Loading...
1d. Approve Contract Amendmend No 1 for Lake Drive/TH 101 /d. I CITY OF ...____ .. i , �sr ., , , CHANHASSEN 1 i, L,� 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 ;. , (612) 937-1900 IAction by Clty Adrdlnitttetbr MEMORANDUM �dorsed 9/ DLO A Q II TO: Don Ashworth, City Manager Modified / Rejected FROM: Gary Warren, City Engineer 67 (A)t & ��-j-� (( Date Submitted to Commission I DATE: November 2, 1989 Dote Submitted to Council SUBJ: Approve Contract Amendment No. 1 for _ //-&- ij I Lake Drive/TH 101 Realignment Project Project No. 88-22 1 Attached is Contract Amendment No.1 for the Lake Drive/TH 101 Realignment improvement project. The amendment and accompanying letter from BRW summarizes the six elements which comprise the II contract amendment. As noted, elements A and C were necessary in order to comply with the permit conditions from the Corps of Engineers and the County. Element B, church driveway modifica- II tions, was a result of the negotiations that were conducted with the church concerning construction impacts to their property and the proposed assessments for the project. I Element D, Lake Susan Park improvements, is the most significant addition to the contract scope, being $73 , 366. 70. As will be recalled, the City has received a LAWCON grant for expansion II improvements to the Lake Susan Park area. As a part of this grant, the City has a 50% matching fund commitment to satisfy. This totals approximately $110,000 worth of matching funds and II will be paid from the park development fund. In addition, the earth balance on the project resulted in the necessity to waste large quantities of poor soils. As it turned out, both elements worked to the City' s advantage in that by proceeding to add the I Lake Susan Park ballfield grading to the scope, the City was able to expedite the construction of this phase of the park improve- ments while recognizing some significant economies of construc- II tion by allowing the Lake Drive/TH 101 Realignment contractor to dispose of these excess materials while encountering minimal haul distance. As a result, the City has been able to complete the I rough grading for the ballfield site as well as come a long way towards complying with our $110,000 matching fund commitment. The final elements of the contract amendment, E and F, reflect I modifications necessary to address changed field conditions and are relatively straightforward and reasonable. The net contract II I ilDon Ashworth November 2 , 1989 I Page 2 I amendment is an addition of $90, 932.46 which results in an amended contract ceiling price of $2,294,150. 84 . It is therefore recommended that the attached Contract Amendment No. 1 be approved by the City Council and authorized for execution. Attachments I1 . October 24, 1989 letter from BRW. 2 . Contract Amendment No. 1. Ic : Gary Ehret, BRW I I I I I I I I I I I 1 I I tW PLANNING TRANSPORTATION ENGINEERING URBAN DESIGN SAW. INC. THRESHER SQUARE 700 THIRD STREET SOUTH • MINNEAPOLIS.MINNESOTA 55415 PHONE 612:370-0700 FAX 612'370-1378 October 24, 1989 Mr. Gary Warren, PE 11 City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 RE: TH 101 Realignment/Lake Drive ' City of Chanhassen Project 88-22 Dear Gary, Please find enclosed six copies of Contract Amendment No. 1 for the above- referenced project for your approval . The amendment has been prepared to include new bid items and contract quantities, as required by the following modifications and additions to the project plans. A. Lake Drive East and TH 101 Intersection Modifications ' The Lake Drive East/Rosemount access driveway intersection with TH 101 has been moved approximately ninety feet north to minimize the conflict of the new construction with the existing wetland in the area. In addition, the construction of the driveway to the parking lot on the Rosemount site has been included in the contract. B. Church Driveway Modifications The church driveway alignment has been modified, as requested by repre- I sentatives of The Lutheran Church of the Living Christ. Two catch basins and appurtenant storm sewer pipe were added at the driveway entrance. C. CSAH 17 Improvements Roadway improvements, including the construction of a median island, 1 have been included for CSAH 17 in response to the permit requirements of Carver County. D. Lake Susan Park Improvements Clearing and grubbing, earthwork and grading for Lake Susan Park have been added to the project as you had requested. AN AFFILIATE OF THE BENNETT RINGROSE.WOLSFELD.JARVIS.GARDNER.INC GROUP DAVID J BENNETT DONALD W RINGROSE RICHARD P WOLSFELD PETER E JARVIS LAWRENCE J GARDNER THOMAS F CARROLL CRAIG A AMUNDSEN DONALD E HUNT MARK G SWENSON JOHN B McNAMARA RICHARD D-PILGRIM DALE N BECKMANN DENNIS J SUTLIFF JEFFREY L BENSON RALPH C BLUM DAVID L GRAHAM MINNEAPOLIS DENVER PHOENIX TUCSON ST.PETERSBURG 1 - - , I Mr. Gary Warren October 24, 1989 Page 2 E. Lake Drive Water Main Modifications ' A portion of the design for the new water main along Lake Drive has been revised, as necessary, due to field verification of the location and depth of the existing water main in the area. F. Lake Drive Culvert Modifications ' A 24-inch corrugated metal pipe (CMP) culvert has been substituted for the 24-inch reinforced concrete pipe (RCP) culvert originally specified at Lake Drive Station 1+40. The CMP is more practical and economical considering the temporary nature of this culvert. We will continue to provide you and the City Council with the appropriate infor- mation subsequent to this Contract Amendment should any significant contract ' changes occur. If you have any questions, please do not hesitate to call . ' Sincerely, BRW, ,77 Gary A. Ehret, PE Project Manager GAE/sk Enclosures File 7-8912 I 1 I BRW Copy City CopY V Contractor COPY %W "'OOPY CITY OF CHANHASSEN , CONTRACT AMENDMENT Project: TH 101 Realignment/Lake Drive City Project No. : 88-22 Amendment No.: (1) One Date: October 24, 1989 Contractor: Northdale Construction Company, Inc. The additions, revisions and corrections contained herein shall be the ade to m Contract Documents for the project, and shall become a part of the Scope of Work. ' Description of Changes: A. The Contractor shall provide all materials and labor to -construct the Lake ' Drive East and TH 101 intersection and all associated utilities as shown in the revised plan drawings attached. Plan Sheets 13, 14, 20, 21, 22 and 28 show the roadway, sanitary sewer, water main and storm sewer designs for the new intersection location. The intersection has been moved approximately ninety feet north to minimize the conflict of the new construction with the existing wetland in the area. In addition, the construction of the driveway to the parking lot on the Rosemount site has been included in the contract, as shown in the attached drawings. Two existing catch basins previously installed for the driveway shall be removed and new structures shall be installed to match the new alignment. The changes have resulted in new contract quantities for a number of bid items, as required by the modifications to the plans. New bid items have been provided for the required work to remove and reinstall the catch basins for the Rosemount driveway. Our estimate of the changes is summarized as follows: ' Bid Schedule A - Sanitary Sewer ORIGINAL QUANTITY AMOUNT ' SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 5/ 8" PVC 18' to 20' LF $ 20.00 362.00 58.00 $ 1,160.00 Depth 19/ Standard Manhole EA 875.00 11.00 1.00 875.00 ' 0' to 10' Depth 20/ Extra Depth Manhole LF 65.00 54.30 10.80 702.00 ' Over 10' Depth Total Add $ 2,737.00 ' CA1-1 I I IIBid Schedule B - Water Main ORIGINAL QUANTITY AMOUNT I SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ UNIT Mn/DOT NO. ITEM PRICE QUANTITY (DECREASE) (DEDUCT) 4/ 12" DIP LF $ 19.05 3,248.00 60.00 $ 1,143.00 I42/ 3" Thick Insulation SF 1.75 128.00 128.00 224.00 ITotal Add $ 1,367.00 Bid Schedule C - Storm Sewer IORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) II2/ 15" RC Pipe Sewer LF $ 20.00 258.00 16.00 $ 320.00 2503.541 Design 3006 Cl III I17/ Construct CB EA 825.00 9.00 2.00 1,650.00 2506.509 Design (24" x 36") II 45/ Remove Existing 2104.509 Catch Basins EA 200.00 0.00 2.00 400.00 1 2104 4.506/1 Remove 18" RCP LF 3.50 0.00 16.00 56.00 II 210447/ .521 Salvage 18" RCP LF 3.50 0.00 16.00 56.00 48/ Install Salvaged LF 11.00 0.00 16.00 176.00 ' 2503.571 18" RCP Total Add • $ 2,658.00 IIBid Schedule D - Roadway II ORIGINAL QUANTITY AMOUNT SEQ. NO.! UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) I10/ Select Granular 2105.522 Borrow (CV) CY $ 4.20 39,500.00 ( 340.00) ($ 1,428.00) I 12/ Aggregate Base 2211.501 Class 5 (100% Ton 6.75 9,385.00 ( 80.00) ( 540.00) Crushed Limestone) I 13/ Base Course Mixture Ton 11.45 3,900.00 ( 63.00) ( 721.35) 2331.514 2331 I CA1-2 II 11 Bid Schedule D (Continued) I ' ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ ' Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 14/ Bituminous Material Ton $126.50 215.00 ( 3.47) ($ 438.96) 2331.504 for Mixture (2331 Base) 15/ Wearing Course Ton 11.85 3,500.00 (129.00) ( 1,528.65) ' 2331.508 Mixture- (Mod) 2341 16/ Bituminous Material Ton 138.00 225.00 (8.28) ( 1,142.64) 2341.518 for Mixture (2341 Wear) 17/ Bituminous Material Gal 0.95 1,950.00 ( 72.00) ($ 68.40) ' 2357.502 for Tack Coat 26/ 4" Concrete Walk SF 1.25 22,400.00 (540.00) ( 675.00) 2521.501 27/ 4" Concrete Median SF 1.35 8,430.00 (600.00) ( 810.00) 2521.501 38/ 4" Solid Line LF $ 0.16 8,280.00 (270.00) ( 43.20) 0564.603 White-Paint 40/ 4" Broken Line LF 0.16 4,665.00 (40.00) ( 6.40) 0564.603 Yellow-Paint 1 Total Deduct ($ 7,402.60) Net Deduct ($ 640.60) ' B. The Contractor shall provide all materials and labor to make the required ' changes to the church driveway, as shown in the attached plan drawings. The changes include a modification of the driveway alignment, and the addition of two storm sewer catch basins at the intersection of the driveway with Lake Drive. Plan Sheets 25, 27, 28, 29, 56 and 57 show the new church driveway information. The changes to the driveway have been made at the request of the representatives of the church. ' The changes have resulted in new contract quantities for the 12" RC pipe and construct catch basin items in Bid Schedule C - Storm Sewer. Our estimate of the changes in the contract quantities is summarized as follows: CA1-3 ' II II ( Bid Schedule C - Storm Sewer ORIGINAL QUANTITY AMOUNT I SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) Ill 12" RC Pipe Sewer LF $ 19.70 590.00 44.00 $ 866.80 2503.541 Design 3006 Cl III 17/ Construct CB Design EA 825.00 9.00 _2.00 1,650.00 II2506.509 (24" x 36") Total Add $ 2,516.80 INet Add $ 2,516.80 1 C. The Contractor shall provide all materials and labor to-construct a new median island and perform roadway improvements on CSAH 17, as shown in the revised plan drawings attached. Plan Sheets 24 and 35 show the new island I and roadway information. The island construction is added to the project in response to the permit requirements of Carver County. I The changes have resulted in new contract quantities for numerous items of Bid Schedule D - Roadway. Our estimate of changes in the contract quan- tities is summarized as follows: IBid Schedule D - Roadway ORIGINAL QUANTITY AMOUNT I SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ UNIT Mn/DOT NO. ITEM PRICE QUANTITY (DECREASE) (DEDUCT) II 12/ Aggregate Base Ton $ 6.75 9,385.00 315.00 $ 2,126.25 2211.501 Class 5 (100% Crushed Limestone) 13/ Base Course 2331.514 Mixture 2331 Ton 11.45 3,900.00 63.00 721.35 I . 14/ Bituminous Material Ton $126.50 215.00 3.47 $ 438.96 2331.504 for Mixture (2331 Base) 15/ Wearing Course 2331.508 Mixture (MOD) 2341 Ton 11.85 3,500.00 81.00 959.85 I 16/ Bituminous Material Ton 138.00 225.00 5.18 714.84 2341.518 for Mixture (2341 Wear) I17/ Bituminous Material Gal 0.95 1,950.00 23.50 22.33 2357.502 for Tack Coat IICA1-4 II 11 Bid Schedule D - Roadway (Continued) I ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 24/ Bituminous Curb LF $ 3.15 2,000.00 468.00 $ 1,474.20 2535.501 30/ Saw Inplace Bit. LF 5.00 595.00 95.00 475.00 0331.603 (Full Depth) 36/ Furnish and Install SF 23.50 217.85 67.25 1,580.38 2564.531 Sign Panels Type C (TH 101) 38/ 4" Solid Line LF 0.16 8,280.00 505.00 80.80 0564.603 White-Paint - 39/ 4" Solid Line LF $ 0.16 605.00 300.00 $ 48.00 0564.603 Yellow-Paint 40/ 4" Broken Line LF 0.16 4,665.00 50.00 8.00 0564.603 Yellow-Paint ' Total Add $ 8,649.96 Net Add $ 8,649.96 , D. The Contractor shall provide all materials and labor to perform clearing and grubbing, earthwork, and grading for the Lake Susan Park improvements, as shown in the attached drawing. The work shall be performed in accordance with the requirements of the project specifications. The additional work creates new items for common excavation, muck excavation and clearing and grubbing, as summarized below. The clearing and grubbing item shall also include the work required for the trees affected by the change in the Rosemount driveway and the relocation of the church driveway. Excess material available from the TH 101/Lake Drive roadway construction shall be used to construct embankments in the park, as shown on the plans and as directed by the Engineer. 1 CA1-5 I II Bid Schedule D - Roadway , 1 ORIGINAL QUANTITY AMOUNT ' II SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 54/ Common Excavation CY $ 1.90 0.00 31,622.00 $ 60,081.80 I2105.501 (Lake Susan Park) 55/ Clearing & Grubbing LS 4,100.00 0.00 _ 1.00 4,100.00 I (Lake Susan Park) 56/ Muck Excavation CY 2.65 0.00 3,466.00 9,184.90 I2105.505 (Lake Susan Park) Total Add $ 73,366.70 IINet Add - $ 73,366.70 1 E. The Contractor shall provide all materials and labor to construct the water main along Lake Drive, as shown in the attached drawings. Plan Sheets 16 and 17 show the new water main design. The water main design was revised as necessary due to field verification of the location and depth of the Iexisting water main in the area. The changes have resulted in new contract quantities for numerous items in I Bid Schedule B - Water Main. Our estimate of the changes in the contract quantities is summarized as follows: II Bid Schedule B - Water Main ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) II1/ 6" DIP LF $ 13.20 289.00 (53.00) ($ 699.60) I2/ 8" DIP LF 15.40 150.00 5.00 77.00 4/ 12" DIP LF 19.05 3,248.00 (100.00) ( 1,905.00) I5/ 18" DIP LF 32.50 695.00 105.00 3,412.50 14/ Cut in Connection EA 750.00 3.00 (1.00) ( 750.00) I to Existing 18" Water Main 28/ 18" Bends EA 760.00 3.00 2.00 1,520.00 38/ Remove Existing LF 4.50 160.00 420.00 1,890.00 18" DIP II IICA1-6 II 11 . Bid Schedule B (Continued) I I ' ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ I Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 39/ Blow Sand in LF $ 5.00 500.00 (350.00) ($1,750.00) II Existing 18" DIP and Grout Ends 42/ 3" Thick Insulation SF 1.75 128.00 640.00 1,120.00 I Total Add $2,914.90 The following items shall be added to Bid Schedule B - Water Main ORIGINAL QUANTITY AMOUNT II SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 43/ 18" x 18" x 18" EA $1,450.00 0.00 2.00 $2,900.00 II Tee 44/ 18" x 12" Reducer EA 1,075.00 0.00 1.00 1,075.00 I 45/ 18" Straight EA 390.00 0.00 1.00 390.00 Sleeve II 46/ 10" Bend EA 175.00 0.00 1.00 175.00 47/ 8" Bend EA 158.00 0.00 2.00 316.00 I 47/ 10" Straight EA 159.00 0.00 2.00 318.00 Sleeve I Total Add $ 5,174.00 Net Add $ 8,088.90 I F. The Contractor shall provide all materials and labor to construct a corru- gated metal pipe (CMP) culvert at Lake Drive Station 1+40 instead of the reinforced concrete pipe (RCP) culvert originally specified. The 24" RCP culvert and aprons shall be deleted and replaced by a 24" CMP culvert with II flared end sections as shown in the attached revised Sheet 28 of the plan set. II CA1-7 1 II I ' The changes have resulted in new contract quantities and bid items in Bid Schedule C - Storm Sewer. The modifications to the bid schedule are sum- marized as follows: ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ ' Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 5/ 24" RC Pipe Sewer LF $ 25.85 132.00 (98.00) ($2,533.30) 2503.541 Design 3006 Class III 27/ 24" RC Apron with LF 820.00 2.00 (2.00) ( 1,640.00) ' Trash Guard 49/ 24" CM Pipe LF 22.00 0.00 142.00 3,124.00 2501.511 Culvert ' Total Deduct - ($1,049.30) Net Deduct ($1,049.30) SUMMARY ' Current Contract Amount $2,203,218.38 Item A Net Deduction ($ 640.60) Item B Net Add $ 2,516.80 ' Item C Net Add $ 8,649.96 Item D Net Add $73,366.70 Item E Net Add $ 8,088.90 ' Item F Net Deduction ($ 1,049.30) Contract Amendment No. 1 Add 90,932.46 Amended Contract Amount $2,294,150.84 ' No changes to the Construction Schedule for the project shall be made due to the modifications which are included as a part of this Contract Amendment. 1 ' CA1-8 I APPROVALS: ' RECOMMENDED BY: BRW, Inc. I i, /,/ By: Title: Project Manager Date: //e 2, //c /i 1 1 ACCEPTED BY: Northdale Const uction Company, Inc. By. '� -� Title: in�-11 1`"�A-4' ,e.--- Date: 10 Vic! 7 APPROVED BY: City y of Chanhassen 1 By: Title: • Date: 1 1