1q. Change Order No. 3 for City Hall/Fire Station I
C I T Y OF
C BANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937-1900
' MEMORANDUM -
TO: Don Ashworth, City Manager 2-‹PA-'41
' FROM: Ji: ; e8: l Chffe, ubic Safety Director 40 t
DATE: Mach G` u
' SUBJ: Approval of Change Order No. 3 , City Hall and Fire Station
Expansions
Please find attached roposed Change Order No. 3 for the Fire
p g
Station and City Hall. The major item for the Fire Station is
' the roofing on the old section. While working on the new roof,
it was learned that potential leakage problems could occur on the
old roof. In fact, the old Fire Station has had leakage problems
' in the past ncessitating repairs.
The possibility of replacing the old section of roof was
discussed at our weekly construction meetings. It was suggested
by the architect and agreed to by Dale Gregory and myself that it
would be cheaper in the long run to replace the old roof at the
same time the new roof was being constructed.
Therefore, the additional $7, 707. 00 represents an investment for
the fire station and would warranty the entire roof with
Firestone' s 10 year guarantee. The remaining costs represent
minor adjustments that were found to be needed during demolition.
As noted, the costs associated with the City Hall change include
' the library expansion and air conditioning for the Council
Chambers .
Recommendation
Staff recommends approval of Change Order No. 3 for a total of
$7, 337. 00 for the Fire Station and $5, 722. 00 for City Hall.
Manager' s Comments : The budget for each of these accounts was
initially established with a contingency account. The work is
nearly complete on both structures and we have been very fortunate
in not having significant contingencies to date. Approval of the
' change order is still less than the original contingency amount
including all changes to date.
1-)if
I
I
CHANHASSEN CITY HALL/CHANHASSEN FIRE STATION
PROJECT NO: 87126/87146
A. FIRE STATION: '
Item No. 1 Deduct signage allowance Deduct [$3,000 .00]
Item No. 2 Additional gypsum board Add $543 .00 1
furring and removal necessary
due to existing wall
conditions .
Item No. 3 Remove existing ballast and Add $7,707 . 00
roof membrane and install new
membrane roofing system for
the existing roof areas over
the office and apparatus
garage. This includes
Firestone's 10 year warranty.
Item No. 4 Provide new coped garage door Add $642 . 00
programmable entry system on
the exterior of the building
at the existing south garage
door ( including electrical
wiring) .
Item No. 5 Mechanical revisions needed Add $815 . 00
to maintain required ceiling
height in the lounge, and
additional capping of
mechanical work necessary due
to existing unforeseen
conditions .
Item No. 6 Reroute roof drain from racquet- Add $345 . 00
ball court at the lobby to
maintain desired ceiling
height.
Item No. 7 Provide alternate windows in new Add $275 . 00
garage doors on East side to
match the windows in the
existing garage doors .
SUB TOTAL: FIRE STATION $7, 327 . 00
I
I
II
II
IB. CITY HALL:
Item No. 1 Deduct signage on exterior Deduct ($2, 000 . 00]
of building.
IIItem No. 2 Revised floor plan in lower Add $3, 154 . 00
level for future library
I expansion as per proposal
request #5 .
Item No. 3 Provide air conditioning in Add $4,568 .00
Ithe existing council chambers .
ISUB TOTAL: CITY HALL $5,722 .00
I
ITOTAL $13,049.00