1g Feasibility Study 97-6
CITY OF
CHANHASSEN
City Center Drive, PO Box 147
ianhas,en, Minnesota 55317
Phone 612.937.1900
~eneral Fax 612.937.5739
gineering Fax 612.937.9152
¿lie Safety Fax 612.934.2524
éb www.ci.chanhassen.mn.UJ
MEMORANDUM
TO:
Teresa J. Burgess, Public Works Director/City Engineer
..·.~_.L_
::!:-d
Citv of Chanhassen. A f1'(Jwin; communitv with clean IaktJ, aualitv "hook, a charmin; downtuwn, thrivinr businesses, and beautilùl paries. A rreat place to Ii", work, and play,
FROM:
Dave Hempel, Assistant City Engineer ~\-Yt-
July 18, 2000
DATE:
SUBJ:
West 78th Street ExtensionlReconstruction of Trunk Highway 5
Between Lake Ann Park and Century Boulevard; Approve
Feasibility Study dated June 23, 2000 and Order Public
Improvement Project No. 97-6
On July 10,2000 the City Council held a public hearing on the above-referenced
project to gather input from the affected residents. At the close of the public
hearing, there were no further relevant questions or concerns which require
further study. The public hearing was closed and all action was tabled due to not
having a quorum. Therefore, this item is being brought back to the City Council
to act upon. All actions require a 415 vote to be approved. It is recommended
that the City Council approve the following:
1. Approve feasibility study dated June 23, 2000.
2. Order Public Improvement Project No. 97-6 for the reconstruction of
Trunk Highway 5 and the extension of West 78th Street between Lake Ann
Park and Century Boulevard.
Attachments: 1. Copy of staff report dated July 5, 2000.
g:\eng\public\97-6\public hearing2.doc
~~;¡:.:~(:¡,:;:! t;; ;;'''~:-,~,¡~·'0,;:''~J''~ C^"¡··v
\.1. , /"'-:..!... ..........~;', ·,S......._id'~\.:,; JUt".
Rœe;vcc~ __.._._____..
HGvk::·::n ~!o. _
~.PPïOIjBd by Cfty Engh13ar
Dc,to ::J':iò._:J!'Y.~3'-____
Approvo,) by C1:y COU\1CU
Date _
If at the close ofthe public hearing there are no further relevant questions or
'iirx¿ p.¡~¿æ¡:;J:l.6 COPY concerns which require further study it is recommended that the City Council
approve the feasibility study for the Reconstruction ofTH 5 and the extension of
West 78th Street frontage road between Lake Ann Park and Century Boulevard
and order the public improvements associated with Project No. 97-6,
CITY OF
CHANHASSEN
690 City Ctnur Drivt, PO Box 147
Chanhassen, Minntsota 55317
Phone 612.937.1900
Genera/Fax 612.937.5739
Engineering Fax 612.937.9152
Publit Safety Fax 612.934.2524
~b www.ci.chanhassen.mn.UJ
:?;3:··J·~~
:'¡,'Í~~cr.~.
;.¡:¡¡rovad by CIty EngIneeI'
Dal'3 "'/<5ÞC> ~
Ap;Jfoved by ~ council
Data
;t
MEMORANDUM
TO:
Teresa J. Burgess, Public Works Director/City Engineer
Dave Hempel, Assistant City Engineer \)\\ \~"\./
July 5, 2000
FROM:
DATE:
SUBJ:
Public Hearing for Street and Utility Improvements along West
78th StreetITrunk Highway 5 Between Lake Ann Park and Century
Boulevard; Approve Feasibility Study dated June 23, 2000 and
Order Public Improvement Project No. 97-6
Attached is the feasibility study prepared by city staff for the construction of
street and utility improvements associated with the Minnesota Department of
Transportation's Roadway and Utility Project for the reconstruction ofTH 5. The
City Council previously approved the construction plans and specifications for
this project back in January 2000. The report reflects only the improvements
proposed to be assessed with the project. It does not include costs for the streets,
trails and bridges. I have attached a funding summary sheet dated July 6, 2000
which reflects the proposed allocation of funds to pay for the street, trail and
bridge improvements. Street lighting and landscaping improvements are also not
proposed along West 78th Street with this phase. The street lighting system and
landscaping improvements will be installed as a separate project in the future by
the City of Chanhassen. MnDOT opened bids on June 30, 2000 for this project
and proposed to award a contract during the first week of Augnst 2000. The City
Council needs to approve the feasibility study and order the project prior to
MnDOT awarding the project.
The primary elements associated with this project are the extension W 78th St.
from Lake Ann Park to Century Blvd. and trunk sanitary sewer and water main
improvements. The project is scheduled to be completed within two years. The
total estimated project cost (city's) for the proposed public improvements is
$1,651,863.00. The feasibility study outlines primary project elements, associated
cost estimate and preliminary assessment roll. The project appears to produce a
net revenue of approximately $550,828.00 from the trunk sewer and water
assessments. It should be noted that there are a couple of parcels ofland that are
in green acre status, which will impact the payback period of the assessments.
Attachments: 1. Feasibility Study.
2. Funding Summary.
g:\eng\public\97 ~6\public hearing.doc
FlU
TIN Cih øfCbanhnssm. A mwin, communi,., with ,kan laktr. fJua[;tv ,ffJ,(lnlc. n rl1t1rm;ntT Afttlmtllflln, th,.;,nnv In¡ti1'JµrI'f. tI"d hMutiñJ.I MrIN. A fIffllt "fArf tf/ låJf. rlmrr. t1