1i Powers Blvd Office Bldg
I-
lZ
~
u
:J
Cl.
r
c::(
-
~
J.J
--
P.C.DATE: May 7, 2002 .1.-i,
C.C. DATE: May 28, 2002
REVIEW DEADLINE: 6/29/02
CASE: 02-3 Site Plan
CITY OF
CHANHASSEN
BY: AI-Jaff
STAFF REPORT
PROPOSAL:
Site Plan Review for a 28,980 square foot Office Building to be
constructed in two phases (phase I with an area of 20,525 square feet and
Phase IT with an. area of 8,455 square feet), Powers Boulevard Office
Building
LOCATION:
South of Hwy. 5, East of Powers Boulevard, Lot 2, Block 3, Park Two
Mount Properties (J ~
7808 Creekridge Circle, #305
Bloomington, MN 55439
Steve Michaels (952) 941-1383
APPLICANT:
PRESENT ZONING: Industrial Office Park
2020 LAND USE PLAN: OfficelIndustrial
ACREAGE: 122,859 Square Feet (2.8 Acres)
DENSITY:
SUMMARY OF REQUEST:
Site Plan Review for a 28,980 square foot office building.
Notice of this public hearing has been mailed to all property owners within 500 !eet.
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
:¡:; The City's discretion in approving or denying a site plan is limited to whether or not the proposed project
" ~ complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the
site plan. This is a quasi-judicial decision.
)
1 KIMBERLY LANE
2 Kelly Court
3 Nicholas Way
~
~
W 78' ~
('I) Streei
i nte~E
@ÐJLJ
º
C
State Hw ~
.
Powers Boulevard Office Building
May-+, 28, 2002
Page 2
BACKGROUND
On April 5, 1981, the City Council approved the final plat to Park Two.
PROPOSALfflUMMARY
The applicant is requesting site plan approval for the construction of a 28,980 square foot office
building to be constructed in two phases. Phase I, which is a one story building, is proposed to have
an area of 20,525 square feet. Phase IT is proposed to be constructed as a second story and will have
an area of 8,455 square feet. The site is zoned lOP, Industrial Office Park and bordered by
Highway 5 to the north, Powers Boulevard to the west, and industrial sites to the east and west. The
lot area is 2.8 acres. The Hwy. 5 Overlay District applies to the site. The site is visible directly
from Highway 5. It has full access from a private street to the south off of Powers Boulevard.
The site plan is for an office building situated on the northwest comer of the site. The exterior
materials are comprised of face brick and stucco, E.F.LS., precast stone, and prefinished metal.
A stucco canopy supported by two columns adorns the main entrance into the building. The
roofline is staggered providing architectural relief to the building. Windows are proposed on all
four elevations. The building height (for Phase 1) is 22 feet to the top of the parapet on the east and
south elevations and 19 feet on the west and north elevations. Phase IT will bring up the total height
of the building to 32.4 feet. One issue raised at the Planning Conunission meeting dealt with
the Phase II elevator shaft. The walls lack detail and articulation. The applicant proposed
scoring the wall, which will provide a grid pattern.
Parking for vehicles is located south and west of the building. The building hides the majority of
the parking lot and the portion that abuts Highway 5 is screened by a combination of elevation
changes and landscaping. The elevation of Highway 5 is approximately 10 feet higher than the
proposed parking lot. The difference in elevation, combined with landscaping will provide
adequate screening and will meet the Highway 5 overlay district screening requirements.
The plans reflect future parking, which is proposed to be constructed with phase two. The
expanded parking lot is located along the southwest comer of the site.
'4'
The proposed development will have a total impervious area of 57.6% for Phase I and 67%
coverage when Phase IT is completed. The maximum impervious area permitted by ordinance is
70%.
~:
,
".".'
;"
An existing stormwater pond is located in the southern portion of the site on the one low area. The
applicant has proposed to relocate this pond to the south, on the Lake Susan Park Site.
Staff regards the project as a reasonable use of the land. Based upon the foregoing, staff is
recommending approval of the site plan, with conditions outlined in the staff report.
.~
~
~~
Powers Boulevard Office Building
May-+, 28, 2002
Page 3
GENERAL SITE PLAN/ARCHITECTURE
The proposed office building, with an area of 28,980 square feet, will be situated on the
northwest comer of the property. The site is bordered by Highway 5 to the north, and Powers
Boulevard to the west. Instant Web occupies the property to the east, and Teleplan is located to the
west across Powers Boulevard. Both are industrial users. Access to the building is proposed from
a private street south of the site. The Private Street is shared with Instant Web and leads to
Powers Boulevard. Parking will be located along the east and south portion of the building.
The building is located 30 feet from the north, 117 feet from the east, 265 feet from the south,
and 30 feet from the west property line.
The proposed Phase I building will utilize a combination of face brick and stucco as the main
materials. Accents are introduced through the use of EF.LS. columns projecting out I inch
accompanied by a soldier course base. Each column contains a medallion and recessed brick
treatments in the center. A combination of EF.LS. and prefinished metal canopies with a
staggered roof line provide architectural relief to the building. Windows are proposed on all four
elevations. The entrance to the building utilizes a projecting canopy supported by two columns.
The comer facing the intersection of Hwy. 5 and Powers Boulevard has three sets of double row
windows. Phase II will utilize identical materials as Phase I, continue the architectural design of
staggered roofline, windows, etc. The applicant has provided relief of the continuous walls
through the use of different colors and material (samples will be provided at the meeting).
This development falls within the Highway Corridor Overlay and must comply with the district's
design standards in addition to the Industrial Office Park Standards and the city's new design
standards. The purpose of the overlay district is to promote high-quality architectural and site
design through improved development standards with the corridor. The design standards should
create a unified, harmonious and high quality visual environment. The building meets all the
requirements of the design standards, which include:
1. A defined entrance accentuated by a projecting canopy.
2. The building provides articulation through the use of staggered parapets on the roof,
different materials, landscaping, windows, and columns.
3. All materials used on the building are durable and permitted.
4. E.LF.S is used as an accent and occupies a range of 10% to 12% of each elevation as
permitted by ordinance.
5. The colors on the building are harmonious.
6. All elevations that can be viewed by the public have been designed to include windows
and/or doors to minimize expanses of blank walls.
7. A bench is proposed along the east side of the entrance into the building (Sheet LI.O).
8. Trash enclosure is screened from views.
Powers Boulevard Office Building
May-+, 28, 2002
Page 4
9. No more than 50% of the parking lot faces Highway 5. This parking area is screened by
existing topography and landscaping.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the city shall consider the development's compliance
with the following:
(1) Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that
may be adopted;
(2) Consistency with this division;
(3) Preservation of the site in its natural state to the extent practicable by minimizing
tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing areas;
(4) Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
(5) Creation of functional and harmonious design for structures and site features, with
special attention to the following:
a. An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors, and general
community;
b. The amount and location of open space and landscaping;
c. Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
Powers Boulevard Office Building
May-+, 28, 2002
Page 5
(6) Protection of adjacent and neighboring properties through reasonable provision
for surface water drainage, sound and sight buffers, preservation of views, light
and air and those aspects of design not adequately covered by other regulations
which may have substantial effects on neighboring land uses.
Finding: The proposed development is consistent with the City's Highway 5 corridor
design requirements, the comprehensive plan, the zoning ordinance, and the site plan
review requirements with the incorporation of staff's conditions. The site design is
compatible with the surrounding development. It is functional and harmonious with the
approved development for this area.
WETLANDS
There is one low area on-site. According to the Preliminary Plat for the Park Two Addition, no
wetlands existed on this site prior to development. At the time of the preliminary plat, there was
a small "wet area" just south of the existing storrnwater pond. This was impacted in 1981-1982
with the construction of the Instant Web building and parking lot. Because the existing basin
was created for a purpose other than wetland creation, it qualifies for an incidental wetland
exemption under the Minnesota Wetland Conservation Act (Minnesota Rule 8420). The
applicant received an exemption application, but has not yet submitted the completed
application. A complete exemption application should be submitted and an exemption should be
issued prior to impact to the basin on-site.
GRADING. DRAINAGE & EROSION CONTROL
Existing site elevations for the property range from a high of 952 to 923 at the southerly pond.
Highway 5, which borders the site to the north, is at an elevation of approximately 955±. The
applicant is proposing to grade down from the northern slope to the proposed building elevation
of 946.3. Staff is recommending that the slope off the northeasterly and southeasterly comer of
the parking lot be revised to meet the maximum allowable slope grade of 3: 1 or that a retaining
wall be constructed. The north half of the site will be cut down for construction of the building
and parking lot, while the south half of the site will need to be filled for the parking lot.
The existing site drains from north to south. There is an existing public pond in the
southwesterly comer of the site. This pond receives existing site drainage in addition to partial
site runoff from the Instant Web property to the east. The applicant is proposing to fill in the
existing pond and transport the site's storrnwater to an off-site regional pond located within Lake
Susan Park. The applicant will increase the storage capacity of the regional pond to
accommodate the additional drainage that is being routed there. The enlarged pond must be
designed to National Urban Runoff Program (NURP) standards, with maximum side slopes of
3: 1 and a 10: I slope bench at the normal water level.
Powers Boulevard Office Building
May-+, 28, 2002
Page 6
The applicant is also proposing an approximate 1O-foot tall berm just south ofthe pond
expansion area. Staff is recommending that this berm be eliminated and the excess dirt be
disposed of off-site. The City's Park and Recreation Director has indicated that the proposed
berm is in the area of a future trail extension and is, therefore, not wanted.
Stormwater calculations have been submitted for the site. Staff has reviewed the calculations
and found that only minor revisions remain. The construction of the public pond will require a
financial security to be obtained from the applicant. The security must be in the form of a cash
escrow or letter of credit and will cover the installation of the public improvement, i.e. pond.
The security is required to be in place prior to any construction occurring on site.
Erosion control measures and site restoration shall be developed in accordance with the City's
Best Management Practice Handbook (BMPH). The current plan shows silt fence around the
entire perimeter of the site and a rock construction entrance at the main access drive.
UTILITIES
Municipal sanitary sewer and water is available to the site from Powers Boulevard. The
applicant is proposing to connect to existing sewer and water lines off the southwesterly comer
of the site and extend private services for the proposed office building.
According to the City's Finance Department records, the site was previously assessed for
utilities. As such, only sanitary sewer and water hook-up charges, along with the Met Council's
SAC fee, will be due at the time of building permit issuance. The 2002 trunk utility hook-up
charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water. The 2002 SAC fee is
$1,275 per unit.
The applicant is responsible for obtaining permits from the appropriate regulatory agency
including Carver County and the Riley-Purgatory-Bluff Creek Watershed District.
STREETS/ACCESSIPARKING
No public streets are proposed with this project. Full site access will be gained off of the
existing Instant Web driveway just south of the site. Since the Instant Web driveway will now
be a shared access, it falls under the private street ordinance. As such, a 40-foot wide cross-
access easement must be recorded across the shared portion of the driveway of the Instant Web
site.
Private streets are permitted in this district if the following conditions exist:
Powers Boulevard Office Building
May-+, 28, 2002
Page 7
1. The prevailing development pattern makes it unfeasible or inappropriate to construct a public
street. In making this determination the city may consider the location of existing property lines
and homes, local or geographic conditions and the existence of wetlands.
2. After reviewing the surrounding area, it is concluded that an extension of the public street
system is not required to serve other parcels in the area, improve access, or to provide a street
system consistent with the comprehensive plan.
3. The use of a private street will permit enhanced protection of the city's natural resources
including wetlands and forested areas.
A public street is not required to serve this parcel. It was intended to share the existing access
off of Powers Boulevard with Instant Web.
A sidewalk is shown at the entrance of the building (southeast comer). This sidewalk must be
extended to the west to connect with the existing trail on Powers Boulevard.
The parking ordinance for medical office buildings requires one (1) parking space for each 150
square feet of gross floor area. The total spaces required for the building is 129 spaces. The
applicant is providing 130 spaces. With the addition of Phase IT, the total parking spaces required
will be 169. The plans reflect 169 parking spaces.
Landscaping is proposed along the north side, adjacent to Highway 5, on the west side adjacent to
Powers Boulevard as well as throughout the parking area. This will provide screening of cars
parked in the lot. A berm is proposed between the parking lot and Powers Boulevard to provide
additional screening.
LANDSCAPING
Minimum requirements for landscaping, based on 49,640 sq. ft. of parking lot area, include 3.971
sq. ft. of landscaped area around the parking lot, 18 trees for the parking lot, and buffer yard
plantings along all property lines. The applicant's proposed as compared to the requirements for
landscape area, parking lot trees and buffer yard plantings is shown in the following table.
Required Prooosed
Vehicular use landscaoe area 3,971 Sq. ft. 3,971 Sq. ft.
Trees/ parking lot 16 overstory 16 overstory
8 islands/peninsulas 6 islands/oeninsulas
North prop. Line - buffer yard 6 overs tory 60verstory
B, 20' width, 285' length 9 understory 5 understory
14 shrubs 14 shrubs
East prop. line - buffer yard 4 overs tory trees 7 overstory
A, 20' width, 415' length 4 understory trees 5 understory
Powers Boulevard Office Building
May-+, 28, 2002
Page 8
8 shrubs 8 shrubs
South prop. Line - buffer yard o overs tory 1 overstory
A, 25' width, 120' length 1 understory o understory
1 shrubs 4 shrubs
West prop. Line - buffer yard 9 overs tory 8 overstory (+ 11 existing
B, 20' width, 460' length 14 understory overstory in ROW)
23 shrubs 15 understory
23 shrubs
Proposed landscaping for parking lot landscaping and north buffer yards does not meet minimum
ordinance requirements. Additionally, according to city ordinance the parking lot views from
Highway 5 and Powers Blvd. must be obscured with either landscaping and/or berms. Staff
recommends that the applicant meet all minimum quantities for parking lot and buffer yard
landscaping requirements. The applicant should submit a revised landscape plan to the city for
approval.
LIGHTING
Lighting locations have been illustrated on the plans. Only shielded fixtures are allowed with a
maximum height of 30 feet. The ordinance requires no more than Y2 foot candles of light at the
property line. The Photometric Plan shows that the proposed lighting complies with this
requirement with the exception of the south and southwest portions of the site. These are driveway
accesses. The southem access will be shared with the property located to the south of the subject
site, and should be illuminated for safety reasons. Detailed lighting plan should be submitted when
building permits are requested.
SIGNAGE
In the lOP-Industrial Office Park District the following signs are permitted:
· Ground low profile business sign defined as "A business sign affIXed directly to the
ground. "
One ground low profile sign is permitted per site for each street frontage (Hwy. 5 & Powers
Boulevard). The area of the sign may not exceed 64 square feet and 8 feet in height. The sign
must maintain a 10 foot setback from property lines.
· Wall mounted sign defined as: "A sign attached to or erected against the wall of a building
or structure with the exposed face of the sign in a plane approximately parallel to the face of the
wall, and which does not project more than twelve (12) inches from such building or structure.
Powers Boulevard Office Building
May-+, 28, 2002
Page 9
Wall signs shall not include product advertising. Wall signs shall include tenant identification,
tenant logo, center name, or any combination of the three."
Only one (1) wall-mounted sign is permitted on the street frontage for each building occupant.
The applicant has two street frontages.
The applicant has not submitted a detailed signage plan, however, two (2) ground low profile
signs are shown on the site -- one on the northwest comer (with dimensions of 8 feet in height
and 10 feet in width) and one on the southwest corner of the site (with dimensions of 6 feet in
height and 8 feet in width).
Staff is recommending the following signage criteria be adopted:
1. Monument signage shall be subject to the monument standards in the sign
ordinance.
2. Wall signs are permitted on the north and west elevations only. The sign area
shall meet standards set in the sign ordinance.
3. All signs require a separate permit.
4. The signage will have consistency throughout the development and add an
architectural accent to the building.
5. Consistency in signage shall relate to color, size, materials, and heights.
6. Back-lit individual letter signs are permitted.
7. Individual letters may not exceed 30 inches in height.
8. Only the name and logo of the business occupying the building will be permitted
on the sign.
The applicant must obtain sign permits prior to erecting the signs on site. A detailed sign plan
incorporating the method of lighting, acceptable to staff should be provided prior to requesting a
building permit.
Powers Boulevard Office Building
May-+, 28, 2002
Page 10
Building Height
Building Setback
Parking stalls
Parking Setback
Hard surface
Coverage
Lot Area
COMPLIANCE TABLE - lOP DISTRICT
Ordinance Powers Office Building
Phase I Phase IT
2 stories 1 story 2 story
N-lO' E-30' N-30' E-I17' N-30' E-I17'
S-30'W-IO' S-265' W-30' S-265' W-30'
169 stalls 130 stalls 39 stalls
N-30' E-O' N-17.3'* E-23.4' N-17.3'* E-23.4'
S-O' W-25' S-90' W-12.7'* S-IO' W-IO.7'*
70% 57.6% 67%
1 acre
2.82 acres
· The Zoning Ordinance (Section 20-815) allows parking setbacks along public rights-of-way
to be reduced to a minimum of ten (10) feet if the applicant can demonstrate to the
satisfaction of the city that one-hundred-percent screening is provided at least five (5) feet
above the adjacent parking lot. The intent of this section is that the city is willing to trade a
reduced setback for additional landscaping that is both an effective screen and of high quality
aesthetically. Acceptable screening is to be comprised of berming and landscaping.
Screening through the use of fencing is not permitted.
· Also, section 20-1073 Lot frontage and parking location. (a) Highway 5 Corridor District,
states, "One row of parking shall be allowed within the required minimum front yard setback
of any lot. The majority of parking shall be located to the side or rear of the building.
The front yard setback required by ordinance is 30 feet along Highway 5 and 25 feet
along Powers Boulevard. However, a reduced setback is permitted if adequate
screening was provided. The proposed plans for the parking area reflect a setback of
17.3 feet along Highway 5 and 10.7 feet along Powers Boulevard. The applicant has
provided adequate screening through berming and landscaping. The site is in
compliance with the Hwy. 5 corridor and underlying district requirements.
Powers Boulevard Office Building
May-+, 28, 2002
Page 11
PARK AND TRAIL DEDICATION FEES
The Powers Boulevard Office Building is being built in an established area of town. Both Lake
Susan and Lake Ann Parks are readily accessible from this future building. A section of the City's
Comprehensive Trail System abuts the western edge of the site. These things being said, Mount
Properties will pay park and trail dedication fees in lieu of land dedication or trail construction. The
applicable fees for this property should be charged as follows:
. Park fee to be paid at the time of building permit: $12,694.50.
. Trail fee to be paid at the time of building permit: $ 4,231.50.
The applicant shall ensure that the Powers Boulevard trail and landscaping are protected during
construction.
PLANNING COMMISSION UPDATE
On May 7, 2002, the Planning Commission reviewed and approved this application unanimously.
STAFF RECOMMENDATION
Staff recommends that the Pll!llfliHg CommissioH City Council adopt the following motion:
SITE PLAN REVIEW
"The Pll!llfliHg CommissioH fecommeHàs City Council approves Site Plan Review #02-3 as shown
on the site plan dated April 16, 2002, subject to the following conditions:
1. Revise the slope off the northeasterly and southeasterly comer of the parking lot (disturbed
areas only) to meet the maximum allowable slope grade of 3: 1 or construct a retaining wall.
2. Eliminate the proposed berm just south of the regional pond expansion and spread the
material on site to a maximum depth of two feet dispose of tile e)¡eess àirt sff site.
3. The enlarged portion of the regional pond must be designed to National Urban Runoff
Program (NURP) standards with maximum side slopes of 3: I and a 10: 1 slope bench at the
normal water level.
4. Construction of the public pond will require a financial security to be obtained from the
applicant. Security must be in the form of a cash escrow or letter of credit and will cover the
installation of the public improvement, i.e. pond. The security is required to be in place prior
to any construction occurring on site.
Powers Boulevard Office Building
May-+, 28, 2002
Page 12
5. According to the City's Finance Department records, the site was previously assessed for
utilities. As such, only sanitary sewer and water hook-up charges along with the Met
Council's SAC fee will be due at the time of building permit issuance. The 2002 trunk utility
hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water. The 2002
SAC fee is $1,275 per unit.
6. The applicant shall be responsible for obtaining permits from the appropriate regulatory
agency including Carver County and the Riley-Purgatory-Bluff Creek Watershed District.
7. A 40-foot wide cross-access easement must be recorded across the shared portion of the
driveway of the Instant Web site.
8. Add a detail sheet to the plans with all applicable 2002 City of Chanhassen detail plates.
9. On the Utility Plan:
a. For the proposed sanitary sewer service, core drill the existing manhole.
b. All sanitary sewer services must be 6" SDR-26.
10. On the Grading Plan:
a. Show all existing and proposed easements.
b. The maximum cross slope for handicap accessible parking stalls is 2%. Revise the grading
plan to comply.
c. Show the topsoil stockpile area location.
d. Show the location of existing streetlights on Powers Boulevard.
e. Increase the rock construction entrance to a minimum of 75 feet in length as per Detail
Plate No. 530 I.
f. Use Type II silt fence along the easterly, southerly, and westerly sides, and use Type I
along the northerly side of the site.
11. Fire Marshal Conditions:
a. "No parking fire lane" signs will be required as well as curbing to be painted yellow.
Contact the Chanhassen Fire Marshal for exact locations of signs and curbing to be
painted yellow. Pursuant to 1997 Minnesota Uniform Fire Code Section 904.1.
b. An additional fire hydrant will be required. Contact the Chanhassen Fire Marshal
for exact location.
c. A P.LV. (Post Indicator Valve) is required. Contact the Chanhassen Fire Marshal
for exact location.
d. A 1O-foot clear space must be maintained around fire hydrants i.e., street lamps,
trees, bushes, shrubs, Qwest, Xcel energy, cable TV and transformer boxes. This
is to ensure that hydrants can be quickly located and safely operated by
firefighters. Pursuant to Chanhassen City Ordinance #9-1.
Powers Boulevard Office Building
May-+, 28, 2002
Page 13
e. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding
premise identification. Pursuant to Chanhassen Fire Department/Fire Prevention
Division PQlicy#29-1992.
f. Comply with water service installation policy for commercial and industrial
buildings. Pursuant to Inspection Division Water Service Installation Policy #34-
1993. Copy enclosed.
g. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding
maximum allowed size of domestic water on a combination domestic/fire
sprinkler supply line. Pursuant to Chanhassen Fire Department/Fire Prevention
Division Policy #36-1994.
h. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding
notes being included on all site plans. Pursuant to Chanhassen Fire
Department/Fire Prevention Division Policy #4-1991.
12. The applicant shall increase the quantity of plantings for the north buffer yard
landscaping to meet minimum requirements.
13. A revised landscape plan including the sizes and quantities of plant materials shall be
submitted to the city prior to city council approval.
14. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in
calculating the required financial guarantees. These guarantees must be posted prior to
building permit issuance.
15. The applicant shall landscape all parking lot islands. Only landscaped islands shall meet
the ordinance requirements.
16. Substitute wood chip mulch for landscape rock in island landscape that contains the five
(5) oak trees.
17. The applicant shall enter into a site plan development contract with the city and provide the
necessary financial securities.
18. The applicant must obtain a sign permit prior to erecting any signage on site. Provide a
detailed sign plan for review and approval. The signage shall meet the following criteria:
a. Monument signage shall be subject to the monument standards in the sign
ordinance.
b. Wall signs are permitted on the southwest elevation only. The sign area shall
meet standards set in the sign ordinance.
Powers Boulevard Office Building
May-+, 28, 2002
Page 14
c. All signs require a separate permit.
d. The signage will have consistency throughout the development and add an
architectural accent to the building.
e. Consistency in signage shall relate to color, size, materials, and heights.
f. Back-lit individual letter signs are permitted.
g. Individual letters may not exceed 30 inches in height.
h. Only the name and logo of the business occupying the building will be permitted
on the sign.
19. All roof top equipment shall be screened from views.
20. Concurrent with the building permit, a detailed lighting plan including fixture styles, meeting
city standards shall be submitted.
21. Submit storm sewer sizing design data for a lO-year, 24-hour storm event.
22. Park and trail dedication fees to be collected per city ordinance ($12,694 Park Fees and $4,231
Trail Fees). The applicant shall ensure that the Powers Boulevard trail and landscaping are
protected during construction.
23. Building Official conditions:
a. The building is required to have an automatic fire extinguishing system.
a. The building plans must be prepared and signed by design professionals licensed in the
State of Minnesota.
b. Detailed occupancy related requirements cannot be reviewed until complete plans are
submitted.
c. Utility plan: Provide cleanouts per code on the sanitary sewer line. The HDPE pipe
proposed for the storm sewer must conform to AASHTO M924. It must be installed in
granular fill with watertight gaskets and must be air tested. Portions of the PVC storm
sewer must be air tested when located within 10 feet of buried water lines or the building.
d. The second story proposed for Phase 2 will require the installation of an elevator.
e. The owner and or their representative shall meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
24. The same exterior materials will be used on the trash enclosure as on the building.
Powers Boulevard Office Building
May-+, 28, 2002
Page 15
25. If fill is imported or exported, the applicant will need to supply the City with a haul route
and traffic control plan.
26. The applicant shall work with staff about the selection of tree species in the context of the
Colorado Blue Spruce question.
27. Connect the sidewalk from the building to the sidewalk next to Powers Boulevard.
28. A floating silt curtain shall be installed between the existing pond and the expansion.
29. The applicant will work with staff to explore possibilities of putting architectural accents
or windows in the large walls with Phase II.
30. Only shielded Light fixtures are permitted."
ATTACHMENTS
1. Memo from Matt Saam, Assistant City Engineer, dated April 26, 2002.
2. Memo from Mark Littfin, Fire Marshal, dated March 20, 2002.
3. Memo from Steve Torell, Building Official, dated April 29,2002.
4. Memo from Todd Hoffman, Park and Recreation Director, dated March 7,2002.
5. Memo from MNDOT dated April 2, 2002.
6. Application and Notice of Public Hearing.
7. Planning Conunission minutes dated May 7, 2002.
8. Plans dated April 30, 2002.
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN55317
Administration
Phone. 952.227.1100
Fa,952227.111O
Building Inspections
Phone 952.227.1180
Fa, 952227.1190
Engineering
Poore 952227.1160
hd522271170
Finance
Ph~'1e 952.227.1140
Fax 9522271110
Park & Recreation
Pn c ~1~. 952.227.1120
F,,952227111O
RS':'~2ticn Center
2310 C:JJlter Boulevard
PI:'ne952227.1400
F",52227.1404
Planning &
Natural Resources
P!iDc'e,52227.1130
¡:~¡ 95222ì.111O
PubiicWorks
1591 Park Road
Phone 952.227.1300
Fax,52227.131O
SeniorCenler
Phone 952.2271125
Fa,9522271110
WebSile
\\"NIII'.ci,chanhassen.mn,us
MEMORANDUM
TO:
Sharmeen Al-Jaff, Senior Planner
FROM:
Matt Saam, Assistant City Engineer /0. "7
DATE:
April 26, 2002
SUBJ:
Site Plan Review of Powers Office Building
Land Use Review File No. 02-04
Upon review of the plans dated April 16, 2002 prepared by Alliant Engineering, I offer
the following comments and recommendations:
GRADING, DRAINAGE & EROSION CONTROL
Existing site elevations for the property range rrom a high of952 to 923 at the southerly
pond. Highway 5, which borders the site to the north, is at an elevation of approximately
955±. The applicant is proposing to grade down rrom the northern slope to the proposed
building elevation of946.3. Staff is recommending that the slope off the northeasterly
and southeasterly comer of the parking lot be revised to meet the maximum allowable
slope grade of3: 1 or that a retaining wall be constructed. The north half of the site will
be cut down for construction of the building and parking lot, while the south half of the
site will need to be filled for the parking lot.
The existing site drains rrom north to south. There is an existing public pond in the
southwesterly comer of the site. This pond receives existing site drainage in addition to
partial site runoff rrom the Instant Web property to the east. The applicant is proposing
to fill in the existing pond and transport the site's stormwater to an off-site regional pond
located within Lake Susan Park. The applicant will increase the storage capacity ofthe
regional pond to accommodate the additional drainage that is being routed there. The
enlarged pond must be designed to National Urban Runoff Program (NURP) standards
with maximum side slopes of3:1 and a 10:1 slope bench atthe normal waterlevel.
The applicant is also proposing an approximate IO-foot tall berm just south of the pond
expansion area. Staff is recommending that this berm be eliminated and the excess dirt
be disposed of off-site. The City's Park and Recreation Director has indicated that the
proposed berm is in the area of a future trail extension and is, therefore, not wanted.
Stormwater calculations have been submitted for the site. Staff has reviewed the
calculations and found that only minor revisions remain. The construction ofthe public
pond will require a financial security to be obtained rrom the applicant. The security
must be in the form of a cash escrow or letter of credit and will cover the installation of
the public improvement, i.e. pond. The security is required to be in place prior to any
construction occurring on site.
The City of Chanhassen . A growing community with clean lakes. Quality schools, a charming downlown, !hriving businesses, winding trails. and beau!i!ul parks. A great place 10 live, work. afld play
Sharmeen Al-Jaff
April 26, 2002
Page 2
Erosion control measures and site restoration shall be developed in accordance with the
City's Best Management Practice Handbook (BMPH). The current plan shows silt fence
around the entire perimeter of the site and a rock construction entrance at the main access
drive.
UTILITIES
Municipal sanitary sewer and water is available to the site from Powers Boulevard. The
applicant is proposing to connect to existing sewer and water lines off the southwesterly
comer of the site and extend private services for the proposed office building.
According to the City's Finance Department records, the site was previously assessed for
utilities. As such, only sanitary sewer and water hook-up charges along with the Met
Council's SAC fee will be due at the time of building permit issuance. The 2002 trunk
utility hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water.
The 2002 SAC fee is $1,275 per unit.
The applicant is responsible for obtaining permits from the appropriate regulatory agency
including Carver County and the Riley-Purgatory-BluffCreek Watershed District.
STREETS/ACCESS
No public streets are proposed with this project. Full site access will be gained off of the
existing Instant Web driveway just south ofthe site. Since the Instant Web driveway will
now be a shared access, it falls under the private street ordinance. As such, a 40-foot
wide cross-access easement must be recorded across the shared portion of the driveway
of the Instant Web site.
RECOMMENDED CONDITIONS OF APPROVAL
I. Revise the slope off the northeasterly and southeasterly comer of the parking lot
to meet the maximum allowable slope grade of 3: I or construct a retaining wall.
2. Eliminate the proposed berm just south of the regional pond expansion and
dispose ofthe excess dirt off site.
3. The enlarged portion of the regional pond must be designed to National Urban
Runoff Program (NURP) standards with maximum side slopes of3:1 and a 10:1
slope bench at the normal water level.
4. Construction ofthe public pond will require a financial security to be obtained
from the applicant. Security must be in the form of a cash escrow or letter of
Sharmeen Al-Jaff
April 26, 2002
Page 3
credit and will cover the installation of the public improvement, i.e. pond. The
security is required to be in place prior to any construction occurring on site.
5. According to the City's Finance Department records, the site was previously
assessed for utilities. As such, only sanitary sewer and water hook-up charges
along with the Met Council's SAC fee will be due at the time of building permit
issuance. The 2002 trunk utility hook-up charge is $1,383 per unit for sanitary
sewer and $1,802 per unit for water. The 2002 SAC fee is $1,275 per unit.
6. The applicant shall be responsible for obtaining permits from the appropriate
regulatory agency including Carver County and the Riley-Purgatory-BluffCreek
Watershed District.
7. A 40- foot wide cross-access easement must be recorded across the shared portion
of the driveway of the Instant Web site.
8. Add a detail sheet to the plans with all applicable 2002 City ofChanhassen detail
plates.
9. On the Utility Plan:
a. For the proposed sanitary sewer service, core drill the existing manhole.
b. All sanitary sewer services must be 6" SDR-26.
10. On the Grading Plan:
a. Show all existing and proposed easements.
b. The maximum cross slope for handicap accessible parking stalls is 2%.
Revise the grading plan to comply.
c. Show the topsoil stockpile area location.
d. Show the location of existing streetlights on Powers Boulevard.
e. Increase the rock construction entrance to a minimum of 75 feet in length as
per Detail Plate No. 5301.
f. Use Type II silt fence along the easterly, southerly, and westerly sides and use
Type I along the northerly side of the site.
jms
c: Teresa Burgess, Director of Public Works/City Engineer
Mak Sweidan, Engineer
g:\eng\matt\memos\stafTreports\powers office building spr.doc
CITY OF
CHANHASSEN
7700 Markel Boulevard
PO Box 147
Chanhassen, MN55317
Administration
Phoneo952.1271100
Fax 952.127.1110
Building Inspections
Phoneo952.227.1180
Fax 952.2271190
Engineering
Phone 952.227.1160
F2X9522271170
Finance
Phcne952.227.1140
F2x952.227.1110
Park & Recreation
PI,oneo952.227.1120
Fax 952.227.1110
RecreatlDnCenter
2310 Coulter8oulevard
Pnone952.127.1400
Fax 952.227.1404
Planning &
Natural Resources
Phone 952.127.1130
F".9522271110
Public Works
1591 Park Road
Phone 952.227.1300
Fa" 9522271310
Senior Center
Phone,952.227.1125
Fa<0952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO:
Julie Grove, Planner I
FROM:
Mark Littfin, Fire Marshal
DATE:
March 20, 2002
SUBJECT:
Request for a site plan review for the construction of a 20,525 square foot
office building. The property is located at the southeast intersection of
Highway 5 and Powers Boulevard. The site is zoned Industrial Office
Park District. The applicant is Mount Properties, Inc.
Planning Case: 2002-3 SPR
I have reviewed the site plan for the above project. In order to comply with the Chanhassen
Fire DepartmentlFire Prevention Division, I have the following fire code or city
ordinance/policy requirements. The site plan is based on the infonnation submitted at this
time. If additional plans or changes are submitted, the appropriate code or policy items will be
addressed.
I. "No parking fire lane" signs will be required as well as curbing to be painted yellow.
Contact the Chanhassen Fire Marshal for exact locations of signs and curbing to be
painted yellow. Pursuant to 1997 Minnesota Unifonn Fire Code Section 904.1.
2. An additional fire hydrant will be required. Contact the Chanhassen Fire Marshal for
exact location.
3. A P.LV. (Post Indicator Valve) is required. Contact the Chanhassen Fire Marshal for
exact location.
4. A I O-foot clear space must be maintained around fire hydrants i.e., street lamps, trees,
bushes, shrubs, Qwest, Xcel energy, cable TV and transfonner boxes. This is to ensure
that hydrants can be quickly located and safely operated by firefighters. Pursuant to
Chanhassen City Ordinance #9-1.
5. Comply with the Chanhassen Fire Department/Fire Prevention Division regarding
premise identification. Pursuant to Chanhassen Fire Department/Fire Prevention
Division Policy #29-1992.
6. Comply with water service installation policy for commercial and industrial buildings.
Pursuant to Inspection Division Water Service Installation Policy #34-1993. Copy
enclosed.
The City 01 Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding ¡rails. and beautiful parks. A gœat place 10 live, work, and play
Ms. Julie Grove
March 20, 2002
Page 2
7. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding
maximum allowed size of domestic water on a combination domesticlfire sprinkler
supply line. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy
#36-1994.
8. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding
notes being included on all site plans. Pursuant to Chanhassen Fire Department/Fire
Prevention Division Policy #4-1991.
g;\safety\mllsiteplan2002-3
J.
(
ClTYOF
CHANHASSEN
690 City Cmttr Drive, PO Box 147
CiJIlnhmstn. Minnnol4 55317
l'htmt 612.937.1900
GmmdFax 612.937.5739
E.ginetri.g Fax 612.937.9152
l'ubli& Sttfay Fax 612.934.2524
mb WlJJUJ.å.ciJllnhllJJm.mn.us
CHANHASSENFlRE DEPARTMENT POLICY
CHANHASSENFIRE DEPARTMENT NOTES TO BE
INCLUDED ON ALL SITE PLANS
Fire Marshal must witness the flushing of underground sprinkler
service line, per NFP A 13-8-2.1.
2. A final inspection by the Fire Marshal before a Certificate of
Occupancy is issued.
I.
3. Fire Deoartment access roads shall be provided on site during aU
phases of construction. The construction of these temporary roads
will conform with the Chanhassen Fire Department requirements for
temporary access roads at construction sites. Details are available.
4. Onsite fIre hvdrants shall be provided and in operating condition
during aU phases of coristruction.
5. The use of liquefied petroleum gas shall be in conformance with
NFP A Standard 58 and the Miunesota Uniform Fire Code. A list of
these requirements is available. (See policy #33-1993)
6. AU fire detection and fire suooression svstems shall be monitored by
an approved UL central station with a UL 72 Certificate issued on
these systems before final occupancy is issued.
7. An 11" x 14" As Built shall be provided to the Fire Department. The
As Built shall be reproducible and acceptable to the Fire Marshal.
(See policy #07-1991).
Chanhassen Fire Department
Fire Prevention
Policy #04-1991
Date: 11/22/91
Revised: 06/05/98
Page 1 of2
8. An aooroved lock box shall be provided on the building for fire
department use. The lock box should be located by the Fire
Department connection or as located by the Fire Marshal.
9. High-oiled combustible storage shall comolv with the reauirements
of Article #81 of the Minnesota Uniform Fire Code. High-piled
combustible storage is combustible materials on closely packed piles
more than 15' in height or combustible materials on pallets or in
racks more than 12' in height. For certain special-hazard
commodities such as rubber tires, plastics, some flammable liquids, .
idle pallets, etc. the critical pile height may be as low as 6 feet.
10. Fire lane signaee shall be provided as required by the Fire Marshal.
(See policy #06-1991).
11. Maximum allowed size of domestic water service on a combination
domestic/fire sprinkler supply line policy must be followed. (See
policy #36-1994).
M1
AppròÝed - Public Safety Director
Chanhassen Fire Department
Fire Prevention
Policy #04-1991
Date: 11/22/91
Revised: 06/05/98
Page 2 of2
CITY OF
CHANHASSEN
690 City Cmttr Drivt, PO Box 147
ChanhllSSffl, Minnesota 55317
Phone 612.937.1900
Central Fax 612.9375739
EnginetTmg Fax 612.937.9152
Public Safety Fax 612.934.2524
Wíb www.ci.chanhllSSen.mn.UI
CHANHASSEN FIRE DEPARTMENT POLICY
MAXIMUM ALLOWED SIZE OF DOMESTIC WATER SERVICE ON A
COMBINATION DOMESTlCIFIRE SPRINKLER SUPPLY LINE
1. Domestic water line shall not be greater than Y. pipe size of the
combination service water supply line.
2. 1)1," domestic off 6" line.
3. 2" domestic off 8" line.
4. 2 Yo domestic off 10" line.
Option 1:
Domestic sizes may be increased if it can be calculated hydraulically that
the demand by all domestic fixtures will not drop the fire sprinkler water
below its minimum gallonage required.
Option 2:
Combination domestic and fire line service shall have an electric
solenoid valve installed on the domestic side of the service. This
valve shall be normally powered open and close on loss of electric
power or signal from the system water flow indicator.
Must be approved by the Chanhassen Fire Marshal and Chanhassen
Mechanical Inspector.
54f~.
Approved- Bui ding Official
Chanhassen Fire Department
Water Line Sizing
Policy #36-1994
Date: 06/10/94
Revised: 11/24/99
Page 1 of!
A~~hm
CITY OF
CHANHASSEN
)0 City Cmtn- Drive, PO Box 147
ChanhllI!tn, Minn"ota 55317
Pho7U! 612.J37.1900
General Fax 612.937.5739
Engineering Fax 612.J37.9152
'ublie Safety Fax 612.934.2524
lfíb U/Ww.ci.ehanha",n.mn.us
WATER SERVICE INSTALLATION POLICY
FOR COMMERCIAL AND INDUSTRIAL BUILDINGS
I) The Inspections Division shall be responsible for issuance of permits
No permit shall be issued until approval of plans have been obtained
ITom the following:
a) Engineering Department
b) Fire Marshal
c) Minnesota Department of Health
d) Plumbing Inspector
2) Mechanical inspectors will do all installation inspections and witness the
hydrostatic and conductivity tests. Call 937-1900 ex!. 31 to schedule an
inspection.
Inspection and Test Requirements
a) All pipes shall be inspected before being covered. Phone 937-1900,
ext. 31, to schedule inspections. A 24 hour notice is required.
b) Conductivity test is required. The pipe shall be subjected to
minimum 350 amp test for a period of not less than 5 minutes.
c) Hydrostatic test required. All pipe shall be subjected to a
hydrostatic pressure of 150 PSI for 2 hours. Allowable pressure
drop shall not exceed I PSL
d) Pipe shall not be run under buildings - NFPA 24,8-3.1.
Inspections Division
Water Service Installation
Policy #34-1993
Date: 04/15/93
Revised: 4/17/96
Page 1 of2
I
..
3) Upon approval of the hydro test, the plumbing inspector shall submit a
copy of the inspection report to the utility superintendent The
inspection report shall note whether the system is ready for main flush
and drawing of water sample for the bug test,
4) Water main flushing shall be witnessed by the utility superintendent.
a) Watermain flushing may be scheduled by contacting the utility
superintendent at 474-2086. A 24 hour notice is required.
b) The utility superintendent shall obtain a water sample for a
bacteria test after the main flush and deliver to a testing
company. The contractor shall be responsible for testing costs.
Allow two weeks for testing results to be returned to the City.
c) Upon receiving approval of the water sample test, the utility
superintendent shall submit a copy to each plumbing inspector
and turn water on to the tested and approved sections of the piping.
5) An additional supervised flush and flow test will be required and
witnessed by the Fire Marshal for services supplying fire suppression
systems. The flush and flow test shall be performed in accordance
with 1991 edition ofNFPA 13, Sec. 8-2.1. Contact the Chanhassen
Fire Marshal at 937-1900 ext. 132.
6) Watermain installations shall comply with:
a) Minnesota Plumbing Code, Chapter 4715
b) Chanhassen Engineering Department, Watermain Specifications
c) National Fire Protection Association, Chapter 24
7) Only authorized city employees are permitted to operate city water
control valves, For water turn on or off contact the utility
superintendent by phone 474-2086. A 24 hour notice is required.
ç-Ø~
~oved- Building 0 lClal
1trJ-
Approv d re Marshal
Inspections Division
Water Service Installation
Policy #34-1993
Date: 04/15/93
Revised: 04/17/96
Page 2 of2
CITY OF
CHANIIASSEN
90 City Cmltr Driw, PO Box 147
ChanhtJSStn, Minn(SotJl55317
Phonf612.937.1900
Gtn"al FI1X 612.937.5739
Enginming FI1X 612.937.9/52
"ublie Saftty FI1X 6/2.934.2524
~b u1ww.cí.thallhllSsm.mn.us
rHANHASSF,N FTRF. OF.PARTMF.NT POT,TrV
PRF.MTSF.S TOF.NTTFTrATTON
GpnPMIII
Numbers or addresses shall be placed on all new and existing buildings in such a position
as to be plainly visible and legible from the street or road fronting the property. Said
numbers shall contrast with their background. Size and location of numbers shall be
approved by one of the following - Fire Marshal, Fire Inspector, Building Official,
Building Inspector.
Requirements are for new construction and existing buildings where no address numbers
are posted.
Ofh,... R"qllirrmf'nh: _ r.,.npr~1
1. I\'umbcrs shall be a contrasting color from the background.
2. Numbers shall not be in script.
J. If a structure is not ,,'¡sible from the street. additional numbers are required at the driveway entrance.
Size and location must be approved.
4. Numbers on mail box at drh'cW8)' entrance mB)' he a minimum of 4". Howc\'cr, requirement #3 must still
be met.
S. Administratiw authorif)' may require additional numbers if deemed necessary.
Rr<;;irtf'nfi!1l1 npQIlÎrrml'nh: 17 or 1..<;;", rJ"'plling unit,
I. Minimum height shall be 5 inches.
2. Building permits will not be finaled unless numbers are posted and approved by the Building Department.
('nmmprriJ:lI R"ql1¡rpm,.nt~
1. Minimum height shall be 12".
2. Multi-Tenant Buildings
a. Building address range, minimum height of 12 inches.
b. Address numbers required on all tenant doors. Minimum height of6 inches.
3. If address numbers are located on a directol'")' entry sign, additional numbers will be required on the
buildings main entrance.
4. Signage on overhead! delivery doors will also be required.
Chanhassen Fire Department
Fire Prevention
Policy #29- I 992
Date: 06/1 5/92
Revised: 4/12/00
Page 1 of I
1¡v~
APprovei/í' Marshal
~
MEMORANDUM
TO:
Shannin Al-Jaff, Senior Planner
Steven Torell, Building Official ~...
FROM:
DATE:
April 29, 2002
SUBJ:
Site Plan review of REVISED Powers Blvd. Office Building.
Located on the southeast comer of Highway 5 and Powers Blvd.
Planning Case: 2002-3 Site Plan
I have reviewed the revised plans for the above building. Following are my
comments, which should be included as conditions of approval.
I. The building is required to have an automatic fire extinguishing system.
2. The building plans must be prepared and signed by design professionals
licensed in the State of Minnesota.
3. Detailed occupancy retailed requirements cannot be reviewed until complete
plans are submitted.
4. Utility plan: Provide cleanouts per code on the sanitary sewer line. The
HDPE pipe proposed for the storm sewer must conform to AASHTO M924.
It must be installed in granular fill with watertight gaskets and must be air
tested. Portions of the PVC storm sewer must be air tested when located
within 10 feet of buried water lines or the building.
5. The second story proposed for Phase 2 will require the installation of an
elevator.
6. The õwner and or their representative shall meet with the Inspections
Division as soon as possible to discuss plan review and permit procedures.
G/safety/stlmemos/plan/PowersBlvdOfficeBldg2
CITY OF
CHANHASSEN
7700 Markel Bout"ard
POBox 147
Chanhassen, MN 55317
Administration
Phoce952.227.1100
Fa.. 952.227.1110
Building Inspections
Phone 952.227.11BO
Fax 952.227.1190
Engineering
Phone 952.227.1160
Fax 952227.1170
Finance
Phone 952.227.1140
F21952.227.1110
Park & Recreation
Phoce952.227.1120
Fax 952.227.1110
Recreation Center
. 2310 Coulter Boul"ard
Phone. 952.227.1400
Fax. 952.2271404
Pianning &
Natural Resources
Phone 952.227.1130
Fax 952.2271110
Public Works
1591 Park Road
Phone 952.227.1300
F2x952.227.1310
Senior Center
Phoneo952.227.1125
Fax. 952.227.1110
Web Sit.
WW\o\'.ci,chanhassen.mn,us
MEMORANDUM
TO:
Julie Grove, Planner J
~
FROM:
Todd Hoffman, Park & Recreation Director
DATE:
March 7, 2002
SUBJ:
Park & Trail Dedication Fees for Powers Boulevard
Office Building
The Powers Boulevard Office Building is being built in an established area of
town. Both Lake Susan and Lake Ann Parks are readily accessible from this
future building. A section of the City's Comprehensive Trail System abuts the
western edge of the site. These things being said, Mount Properties will pay
park and trail dedication fees in lieu of land dedication or trail construction. The
applicable fees for this property should be charged as follows:
· Park fee to be paid <it the time of building permit: $12,694.50.
· Trail fee to be paid at the time. of building permit: $ 4,231.50.
Please ensure that the Powers Boulevard trail and landscaping are protected
during construction. No other park and recreation conditions apply.
The City of Chanhassen . A growing community with clean lakes, quality schools, a charming downtown. thriving busirJ8sses, winding trails, and beaulitul parks. A great place to live, work, and play,
Iii
!r...\
\!., ,..11
Minnesota Department of Transportation
Metropolitan Division
Waters Edge
1500 West County Road 82
Roseville, MN 55113
RECEIVED
APR 0 4 2002
CITY OF CHANHAssEN
April 2, 2002
Mr. Robert Generous, Senior Planner
City of Chanhassen
690 City Center Drive
Post Office Box 147
Chanhassen, Minnesota 55317
Subject:
Powers Blvd Office Building--MnlDOT Review #S02-014
Southeast Quadrant of Tnmk Highway 5 and County State Aid Highway 17
Chanhassen, Carver County
Control Section 1002
Dear Mr. Generous:
The Minnesota Department of Transportation (MnlDOT) has reviewed the above referenced site
plan. Before any further development, please address the following issues:
. Any use of or work within MnlDOT right of way requires a permit. If runoff rates and
patterns change along Trunk Highway 5, a drainage permit may be required. Please direct
questions regarding permit applications to Keith VanWagner (651-582-1443) ofMnlDOT's
Permits section.
. As a reminder, Powers Boulevard is Carver County State Aid Route 17. Any work on a
CSAH route must meet State Aid rules and policies. Also, the County must review any
changes to its County State Aid system so that they stay within its system limitations. You
may obtain additional information regarding State Aid rules and policies in any of the
following ways:
~ hltP:llwww.doLstate.mn.us/staleaid! shows or has links to the applicable forms and the
MnlDOT State Aid Manual.
~ Refer to the Mn/DOT State Aid Manual, Chapter 5-892.200 for information regarding
standards and policies.
~ Please go to http://www.revisor.leg.state.mn.us!arule/8820/ for information regarding
State Aid Operations Rules Chapter 8820.
~ For driveway standards, the designer is directed to refer to the MnlDOT Road Design
Manual (English) Table 5-3.04A and Figure 5-3.04A for guidance and policies.
Driveway widths, other than those recommended, up to 50 feet will be permitted only by
special permission of the Commissioner of Transportation or designee.
Please contact Jim Deeny in our State Aid section at (651) 582-1389 with any additional
questions.
Please address all future correspondence for development activity such as plats, site plans,
environmental reviews, and comprehensive plan amendments to:
Paul Czech
MnlDOT - Metro Division
Waters Edge
An equal opportunity employer
1500 West County Road B-2
Roseville, Minnesota 551B
MnlDOT document submittal guidelines require three (3) complete copies of plats and two (2)
copies of other review documents including site plans. Failure to provide three (3) copies of a
plat and/or two (2) copies of other review documents will make a submittal incomplete and delay
Mn/DOT's review and response to development proposals. We appreciate your anticipated
cooperation in providing the necessary number of copies, as this will prevent us ftom having to
delay and/or return incomplete submittals.
Feel ftee to contact me at (651) 582-1378 if you should have any questions.
Cß~~~
cc: John Freemyer, Carver County Surveyor
Roger Gustafson, Carver County Engineer
WeIman Sperides Architects
Mount Properties
Alliant Engineering
MnlDOT Division File C.S. 1002
MnlDOT LGL - Chanhassen
2
Ii
,j,
;;,'f
'.,
·0
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN. MN 55317
(612) 937-1900
DEVELOPMENT REVIEW APPLICATION
IIPPUCANT: VV\ OU IJT P iLoPe'2-ì(€"J,.::u;c.. OWNER: -=:ç:...N 5 Tì'\-rJí WEß .J::JJG
ADDRESS: I <loB Cflec:f!.. IL,f)ð-€ c.¡(l.t..l.t=-- ADDRESS: \ 000 P /'t-~'fC. i<oAj)
ßi...VV\~ 'M,,J SS~Jq C H-fr,Vt-\-J'r5.Se:')./ 1"1\"; S'S'31l
TElEPHONE (Daytime) 152- CJ'tI-1383 TELEPHONE: QS2..- 470-h'io.s-
_ Comprehensive Plan Amendment _ Temporary Sales Permit
- Conditional Use Permit - Vacation of ROWlEasements
- Jnterim Use Permit - Variance
_ Non-conforming Use Permit - Wetland Alteration Permit
_ Planned Unit Development" _ Zoning Appeal
_ Rezoning _ Zoning Ordinance Amendment
_ Sign Permits
_ Sign Plan Review _ Notification Sign .1. IISÙ
V Site Plan Review' ""25"0 -r ~o ç --X- Escrow for Filing Fees/Attorney Cost" ,$ S-o
($50 CUP/SPAN ACN ARNI AP/Metes
and Bounds, $400 Minor SUB)
Subdivision' TOTAL FEE $ 50S'
-
A list of all pro~erty owners within 500 feet of the boundaries of the property must be included with the
application. fl-f:lT.5t: ~f:'~,e..c..H f ;I.fJ. 2S-Sb S-ð oqo
. Building materIal samples must be submltte!f with site plan reviews.
of.}
/v
\\1 ,1'/ '"Twenty-sIx full size folded copies of the plans must be submitted, including an BW' X 11" reduced copy of
transparency for each plan sheet.
- Escrow will be required for other applications through the development contract
]lJD1E - When multiple applications are processed, the appropriate fee shall be charged for each application.
11.'. t
PßOJECTNAME
l.OcATlON
1J:GAl.DESORIPTION
POWeit-S
Po IA.I$-,s
·L.OT
{'A~\L
"2..1
ß 0\1 L-E VA~D ðFF1 Le- ßVI LOIAl6-
ßO"'¡"'I;V^,~O 'NT H-wy S
'2... 'iß LOC.\<: '3
-rWO A-þþ 1\10,J
117 ql..S s.t==-.
ß .
oS.r. Coi!AI~
TOTAlACREAGE
WEIlANDSPJ1ESENT
:PßESENT20MNG
1ŒQ~~I&:U ZONING
PHl:SENTlAND USE DESIGNATION
YES ANO
reP.
-
:¡IJDvST"1..\A- L
1!EQUESTSO lAND use DESIGNATION
-
REASON FOR 11iIS REQUEST
'"
This <1PpficatiOn must be completed in full and be typewtlnen or Clearly printed and must be accompanied by all intormatlon
and plans required by applicable City Ordinance ptovislons. Before fiUng this application, you should confer with the Planning
Department to delermlne the specific ordlnanœ and procedural requirements appficabfe to your application,
A determination cf completeness of the application shall be made within ten business days of application submittal A written
J1ol1ce of appllœlion deficIencies shall be mailed to the applicant within ten business days of application.
ThiÌJ 1& 10 cettlTy that I am making application for the described action by the City and that lam responsible for complying with
all City requlrCll/1entls with regard to this request. This applica1ion should be processed In my name and I am the pany Whom
1he City should contact regarding any maner pertaining to this appfication. I have attached a copy of proof of ownership (either
copy of Owner's Duplicate Certificate of· Title, Abstract of Title or purChase agreement). or I am the authorlzed person to mal(e
1his application éII1d the fee owner has also signed this appßcallon.
1 wm keep myse1f informed 01 the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibiflty studies, etc. with an estimate prior to any
authorization 10 proceed wffh the study. The documents and Information' have submitted ·are true and correct to the best of
my knOwled,ge.
'The dty 1\ereby notifies the applicant thai development review cannot be completed within 69 days due to public hearing
requirements and agency review, Therefore, the city is notifying the appßcant that the tIIy requires an automatic 60 day
Ðxt8n for development review. Development review shall be completed within 120 day¡ unless additional review
ex! os are approv by the applicant.
2- 2.e--o~
Date
2/28/02
James N. Andersen Date
President & CEO - IWeO
App1!calion 1'Iecelved on Fee Paid Receipt No.
The app1lcan\ should contact staff for a copy of the staff report whlctt wlR be avallabte on Friday prior to the meeting.
1t not COIIIacted. a copy of the report wlfI be mailed to the applicant's address.
-. - -.
,..,bt°,; 'ì
V .1 ~ jo-
L( j- J
/),', .
Vii
U
NOTICE OF PUBLIC HEARING
CHANHASSEN PLANNING COMMISSION MEETING
TUESDAY, MAY 7,2002 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
7700 MARKET BLVD.
PROPOSAL: Site Plan for a 20,525 s.f.
Office Building
APPLICANT: Mount Properties
LOCATION: East of Powers Blvd.
and South of Hwy. 5
NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Mount
Properties, is requesting approval of a Site Plan Review for a 20,525 square foot Office Building, located
south of Hwy. 5, east of Powers Boulevard, on Lot 2, Block 3, Park Two, Powers Boulevard Office Building.
What Happens at the Meeting: The purpose of this public hearing is to infonn you about the applicant's
request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead
the public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses the project.
Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during
office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project,
please contact Shanneen at 227-1134. If you choose to submit written comments, it is helpful to have one
copy to the department in advance of the meeting. Staff will provide copies to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on April 25, 2002.
~
1 KIMBERLY LANE
2 Kelly Court
3 Nichola. Way
~
ark Road
..,
City Review Procedure
Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim
Uses, Wetland Alterations, Rezonings, Comprehensive Plan Amendments, Code
Amendments require a public hearing before the Planning Commission. City
ordinances require all property within 500 feet of the subject site to be notified of the
application in writing. Any interested party is invited to attend the meeting.
"
The staff prepares a report on the subject application. This report includes all pertinent
information and a recommendation. These reports are available by request. At the
Planning Commission meeting, staff will give a verbal overview of the report and a
recommendation. The item will be opened for the public to speak about the proposal
as a part of the hearing process. The Commission will close the public hearing and
discuss the item and make a recommendation to the City Council. The City Council
may reverse, affirm or modify wholly or partly the Planning Commission's
recommendation. Rezonings, land use and code amendments take a simple majority
vote of the City Council except rezonings and land use amendments from residential to
commercial/industrial.
Minnesota State Statute 519.99 requires all applications to be processed within 60 days
unless the applicant waives this standard. Some applications due to their complexity
may take several months to complete. Any person wishing to follow an item through
the process should check with the Planning Department regarding its status and
scheduling for the City Council meeting.
A neighborhood spokesperson/representative is encouraged to provide a contact for
the city. Often developers are encouraged to meet with the neighborhood regarding
their proposal. Staff is also available to review the project with any interested
person(s).
Because the Planning Commission holds the public hearing, the City Council does not.
Minutes are taken and any correspondence regarding the application will be included in
the report to the City Council. If you wish to have something to be included in the
report, please contact the Planning Staff person named on the notification.
Smooth Feed Sheets™
.
Use template for 5160®
THE RESTAURANT CO OF MINNESOTA
ATTN: ACCOUNTING DEPT
SUITE 800
6075 POPLAR AVE
MEMPHIS TN 38Il9 4709
CNL FUNDING 2000-A
SUITE 202
LP AT!03 FOULKRD
WILMINGTON DE 19803 3742
CAPTEC NET LEASE REALTY INC
C/O BORDERS FOODS INC
SUITE I!O
12800 INDUSTRIAL PARK BLVD
MINNEAPOLIS MN 55441 3928
TARGET CORPORATION T-0862
ATTN: PROPERTY TAX DEPT
TPN-0950 PO BOX 9456
MINNEAPOLIS MN 55440 9456
BEDDOR ENTERPRISESIE J CARLSON
CIO UNITED MAILING INC
1001 PARK RD
CHANHASSEN MN 55317 9299
BEDDOR ENTERPRISES
E J CARLSON
7951 POWERS BLVD
CHANHASSEN MN 55317 9502
INSTANT WEB INC
1000 PARK RD
CHANHASSEN MN 55317 9240
BEDDOR ENTERPR1SESIE J CARLSON
CIO VICTORY ENVELOPE
PO BOX 159
1000 PARK RD
CHANHASSEN MN 55317 0159
r~- ,-, "~,."",,,~
.. "
CHANHASSEN PLANNING COMMISSION
REGULAR MEETING
MAY 7,2002
Chairwoman Blackowiak called the meeting to order at 7:00 p.m. and gave an introduction of the
duties of the Planning Commission.
MEMBERS PRESENT: Alison Blackowiak, Uli Sacchet, Bruce Feik, LuAnn Sidney, Craig
Claybaugh, and Steven Lillehaug
MEMBERS ABSENT: Rich Slagle
STAFF PRESENT: Kate Aanenson, Conununity Development Director: Sharmin AI-Jaff,
Senior Planner; and Mahmoud Sweidan, Project Engineer
PUBLIC HEARING:
CONSIDER THE REOUEST OF MOUNT PROPERTIES FOR A SITE PLAN REVIEW
FOR A TWO-PHASE 28.980 SOUARE FOOT OFFICE BUILDING. LOCATED SOUTH
OF HIGHWAY 5. EAST OF POWERS BOULEVARD. ON LOT 2. BLOCK 3. PARK
TWO. POWERS BOULEVARD OFFICE BUILDING.
Public Present:
Name
Address
Rob M. Olson
Pete Karlis
7700 Crimson Bay Road
7910 County Road 26
Sharmin AI-Jaff presented the staff report on this item.
Blackowiak: Thank you Sharmin. Commissioners, any questions of staff at this time? Uli, go
ahead.
Sacchet: Yeah, Madam Chair. I do have a few quick questions. One thing that I found
interesting is how the pond would be relocated and so my question there was, where it's going to
. be relocated south of that pond, there in the Lake Susan Park area, is that already wetland or is
that dry land? Is there a wetland aspect involved basically?
Al-Jaff: That actually is a pond. And just to orient you, we're looking at this piece off of Powers
Boulevard. This is the existing pond, and this is the expansion.
Sacchet: Now where the expansion is being put, that's not currently wetland?
AI-Jaff: No. No it's not.
Sacchet: Okay. So there is no wetland consideration off of that? That answers my question.
Okay, thank you. When we look at this, are we just looking at Phase I or the.
Al-Jaff: No.
Planning Commission Meeting - May 7, 2002
Sacchet: We're looking at both phases.
AI-Jaff: You're looking at both phases.
Sacchet: So it would be appropriate to ask the applicant some questions about the Phase II part as
well, okay. I noticed on the grading it seems like the borders of the grading, and actually the silt
fence go beyond just the property itself. Is that something that needs any special consideration?
Like I remember on other applications we used to say, some sort of an agreement needs to be in
place from where it's going beyond the property itself. I wonder if I read that correctly. It
seemed like the silt fence went actually beyond the property line. On the southeast for instance it
seems to be quite a bit out from what I think is the property line. Is that because it's in a POO,
it's no big deal or?
Al-Jaff: No. It basically is, this is the portion that we're talking about correct?
Sacchet: Right. Right down there, yeah. That's where it seems to go quite a bit off.
Al-Jaff: It is to prevent erosion onto the neighboring site and you really have to have it in this
area.
Sacchet: And actually also towards Powers I think there's a similar. You start with south.
Basically it's southern part there towards Powers it seems to go beyond. They don't need special
agreements? That's just a given?
AI-Jaff: No. When vegetation is re-established they do remove this.
Sacchet: Just want to make sure. In some other proposals we usually put a condition that if
there's hauling, that they need to get, submit a haul route. Where they have to, for the trucks and
all that. I don't think there's one in this.
AI-Jaff: Correct, and I believe that the dirt will balance on site.
Sacchet: So they wouldn't need hauling, okay.
AI-Jaff: Correct. Currently there is a depression in this area and the dirt will be moved into this
depression.
Sacchet: Yeah. I guess where they definitely will have dirt is to make the pond bigger. That's
where the issue might come into play. Okay. Since this is going to be a shared driveway,
technically it's going to be a private street.
Al-J aff: Correct.
Sacchet: We don't need to do anything?
AI-Jaff: This is industrial office park and in that district it's a permitted use.
Sacchet: Okay, so it's a straight forward thing.
AI-Jaff: They don't need to go through the variance process.
2
Planning Commission Meeting - May 7, 2002
Sacchet: Okay. Not to get lost in minutia, they are spading trees.
Al-Jaff: Yes they are.
Sacchet: Redistributing trees. And I also noticed on the tree inventory, or the landscape plan,
there is Colorado Spruce in there. Are we still, was our Forester still suggest to use different
kinds of spruce? Just in order to be consistent with how we dealt with that in the past.
Al-Jaff: Sure.
Sacchet: Okay. I believe that's my questions, thank you.
Blackowiak: Okay, thank you. Bruce, questions?
Feik: Yeah, I have a quick one. Sorry about that. Okay I have a quick one regarding Phase I and
Phase II on the approval process here. We'll be discussing both the Phase II portion with this. Is
there a time limit regarding how long the approval of Phase II, how long the applicant would have
to commence or complete Phase II?
Al-Jaff: There is no expiration on site plan reviews.
Aanenson: I guess it was the staffs opinion when they disclosed to us they may want to go 2
stories, it's always our intent to do full disclosure so you can review the impacts of the second
story instead of coming back later with the intent and then we're stuck with maybe we didn't or
didn't like it so the 2 stories is approved at this point. When they want to come back and do it,
that's why all the parking and everything is set up ultimately for the two story.
Feik: I guess my concern was really regarding codes. The design criteria. Other things that
might change from now until the time that the second phase is added. It would not be subject to
whatever changes council or the city has made?
Aanenson: No. No.
Feik: Is it appropriate in your mind to add a sunset clause on Phase II at all, even if it's a number
of years versus whatever?
Aanenson: Well, for them, if they're going to go to 2 stories, it affects their construction type in
Phase I. They've got to size it so they can support the.
Feik: Understood.
Aanenson: Correct, so I think if they're going to size it such so they can add a second story on, I
think in good faith, just like a subdivision, you kind of work with them on that. If it meets their
design criteria today, and it's a nice looking building I'm not sure, you know.
Feik: Okay, thank you.
Blackowiak: Question LuAnn.
3
Planning Commission Meeting - May 7, 2002
Sidney: I guess I have a question for staff about the slope on the northeasterly and southeasterly
comer of the parking lot. Are we close to a 3 to I grade or I guess the retaining wall is advisable
in this case.
AI-Jaff: I'm sorry, I didn't hearthe beginning of the question.
Sidney: Oh I'm sorry. Wondering about the slope on the northeasterly and southeasterly comer.
You say in the report that the grade, the slope should be revised to meet the maximum allowable
slope grade. Are we close or is that a precipitous drop that we're talking about and retaining
walls may be more advised.
Sweidan: What we meant with the side slope 3 to I, not of course to carve out of that... It's
actually what's the remaining of the existing grades. Now in this situation we always ask for 3 to
I slope. If it happened that he needs a retaining wall, he has to put or install retaining wall.
Otherwise we don't want to be like no sharperthan 3 to I dropping on the...
Sidney: Okay. And I had one more question about, on page 7 Sharmin you talk about a sidewalk
that's shown at the entrance to the building. Could you show how that would work and, is there a
condition for that?
AI-Jaff: Yes there is.
Sidney: Is there?
Blackowiak: I didn't see one.
Sidney: I didn't see one.
Blackowiak: I added 27.
AI-Jaff: Okay. I thought I had it but it's very possible. So here is our, there is an existing
sidewalk here and you have another existing sidewalk in this area. We believe that you should
have some form of connection from this site to this sidewalk.
Sidney: Okay. We'll add a condition for that.
Al-Jaff: Okay.
Blackowiak: Unless you find one that we missed. We both missed it so. Is that it for you? Any
other questions of staff?
Claybaugh: Yeah, I have a few questions. Some of the questions that I had have been addressed,
but on page 5 under grading, drainage and erosion control. Staff highlighted the proposed IO foot
tall berm. Was that resolved t9 your satisfaction? It was on page 5 of the report.
Al-J aff: Under grading.
Claybaugh: Bottom paragraph on page 5 under grading, drainage and erosion control. The
applicant was proposing approximately a 10 foot tall berm just to the south of the pond
expansion. Staff is recommending that that berm be eliminated.
4
Planning Commission Meeting - May 7, 2002
Al-Jaff: Yes. There was a conversation between Alliant Engineering and our engineering
department and we believe that they have reached a resolution. They're just going to spread the
dirt over a larger area, which is acceptable.
Claybaugh: Okay. I may have overlooked it but on Sheet C-I, there's two bituminous pavement
details. As I could see it didn't identify which detail applied to the drive in the parking lot here.
Or whether a split was going to come into play. One's a light duty, the other's a heavy duty
detail.
Sweidan: Actually we asked them to use the city detail plates. We are not necessarily following
these cross sections. Yeah.
Blackowiak: So are you.
Claybaugh: So it will come out in the wash?
Sweidan: Yes.
Blackowiak: Yeah, so you're happy with what they're going to be doing based on the city detail
plates?
Sweidan: Yes.
Blackowiak: Okay.
Sweidan: If it doesn't show exactly the same as it is, but it should be applied as the city plate.
Blackowiak: Okay, thanks.
Claybaugh: That's aliI have.
Blackowiak: Okay, questions?
Lillehaug: Yes, I do have one question. I spoke with you earlier this week and I failed to ask this
question. In that pond expansion area, I realize that it's not currently a wetland area, but would
that be considered an upper buffer area?
AI-Jaff: An upper buffer area?
Lillehaug: Right, a buffer to the wetland area.
Aanenson: No. It's being treated as storm water is taking water from quite a, several locations so
it's being maintained as a storm water pond. And managed as a storm water pond.
Lillehaug: Okay but what.
Aanenson: What I'm saying is it's mowed. It's manicured the same as a city's park.
Lillehaug: Okay.
5
Planning Commission Meeting - May 7, 2002
Blackowiak: Okay. And I don't have any questions at this time. So at this point would the
applicant or their designee like to make a presentation? If so, please come to the podium and
state your name and address for the record.
Bob Sofeldt: Good evening. My name is Bob Sofeldt. I'm the President of Mount Properties.
I'm here with my partner, Steve Michaels and we are in agreement with the staff report and what
we believe to be a nice addition to the city of Chanhassen at the comer of Powers and Highway 5.
And we are available for any questions that you might have but we seek approval for a two
phased project as submitted.
Blackowiak: Okay, thank you. Commissioners, any questions of the applicant? Mr. Sofeldt,
could I get you to come back up to the microphone? We have a couple questions for you.
Claybaugh: If I could get you to comment just on the east elevation of the building there for the,
along the property line there. There's been some discussion about the 3 to I grade. Possibility
for a retaining wall. Could you comment on that?
Bob Sofeldt: Yeah. This is a picture of the existing site. And in fact the site arrow is really on
that east elevation. Weare not changing the grade on the east elevation at all, so what you see
there currently, which is not only natural grasses now but is planted with trees. Several trees. We
will be leaving that intact. We are just simply lowering the current elevation for the building pad
and parking lot.
Claybaugh: Can I re-address staff with respect.
Blackowiak: Sure, go ahead.
Claybaugh; Did I understand you correctly Mak that you wanted to achieve a 3 to 1 grade in that
area as part of this project or did I misinterpret your comment?
Sweidan: Yes, another part 3 to I. The shoulders. Out of the curb.
Claybaugh; Right. If I understand the applicant correctly, the existing grade out there is how
they intend to leave it. And if I understood the report correctly it's greaterthan a 3 to 1.
Sweidan: Yes.
Claybaugh: Okay. Is the City's position that they want that changed or is that acceptable to leave
it as is undisturbed?
Sweidan; According to our, you know side the slope, we usually ask for like 3 to 1. Now I know
what you meant by keeping it, it will be more than 3 to I but he has to comply with the 3 to I
slope.
Aanenson: Right, or put a retaining wall in. That was our recommendation. It says or retaining
wall.
Claybaugh: Okay. So unless I'm misunderstanding something, I guess I'd readdress. .. if I
understand the City's position, or staffs position correctly, they're asking that that shoulder be
corrected and comply with city standards of the 3 to 1.
6
Planning Commission Meeting - May 7, 2002
Sweidan: We are in agreement.
Aanenson: No, let me clarify that. No, we said if you can't make the 3 to I, then you have to put
a retaining wall in. We're not saying he has to blend the slope. We're saying if you can't make
it, then you have to put the retaining wall in.
Claybaugh: When it's all said and done and they're done with their site grading and the rest of it,
that slope on that easterly side you want to be 3 to I or less, is that correct?
Aanenson: No. If you can't make it through the parking lot blending, a retaining wall could
mitigate that.
Claybaugh: Right. Okay. Is it your intention to put in a retaining wall if you can't achieve the 3
to I or blending?
Bob Sofeldt Yes. We are in agreement with the staff report.
Blackowiak: Yeah, that's condition I so, either or.
Aanenson: Yes, correct.
Blackowiak: Any questions?
Claybaugh: That's all the questions I had.
Blackowiak: Questions? No?
Sacchet I have a question.
Blackowiak: Vii, go ahead.
Sacchet I have a question about the second phase elevation. The upper story that's kind of
offset a little bit.
Bob Sofeldt Yes.
Sacchet The wall that is further on the roof, is basically just a wall. There's no windows.
There's no decoration on them. I'm talking about this part. And then that's actually on the
outside as well, and I wondered since the surrounding roadways were somewhat up, it's not like
since it's a second story will not be all that visible. Actually it will be fairly visible I would think,
and I wonder if you've given any thought to, or whether there's a reason why there's no windows
or maybe some accents like little squares or what have you to break up the flatness of that wall.
Is that a consideration or was that all in the picture at any time?
Bob Sofeldt: It's difficult to catch the architectural design of this second phase with a flat picture
like this, but this is really quite a dramatic addition and it will be a really architectural element to
the building itself. There is a reason why those walls are blank. When you take a second story
you have to create an elevator core, and you have to have 2 stairway cores. So there will be a
stairway core and an elevator core by the main entrance, which is that wall, and there will be a
stairway element on the north side as well.
7
Planning Commission Meeting - May 7, 2002
Sacchet: That eliminates the window possibility pretty much?
Bob Sofeldt: Well, it doesn't eliminate the opportunity for a window, but architecturally those
elements really blend in together. That sits quite a ways off the edge of the building and creates a
certain massing that we wanted to create. There is a floorplan that you have in your plans that
shows, it looks a little bit like a Z on the top of the roof there and creates some architectural
interest, which is something that we really tried to achieve rather than just putting a cube over
half of the building on the north side or the south side or the east side or the west side, we tried to
create some architectural interest and that massing on the comers is what creates that element.
Sacchet: So your intent was actually to put that in as an element?
Bob Sofeldt: Absolutely.
Sacchet: Not just that it happened to be a blank wall.
Bob Sofeldt: Yeah.
Sacchet: Well that answers it reasonably well.
Blackowiak: Okay. Any other questions? LuAnn?
Sidney: One question. Well two questions maybe. I guess about lighting on the building. Do
you intend to have any wall lighting at all?
Bob Sofeldt: Yes. On the north west elevations we do plan to up light the signage on the
building. We think that that's going to be a really nice architectural element at that comer. And
then there will be some, of course the standard lighting within the parking lot on the south and
east sides.
Sidney: Okay. And I'd maybe refer you to staff for guidance about types of lighting that would
be allowed. And then EFIS, did you catch that?
AI-Jaff: Yes.
Sidney: Okay.
Al-Jaff: It is used as an accent in very limited areas, and it's under the, what's permitted by
ordinance.
Sidney: Okay. And then EFIS. You said EFIS on the building. Is it only the comice strip that is
EFIS? Okay. So that's less than 10 percent...
Al-Jaff: Correct.
Sidney: Very good.
Al-Jaff: 15 is the maximum they can use and they are substantially below that.
Blackowiak: Thanks. I just have one question. Do you have any kind of a time line on this
Phase II?
8
Planning Commission Meeting - May 7, 2002
Bob Sofeldt: No. One of the things that happens in our buildings is we develop them, we want to
create as much flexibility in them as possible and there's always, typically in, when you get a
good client into a building and they want to grow their organization within a building, we wanted
to create the opportunity for that to happen and so we are seeking that approval so that if per
chance they do that, there is the opportunity to do it. We really do need approval for that because
it is quite substantially a big deal to do, what to do.
Blackowiak: Well yeah, structurally I'm sure.
Bob Sofeldt: It really is and it adds a lot of expense to the building so they need to know that
they're going to put the expense in that they have the right to do that in the future.
Blackowiak: Sure. Okay, thank you. Alright. This item is open for a public hearing so if
anybody would like to speak on this issue, please come to the microphone and state your name
and address for the record. Seeing no one I will close the public hearing, and I'll open it up for
commissioner's comments. Vii, would you like to start? Any comments from you?
Sacchet: Yeah. Really the only thing that I was a little tom is those, what seemed relatively
substantial blank walls but I hear that they're there for a reason. Not just functionally but also
aesthetically so I feel that's their space. I am satisfied with.. .so generally I think this is a great
project. I don't have any problems with it.
Blackowiak: Okay, Bruce.
Feik: I very much like the project. Typically drive by it twice, 3 times a day so, I think it'd be a
good addition to that comer so I support the way it is.
Blackowiak: Okay.
Sidney: It's a very good looking building. I'm a little surprised it fits on that lot. Obviously it
does. I never thought anything would build on that comer but it's very nice. I guess the only
concem would be the slope off the parking lot so those are taken care of but certainly you'll be
able to do that.
Blackowiak: Okay, any other comments? Any comments Craig?
Claybaugh: Yeah, I think it looks like a very nice project. I guess I share Uli's limited concem
with respect to the blank wall on the second phase. I guess I would at least make the statement
that I'd like staff to take a look. There's no elevator cores and stair shafts indicated on these
drawings so we don't have any way to dial in if there is any opportunity in fact as part of that
second phase to incorporate a window or two up there or something else additional to break up
that outline but overall it looks like a nice project. I'd like them to take a look at that detail when
those drawings come in. Come available but I'm prepared to move it forward.
Blackowiak: Okay, thank you. Comments?
Lillehaug: I also like the site plan. I do have a comment on the pond expansion though. One
thing I think would be very necessary is to install floating silt curtain on the, adjacent to the
expansion of the pond in the existing pond. I think that'd be very necessary. And then I'd also
like to comment, just generally on this pond expansion. I realize that there's other parcels out
9
Planning Commission Meeting - May 7, 2002
here that are undeveloped, and that this is the regional pond for that area. And there's a potential
to expand on this pond again in the future with possible dredging. It would be good to try to
coordinate this all at once so we're not in this pond consecutively for the next few years. I realize
that's hard but I would just like to comment that it would be a good goal of the city to try to
coordinate this, the expansion of this pond for future development. Other than that I like the site
plan.
Blackowiak: I don't have much else to add. With the addition of a few conditions, specifically
the sidewalk, trash enclosure, blue spruce substitution, and maybe the pond expansion, I think
we're good to go on this. It looks good and I also think we should look into the elevator shaft and
stairway and make sure that those are placed properly. And look into the possibility, like Craig
suggested, of windows or something on the second floor. That's kind of a future thing but with
that I would like a motion.
Sacchet: Madam Chair, I make the motion that the Planning Commission recommends City
Council approves site plan review number 02-3 as shown on the site plan dated April 16, 2002,
subject to the following conditions, I through 26 with the following additions. 27. The same
exterior materials will be used on the trash enclosure as on the building. That's 27. 28. Just to
be consistent, if there is a need for hauling dirt off, that the hauling route needs to be, or whatever
the standard language is that they use for that. 29. Applicant shall work with staff about the
selection of tree species in the context of the Colorado Spruce question. Number 30. What was
the sidewalk thing?
Blackowiak: To extend the sidewalk to the west.
Sacchet: Connect the sidewalk from the building to the sidewalk next to Powers Boulevard.
Number 31. I like Steven's point that there should be, I know how he called these things a
floating fence?
Lillehaug: Floating silt fence.
Sacchet: Floating silt fence between the existing pond and the expansion. And then on 32,
applicant will work with staff to explore possibilities of possibly putting accents or windows in
those large walls. I mean I don't want to put a condition in to say that they have to do it but I
think it deserves possibly more consideration.
Blackowiak: Good, with Phase II?
Sacchet: With Phase II. That's specific with Phase II.
Blackowiak: Okay, there's been a motion. Is there a second?
Claybaugh: Second.
Sacchet moved, Claybaugh seconded that the Planning Commission recommends the City
Council approves Site Plan Review #02-3 as shown on the site plan dated April 16, 2002,
subject to the following conditions:
I. Revise the slope off the northeasterly and southeasterly comer of the parking lot to meet
the maximum allowable slope grade of 3: I or construct a retaining wall.
10
Planning Commission Meeting - May 7, 2002
2. Eliminate the proposed berm just south of the regional pond expansion and dispose of the
excess dirt off site.
3. The enlarged portion of the regional pond must be designed to National Urban Runoff
Program (NURP) standards with maximum side slopes of 3: I and a 10: I slope bench at
the normal water level.
4. Construction of the public pond will require a financial security to be obtained from the
applicant. Security must be in the form of a cash escrow or letter of credit and will cover
the installation of the public improvement, i.e. pond. The security is required to be in
place prior to any construction occurring on site.
5. According to the City's Finance Department records, the site was previously assessed for
utilities. As such, only sanitary sewer and water hook-up charges along with the Met
Council's SAC fee will be due at the time of building permit issuance. The 2002 trunk
utility hook-up charge is $1,383 per unit for sanitary sewer and $1,802 per unit for water.
The 2002 SAC fee is $1,275 per unit.
6. The applicant shall be responsible for obtaining permits from the appropriate regulatory
agency including Carver County and the Riley-Purgatory-BluffCreek Watershed District.
7. A 40 foot wide cross-access easement must be recorded across the shared portion of the
dri veway of the Instant Web site.
8. Add a detail sheet to the plans with all applicable 2002 City of Chanhassen detail plates.
9. On the Utility Plan:
a. For the proposed sanitary sewer service, core drill the existing manhole.
b. All sanitary sewer services must be 6" SDR-26.
10. On the Grading Plan:
a. Show all existing and proposed easements.
b. The maximum cross slope for handicap accessible parking stalls is 2%. Revise
the grading plan to comply.
c. Show the topsoil stockpile area location.
d. Show the location of existing streetlights on Powers Boulevard.
e. Increase the rock construction entrance to a minimum of 75 feet in length as per
Detail Plate No. 5301.
f. Use Type II silt fence along the easterly, southerly, and westerly sides and use
Type I along the northerly side of the site.
II. Fire Marshal Conditions:
a.
"No Parking Fire Lane" signs will be required as well as curbing to be painted
yellow. Contact the Chanhassen Fire Marshal for exact locations of signs and
curbing to be painted yellow. Pursuant to 1997 Minnesota Uniform Fire Code
Section 904.1.
An additional fire hydrant will be required. Contact the Chanhassen Fire Marshal
for exact location.
,
b.
II
Planning Commission Meeting - May 7, 2002
c. A P.I.V. (Post Indicator Valve) is required. Contact the Chanhassen Fire Marshal
for exact location.
d. A 10 foot clear space must be maintained around fire hydrants, i.e. 5Ireet lamps,
trees, bushes, shrubs, Qwest, Xcel Energy, cable TV, and transformer boxes. This
is to ensure that hydrants can be quickly located and safely operated by
firefighters. Pursuant to Chanhassen City Ordinance #9-1.
e. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding
premise identification. Pursuant to Chanhassen Fire DepartmentlFire Prevention
Division Policy #29-1992.
f. Comply with water service installation policy for commercial and industrial
buildings. Pursuant to Inspections Division Water Service Installation Policy
#34-1993. Copy enclosed.
g. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding
maximum allowed size of domestic water on a combination domestic/fire
sprinkler supply line. Pursuant to Chanhassen Fire DepartmentlFire Prevention
Division Policy #36-1994.
h. Comply with the Chanhassen Fire DepartmentlFire Prevention Division regarding
notes being included on all site plans. Pursuant to Chanhassen Fire
DepartmentlFire Prevention Division Policy #4-1991.
12. The applicant shall increase the quantity of plantings for the north buffer yard landscaping
to meet minimum requirements.
13. A revised landscape plan including the sizes and quantities of plant materials shall be
submitted to the city prior to City Council approval.
14. The applicant shall provide staff with a detailed cost estimate of landscaping to be used in
calculating the required financial guarantees. These guarantees must be posted prior to
building permit issuance.
15. Applicant shall landscape all parking lot islands. Only landscaped islands shall meet the
ordinance requirements.
16. Substitute wood chip mulch for landscape rock in island landscape that contains the five
(5) oak trees.
17. The applicant shall enter into a site plan development contract with the city and provide
the necessary financial securities.
18. The applicant must obtain a sign permit prior to erecting any signage on site. Provide a
detailed sign plan for review and approval. The signage shall meet the following criteria:
a. Monument signage shall be submit to the monument standards in the sign
ordinance.
b. Wall signs are permitted on the southwest elevation only. The sign area shall
meet standards set in the sign ordinance.
c. All signs require a separate permit.
d. The signage will have consistency throughout the development and add an
architectural accent to the building.
e. Consistency in signage shall relate to color, size, materials, and heights.
f. Back-lit individual letter signs are permitted.
12
Planning Commission Meeting - May 7, 2002
g. Individual letters may not exceed 30 inches in height.
h. Only the name and logo of the business occupying the building will be permitted
on the sign.
19. All rooftop equipment shall be screened from views.
20. Concurrent with the building permit, a detailed lighting plan including fixture styles,
meeting city standards shall be submitted.
21. Submit storm sewer sizing design data for a 10 year, 24 hour storm event.
22. Park and trail dedication fees to be collected per city ordinance ($12,694 Park Fees and
$4,231 Trail Fees). The applicant shall ensure that the Powers Boulevard trail and
landscaping are protected during construction.
23. Building Official conditions:
a. The building is required to have an automatic fire extinguishing system.
b. The building plans must be prepared and signed by design professionals licensed
in the State of Minnesota.
c. Detailed occupancy related requirements cannot be reviewed until complete plans
are submitted.
d. Utility plan: Provide cleanouts per code on the sanitary sewer line. The HDPE
pipe proposed for the storm sewer must conform to AASHTO M924. It must be
installed in granular fill with watertight gaskets and must be air tested. Portions
of the PVC storm sewer must be air tested when located within 10 feet of buried
water lines or the building.
e. The second story proposed for Phase 11 will require the installation of an elevator.
f. The owner and/or their representative shall meet with the Inspections Division as
soon as possible to discuss plan review and permit procedures.
24. The same exterior materials will be used on the trash enclosure as on the building.
25. If fill is imported or exported, the applicant will need to supply the City with a hanl
route and traffic control plan.
26. Applicant shall work with staff about the selection of tree species in the context of
the Colorado Blue Spruce question.
27. Connect the sidewalk from the building to the sidewalk next to Powers Boulevard.
28. A floating silt curtain shall be installed between the existing pond and the expansion.
29. The applicant will work with staff to explore possibilities of putting architectural
accents or windows in the large walls with Phase II.
All voted in favor and the motion carried unanimously with a vote of 6 to O.
Blackowiak: The motion carries 6-0 and this item goes before the City Council on May 28th.
Thank you.
.
I3