Loading...
E-7. Hwy 101 River Crossing Project Extension of Working Hours and Night ConstructionCITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.2271300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us E -� MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Paul Oehme, Director of Public Works /City Engineer q ` DATE: April 14, 2014 (X�Y, SUBJ-. Highway 101 Minnesota River Crossing and CSAH 61 Improvements, City Project No. 13 -04: Approve Extension of Regular Working Hours and Night Working Hours PROPOSED MOTION: "The City Council approves a resolution for extending regular working hours and approving night construction working hours for the Highway 101 Minnesota River Crossing and CSAH 61 Improvements Project No. 13 -04. City Council approval requires a simple majority vote of the City Council present. On February 24, 2014, the City Council approved a Joint Powers Agreement with Carver County and approved plans and specifications. Staff discussed briefly the need for extending working hours for this project to meet the project completion date. DISCUSSION The Counties of Carver and Scott, along with the Minnesota Department of Transportation (MnDOT) and the Cities of Chanhassen and Shakopee have completed the design for a four -lane river bridge over the Minnesota River that will protect the traveling public from 100 -year flooding events. In addition to the Highway 101 bridge, the Highway 101 /CSAH 61 (old 212) intersection, known as the "Y" intersection, will be reconstructed with a roundabout to accommodate future traffic demands. This design also accommodates a future north leg to the roundabout. CSAH 61 will also be reconstructed to a 4 -lane design from Bluff Creek Drive to just east of the Highway 101 /CSAH 61 roundabout. A roundabout is planned at the intersection of CSAH 61 and Bluff Creek Drive. The intersection at CSAH 61 and the Highway 101 north leg will still operate with a signal until the alignment up the bluff is improved. The project will be constructed in both the City limits of Chanhassen and Shakopee. Chanhassen is a Community for Life - Providing for Today and Planning forTomorrow Todd Gerhardt MN River Crossing Project: Approve Extending Working Hours & Night Working Hours April 14, 2014 Page 2 WORKING HOURS To meet the proposed schedule, extended working hours will need to be considered. The City of Chanhassen's normal working hours are from 7:00 a.m. to 6:00 p.m. Monday through Friday and Saturday from 9:00 a.m. to 5:00 p.m. with no work on Sundays or legal holidays. The City of Shakopee's normal working hours are from 7:00 a.m. to 10:00 p.m. Monday through Friday and between the hours of 9:00 a.m. and 9:00 p.m, on weekends. It is important to have the same working hours for the project between the two communities. MnDOT feels the project cannot be constructed within the given completion dates without extension of normal working hours. MnDOT, Carver County and the City of Shakopee are requesting the City of Chanhassen normal working hours be Monday through Friday from 6:00 a.m. to 10:00 p.m. and Saturday from 7:00 a.m. to 10:00 p.m. for this project. The project will require a lot of pile driving for the bridge abutments and retaining walls. Also a large amount of muck will be removed from the project along with placement of sand backfill. Over 400,000 cubic yards of muck will need to be removed and over 70,000 feet of 12" to 16" diameter pipes will be installed. For just the 4,100' long bridge, 408 piles are required. The muck operation will take place in high water table areas which requires the operation to be continuous so the dewatering operation can be limited. Also, erosion will be limited with continuous operation and the execution area does not become super saturated. Night work hours will also need to be considered to complete the muck operation efficiently and to meet completion dates. Night work was performed on the TH 212 project with few problems. Most of the muck work is anticipated to take place in the fall and winter. Night work would only include muck removal operations and paving. It is not anticipated night work will be continuous throughout the project but will be needed for several continuous weeks during the muck operation work. Few residential homes are in close proximity to the project. Night Construction shall be defined as construction between 10:00 p.m. and 6:00 a.m. Monday through Friday and from 12:00 a.m. to 7:00 a.m. on Saturdays. For the following dates, July 30, 2014 to August lat, 2014, Night Construction shall be defined as all hours between 5:00 p.m. and 6:00 a.m. On Saturday, August 2, 2014, Night Construction shall be defined as all hours between 10:00 a.m. to 12:00 a.m. No work shall be allowed on Sundays without prior written approval from the Engineer. The City of Shakopee approved the extension of working hours and night working hours at their April 1, 2014 City Council meeting. The proposed requirements for night work are as follows: • For Night Construction, the Contractor shall be prohibited from performing the following activities: pile driving /removal, concrete pavement demolition, sawing for pavement removal, crushing operations, and jack - hammering. Any deviation from the hours that these activities are prohibited from occurring must be approved by the Engineer. g:\eng \pub1ic \_2013 projects \13 -04 th 101 river crossing - csah 61 improvements \bkgd 041414 appry extension of working hours.docx Todd Gerhardt MN River Crossing Project: Approve Extending Working Hours & Night Working Hours April 14, 2014 Page 3 The Contractor shall have a supervisor on site during Night Construction that has completed the "MnDOT Noise Mitigation for Night Construction" training in the five years prior to the start date of this Contract and shall be on file as having completed the training with the Department. This training is free of charge, approximately 30 minutes in length, and can be found online at http: / /www. dot. state. nm. us /onlineleaming /construction/noisemitigation. The nighttime supervisor's name and a copy of his/her certification shall be furnished to the Engineer prior to Night Construction. For Night Construction, the following shall be required of the Contractor: • Notify all sensitive areas of the proposed Night Construction. Notification of the type, location, and duration of the work shall be made in writing no later than five calendar days prior to beginning the work. Provide a copy of the notification to the Engineer and the City. • Provide a contact person who is on site to ensure that any issues related to Night Construction are immediately addressed. • Equipment shall have OSHA approved ambient, sound - sensing backup alarms or, as an alternative, an observer may be utilized in accordance with OSHA standards. • Allow for equipment to turn - around in lieu of backing up (this includes equipment entering /exiting the project). • Construct temporary noise mitigation enclosures or curtains around stationary equipment (e.g., generators, compressors). • Tailgates on trucks shall not be slammed. Truck drivers that are unable to control the tailgates from slamming shall be removed from the project. • All engines and engine driven equipment used for hauling or construction shall be equipped with an adequate muffler in constant operation and properly maintained to prevent excessive or unusual noise. If the Engineer determines that the Contractor is not in compliance with the Night Construction requirements, the Engineer will suspend Night Construction until the non - compliant issues are addressed or the Engineer accepts an action plan from the Contractor that satisfactorily addresses any non - compliant issues noted. Start Minnesota River Crossing Construction Summer, 2014 �MnDan OT d Carver County Project Substantially Complete F— Fall, 2015 Attachment: Resolution g: \eng \pub1ic \_2013 projects \13 -04 th 101 river crossing - csah 61 improvements \bkgd 041414 appry extension of working hours.docx CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: April 14, 2014 RESOLUTION NO: 2014 -XX MOTION BY: SECONDED BY: A RESOLUTION APPROVING EXTENSION OF REGULAR WORKING HOURS AND NIGHT WORKING HOURS FOR THE HIGHWAY 101 MINNESOTA RIVER CROSSING AND CSAH 61 luI�: ZI] �/ 11�LI11►YY.y9;Z131DrelWr1xrglfl ! WHEREAS, representatives of MnDOT, Carver County and the Cities of Chanhassen and Shakopee have discussed the need for extending working hours for this project to meet project completion dates; and WHEREAS, the project requires several piles be driven for the bridge and muck removal and placement of sand backfill, as such, night construction working hours are requested to perform this work; and WHEREAS, the following requirements are proposed for night work to be performed: For Night Construction, the Contractor shall be prohibited from performing the following activities: pile driving/removal, concrete pavement demolition, sawing for pavement removal, crushing operations, and jack - hammering. Any deviation from the hours that these activities are prohibited from occurring must be approved by the Engineer. The Contractor shall have a supervisor on site during Night Construction that has completed the "MnDOT Noise Mitigation for Night Construction" training in the five years prior to the start date of this Contract and shall be on file as having completed the training with the Department. This training is free of charge, approximately 30 minutes in length, and can be found online at http: / /www. dot. state.mn.us /onlineleaming /construction/noisemitigation. The nighttime supervisor's name and a copy of his/her certification shall be furnished to the Engineer prior to Night Construction. • Notify all sensitive areas of the proposed Night Construction. Notification of the type, location, and duration of the work shall be made in writing no later than five calendar days prior to beginning the work. Provide a copy of the notification to the Engineer and the City. • Provide a contact person who is on site to ensure that any issues related to Night Construction are immediately addressed. • Equipment shall have OSHA approved ambient, sound- sensing backup alarms or, as an alternative, an observer may be utilized in accordance with OSHA standards. • Allow for equipment to turn - around in lieu of backing up (this includes equipment entering/exiting the project). • Construct temporary noise mitigation enclosures or curtains around stationary equipment (e.g., generators, compressors). • Tailgates on trucks shall not be slammed. Truck drivers that are unable to control the tailgates from slamming shall be removed from the project. • All engines and engine driven equipment used for hauling or construction shall be equipped with an adequate muffler in constant operation and properly maintained to prevent excessive or unusual noise. WHEREAS, if it is determined that the contractor is not in compliance with the night construction requirements, the engineer will suspend night construction until the non - compliant issues are addressed or the engineer accepts an action plan from the contractor that satisfactorily addresses any non - compliant issues noted. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. Regular working hours shall be Monday through Friday from 6:00 a.m. to 10:00 p.m. and Saturday from 7:00 a.m. to 10:00 p.m. for the Highway 101 Minnesota River Crossing and CSAH 61 Improvements Project No. 13 -04. 2. As long as all requirements are met for Night Construction work for the Highway 101 Minnesota River Crossing and CSAH 61 Improvements Project No. 13 -04, Night Construction hours shall be defined as between 10:00 p.m. and 6:00 a.m. Monday through Friday and from 12:00 a.m. to 7:00 am. on Saturdays. For the following dates, July 30, 2014 to August 1, 2014, Night Construction shall be defined as all hours between 5:00 p.m. and 6:00 a.m. On Saturday, August 2, 2014, Night Construction shall be defined as all hours between 10:00 a.m. to 12:00 a.m. No work shall be allowed on Sundays without prior written approval from the Engineer. Passed and adopted by the Chanhassen City Council this 14a' day of April, 2014. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT