail and articulation. The applicant proposed scoring the wall, which will provide a grid pattern. Parking for vehicles is located south and west of the building. The building hides the majority of the parking lot and the portion that abuts Highway 5 is screened by a combination of elevation changes and landscaping. The elevation of Highway 5 is approximately 10 feet higher than the proposed parking lot. The difference in elevation, combined with landscaping will provide adequate screening and will meet the Highway 5 overlay district screening requirements. The plans reflect future parking, which is proposed to be constructed with phase two. The expanded parking lot is located along the southwest comer of the site. '4' The proposed development will have a total impervious area of 57.6% for Phase I and 67% coverage when Phase IT is completed. The maximum impervious area permitted by ordinance is 70%. ~: , ".".' ;" An existing stormwater pond is located in the southern portion of the site on the one low area. The applicant has proposed to relocate this pond to the south, on the Lake Susan Park Site. Staff regards the project as a reasonable use of the land. Based upon the foregoing, staff is recommending approval of the site plan, with conditions outlined in the staff report. .~ ~ ~~ Powers Boulevard Office Building May-+, 28, 2002 Page 3 GENERAL SITE PLAN/ARCHITECTURE The proposed office building, with an area of 28,980 square feet, will be situated on the northwest comer of the property. The site is bordered by Highway 5 to the north, and Powers Boulevard to the west. Instant Web occupies the property to the east, and Teleplan is located to the west across Powers Boulevard. Both are industrial users. Access to the building is proposed from a private street south of the site. The Private Street is shared with Instant Web and leads to Powers Boulevard. Parking will be located along the east and south portion of the building. The building is located 30 feet from the north, 117 feet from the east, 265 feet from the south, and 30 feet from the west property line. The proposed Phase I building will utilize a combination of face brick and stucco as the main materials. Accents are introduced through the use of EF.LS. columns projecting out I inch accompanied by a soldier course base. Each column contains a medallion and recessed brick treatments in the center. A combination of EF.LS. and prefinished metal canopies with a staggered roof line provide architectural relief to the building. Windows are proposed on all four elevations. The entrance to the building utilizes a projecting canopy supported by two columns. The comer facing the intersection of Hwy. 5 and Powers Boulevard has three sets of double row windows. Phase II will utilize identical materials as Phase I, continue the architectural design of staggered roofline, windows, etc. The applicant has provided relief of the continuous walls through the use of different colors and material (samples will be provided at the meeting). This development falls within the Highway Corridor Overlay and must comply with the district's design standards in addition to the Industrial Office Park Standards and the city's new design standards. The purpose of the overlay district is to promote high-quality architectural and site design through improved development standards with the corridor. The design standards should create a unified, harmonious and high quality visual environment. The building meets all the requirements of the design standards, which include: 1. A defined entrance accentuated by a projecting canopy. 2. The building provides articulation through the use of staggered parapets on the roof, different materials, landscaping, windows, and columns. 3. All materials used on the building are durable and permitted. 4. E.LF.S is used as an accent and occupies a range of 10% to 12% of each elevation as permitted by ordinance. 5. The colors on the building are harmonious. 6. All elevations that can be viewed by the public have been designed to include windows and/or doors to minimize expanses of blank walls. 7. A bench is proposed along the east side of the entrance into the building (Sheet LI.O). 8. Trash enclosure is screened from views. Powers Boulevard Office Building May-+, 28, 2002 Page 4 9. No more than 50% of the parking lot faces Highway 5. This parking area is screened by existing topography and landscaping. SITE PLAN FINDINGS In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: (1) Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; (4) Creation of a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: a. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors, and general community; b. The amount and location of open space and landscaping; c. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. Powers Boulevard Office Building May-+, 28, 2002 Page 5 (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the City's Highway 5 corridor design requirements, the comprehensive plan, the zoning ordinance, and the site plan review requirements with the incorporation of staff's conditions. The site design is compatible with the surrounding development. It is functional and harmonious with the approved development for this area. WETLANDS There is one low area on-site. According to the Preliminary Plat for the Park Two Addition, no wetlands existed on this site prior to development. At the time of the preliminary plat, there was a small "wet area" just south of the existing storrnwater pond. This was impacted in 1981-1982 with the construction of the Instant Web building and parking lot. Because the existing basin was created for a purpose other than wetland creation, it qualifies for an incidental wetland exemption under the Minnesota Wetland Conservation Act (Minnesota Rule 8420). The applicant received an exemption application, but has not yet submitted the completed application. A complete exemption application should be submitted and an exemption should be issued prior to impact to the basin on-site. GRADING. DRAINAGE & EROSION CONTROL Existing site elevations for the property range from a high of 952 to 923 at the southerly pond. Highway 5, which borders the site to the north, is at an elevation of approximately 955±. The applicant is proposing to grade down from the northern slope to the proposed building elevation of 946.3. Staff is recommending that the slope off the northeasterly and southeasterly comer of the parking lot be revised to meet the maximum allowable slope grade of 3: 1 or that a retaining wall be constructed. The north half of the site will be cut down for construction of the building and parking lot, while the south half of the site will need to be filled for the parking lot. The existing site drains from north to south. There is an existing public pond in the southwesterly comer of the site. This pond receives existing site drainage in addition to partial site runoff from the Instant Web property to the east. The applicant is proposing to fill in the existing pond and transport the site's storrnwater to an off-site regional pond located within Lake Susan Park. The applicant will increase the storage capacity of the regional pond to accommodate the additional drainage that is being routed there. The enlarged pond must be designed to National Urban Runoff Program (NURP) standards, with maximum side slopes of 3: 1 and a 10: I slope bench at the normal water level. Powers Boulevard Office Building May-+, 28, 2002 Page 6 The applicant is also proposing an approximate 1O-foot tall berm just south ofthe pond expansion area. Staff is recommending that this berm be eliminated and the excess dirt be disposed of off-site. The City's Park and Recreation Director has indicated that the proposed berm is in the area of a future trail extension and is, therefore, not wanted. Stormwater calculations have been submitted for the site. Staff has reviewed the calculations and found that only minor revisions remain. The construction of the public pond will require a financial security to be obtained from the applicant. The security must be in the form of a cash escrow or letter of credit and will cover the installation of the public improvement, i.e. pond. The security is required to be in place prior to any construction occurring on site. Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). The current plan shows silt fence around the entire perimeter of the site and a rock construction entrance at the main access drive. UTILITIES Municipal sanitary sewer and water is available to the site from Powers Boulevard. The applicant is proposing to connect to existing sewer and water lines off the southwesterly comer of the site and extend private services for the proposed office building. According to the City's Finance Department records, the site was previously assessed for utilities. As such, only sanitary sewer and water hook-up charges, along with the Met Council's SAC fee, will be due at the time of building permit issuance. The 2002 trunk utility hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water. The 2002 SAC fee is $1,275 per unit. The applicant is responsible for obtaining permits from the appropriate regulatory agency including Carver County and the Riley-Purgatory-Bluff Creek Watershed District. STREETS/ACCESSIPARKING No public streets are proposed with this project. Full site access will be gained off of the existing Instant Web driveway just south of the site. Since the Instant Web driveway will now be a shared access, it falls under the private street ordinance. As such, a 40-foot wide cross- access easement must be recorded across the shared portion of the driveway of the Instant Web site. Private streets are permitted in this district if the following conditions exist: Powers Boulevard Office Building May-+, 28, 2002 Page 7 1. The prevailing development pattern makes it unfeasible or inappropriate to construct a public street. In making this determination the city may consider the location of existing property lines and homes, local or geographic conditions and the existence of wetlands. 2. After reviewing the surrounding area, it is concluded that an extension of the public street system is not required to serve other parcels in the area, improve access, or to provide a street system consistent with the comprehensive plan. 3. The use of a private street will permit enhanced protection of the city's natural resources including wetlands and forested areas. A public street is not required to serve this parcel. It was intended to share the existing access off of Powers Boulevard with Instant Web. A sidewalk is shown at the entrance of the building (southeast comer). This sidewalk must be extended to the west to connect with the existing trail on Powers Boulevard. The parking ordinance for medical office buildings requires one (1) parking space for each 150 square feet of gross floor area. The total spaces required for the building is 129 spaces. The applicant is providing 130 spaces. With the addition of Phase IT, the total parking spaces required will be 169. The plans reflect 169 parking spaces. Landscaping is proposed along the north side, adjacent to Highway 5, on the west side adjacent to Powers Boulevard as well as throughout the parking area. This will provide screening of cars parked in the lot. A berm is proposed between the parking lot and Powers Boulevard to provide additional screening. LANDSCAPING Minimum requirements for landscaping, based on 49,640 sq. ft. of parking lot area, include 3.971 sq. ft. of landscaped area around the parking lot, 18 trees for the parking lot, and buffer yard plantings along all property lines. The applicant's proposed as compared to the requirements for landscape area, parking lot trees and buffer yard plantings is shown in the following table. Required Prooosed Vehicular use landscaoe area 3,971 Sq. ft. 3,971 Sq. ft. Trees/ parking lot 16 overstory 16 overstory 8 islands/peninsulas 6 islands/oeninsulas North prop. Line - buffer yard 6 overs tory 60verstory B, 20' width, 285' length 9 understory 5 understory 14 shrubs 14 shrubs East prop. line - buffer yard 4 overs tory trees 7 overstory A, 20' width, 415' length 4 understory trees 5 understory Powers Boulevard Office Building May-+, 28, 2002 Page 8 8 shrubs 8 shrubs South prop. Line - buffer yard o overs tory 1 overstory A, 25' width, 120' length 1 understory o understory 1 shrubs 4 shrubs West prop. Line - buffer yard 9 overs tory 8 overstory (+ 11 existing B, 20' width, 460' length 14 understory overstory in ROW) 23 shrubs 15 understory 23 shrubs Proposed landscaping for parking lot landscaping and north buffer yards does not meet minimum ordinance requirements. Additionally, according to city ordinance the parking lot views from Highway 5 and Powers Blvd. must be obscured with either landscaping and/or berms. Staff recommends that the applicant meet all minimum quantities for parking lot and buffer yard landscaping requirements. The applicant should submit a revised landscape plan to the city for approval. LIGHTING Lighting locations have been illustrated on the plans. Only shielded fixtures are allowed with a maximum height of 30 feet. The ordinance requires no more than Y2 foot candles of light at the property line. The Photometric Plan shows that the proposed lighting complies with this requirement with the exception of the south and southwest portions of the site. These are driveway accesses. The southem access will be shared with the property located to the south of the subject site, and should be illuminated for safety reasons. Detailed lighting plan should be submitted when building permits are requested. SIGNAGE In the lOP-Industrial Office Park District the following signs are permitted: · Ground low profile business sign defined as "A business sign affIXed directly to the ground. " One ground low profile sign is permitted per site for each street frontage (Hwy. 5 & Powers Boulevard). The area of the sign may not exceed 64 square feet and 8 feet in height. The sign must maintain a 10 foot setback from property lines. · Wall mounted sign defined as: "A sign attached to or erected against the wall of a building or structure with the exposed face of the sign in a plane approximately parallel to the face of the wall, and which does not project more than twelve (12) inches from such building or structure. Powers Boulevard Office Building May-+, 28, 2002 Page 9 Wall signs shall not include product advertising. Wall signs shall include tenant identification, tenant logo, center name, or any combination of the three." Only one (1) wall-mounted sign is permitted on the street frontage for each building occupant. The applicant has two street frontages. The applicant has not submitted a detailed signage plan, however, two (2) ground low profile signs are shown on the site -- one on the northwest comer (with dimensions of 8 feet in height and 10 feet in width) and one on the southwest corner of the site (with dimensions of 6 feet in height and 8 feet in width). Staff is recommending the following signage criteria be adopted: 1. Monument signage shall be subject to the monument standards in the sign ordinance. 2. Wall signs are permitted on the north and west elevations only. The sign area shall meet standards set in the sign ordinance. 3. All signs require a separate permit. 4. The signage will have consistency throughout the development and add an architectural accent to the building. 5. Consistency in signage shall relate to color, size, materials, and heights. 6. Back-lit individual letter signs are permitted. 7. Individual letters may not exceed 30 inches in height. 8. Only the name and logo of the business occupying the building will be permitted on the sign. The applicant must obtain sign permits prior to erecting the signs on site. A detailed sign plan incorporating the method of lighting, acceptable to staff should be provided prior to requesting a building permit. Powers Boulevard Office Building May-+, 28, 2002 Page 10 Building Height Building Setback Parking stalls Parking Setback Hard surface Coverage Lot Area COMPLIANCE TABLE - lOP DISTRICT Ordinance Powers Office Building Phase I Phase IT 2 stories 1 story 2 story N-lO' E-30' N-30' E-I17' N-30' E-I17' S-30'W-IO' S-265' W-30' S-265' W-30' 169 stalls 130 stalls 39 stalls N-30' E-O' N-17.3'* E-23.4' N-17.3'* E-23.4' S-O' W-25' S-90' W-12.7'* S-IO' W-IO.7'* 70% 57.6% 67% 1 acre 2.82 acres · The Zoning Ordinance (Section 20-815) allows parking setbacks along public rights-of-way to be reduced to a minimum of ten (10) feet if the applicant can demonstrate to the satisfaction of the city that one-hundred-percent screening is provided at least five (5) feet above the adjacent parking lot. The intent of this section is that the city is willing to trade a reduced setback for additional landscaping that is both an effective screen and of high quality aesthetically. Acceptable screening is to be comprised of berming and landscaping. Screening through the use of fencing is not permitted. · Also, section 20-1073 Lot frontage and parking location. (a) Highway 5 Corridor District, states, "One row of parking shall be allowed within the required minimum front yard setback of any lot. The majority of parking shall be located to the side or rear of the building. The front yard setback required by ordinance is 30 feet along Highway 5 and 25 feet along Powers Boulevard. However, a reduced setback is permitted if adequate screening was provided. The proposed plans for the parking area reflect a setback of 17.3 feet along Highway 5 and 10.7 feet along Powers Boulevard. The applicant has provided adequate screening through berming and landscaping. The site is in compliance with the Hwy. 5 corridor and underlying district requirements. Powers Boulevard Office Building May-+, 28, 2002 Page 11 PARK AND TRAIL DEDICATION FEES The Powers Boulevard Office Building is being built in an established area of town. Both Lake Susan and Lake Ann Parks are readily accessible from this future building. A section of the City's Comprehensive Trail System abuts the western edge of the site. These things being said, Mount Properties will pay park and trail dedication fees in lieu of land dedication or trail construction. The applicable fees for this property should be charged as follows: . Park fee to be paid at the time of building permit: $12,694.50. . Trail fee to be paid at the time of building permit: $ 4,231.50. The applicant shall ensure that the Powers Boulevard trail and landscaping are protected during construction. PLANNING COMMISSION UPDATE On May 7, 2002, the Planning Commission reviewed and approved this application unanimously. STAFF RECOMMENDATION Staff recommends that the Pll!llfliHg CommissioH City Council adopt the following motion: SITE PLAN REVIEW "The Pll!llfliHg CommissioH fecommeHàs City Council approves Site Plan Review #02-3 as shown on the site plan dated April 16, 2002, subject to the following conditions: 1. Revise the slope off the northeasterly and southeasterly comer of the parking lot (disturbed areas only) to meet the maximum allowable slope grade of 3: 1 or construct a retaining wall. 2. Eliminate the proposed berm just south of the regional pond expansion and spread the material on site to a maximum depth of two feet dispose of tile e)¡eess àirt sff site. 3. The enlarged portion of the regional pond must be designed to National Urban Runoff Program (NURP) standards with maximum side slopes of 3: I and a 10: 1 slope bench at the normal water level. 4. Construction of the public pond will require a financial security to be obtained from the applicant. Security must be in the form of a cash escrow or letter of credit and will cover the installation of the public improvement, i.e. pond. The security is required to be in place prior to any construction occurring on site. Powers Boulevard Office Building May-+, 28, 2002 Page 12 5. According to the City's Finance Department records, the site was previously assessed for utilities. As such, only sanitary sewer and water hook-up charges along with the Met Council's SAC fee will be due at the time of building permit issuance. The 2002 trunk utility hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water. The 2002 SAC fee is $1,275 per unit. 6. The applicant shall be responsible for obtaining permits from the appropriate regulatory agency including Carver County and the Riley-Purgatory-Bluff Creek Watershed District. 7. A 40-foot wide cross-access easement must be recorded across the shared portion of the driveway of the Instant Web site. 8. Add a detail sheet to the plans with all applicable 2002 City of Chanhassen detail plates. 9. On the Utility Plan: a. For the proposed sanitary sewer service, core drill the existing manhole. b. All sanitary sewer services must be 6" SDR-26. 10. On the Grading Plan: a. Show all existing and proposed easements. b. The maximum cross slope for handicap accessible parking stalls is 2%. Revise the grading plan to comply. c. Show the topsoil stockpile area location. d. Show the location of existing streetlights on Powers Boulevard. e. Increase the rock construction entrance to a minimum of 75 feet in length as per Detail Plate No. 530 I. f. Use Type II silt fence along the easterly, southerly, and westerly sides, and use Type I along the northerly side of the site. 11. Fire Marshal Conditions: a. "No parking fire lane" signs will be required as well as curbing to be painted yellow. Contact the Chanhassen Fire Marshal for exact locations of signs and curbing to be painted yellow. Pursuant to 1997 Minnesota Uniform Fire Code Section 904.1. b. An additional fire hydrant will be required. Contact the Chanhassen Fire Marshal for exact location. c. A P.LV. (Post Indicator Valve) is required. Contact the Chanhassen Fire Marshal for exact location. d. A 1O-foot clear space must be maintained around fire hydrants i.e., street lamps, trees, bushes, shrubs, Qwest, Xcel energy, cable TV and transformer boxes. This is to ensure that hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. Powers Boulevard Office Building May-+, 28, 2002 Page 13 e. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding premise identification. Pursuant to Chanhassen Fire Department/Fire Prevention Division PQlicy#29-1992. f. Comply with water service installation policy for commercial and industrial buildings. Pursuant to Inspection Division Water Service Installation Policy #34- 1993. Copy enclosed. g. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding maximum allowed size of domestic water on a combination domestic/fire sprinkler supply line. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #36-1994. h. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding notes being included on all site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #4-1991. 12. The applicant shall increase the quantity of plantings for the north buffer yard landscaping to meet minimum requirements. 13. A revised landscape plan including the sizes and quantities of plant materials shall be submitted to the city prior to city council approval. 14. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating the required financial guarantees. These guarantees must be posted prior to building permit issuance. 15. The applicant shall landscape all parking lot islands. Only landscaped islands shall meet the ordinance requirements. 16. Substitute wood chip mulch for landscape rock in island landscape that contains the five (5) oak trees. 17. The applicant shall enter into a site plan development contract with the city and provide the necessary financial securities. 18. The applicant must obtain a sign permit prior to erecting any signage on site. Provide a detailed sign plan for review and approval. The signage shall meet the following criteria: a. Monument signage shall be subject to the monument standards in the sign ordinance. b. Wall signs are permitted on the southwest elevation only. The sign area shall meet standards set in the sign ordinance. Powers Boulevard Office Building May-+, 28, 2002 Page 14 c. All signs require a separate permit. d. The signage will have consistency throughout the development and add an architectural accent to the building. e. Consistency in signage shall relate to color, size, materials, and heights. f. Back-lit individual letter signs are permitted. g. Individual letters may not exceed 30 inches in height. h. Only the name and logo of the business occupying the building will be permitted on the sign. 19. All roof top equipment shall be screened from views. 20. Concurrent with the building permit, a detailed lighting plan including fixture styles, meeting city standards shall be submitted. 21. Submit storm sewer sizing design data for a lO-year, 24-hour storm event. 22. Park and trail dedication fees to be collected per city ordinance ($12,694 Park Fees and $4,231 Trail Fees). The applicant shall ensure that the Powers Boulevard trail and landscaping are protected during construction. 23. Building Official conditions: a. The building is required to have an automatic fire extinguishing system. a. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. b. Detailed occupancy related requirements cannot be reviewed until complete plans are submitted. c. Utility plan: Provide cleanouts per code on the sanitary sewer line. The HDPE pipe proposed for the storm sewer must conform to AASHTO M924. It must be installed in granular fill with watertight gaskets and must be air tested. Portions of the PVC storm sewer must be air tested when located within 10 feet of buried water lines or the building. d. The second story proposed for Phase 2 will require the installation of an elevator. e. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. 24. The same exterior materials will be used on the trash enclosure as on the building. Powers Boulevard Office Building May-+, 28, 2002 Page 15 25. If fill is imported or exported, the applicant will need to supply the City with a haul route and traffic control plan. 26. The applicant shall work with staff about the selection of tree species in the context of the Colorado Blue Spruce question. 27. Connect the sidewalk from the building to the sidewalk next to Powers Boulevard. 28. A floating silt curtain shall be installed between the existing pond and the expansion. 29. The applicant will work with staff to explore possibilities of putting architectural accents or windows in the large walls with Phase II. 30. Only shielded Light fixtures are permitted." ATTACHMENTS 1. Memo from Matt Saam, Assistant City Engineer, dated April 26, 2002. 2. Memo from Mark Littfin, Fire Marshal, dated March 20, 2002. 3. Memo from Steve Torell, Building Official, dated April 29,2002. 4. Memo from Todd Hoffman, Park and Recreation Director, dated March 7,2002. 5. Memo from MNDOT dated April 2, 2002. 6. Application and Notice of Public Hearing. 7. Planning Conunission minutes dated May 7, 2002. 8. Plans dated April 30, 2002. CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN55317 Administration Phone. 952.227.1100 Fa,952227.111O Building Inspections Phone 952.227.1180 Fa, 952227.1190 Engineering Poore 952227.1160 hd522271170 Finance Ph~'1e 952.227.1140 Fax 9522271110 Park & Recreation Pn c ~1~. 952.227.1120 F,,952227111O RS':'~2ticn Center 2310 C:JJlter Boulevard PI:'ne952227.1400 F",52227.1404 Planning & Natural Resources P!iDc'e,52227.1130 ¡:~¡ 95222ì.111O PubiicWorks 1591 Park Road Phone 952.227.1300 Fax,52227.131O SeniorCenler Phone 952.2271125 Fa,9522271110 WebSile \\"NIII'.ci,chanhassen.mn,us MEMORANDUM TO: Sharmeen Al-Jaff, Senior Planner FROM: Matt Saam, Assistant City Engineer /0. "7 DATE: April 26, 2002 SUBJ: Site Plan Review of Powers Office Building Land Use Review File No. 02-04 Upon review of the plans dated April 16, 2002 prepared by Alliant Engineering, I offer the following comments and recommendations: GRADING, DRAINAGE & EROSION CONTROL Existing site elevations for the property range rrom a high of952 to 923 at the southerly pond. Highway 5, which borders the site to the north, is at an elevation of approximately 955±. The applicant is proposing to grade down rrom the northern slope to the proposed building elevation of946.3. Staff is recommending that the slope off the northeasterly and southeasterly comer of the parking lot be revised to meet the maximum allowable slope grade of3: 1 or that a retaining wall be constructed. The north half of the site will be cut down for construction of the building and parking lot, while the south half of the site will need to be filled for the parking lot. The existing site drains rrom north to south. There is an existing public pond in the southwesterly comer of the site. This pond receives existing site drainage in addition to partial site runoff rrom the Instant Web property to the east. The applicant is proposing to fill in the existing pond and transport the site's stormwater to an off-site regional pond located within Lake Susan Park. The applicant will increase the storage capacity ofthe regional pond to accommodate the additional drainage that is being routed there. The enlarged pond must be designed to National Urban Runoff Program (NURP) standards with maximum side slopes of3:1 and a 10:1 slope bench atthe normal waterlevel. The applicant is also proposing an approximate IO-foot tall berm just south of the pond expansion area. Staff is recommending that this berm be eliminated and the excess dirt be disposed of off-site. The City's Park and Recreation Director has indicated that the proposed berm is in the area of a future trail extension and is, therefore, not wanted. Stormwater calculations have been submitted for the site. Staff has reviewed the calculations and found that only minor revisions remain. The construction ofthe public pond will require a financial security to be obtained rrom the applicant. The security must be in the form of a cash escrow or letter of credit and will cover the installation of the public improvement, i.e. pond. The security is required to be in place prior to any construction occurring on site. The City of Chanhassen . A growing community with clean lakes. Quality schools, a charming downlown, !hriving businesses, winding trails. and beau!i!ul parks. A great place 10 live, work. afld play Sharmeen Al-Jaff April 26, 2002 Page 2 Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). The current plan shows silt fence around the entire perimeter of the site and a rock construction entrance at the main access drive. UTILITIES Municipal sanitary sewer and water is available to the site from Powers Boulevard. The applicant is proposing to connect to existing sewer and water lines off the southwesterly comer of the site and extend private services for the proposed office building. According to the City's Finance Department records, the site was previously assessed for utilities. As such, only sanitary sewer and water hook-up charges along with the Met Council's SAC fee will be due at the time of building permit issuance. The 2002 trunk utility hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water. The 2002 SAC fee is $1,275 per unit. The applicant is responsible for obtaining permits from the appropriate regulatory agency including Carver County and the Riley-Purgatory-BluffCreek Watershed District. STREETS/ACCESS No public streets are proposed with this project. Full site access will be gained off of the existing Instant Web driveway just south ofthe site. Since the Instant Web driveway will now be a shared access, it falls under the private street ordinance. As such, a 40-foot wide cross-access easement must be recorded across the shared portion of the driveway of the Instant Web site. RECOMMENDED CONDITIONS OF APPROVAL I. Revise the slope off the northeasterly and southeasterly comer of the parking lot to meet the maximum allowable slope grade of 3: I or construct a retaining wall. 2. Eliminate the proposed berm just south of the regional pond expansion and dispose ofthe excess dirt off site. 3. The enlarged portion of the regional pond must be designed to National Urban Runoff Program (NURP) standards with maximum side slopes of3:1 and a 10:1 slope bench at the normal water level. 4. Construction ofthe public pond will require a financial security to be obtained from the applicant. Security must be in the form of a cash escrow or letter of Sharmeen Al-Jaff April 26, 2002 Page 3 credit and will cover the installation of the public improvement, i.e. pond. The security is required to be in place prior to any construction occurring on site. 5. According to the City's Finance Department records, the site was previously assessed for utilities. As such, only sanitary sewer and water hook-up charges along with the Met Council's SAC fee will be due at the time of building permit issuance. The 2002 trunk utility hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water. The 2002 SAC fee is $1,275 per unit. 6. The applicant shall be responsible for obtaining permits from the appropriate regulatory agency including Carver County and the Riley-Purgatory-BluffCreek Watershed District. 7. A 40- foot wide cross-access easement must be recorded across the shared portion of the driveway of the Instant Web site. 8. Add a detail sheet to the plans with all applicable 2002 City ofChanhassen detail plates. 9. On the Utility Plan: a. For the proposed sanitary sewer service, core drill the existing manhole. b. All sanitary sewer services must be 6" SDR-26. 10. On the Grading Plan: a. Show all existing and proposed easements. b. The maximum cross slope for handicap accessible parking stalls is 2%. Revise the grading plan to comply. c. Show the topsoil stockpile area location. d. Show the location of existing streetlights on Powers Boulevard. e. Increase the rock construction entrance to a minimum of 75 feet in length as per Detail Plate No. 5301. f. Use Type II silt fence along the easterly, southerly, and westerly sides and use Type I along the northerly side of the site. jms c: Teresa Burgess, Director of Public Works/City Engineer Mak Sweidan, Engineer g:\eng\matt\memos\stafTreports\powers office building spr.doc CITY OF CHANHASSEN 7700 Markel Boulevard PO Box 147 Chanhassen, MN55317 Administration Phoneo952.1271100 Fax 952.127.1110 Building Inspections Phoneo952.227.1180 Fax 952.2271190 Engineering Phone 952.227.1160 F2X9522271170 Finance Phcne952.227.1140 F2x952.227.1110 Park & Recreation PI,oneo952.227.1120 Fax 952.227.1110 RecreatlDnCenter 2310 Coulter8oulevard Pnone952.127.1400 Fax 952.227.1404 Planning & Natural Resources Phone 952.127.1130 F".9522271110 Public Works 1591 Park Road Phone 952.227.1300 Fa" 9522271310 Senior Center Phone,952.227.1125 Fa<0952.227.1110 Web Site www.ci.chanhassen.mn.us MEMORANDUM TO: Julie Grove, Planner I FROM: Mark Littfin, Fire Marshal DATE: March 20, 2002 SUBJECT: Request for a site plan review for the construction of a 20,525 square foot office building. The property is located at the southeast intersection of Highway 5 and Powers Boulevard. The site is zoned Industrial Office Park District. The applicant is Mount Properties, Inc. Planning Case: 2002-3 SPR I have reviewed the site plan for the above project. In order to comply with the Chanhassen Fire DepartmentlFire Prevention Division, I have the following fire code or city ordinance/policy requirements. The site plan is based on the infonnation submitted at this time. If additional plans or changes are submitted, the appropriate code or policy items will be addressed. I. "No parking fire lane" signs will be required as well as curbing to be painted yellow. Contact the Chanhassen Fire Marshal for exact locations of signs and curbing to be painted yellow. Pursuant to 1997 Minnesota Unifonn Fire Code Section 904.1. 2. An additional fire hydrant will be required. Contact the Chanhassen Fire Marshal for exact location. 3. A P.LV. (Post Indicator Valve) is required. Contact the Chanhassen Fire Marshal for exact location. 4. A I O-foot clear space must be maintained around fire hydrants i.e., street lamps, trees, bushes, shrubs, Qwest, Xcel energy, cable TV and transfonner boxes. This is to ensure that hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. 5. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding premise identification. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #29-1992. 6. Comply with water service installation policy for commercial and industrial buildings. Pursuant to Inspection Division Water Service Installation Policy #34-1993. Copy enclosed. The City 01 Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding ¡rails. and beautiful parks. A gœat place 10 live, work, and play Ms. Julie Grove March 20, 2002 Page 2 7. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding maximum allowed size of domestic water on a combination domesticlfire sprinkler supply line. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #36-1994. 8. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding notes being included on all site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #4-1991. g;\safety\mllsiteplan2002-3 J. ( ClTYOF CHANHASSEN 690 City Cmttr Drive, PO Box 147 CiJIlnhmstn. Minnnol4 55317 l'htmt 612.937.1900 GmmdFax 612.937.5739 E.ginetri.g Fax 612.937.9152 l'ubli& Sttfay Fax 612.934.2524 mb WlJJUJ.å.ciJllnhllJJm.mn.us CHANHASSENFlRE DEPARTMENT POLICY CHANHASSENFIRE DEPARTMENT NOTES TO BE INCLUDED ON ALL SITE PLANS Fire Marshal must witness the flushing of underground sprinkler service line, per NFP A 13-8-2.1. 2. A final inspection by the Fire Marshal before a Certificate of Occupancy is issued. I. 3. Fire Deoartment access roads shall be provided on site during aU phases of construction. The construction of these temporary roads will conform with the Chanhassen Fire Department requirements for temporary access roads at construction sites. Details are available. 4. Onsite fIre hvdrants shall be provided and in operating condition during aU phases of coristruction. 5. The use of liquefied petroleum gas shall be in conformance with NFP A Standard 58 and the Miunesota Uniform Fire Code. A list of these requirements is available. (See policy #33-1993) 6. AU fire detection and fire suooression svstems shall be monitored by an approved UL central station with a UL 72 Certificate issued on these systems before final occupancy is issued. 7. An 11" x 14" As Built shall be provided to the Fire Department. The As Built shall be reproducible and acceptable to the Fire Marshal. (See policy #07-1991). Chanhassen Fire Department Fire Prevention Policy #04-1991 Date: 11/22/91 Revised: 06/05/98 Page 1 of2 8. An aooroved lock box shall be provided on the building for fire department use. The lock box should be located by the Fire Department connection or as located by the Fire Marshal. 9. High-oiled combustible storage shall comolv with the reauirements of Article #81 of the Minnesota Uniform Fire Code. High-piled combustible storage is combustible materials on closely packed piles more than 15' in height or combustible materials on pallets or in racks more than 12' in height. For certain special-hazard commodities such as rubber tires, plastics, some flammable liquids, . idle pallets, etc. the critical pile height may be as low as 6 feet. 10. Fire lane signaee shall be provided as required by the Fire Marshal. (See policy #06-1991). 11. Maximum allowed size of domestic water service on a combination domestic/fire sprinkler supply line policy must be followed. (See policy #36-1994). M1 AppròÝed - Public Safety Director Chanhassen Fire Department Fire Prevention Policy #04-1991 Date: 11/22/91 Revised: 06/05/98 Page 2 of2 CITY OF CHANHASSEN 690 City Cmttr Drivt, PO Box 147 ChanhllSSffl, Minnesota 55317 Phone 612.937.1900 Central Fax 612.9375739 EnginetTmg Fax 612.937.9152 Public Safety Fax 612.934.2524 Wíb www.ci.chanhllSSen.mn.UI CHANHASSEN FIRE DEPARTMENT POLICY MAXIMUM ALLOWED SIZE OF DOMESTIC WATER SERVICE ON A COMBINATION DOMESTlCIFIRE SPRINKLER SUPPLY LINE 1. Domestic water line shall not be greater than Y. pipe size of the combination service water supply line. 2. 1)1," domestic off 6" line. 3. 2" domestic off 8" line. 4. 2 Yo domestic off 10" line. Option 1: Domestic sizes may be increased if it can be calculated hydraulically that the demand by all domestic fixtures will not drop the fire sprinkler water below its minimum gallonage required. Option 2: Combination domestic and fire line service shall have an electric solenoid valve installed on the domestic side of the service. This valve shall be normally powered open and close on loss of electric power or signal from the system water flow indicator. Must be approved by the Chanhassen Fire Marshal and Chanhassen Mechanical Inspector. 54f~. Approved- Bui ding Official Chanhassen Fire Department Water Line Sizing Policy #36-1994 Date: 06/10/94 Revised: 11/24/99 Page 1 of! A~~hm CITY OF CHANHASSEN )0 City Cmtn- Drive, PO Box 147 ChanhllI!tn, Minn"ota 55317 Pho7U! 612.J37.1900 General Fax 612.937.5739 Engineering Fax 612.J37.9152 'ublie Safety Fax 612.934.2524 lfíb U/Ww.ci.ehanha",n.mn.us WATER SERVICE INSTALLATION POLICY FOR COMMERCIAL AND INDUSTRIAL BUILDINGS I) The Inspections Division shall be responsible for issuance of permits No permit shall be issued until approval of plans have been obtained ITom the following: a) Engineering Department b) Fire Marshal c) Minnesota Department of Health d) Plumbing Inspector 2) Mechanical inspectors will do all installation inspections and witness the hydrostatic and conductivity tests. Call 937-1900 ex!. 31 to schedule an inspection. Inspection and Test Requirements a) All pipes shall be inspected before being covered. Phone 937-1900, ext. 31, to schedule inspections. A 24 hour notice is required. b) Conductivity test is required. The pipe shall be subjected to minimum 350 amp test for a period of not less than 5 minutes. c) Hydrostatic test required. All pipe shall be subjected to a hydrostatic pressure of 150 PSI for 2 hours. Allowable pressure drop shall not exceed I PSL d) Pipe shall not be run under buildings - NFPA 24,8-3.1. Inspections Division Water Service Installation Policy #34-1993 Date: 04/15/93 Revised: 4/17/96 Page 1 of2 I .. 3) Upon approval of the hydro test, the plumbing inspector shall submit a copy of the inspection report to the utility superintendent The inspection report shall note whether the system is ready for main flush and drawing of water sample for the bug test, 4) Water main flushing shall be witnessed by the utility superintendent. a) Watermain flushing may be scheduled by contacting the utility superintendent at 474-2086. A 24 hour notice is required. b) The utility superintendent shall obtain a water sample for a bacteria test after the main flush and deliver to a testing company. The contractor shall be responsible for testing costs. Allow two weeks for testing results to be returned to the City. c) Upon receiving approval of the water sample test, the utility superintendent shall submit a copy to each plumbing inspector and turn water on to the tested and approved sections of the piping. 5) An additional supervised flush and flow test will be required and witnessed by the Fire Marshal for services supplying fire suppression systems. The flush and flow test shall be performed in accordance with 1991 edition ofNFPA 13, Sec. 8-2.1. Contact the Chanhassen Fire Marshal at 937-1900 ext. 132. 6) Watermain installations shall comply with: a) Minnesota Plumbing Code, Chapter 4715 b) Chanhassen Engineering Department, Watermain Specifications c) National Fire Protection Association, Chapter 24 7) Only authorized city employees are permitted to operate city water control valves, For water turn on or off contact the utility superintendent by phone 474-2086. A 24 hour notice is required. ç-Ø~ ~oved- Building 0 lClal 1trJ- Approv d re Marshal Inspections Division Water Service Installation Policy #34-1993 Date: 04/15/93 Revised: 04/17/96 Page 2 of2 CITY OF CHANIIASSEN 90 City Cmltr Driw, PO Box 147 ChanhtJSStn, Minn(SotJl55317 Phonf612.937.1900 Gtn"al FI1X 612.937.5739 Enginming FI1X 612.937.9/52 "ublie Saftty FI1X 6/2.934.2524 ~b u1ww.cí.thallhllSsm.mn.us rHANHASSF,N FTRF. OF.PARTMF.NT POT,TrV PRF.MTSF.S TOF.NTTFTrATTON GpnPMIII Numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their background. Size and location of numbers shall be approved by one of the following - Fire Marshal, Fire Inspector, Building Official, Building Inspector. Requirements are for new construction and existing buildings where no address numbers are posted. Ofh,... R"qllirrmf'nh: _ r.,.npr~1 1. I\'umbcrs shall be a contrasting color from the background. 2. Numbers shall not be in script. J. If a structure is not ,,'¡sible from the street. additional numbers are required at the driveway entrance. Size and location must be approved. 4. Numbers on mail box at drh'cW8)' entrance mB)' he a minimum of 4". Howc\'cr, requirement #3 must still be met. S. Administratiw authorif)' may require additional numbers if deemed necessary. Rr<;;irtf'nfi!1l1 npQIlÎrrml'nh: 17 or 1..<;;", rJ"'plling unit, I. Minimum height shall be 5 inches. 2. Building permits will not be finaled unless numbers are posted and approved by the Building Department. ('nmmprriJ:lI R"ql1¡rpm,.nt~ 1. Minimum height shall be 12". 2. Multi-Tenant Buildings a. Building address range, minimum height of 12 inches. b. Address numbers required on all tenant doors. Minimum height of6 inches. 3. If address numbers are located on a directol'")' entry sign, additional numbers will be required on the buildings main entrance. 4. Signage on overhead! delivery doors will also be required. Chanhassen Fire Department Fire Prevention Policy #29- I 992 Date: 06/1 5/92 Revised: 4/12/00 Page 1 of I 1¡v~ APprovei/í' Marshal ~ MEMORANDUM TO: Shannin Al-Jaff, Senior Planner Steven Torell, Building Official ~... FROM: DATE: April 29, 2002 SUBJ: Site Plan review of REVISED Powers Blvd. Office Building. Located on the southeast comer of Highway 5 and Powers Blvd. Planning Case: 2002-3 Site Plan I have reviewed the revised plans for the above building. Following are my comments, which should be included as conditions of approval. I. The building is required to have an automatic fire extinguishing system. 2. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Detailed occupancy retailed requirements cannot be reviewed until complete plans are submitted. 4. Utility plan: Provide cleanouts per code on the sanitary sewer line. The HDPE pipe proposed for the storm sewer must conform to AASHTO M924. It must be installed in granular fill with watertight gaskets and must be air tested. Portions of the PVC storm sewer must be air tested when located within 10 feet of buried water lines or the building. 5. The second story proposed for Phase 2 will require the installation of an elevator. 6. The õwner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. G/safety/stlmemos/plan/PowersBlvdOfficeBldg2 CITY OF CHANHASSEN 7700 Markel Bout"ard POBox 147 Chanhassen, MN 55317 Administration Phoce952.227.1100 Fa.. 952.227.1110 Building Inspections Phone 952.227.11BO Fax 952.227.1190 Engineering Phone 952.227.1160 Fax 952227.1170 Finance Phone 952.227.1140 F21952.227.1110 Park & Recreation Phoce952.227.1120 Fax 952.227.1110 Recreation Center . 2310 Coulter Boul"ard Phone. 952.227.1400 Fax. 952.2271404 Pianning & Natural Resources Phone 952.227.1130 Fax 952.2271110 Public Works 1591 Park Road Phone 952.227.1300 F2x952.227.1310 Senior Center Phoneo952.227.1125 Fax. 952.227.1110 Web Sit. WW\o\'.ci,chanhassen.mn,us MEMORANDUM TO: Julie Grove, Planner J ~ FROM: Todd Hoffman, Park & Recreation Director DATE: March 7, 2002 SUBJ: Park & Trail Dedication Fees for Powers Boulevard Office Building The Powers Boulevard Office Building is being built in an established area of town. Both Lake Susan and Lake Ann Parks are readily accessible from this future building. A section of the City's Comprehensive Trail System abuts the western edge of the site. These things being said, Mount Properties will pay park and trail dedication fees in lieu of land dedication or trail construction. The applicable fees for this property should be charged as follows: · Park fee to be paid <it the time of building permit: $12,694.50. · Trail fee to be paid at the time. of building permit: $ 4,231.50. Please ensure that the Powers Boulevard trail and landscaping are protected during construction. No other park and recreation conditions apply. The City of Chanhassen . A growing community with clean lakes, quality schools, a charming downtown. thriving busirJ8sses, winding trails, and beaulitul parks. A great place to live, work, and play, Iii !r...\ \!., ,..11 Minnesota Department of Transportation Metropolitan Division Waters Edge 1500 West County Road 82 Roseville, MN 55113 RECEIVED APR 0 4 2002 CITY OF CHANHAssEN April 2, 2002 Mr. Robert Generous, Senior Planner City of Chanhassen 690 City Center Drive Post Office Box 147 Chanhassen, Minnesota 55317 Subject: Powers Blvd Office Building--MnlDOT Review #S02-014 Southeast Quadrant of Tnmk Highway 5 and County State Aid Highway 17 Chanhassen, Carver County Control Section 1002 Dear Mr. Generous: The Minnesota Department of Transportation (MnlDOT) has reviewed the above referenced site plan. Before any further development, please address the following issues: . Any use of or work within MnlDOT right of way requires a permit. If runoff rates and patterns change along Trunk Highway 5, a drainage permit may be required. Please direct questions regarding permit applications to Keith VanWagner (651-582-1443) ofMnlDOT's Permits section. . As a reminder, Powers Boulevard is Carver County State Aid Route 17. Any work on a CSAH route must meet State Aid rules and policies. Also, the County must review any changes to its County State Aid system so that they stay within its system limitations. You may obtain additional information regarding State Aid rules and policies in any of the following ways: ~ hltP:llwww.doLstate.mn.us/staleaid! shows or has links to the applicable forms and the MnlDOT State Aid Manual. ~ Refer to the Mn/DOT State Aid Manual, Chapter 5-892.200 for information regarding standards and policies. ~ Please go to http://www.revisor.leg.state.mn.us!arule/8820/ for information regarding State Aid Operations Rules Chapter 8820. ~ For driveway standards, the designer is directed to refer to the MnlDOT Road Design Manual (English) Table 5-3.04A and Figure 5-3.04A for guidance and policies. Driveway widths, other than those recommended, up to 50 feet will be permitted only by special permission of the Commissioner of Transportation or designee. Please contact Jim Deeny in our State Aid section at (651) 582-1389 with any additional questions. Please address all future correspondence for development activity such as plats, site plans, environmental reviews, and comprehensive plan amendments to: Paul Czech MnlDOT - Metro Division Waters Edge An equal opportunity employer 1500 West County Road B-2 Roseville, Minnesota 551B MnlDOT document submittal guidelines require three (3) complete copies of plats and two (2) copies of other review documents including site plans. Failure to provide three (3) copies of a plat and/or two (2) copies of other review documents will make a submittal incomplete and delay Mn/DOT's review and response to development proposals. We appreciate your anticipated cooperation in providing the necessary number of copies, as this will prevent us ftom having to delay and/or return incomplete submittals. Feel ftee to contact me at (651) 582-1378 if you should have any questions. Cß~~~ cc: John Freemyer, Carver County Surveyor Roger Gustafson, Carver County Engineer WeIman Sperides Architects Mount Properties Alliant Engineering MnlDOT Division File C.S. 1002 MnlDOT LGL - Chanhassen 2 Ii ,j, ;;,'f '., ·0 CITY OF CHANHASSEN 690 COULTER DRIVE CHANHASSEN. MN 55317 (612) 937-1900 DEVELOPMENT REVIEW APPLICATION IIPPUCANT: VV\ OU IJT P iLoPe'2-ì(€"J,.::u;c.. OWNER: -=:ç:...N 5 Tì'\-rJí WEß .J::JJG ADDRESS: I <loB Cflec:f!.. IL,f)ð-€ c.¡(l.t..l.t=-- ADDRESS: \ 000 P /'t-~'fC. i<oAj) ßi...VV\~ 'M,,J SS~Jq C H-fr,Vt-\-J'r5.Se:')./ 1"1\"; S'S'31l TElEPHONE (Daytime) 152- CJ'tI-1383 TELEPHONE: QS2..- 470-h'io.s- _ Comprehensive Plan Amendment _ Temporary Sales Permit - Conditional Use Permit - Vacation of ROWlEasements - Jnterim Use Permit - Variance _ Non-conforming Use Permit - Wetland Alteration Permit _ Planned Unit Development" _ Zoning Appeal _ Rezoning _ Zoning Ordinance Amendment _ Sign Permits _ Sign Plan Review _ Notification Sign .1. IISÙ V Site Plan Review' ""25"0 -r ~o ç --X- Escrow for Filing Fees/Attorney Cost" ,$ S-o ($50 CUP/SPAN ACN ARNI AP/Metes and Bounds, $400 Minor SUB) Subdivision' TOTAL FEE $ 50S' - A list of all pro~erty owners within 500 feet of the boundaries of the property must be included with the application. fl-f:lT.5t: ~f:'~,e..c..H f ;I.fJ. 2S-Sb S-ð oqo . Building materIal samples must be submltte!f with site plan reviews. of.} /v \\1 ,1'/ '"Twenty-sIx full size folded copies of the plans must be submitted, including an BW' X 11" reduced copy of transparency for each plan sheet. - Escrow will be required for other applications through the development contract ]lJD1E - When multiple applications are processed, the appropriate fee shall be charged for each application. 11.'. t PßOJECTNAME l.OcATlON 1J:GAl.DESORIPTION POWeit-S Po IA.I$-,s ·L.OT {'A~\L "2..1 ß 0\1 L-E VA~D ðFF1 Le- ßVI LOIAl6- ßO"'¡"'I;V^,~O 'NT H-wy S '2... 'iß LOC.\<: '3 -rWO A-þþ 1\10,J 117 ql..S s.t==-. ß . oS.r. Coi!AI~ TOTAlACREAGE WEIlANDSPJ1ESENT :PßESENT20MNG 1ŒQ~~I&:U ZONING PHl:SENTlAND USE DESIGNATION YES ANO reP. - :¡IJDvST"1..\A- L 1!EQUESTSO lAND use DESIGNATION - REASON FOR 11iIS REQUEST '" This <1PpficatiOn must be completed in full and be typewtlnen or Clearly printed and must be accompanied by all intormatlon and plans required by applicable City Ordinance ptovislons. Before fiUng this application, you should confer with the Planning Department to delermlne the specific ordlnanœ and procedural requirements appficabfe to your application, A determination cf completeness of the application shall be made within ten business days of application submittal A written J1ol1ce of appllœlion deficIencies shall be mailed to the applicant within ten business days of application. ThiÌJ 1& 10 cettlTy that I am making application for the described action by the City and that lam responsible for complying with all City requlrCll/1entls with regard to this request. This applica1ion should be processed In my name and I am the pany Whom 1he City should contact regarding any maner pertaining to this appfication. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of· Title, Abstract of Title or purChase agreement). or I am the authorlzed person to mal(e 1his application éII1d the fee owner has also signed this appßcallon. 1 wm keep myse1f informed 01 the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibiflty studies, etc. with an estimate prior to any authorization 10 proceed wffh the study. The documents and Information' have submitted ·are true and correct to the best of my knOwled,ge. 'The dty 1\ereby notifies the applicant thai development review cannot be completed within 69 days due to public hearing requirements and agency review, Therefore, the city is notifying the appßcant that the tIIy requires an automatic 60 day Ðxt8n for development review. Development review shall be completed within 120 day¡ unless additional review ex! os are approv by the applicant. 2- 2.e--o~ Date 2/28/02 James N. Andersen Date President & CEO - IWeO App1!calion 1'Iecelved on Fee Paid Receipt No. The app1lcan\ should contact staff for a copy of the staff report whlctt wlR be avallabte on Friday prior to the meeting. 1t not COIIIacted. a copy of the report wlfI be mailed to the applicant's address. -. - -. ,..,bt°,; 'ì V .1 ~ jo- L( j- J /),', . Vii U NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING TUESDAY, MAY 7,2002 AT 7:00 P.M. CITY HALL COUNCIL CHAMBERS 7700 MARKET BLVD. PROPOSAL: Site Plan for a 20,525 s.f. Office Building APPLICANT: Mount Properties LOCATION: East of Powers Blvd. and South of Hwy. 5 NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Mount Properties, is requesting approval of a Site Plan Review for a 20,525 square foot Office Building, located south of Hwy. 5, east of Powers Boulevard, on Lot 2, Block 3, Park Two, Powers Boulevard Office Building. What Happens at the Meeting: The purpose of this public hearing is to infonn you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Shanneen at 227-1134. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on April 25, 2002. ~ 1 KIMBERLY LANE 2 Kelly Court 3 Nichola. Way ~ ark Road .., City Review Procedure Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations, Rezonings, Comprehensive Plan Amendments, Code Amendments require a public hearing before the Planning Commission. City ordinances require all property within 500 feet of the subject site to be notified of the application in writing. Any interested party is invited to attend the meeting. " The staff prepares a report on the subject application. This report includes all pertinent information and a recommendation. These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of the report and a recommendation. The item will be opened for the public to speak about the proposal as a part of the hearing process. The Commission will close the public hearing and discuss the item and make a recommendation to the City Council. The City Council may reverse, affirm or modify wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority vote of the City Council except rezonings and land use amendments from residential to commercial/industrial. Minnesota State Statute 519.99 requires all applications to be processed within 60 days unless the applicant waives this standard. Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the process should check with the Planning Department regarding its status and scheduling for the City Council meeting. A neighborhood spokesperson/representative is encouraged to provide a contact for the city. Often developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review the project with any interested person(s). Because the Planning Commission holds the public hearing, the City Council does not. Minutes are taken and any correspondence regarding the application will be included in the report to the City Council. If you wish to have something to be included in the report, please contact the Planning Staff person named on the notification. Smooth Feed Sheets™ . Use template for 5160® THE RESTAURANT CO OF MINNESOTA ATTN: ACCOUNTING DEPT SUITE 800 6075 POPLAR AVE MEMPHIS TN 38Il9 4709 CNL FUNDING 2000-A SUITE 202 LP AT!03 FOULKRD WILMINGTON DE 19803 3742 CAPTEC NET LEASE REALTY INC C/O BORDERS FOODS INC SUITE I!O 12800 INDUSTRIAL PARK BLVD MINNEAPOLIS MN 55441 3928 TARGET CORPORATION T-0862 ATTN: PROPERTY TAX DEPT TPN-0950 PO BOX 9456 MINNEAPOLIS MN 55440 9456 BEDDOR ENTERPRISESIE J CARLSON CIO UNITED MAILING INC 1001 PARK RD CHANHASSEN MN 55317 9299 BEDDOR ENTERPRISES E J CARLSON 7951 POWERS BLVD CHANHASSEN MN 55317 9502 INSTANT WEB INC 1000 PARK RD CHANHASSEN MN 55317 9240 BEDDOR ENTERPR1SESIE J CARLSON CIO VICTORY ENVELOPE PO BOX 159 1000 PARK RD CHANHASSEN MN 55317 0159 r~- ,-, "~,."",,,~ .. " CHANHASSEN PLANNING COMMISSION REGULAR MEETING MAY 7,2002 Chairwoman Blackowiak called the meeting to order at 7:00 p.m. and gave an introduction of the duties of the Planning Commission. MEMBERS PRESENT: Alison Blackowiak, Uli Sacchet, Bruce Feik, LuAnn Sidney, Craig Claybaugh, and Steven Lillehaug MEMBERS ABSENT: Rich Slagle STAFF PRESENT: Kate Aanenson, Conununity Development Director: Sharmin AI-Jaff, Senior Planner; and Mahmoud Sweidan, Project Engineer PUBLIC HEARING: CONSIDER THE REOUEST OF MOUNT PROPERTIES FOR A SITE PLAN REVIEW FOR A TWO-PHASE 28.980 SOUARE FOOT OFFICE BUILDING. LOCATED SOUTH OF HIGHWAY 5. EAST OF POWERS BOULEVARD. ON LOT 2. BLOCK 3. PARK TWO. POWERS BOULEVARD OFFICE BUILDING. Public Present: Name Address Rob M. Olson Pete Karlis 7700 Crimson Bay Road 7910 County Road 26 Sharmin AI-Jaff presented the staff report on this item. Blackowiak: Thank you Sharmin. Commissioners, any questions of staff at this time? Uli, go ahead. Sacchet: Yeah, Madam Chair. I do have a few quick questions. One thing that I found interesting is how the pond would be relocated and so my question there was, where it's going to . be relocated south of that pond, there in the Lake Susan Park area, is that already wetland or is that dry land? Is there a wetland aspect involved basically? Al-Jaff: That actually is a pond. And just to orient you, we're looking at this piece off of Powers Boulevard. This is the existing pond, and this is the expansion. Sacchet: Now where the expansion is being put, that's not currently wetland? AI-Jaff: No. No it's not. Sacchet: Okay. So there is no wetland consideration off of that? That answers my question. Okay, thank you. When we look at this, are we just looking at Phase I or the. Al-Jaff: No. Planning Commission Meeting - May 7, 2002 Sacchet: We're looking at both phases. AI-Jaff: You're looking at both phases. Sacchet: So it would be appropriate to ask the applicant some questions about the Phase II part as well, okay. I noticed on the grading it seems like the borders of the grading, and actually the silt fence go beyond just the property itself. Is that something that needs any special consideration? Like I remember on other applications we used to say, some sort of an agreement needs to be in place from where it's going beyond the property itself. I wonder if I read that correctly. It seemed like the silt fence went actually beyond the property line. On the southeast for instance it seems to be quite a bit out from what I think is the property line. Is that because it's in a POO, it's no big deal or? Al-Jaff: No. It basically is, this is the portion that we're talking about correct? Sacchet: Right. Right down there, yeah. That's where it seems to go quite a bit off. Al-Jaff: It is to prevent erosion onto the neighboring site and you really have to have it in this area. Sacchet: And actually also towards Powers I think there's a similar. You start with south. Basically it's southern part there towards Powers it seems to go beyond. They don't need special agreements? That's just a given? AI-Jaff: No. When vegetation is re-established they do remove this. Sacchet: Just want to make sure. In some other proposals we usually put a condition that if there's hauling, that they need to get, submit a haul route. Where they have to, for the trucks and all that. I don't think there's one in this. AI-Jaff: Correct, and I believe that the dirt will balance on site. Sacchet: So they wouldn't need hauling, okay. AI-Jaff: Correct. Currently there is a depression in this area and the dirt will be moved into this depression. Sacchet: Yeah. I guess where they definitely will have dirt is to make the pond bigger. That's where the issue might come into play. Okay. Since this is going to be a shared driveway, technically it's going to be a private street. Al-J aff: Correct. Sacchet: We don't need to do anything? AI-Jaff: This is industrial office park and in that district it's a permitted use. Sacchet: Okay, so it's a straight forward thing. AI-Jaff: They don't need to go through the variance process. 2 Planning Commission Meeting - May 7, 2002 Sacchet: Okay. Not to get lost in minutia, they are spading trees. Al-Jaff: Yes they are. Sacchet: Redistributing trees. And I also noticed on the tree inventory, or the landscape plan, there is Colorado Spruce in there. Are we still, was our Forester still suggest to use different kinds of spruce? Just in order to be consistent with how we dealt with that in the past. Al-Jaff: Sure. Sacchet: Okay. I believe that's my questions, thank you. Blackowiak: Okay, thank you. Bruce, questions? Feik: Yeah, I have a quick one. Sorry about that. Okay I have a quick one regarding Phase I and Phase II on the approval process here. We'll be discussing both the Phase II portion with this. Is there a time limit regarding how long the approval of Phase II, how long the applicant would have to commence or complete Phase II? Al-Jaff: There is no expiration on site plan reviews. Aanenson: I guess it was the staffs opinion when they disclosed to us they may want to go 2 stories, it's always our intent to do full disclosure so you can review the impacts of the second story instead of coming back later with the intent and then we're stuck with maybe we didn't or didn't like it so the 2 stories is approved at this point. When they want to come back and do it, that's why all the parking and everything is set up ultimately for the two story. Feik: I guess my concern was really regarding codes. The design criteria. Other things that might change from now until the time that the second phase is added. It would not be subject to whatever changes council or the city has made? Aanenson: No. No. Feik: Is it appropriate in your mind to add a sunset clause on Phase II at all, even if it's a number of years versus whatever? Aanenson: Well, for them, if they're going to go to 2 stories, it affects their construction type in Phase I. They've got to size it so they can support the. Feik: Understood. Aanenson: Correct, so I think if they're going to size it such so they can add a second story on, I think in good faith, just like a subdivision, you kind of work with them on that. If it meets their design criteria today, and it's a nice looking building I'm not sure, you know. Feik: Okay, thank you. Blackowiak: Question LuAnn. 3 Planning Commission Meeting - May 7, 2002 Sidney: I guess I have a question for staff about the slope on the northeasterly and southeasterly comer of the parking lot. Are we close to a 3 to I grade or I guess the retaining wall is advisable in this case. AI-Jaff: I'm sorry, I didn't hearthe beginning of the question. Sidney: Oh I'm sorry. Wondering about the slope on the northeasterly and southeasterly comer. You say in the report that the grade, the slope should be revised to meet the maximum allowable slope grade. Are we close or is that a precipitous drop that we're talking about and retaining walls may be more advised. Sweidan: What we meant with the side slope 3 to I, not of course to carve out of that... It's actually what's the remaining of the existing grades. Now in this situation we always ask for 3 to I slope. If it happened that he needs a retaining wall, he has to put or install retaining wall. Otherwise we don't want to be like no sharperthan 3 to I dropping on the... Sidney: Okay. And I had one more question about, on page 7 Sharmin you talk about a sidewalk that's shown at the entrance to the building. Could you show how that would work and, is there a condition for that? AI-Jaff: Yes there is. Sidney: Is there? Blackowiak: I didn't see one. Sidney: I didn't see one. Blackowiak: I added 27. AI-Jaff: Okay. I thought I had it but it's very possible. So here is our, there is an existing sidewalk here and you have another existing sidewalk in this area. We believe that you should have some form of connection from this site to this sidewalk. Sidney: Okay. We'll add a condition for that. Al-Jaff: Okay. Blackowiak: Unless you find one that we missed. We both missed it so. Is that it for you? Any other questions of staff? Claybaugh: Yeah, I have a few questions. Some of the questions that I had have been addressed, but on page 5 under grading, drainage and erosion control. Staff highlighted the proposed IO foot tall berm. Was that resolved t9 your satisfaction? It was on page 5 of the report. Al-J aff: Under grading. Claybaugh: Bottom paragraph on page 5 under grading, drainage and erosion control. The applicant was proposing approximately a 10 foot tall berm just to the south of the pond expansion. Staff is recommending that that berm be eliminated. 4 Planning Commission Meeting - May 7, 2002 Al-Jaff: Yes. There was a conversation between Alliant Engineering and our engineering department and we believe that they have reached a resolution. They're just going to spread the dirt over a larger area, which is acceptable. Claybaugh: Okay. I may have overlooked it but on Sheet C-I, there's two bituminous pavement details. As I could see it didn't identify which detail applied to the drive in the parking lot here. Or whether a split was going to come into play. One's a light duty, the other's a heavy duty detail. Sweidan: Actually we asked them to use the city detail plates. We are not necessarily following these cross sections. Yeah. Blackowiak: So are you. Claybaugh: So it will come out in the wash? Sweidan: Yes. Blackowiak: Yeah, so you're happy with what they're going to be doing based on the city detail plates? Sweidan: Yes. Blackowiak: Okay. Sweidan: If it doesn't show exactly the same as it is, but it should be applied as the city plate. Blackowiak: Okay, thanks. Claybaugh: That's aliI have. Blackowiak: Okay, questions? Lillehaug: Yes, I do have one question. I spoke with you earlier this week and I failed to ask this question. In that pond expansion area, I realize that it's not currently a wetland area, but would that be considered an upper buffer area? AI-Jaff: An upper buffer area? Lillehaug: Right, a buffer to the wetland area. Aanenson: No. It's being treated as storm water is taking water from quite a, several locations so it's being maintained as a storm water pond. And managed as a storm water pond. Lillehaug: Okay but what. Aanenson: What I'm saying is it's mowed. It's manicured the same as a city's park. Lillehaug: Okay. 5 Planning Commission Meeting - May 7, 2002 Blackowiak: Okay. And I don't have any questions at this time. So at this point would the applicant or their designee like to make a presentation? If so, please come to the podium and state your name and address for the record. Bob Sofeldt: Good evening. My name is Bob Sofeldt. I'm the President of Mount Properties. I'm here with my partner, Steve Michaels and we are in agreement with the staff report and what we believe to be a nice addition to the city of Chanhassen at the comer of Powers and Highway 5. And we are available for any questions that you might have but we seek approval for a two phased project as submitted. Blackowiak: Okay, thank you. Commissioners, any questions of the applicant? Mr. Sofeldt, could I get you to come back up to the microphone? We have a couple questions for you. Claybaugh: If I could get you to comment just on the east elevation of the building there for the, along the property line there. There's been some discussion about the 3 to I grade. Possibility for a retaining wall. Could you comment on that? Bob Sofeldt: Yeah. This is a picture of the existing site. And in fact the site arrow is really on that east elevation. Weare not changing the grade on the east elevation at all, so what you see there currently, which is not only natural grasses now but is planted with trees. Several trees. We will be leaving that intact. We are just simply lowering the current elevation for the building pad and parking lot. Claybaugh: Can I re-address staff with respect. Blackowiak: Sure, go ahead. Claybaugh; Did I understand you correctly Mak that you wanted to achieve a 3 to 1 grade in that area as part of this project or did I misinterpret your comment? Sweidan: Yes, another part 3 to I. The shoulders. Out of the curb. Claybaugh; Right. If I understand the applicant correctly, the existing grade out there is how they intend to leave it. And if I understood the report correctly it's greaterthan a 3 to 1. Sweidan: Yes. Claybaugh: Okay. Is the City's position that they want that changed or is that acceptable to leave it as is undisturbed? Sweidan; According to our, you know side the slope, we usually ask for like 3 to 1. Now I know what you meant by keeping it, it will be more than 3 to I but he has to comply with the 3 to I slope. Aanenson: Right, or put a retaining wall in. That was our recommendation. It says or retaining wall. Claybaugh: Okay. So unless I'm misunderstanding something, I guess I'd readdress. .. if I understand the City's position, or staffs position correctly, they're asking that that shoulder be corrected and comply with city standards of the 3 to 1. 6 Planning Commission Meeting - May 7, 2002 Sweidan: We are in agreement. Aanenson: No, let me clarify that. No, we said if you can't make the 3 to I, then you have to put a retaining wall in. We're not saying he has to blend the slope. We're saying if you can't make it, then you have to put the retaining wall in. Claybaugh: When it's all said and done and they're done with their site grading and the rest of it, that slope on that easterly side you want to be 3 to I or less, is that correct? Aanenson: No. If you can't make it through the parking lot blending, a retaining wall could mitigate that. Claybaugh: Right. Okay. Is it your intention to put in a retaining wall if you can't achieve the 3 to I or blending? Bob Sofeldt Yes. We are in agreement with the staff report. Blackowiak: Yeah, that's condition I so, either or. Aanenson: Yes, correct. Blackowiak: Any questions? Claybaugh: That's all the questions I had. Blackowiak: Questions? No? Sacchet I have a question. Blackowiak: Vii, go ahead. Sacchet I have a question about the second phase elevation. The upper story that's kind of offset a little bit. Bob Sofeldt Yes. Sacchet The wall that is further on the roof, is basically just a wall. There's no windows. There's no decoration on them. I'm talking about this part. And then that's actually on the outside as well, and I wondered since the surrounding roadways were somewhat up, it's not like since it's a second story will not be all that visible. Actually it will be fairly visible I would think, and I wonder if you've given any thought to, or whether there's a reason why there's no windows or maybe some accents like little squares or what have you to break up the flatness of that wall. Is that a consideration or was that all in the picture at any time? Bob Sofeldt: It's difficult to catch the architectural design of this second phase with a flat picture like this, but this is really quite a dramatic addition and it will be a really architectural element to the building itself. There is a reason why those walls are blank. When you take a second story you have to create an elevator core, and you have to have 2 stairway cores. So there will be a stairway core and an elevator core by the main entrance, which is that wall, and there will be a stairway element on the north side as well. 7 Planning Commission Meeting - May 7, 2002 Sacchet: That eliminates the window possibility pretty much? Bob Sofeldt: Well, it doesn't eliminate the opportunity for a window, but architecturally those elements really blend in together. That sits quite a ways off the edge of the building and creates a certain massing that we wanted to create. There is a floorplan that you have in your plans that shows, it looks a little bit like a Z on the top of the roof there and creates some architectural interest, which is something that we really tried to achieve rather than just putting a cube over half of the building on the north side or the south side or the east side or the west side, we tried to create some architectural interest and that massing on the comers is what creates that element. Sacchet: So your intent was actually to put that in as an element? Bob Sofeldt: Absolutely. Sacchet: Not just that it happened to be a blank wall. Bob Sofeldt: Yeah. Sacchet: Well that answers it reasonably well. Blackowiak: Okay. Any other questions? LuAnn? Sidney: One question. Well two questions maybe. I guess about lighting on the building. Do you intend to have any wall lighting at all? Bob Sofeldt: Yes. On the north west elevations we do plan to up light the signage on the building. We think that that's going to be a really nice architectural element at that comer. And then there will be some, of course the standard lighting within the parking lot on the south and east sides. Sidney: Okay. And I'd maybe refer you to staff for guidance about types of lighting that would be allowed. And then EFIS, did you catch that? AI-Jaff: Yes. Sidney: Okay. Al-Jaff: It is used as an accent in very limited areas, and it's under the, what's permitted by ordinance. Sidney: Okay. And then EFIS. You said EFIS on the building. Is it only the comice strip that is EFIS? Okay. So that's less than 10 percent... Al-Jaff: Correct. Sidney: Very good. Al-Jaff: 15 is the maximum they can use and they are substantially below that. Blackowiak: Thanks. I just have one question. Do you have any kind of a time line on this Phase II? 8 Planning Commission Meeting - May 7, 2002 Bob Sofeldt: No. One of the things that happens in our buildings is we develop them, we want to create as much flexibility in them as possible and there's always, typically in, when you get a good client into a building and they want to grow their organization within a building, we wanted to create the opportunity for that to happen and so we are seeking that approval so that if per chance they do that, there is the opportunity to do it. We really do need approval for that because it is quite substantially a big deal to do, what to do. Blackowiak: Well yeah, structurally I'm sure. Bob Sofeldt: It really is and it adds a lot of expense to the building so they need to know that they're going to put the expense in that they have the right to do that in the future. Blackowiak: Sure. Okay, thank you. Alright. This item is open for a public hearing so if anybody would like to speak on this issue, please come to the microphone and state your name and address for the record. Seeing no one I will close the public hearing, and I'll open it up for commissioner's comments. Vii, would you like to start? Any comments from you? Sacchet: Yeah. Really the only thing that I was a little tom is those, what seemed relatively substantial blank walls but I hear that they're there for a reason. Not just functionally but also aesthetically so I feel that's their space. I am satisfied with.. .so generally I think this is a great project. I don't have any problems with it. Blackowiak: Okay, Bruce. Feik: I very much like the project. Typically drive by it twice, 3 times a day so, I think it'd be a good addition to that comer so I support the way it is. Blackowiak: Okay. Sidney: It's a very good looking building. I'm a little surprised it fits on that lot. Obviously it does. I never thought anything would build on that comer but it's very nice. I guess the only concem would be the slope off the parking lot so those are taken care of but certainly you'll be able to do that. Blackowiak: Okay, any other comments? Any comments Craig? Claybaugh: Yeah, I think it looks like a very nice project. I guess I share Uli's limited concem with respect to the blank wall on the second phase. I guess I would at least make the statement that I'd like staff to take a look. There's no elevator cores and stair shafts indicated on these drawings so we don't have any way to dial in if there is any opportunity in fact as part of that second phase to incorporate a window or two up there or something else additional to break up that outline but overall it looks like a nice project. I'd like them to take a look at that detail when those drawings come in. Come available but I'm prepared to move it forward. Blackowiak: Okay, thank you. Comments? Lillehaug: I also like the site plan. I do have a comment on the pond expansion though. One thing I think would be very necessary is to install floating silt curtain on the, adjacent to the expansion of the pond in the existing pond. I think that'd be very necessary. And then I'd also like to comment, just generally on this pond expansion. I realize that there's other parcels out 9 Planning Commission Meeting - May 7, 2002 here that are undeveloped, and that this is the regional pond for that area. And there's a potential to expand on this pond again in the future with possible dredging. It would be good to try to coordinate this all at once so we're not in this pond consecutively for the next few years. I realize that's hard but I would just like to comment that it would be a good goal of the city to try to coordinate this, the expansion of this pond for future development. Other than that I like the site plan. Blackowiak: I don't have much else to add. With the addition of a few conditions, specifically the sidewalk, trash enclosure, blue spruce substitution, and maybe the pond expansion, I think we're good to go on this. It looks good and I also think we should look into the elevator shaft and stairway and make sure that those are placed properly. And look into the possibility, like Craig suggested, of windows or something on the second floor. That's kind of a future thing but with that I would like a motion. Sacchet: Madam Chair, I make the motion that the Planning Commission recommends City Council approves site plan review number 02-3 as shown on the site plan dated April 16, 2002, subject to the following conditions, I through 26 with the following additions. 27. The same exterior materials will be used on the trash enclosure as on the building. That's 27. 28. Just to be consistent, if there is a need for hauling dirt off, that the hauling route needs to be, or whatever the standard language is that they use for that. 29. Applicant shall work with staff about the selection of tree species in the context of the Colorado Spruce question. Number 30. What was the sidewalk thing? Blackowiak: To extend the sidewalk to the west. Sacchet: Connect the sidewalk from the building to the sidewalk next to Powers Boulevard. Number 31. I like Steven's point that there should be, I know how he called these things a floating fence? Lillehaug: Floating silt fence. Sacchet: Floating silt fence between the existing pond and the expansion. And then on 32, applicant will work with staff to explore possibilities of possibly putting accents or windows in those large walls. I mean I don't want to put a condition in to say that they have to do it but I think it deserves possibly more consideration. Blackowiak: Good, with Phase II? Sacchet: With Phase II. That's specific with Phase II. Blackowiak: Okay, there's been a motion. Is there a second? Claybaugh: Second. Sacchet moved, Claybaugh seconded that the Planning Commission recommends the City Council approves Site Plan Review #02-3 as shown on the site plan dated April 16, 2002, subject to the following conditions: I. Revise the slope off the northeasterly and southeasterly comer of the parking lot to meet the maximum allowable slope grade of 3: I or construct a retaining wall. 10 Planning Commission Meeting - May 7, 2002 2. Eliminate the proposed berm just south of the regional pond expansion and dispose of the excess dirt off site. 3. The enlarged portion of the regional pond must be designed to National Urban Runoff Program (NURP) standards with maximum side slopes of 3: I and a 10: I slope bench at the normal water level. 4. Construction of the public pond will require a financial security to be obtained from the applicant. Security must be in the form of a cash escrow or letter of credit and will cover the installation of the public improvement, i.e. pond. The security is required to be in place prior to any construction occurring on site. 5. According to the City's Finance Department records, the site was previously assessed for utilities. As such, only sanitary sewer and water hook-up charges along with the Met Council's SAC fee will be due at the time of building permit issuance. The 2002 trunk utility hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water. The 2002 SAC fee is $1,275 per unit. 6. The applicant shall be responsible for obtaining permits from the appropriate regulatory agency including Carver County and the Riley-Purgatory-BluffCreek Watershed District. 7. A 40 foot wide cross-access easement must be recorded across the shared portion of the dri veway of the Instant Web site. 8. Add a detail sheet to the plans with all applicable 2002 City of Chanhassen detail plates. 9. On the Utility Plan: a. For the proposed sanitary sewer service, core drill the existing manhole. b. All sanitary sewer services must be 6" SDR-26. 10. On the Grading Plan: a. Show all existing and proposed easements. b. The maximum cross slope for handicap accessible parking stalls is 2%. Revise the grading plan to comply. c. Show the topsoil stockpile area location. d. Show the location of existing streetlights on Powers Boulevard. e. Increase the rock construction entrance to a minimum of 75 feet in length as per Detail Plate No. 5301. f. Use Type II silt fence along the easterly, southerly, and westerly sides and use Type I along the northerly side of the site. II. Fire Marshal Conditions: a. "No Parking Fire Lane" signs will be required as well as curbing to be painted yellow. Contact the Chanhassen Fire Marshal for exact locations of signs and curbing to be painted yellow. Pursuant to 1997 Minnesota Uniform Fire Code Section 904.1. An additional fire hydrant will be required. Contact the Chanhassen Fire Marshal for exact location. , b. II Planning Commission Meeting - May 7, 2002 c. A P.I.V. (Post Indicator Valve) is required. Contact the Chanhassen Fire Marshal for exact location. d. A 10 foot clear space must be maintained around fire hydrants, i.e. 5Ireet lamps, trees, bushes, shrubs, Qwest, Xcel Energy, cable TV, and transformer boxes. This is to ensure that hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. e. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding premise identification. Pursuant to Chanhassen Fire DepartmentlFire Prevention Division Policy #29-1992. f. Comply with water service installation policy for commercial and industrial buildings. Pursuant to Inspections Division Water Service Installation Policy #34-1993. Copy enclosed. g. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding maximum allowed size of domestic water on a combination domestic/fire sprinkler supply line. Pursuant to Chanhassen Fire DepartmentlFire Prevention Division Policy #36-1994. h. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding notes being included on all site plans. Pursuant to Chanhassen Fire DepartmentlFire Prevention Division Policy #4-1991. 12. The applicant shall increase the quantity of plantings for the north buffer yard landscaping to meet minimum requirements. 13. A revised landscape plan including the sizes and quantities of plant materials shall be submitted to the city prior to City Council approval. 14. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in calculating the required financial guarantees. These guarantees must be posted prior to building permit issuance. 15. Applicant shall landscape all parking lot islands. Only landscaped islands shall meet the ordinance requirements. 16. Substitute wood chip mulch for landscape rock in island landscape that contains the five (5) oak trees. 17. The applicant shall enter into a site plan development contract with the city and provide the necessary financial securities. 18. The applicant must obtain a sign permit prior to erecting any signage on site. Provide a detailed sign plan for review and approval. The signage shall meet the following criteria: a. Monument signage shall be submit to the monument standards in the sign ordinance. b. Wall signs are permitted on the southwest elevation only. The sign area shall meet standards set in the sign ordinance. c. All signs require a separate permit. d. The signage will have consistency throughout the development and add an architectural accent to the building. e. Consistency in signage shall relate to color, size, materials, and heights. f. Back-lit individual letter signs are permitted. 12 Planning Commission Meeting - May 7, 2002 g. Individual letters may not exceed 30 inches in height. h. Only the name and logo of the business occupying the building will be permitted on the sign. 19. All rooftop equipment shall be screened from views. 20. Concurrent with the building permit, a detailed lighting plan including fixture styles, meeting city standards shall be submitted. 21. Submit storm sewer sizing design data for a 10 year, 24 hour storm event. 22. Park and trail dedication fees to be collected per city ordinance ($12,694 Park Fees and $4,231 Trail Fees). The applicant shall ensure that the Powers Boulevard trail and landscaping are protected during construction. 23. Building Official conditions: a. The building is required to have an automatic fire extinguishing system. b. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. c. Detailed occupancy related requirements cannot be reviewed until complete plans are submitted. d. Utility plan: Provide cleanouts per code on the sanitary sewer line. The HDPE pipe proposed for the storm sewer must conform to AASHTO M924. It must be installed in granular fill with watertight gaskets and must be air tested. Portions of the PVC storm sewer must be air tested when located within 10 feet of buried water lines or the building. e. The second story proposed for Phase 11 will require the installation of an elevator. f. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. 24. The same exterior materials will be used on the trash enclosure as on the building. 25. If fill is imported or exported, the applicant will need to supply the City with a hanl route and traffic control plan. 26. Applicant shall work with staff about the selection of tree species in the context of the Colorado Blue Spruce question. 27. Connect the sidewalk from the building to the sidewalk next to Powers Boulevard. 28. A floating silt curtain shall be installed between the existing pond and the expansion. 29. The applicant will work with staff to explore possibilities of putting architectural accents or windows in the large walls with Phase II. All voted in favor and the motion carried unanimously with a vote of 6 to O. Blackowiak: The motion carries 6-0 and this item goes before the City Council on May 28th. Thank you. . I3