Loading...
1e. Contract Amendment No 1 for Phase II of Downtown Redev. I k CITY OF ie. 4 1 ' ,. 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 Action by City AdminlsttelOC MEMORANDUM Endorsed t/ fl ! I TO: Don Ashworth, City Manager tdodifled 1 Rejected FROM: Gary Warren, City Engineer Date 1td/_� G bete Submitted to Commission I DATE: November 2, 1989 .. Dote Submitted to Council I SUBJ: Approve Contract Amendment No. 1 for Phase II , Downtown Redevelopment Project No. 86-11B IIPhase II of the downtown redevelopment is also coming to a rapid conclusion. As the project progressed, certain elements of the I project scope were modified by necessity. The widening of Market Boulevard, for example, was to accommodate turn lanes for the Crossroads National Bank site as well as the decision to construct a full-movement intersection at Market Boulevard with I Trunk Highway 5 to accommodate the Rosemount Engineering traffic demands. This element comprises $47,089 . 92 of the $58,752 .17 contract amendment. IThe modifications to the electrification of fountains A and B in the storm water detention pond resulted from the decision to add I the second fountain to the project scope. This had been antici- pated in the Phase I construction element and has been necessi- tated from and aesthetic and water quality standpoint. Elements C and D of the change order are relatively straightforward Iresulting from the change in scope and field conditions. I have found the attached contract amendment to be in order and 11 the recommended addition is within the construction budget allo- cated for this project. It is therefore recommended that Contract Amendment No. 1 for Phase II of the downtown redevelop- !' project be approved in the amount of $58, 752.17 and that the contract ceiling amount be increased to $702,180. 50. IAttachments 1. October 26 , 1989 letter from BRW. 1 2. Contract Amendment No. 1. c: Gary Ehret, BRW II I I Lr^ TRANSPORTATION �� ENGINEERING I `_ lk URBAN DESIGN BRW INC. THRESHER SQUARE 700 THIRD STREET SOUTH MINNEAPOLIS.MINNESOTA 55415 PHONE 612 370-0700 FAX 612 370-1378 II 1 October 26, 1989 IIMr. Gary Warren, PE City Engineer I City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 IRE: Downtown Redevelopment Phase II City of Chanhassen Project 86-11B 1 Dear Gary, Please find enclosed six copies of Contract Amendment No. 1 for the above- referenced project for your approval . The amendment has been prepared to ' include new bid items and contract quantities, as required by the following modifications and additions to the project plans. IA. General Design Modifications Various modifications and additions have been made to the project plans I during construction in response to the requests of the City of Chanhassen. The changes include the widening of Market Boulevard and all associated changes to the utilities in the area. IIB. Fountain Electrification Additional labor and materials have been included for modifications to the I electrification of Fountains A and B located in the detention pond in the northwest corner of the Highway 5 and Market Boulevard intersection. The modifications are detailed in the drawing attached to the amendment. 1 C. Material Restocking Material restocking fees have been included for the return of utility I construction materials presently stored on the project site to the supplier. The materials are no longer needed due to changes in the plans. (See Item A.) II IIAN AFFILIATE OF THE BENNETT RINGROSE WOLSFELD JARVIS GARDNER INC GROUP DAVID J BENNETT DONALD W RINGROSE RICHARD P WOLSFELD PETER E JARVIS LAWRENCE J GARDNER THOMAS F CARROLL CRAIG A AMUNDSEN DONALD E HUNT I MARK G SWENSON JOHN B McNAMARA RICHARD D PILGRIM DALE N BECKMANN DENNIS J SUTLIFF JEFFREY L BENSON RALPH C BLUM DAVID L GRAHAM MINNEAPOLIS DENVER PHOENIX TUCSON ST PETERSBURG I I Mr. Gary Warren October 26, 1989 Page 2 D. Detention Pond Drain Pipe Additional labor and materials have been included for the installation of a twelve-inch PVC drain pipe for the detention pond located in the northwest corner of the Highway 5 and Market Boulevard intersection. The drain pipe was required to drain the pond to enable the construction of the embankment for the widened Market Boulevard roadway section. We will continue to provide you and the City Council with the appropriate infor- mation subsequent to this Contract Amendment should any significant contract changes occur. If you have any questions, please do not hesitate to call . ' Sincerely, BRW, IN , Gary A. Ehret, PE Project Manager , GAE/sk Enclosures File 7-8815 1 I r I B^cW Copy city COW Contractor Copy Inspector Copy CITY OF CHANHASSEN CONTRACT AMENDMENT IIProject: Chanhassen Downtown Redevelopment Phase II City Project No. : 86-11B IAmendment No. : (1) One Date: October 25, 1989 Contractor: Midwest Asphalt Corporation _ The additions, revisions and corrections contained herein shall be made to the contract documents for the project, and shall become a part of the Scope of Work. IIDescription of Changes: I A. Modifications and additions have been made to the project plans during construc- tion in response to the requests of the City of Chanhassen. The changes have resulted in new contract quantities for a number of existing bid items, as well as a few new items, as required by construction completed to date. A summary of the changes is as follows: Bid Schedule A - General Work ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ ' Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 16/ Common Excavation CY $ 1.50 3,900.00 530.00 $ 795.00 2105.501 ' 171 Subgrade Excavation CY 1.50 5,800.00 1,875.00 2,812.50 2105.507 ' 20/ Common Borrow (CV) CY 6.00 500.00 1,174.00 7,044.00 2105.523 I2021.50 26/1 Mobilization LS 450.00 0.00 1.00 450.00 ' 27/ Geotextile Fabric SY 0.58 0.00 10,000.00 5,800.00 Total Addition $16,901.50 1 1 ' CA1-1 11 Bid Schedule B - Roadway I ORIGINAL QUANTITY ' AMOUNT SEQ. NO.! UNIT CONTRACT INCREASE/ ADD/ II Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 1/ Aggregate Base Placed Ton $ 5.81 5,220.00 297.00 $ 1,725.57 ' 2211.503 Class 5 2! Bituminous Material Ton 135.00 67.00 _ 3.00 405.00 2331.504 Mixture II 3/ Base Course Mixture Ton 8.90 1,470.00 70.00 $ 623.00 2331.514 II 4/ Bituminous Material Ton 135.00 192.00 4.00 540.00 2341.504 of Mixture 5/ Wearing Course Mixture Ton 10.95 3,200.00 63.00 689.85 II 2341.508 7/ Bituminous Material for Gal 1.00 1,630.00 57.00 57.00 I 2357.502 Tack Coat 9/ Concrete Curb & Gutter LF 6.50 1,185.00 65.00 422.50 II 2531.501 Design B618M 13/ Furnish & Install Sign SF 22.00 93.00 1.50 33.00 II 2564.531 Panels Type C 14/ 4" Solid Line White LF 0.23 8,300.00 960.00 220.80 II 0564.603 Paint 15/ 4" Double Solid Line LF 0.47 2,230.00 300.00 141.00 0564.603 Yellow Paint I 18/ 24" Solid Line Yellow LF 1.80 125.00 335.00 603.00 0564.603 Paint a 19/ Pavement Message Type 1 EA 70.00 4.00 1.00 70.00 0564.602 Turn II 22! Concrete Curb & Gutter LF 6.30 0.00 783.00 4,932.90 2531.501 Design B612M Total Addition $10,463.62 II II II CA1-2 I II . IIBid Schedule C - Storm Sewer ORIGINAL QUANTITY AMOUNT ISEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) II 9/ 12" RC Pipe Sewer LF $ 18.70 367.00 (63.00) $(1,178.10) 511 Design 3006 CL III 10/ 15" RC Pipe Sewer LF 19.80 282.00 _ (15.00) (297.00) II2503.511 Design 3006 CL III 11/ 18" RC Pipe Sewer LF 20.70 134.00 (4.00) (82.80) II2503.511 Design 3006 CL III 19/ Construct Manholes EA 930.00 1.00 (1.00) (930.00) I2506.506 Design 48-4020 21/ Construct Catch Basin EA 660.00 12.00 (2.00) (1,320.00) 2506.509 Type 2' x 3' I23/ Construct Catch Basin EA 770.00 1.00 1.00 770.00 2506.509 48" Round II28/ Construct Catch Basin EA 805.00 0.00 2.00 1,610.00 2506.506 Design H II29/ F & I Casting Assembly EA 287.00 0.00 2.00 574.00 2506.516 (Neenah Foundry Company R-2500) II30/ 18" Energy Dissipater EA 862.00 0.00 1.00 862.00 2503.573 I 31/ 12" PVC Pipe Sewer 2503.511 Schedule 26 EA 21.27 0.00 70.00 1,488.90 Total Addition $ 1,497.00 IBid Schedule E - Water Main II ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) I3/ 10" Ductile Iron Pipe LF $ 24.00 802.00 145.00 $ 3,480.00 13/ 10" - Bend, 45 Degrees EA 160.00 1.00 3.00 480.00 II14/ 10" - Bend, 225 Degrees EA 160.00 3.00 1.00 160.00 I 17/ Connect to Existing 10" Water Main EA 495.00 2.00 1.00 495.00 IICA1-3 II . Bid Schedule E - Water Main (Continued) II 1 ' ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ II Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 20/ 10" Ductile Iron Pipe LF 40.00 0.00 235.00 9400.00 II Extra Depth 21/ 10" x 10" Tee EA 455.00 0.00 _ 1.00 455.00 , 22/ 10" Plug EA 402.00 0.00 1.00 402.00 Total Addition $14,872.00 II Bid Schedule G - Electrical II ORIGINAL QUANTITY AMOUNT SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) I 9/ 3" Rigid Steel Conduit LF $ 13.16 0.00 255.00 $ 3,355.80 2545.601 I Total Addition $ 3,355.80 Net Addition $47,089.92 I B. The Contractor shall provide all materials and labor for modifications to the I electrification of Fountains A and B, as shown in the attached drawing. The modifications have resulted in a new bid item as detailed below: Bid Schedule G - Electrical I ORIGINAL QUANTITY AMOUNT II SEQ. NO.! UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 10/ Fountain LS $1,190.00 0.00 1.00 $ 1,190.00 II Electrification Modifications Total Addition: $ 1,190.00 I Net Addition $ 1,190.00 II• II CA1-4 I II , II IIC. Utility construction materials presently storgd on the project site are no longer needed due to changes made to the plans, as directed by the City of Chanhassen. The Contractor shall return these materials to the supplier as required. I Restocking fees shall be paid to the Contractor for the returned items as sum- marized below: IBid Schedule C - Storm Sewer UNIT SEQ. NO./ RESTOCKING IIMn/DOT NO. ITEM UNIT FEE QUANTITY AMOUNT ADD 9/ 12" RC Pipe Sewer Design LF $ 5.75 63.00 $ 362.25 II2503.511 3006 CL III 10/ 15" RC Pipe Sewer Design LF 6.61 15.00 99.15 I2503.511 3006 CL III 11 18" RC Pipe Sewer Design LF 7.76 4.00 31.04 2503.511 3006 CL III I19/ Construct Manholes EA 316.00 1.00 316.00 2506.506 Design 48-4020 II21/ Construct Catch Basin EA 201.00 2.00 402.00 2506.509 Type 2' x 3' IITotal Addition $1,210.44 Net Addition $1,210.44 IID. The Contractor has performed additional work on a time and materials basis to install 12-inch PVC pipe to drain the detention pond at the northwest corner of the I Highway 5 and Market Boulevard intersection. The installation of the pipe was necessary to drain the pond to enable the construction of the embankment fqr widened Market Boulevard. II The additional materials required for the completion of the work are as described below: IITEM UNIT QUANTITY UNIT PRICE AMOUNT 12" SDR 35 PVC LF 325.00 $ 6.79 $2,206.75 IRiprap (Class II) Ton 11.00 10.00 110.00 Select Granular Pipe Bedding CY 60.00 5.00 300.00 ITrench Rock Ton 26.00 6.00 156.00 I Total $2,772.75 Midwest Asphalt 15% 0 & M 415.91 Materials Cost $3,188.66 I CA1-5 II , II r Hourly, rates for equipment and personnel were obtained from the Contractor and II appro/ed by the Engineer prior to beginning the additional work. The hourly rates and respective times required for each item are as summarized below. All equipment costs include the operator. I ITEM UNIT QUANTITY UNIT PRICE AMOUNT 7 Axel Lowboy I (Material Pickup & Delivery) HR 2.00 $ 80.00 $ 160.00 240 Mitsubishi Backhoe HR 12.00 120.00 1,440.00 I 270 Mitsubishi Backhoe HR 3.00 136.00 408.00 C-15 Dyna Pac Compactor HR 15.00 58.00 870.00 I C-25 Dyna Pac Compactor HR 3.00 74.00 222.00 Hand Compactor DAY 1.50 45.00 67.50 II 941 Cat HR 9.50 65.00 617.50 I 950 Cat HR 8.00 43.00 344.00 Laborer (Regular) HR 27.00 32.00 864.00 II Laborer (Overtime) HR 6.00 48.00 288.00 Total $5,281.00 II Midwest Asphalt 15% 0 & M 792.15 Labor & Equipment Cost $6,073.15 I The changes have resulted in a new lump sum bid item for the installation of the drain pipe. The lump sum unit price includes all materials, labor, and equipment II costs required for the completion of the work. The new bid item is detailed as follows: Bid Schedule C - Storm Sewer II ORIGINAL QUANTITY AMOUNT II SEQ. NO./ UNIT CONTRACT INCREASE/ ADD/ Mn/DOT NO. ITEM UNIT PRICE QUANTITY (DECREASE) (DEDUCT) 32/ Install 12" PVC LS $9,261.81 0.00 1.00 $9,261.81 I Detention Pond Drain Pipe Total Addition $9,261.81 I Net Addition $9,261.81 II CA1-6 I II I ' SUMMARY ' Current Contract Amount $643,428.33 Item A Net Add $47,089.92 Item B Net Add $ 1,190.00 ' Item C Net Add $ 1,210.44 Item D Net Add $ 9,261.81 Contract Amendment No. 1 Add 58,752.17 Amended Contract Amount $702,180.50 ' APPROVALS RECOMMENDED BY: BRW, Inc. : 7 /BY /. _ -4A.1/1/ Title Project Manager D at e Z S o Y ACCEPTED BY: Midwest Asphalt Corporation By: 01t4 / / C �f Title �� 1, CtArs;_ Date , t APPROVED BY: City of Chanhassen ' By: Title Date CA1-7 .� . I. . F Y • e� PR `�w I tl z . . i C t a§ 1 lijial 4- 0, ag — 22 iii 1 -1 cit:I . ! i iix lit w z I • a 3 .. a g . iM�_ R 3 % I—EL _ II ' 2 F+ Its T. 1 In jai •;1 • it g31 i 1 �., wV �/iA ' 8 3 •% w � j � F.. H s 61 I :.1 \4 V . . 0 i ),;:i' 7 " ..., , 411 ii5° ill "t1I ..i :.!,............,..„—:->4-- ` 1" Ili 131 il ice. A aA 1 �� Pig" .g ia� v i 0 1 i..v. Oil ni : a - ./. • 1 yo 1 -, "3" • /• - / 8 ))) : s'7 1- I . i ; 41.311 i 1.ii? 1.1 dc / ) : . // 1 /I 1 . i . e I— / /1/1 1 2 ' ' . //(//1. / l I. YM.4.-.114 . . ._�� j , d N. ., 1 m 1.- / �_ I i 1 = ) 'I $ fr I / H 4 gi iF, r a f r N , . . - 1 At p , ®• . . ,, - , _.. ., I �I .� •