1g. Change Order No. 5, Chan Fire Station and City Hall 1 CITY OF ti \ I , CHANHASSEN 1 , w 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 "t , .,, A I;,lrj4tMror 1 MEMORANDUM TO: Don Ashworth, City Manager Cste ubmhed ,a evmni :inn FROM: Jim Chaffee, Public Safety Director 1 Sete :submitted to COLMe$ DATE: June 7, 1989 1 SUBJ: Change Order No. 5 , Fire Station/City Hall Expansions 1 Please find attached Change Order No. 5 for the remodel and addi- tion at the Fire Station and the addition at City Hall. These items are either code required or items that will provide the 1 finishing touches to the completed project. This should be the final change order to come through and will still be within the budgeted funds. 1 Recommendation It is the recommendation of staff to proceed with Change Order 1 No. 5 in the total amount of $3, 093 . 00 for the Fire Station and City Hall to bring it up to code and final completion. i 1 1 1 1 1 1 11 1 CHANHASSEN CITY HALL/CHANHASSEN FIRE STATION 11 PROJECT NO 87126/87146 A. FIRE STATION II Item No. 1 Reinstall the existing air intake line for the air compressor II as directed by the Owner. Add $ 291 .00 Item No. 2 Installation of pad under carpet at stairways; to increase life of II stair carpet. Add $ 67 . 00 Item No. 3 Add switch control to both the II relocated east light pole and the west light pole. Add $ 446 . 00 Item No. 4 Update the existing basement exhaust flue as required to current building code requirements Add $ 615 . 00 II Item No. 5 Install dropped soffit headers at room 214 and furring for roof II drain pipe at room 213. Add $ 197 .00 Item No. 6 Add 4 duplex outlets in room 204 and provide additional control II switch location for exhaust fan EF-2 . Add $ 564.00 Item No. 7 Provide safety stops at the two II existing overhead doors and three additional radio receivers . Add $ 530 . 00 SUB TOTAL: FIRE STATION $ 2710.00 II II II II ATTACHMENT TO CHANGE ORDER NUMBER 5 1 s i DOW B. CITY HALL: Item No. 1 Install sound insulation above ceiling as directed by owner. Add $ 183.00 Item No. 2 Apply cement finish to exposed concrete block in courtyard Add $ 200 .00 SUB TOTAL: CITY HALL $ 383 .00 TOTAL $ 3093 .00 ATTACHMENT TO CHANGE ORDER NUMBER 5 2