Loading...
4. Lake Ann Park Expansion ii ; z_i_. CITY OF ,,, 1 c : : -, NHAssEN I 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 F IMEMORANDUM kllaTt by City A:tMin crttor TO: Don Ashworth, City Manager Endorse' weiZzCli I Ordi.izcl .�___�_..�..._......._ FROM: Gary Warren, City Engineer i ,.re1 t-�— -- '. V Die .tea-.)7--a-,--1 ' DATE: March 22 , 19 8 9 ta';e SnbT[;:tA in ^mission lo Ucunci SUBJ: Award of Bids Ng -m �I Lake Ann Park Expansion �,,,� File No. 88-13 1 Attached is the bid tabulation for the Lake Ann Park expansion project. As with the Audubon Road improvement project, we have received very favorable and competitive bids for this project. I As noted in the attached bid tabulation , we requested two alter- nate bids as a part of this solicitation . Alternate #1 was for the construction of concrete barrier curbing within the parking areas of the site and Alternate #2 addresses the sealcoating and I striping of the existing roadway surfaces which are in need of upkeep and which would encounter further abuse as a result of this construction project. IThe engineer ' s estimate on this project was $282 , 660 . As can be seen, the low bidder, Imperial Developers , was $59, 748 below the I engineer ' s estimate for the base bid. Including the alternate bids, the low bidder is $66 , 747 under the engineer ' s estimate. Imperial Developers has been involved with several projects in the City over the past one and one-half years, i .e. Kerber I Boulevard, McGlynn Bakery and is also the low bidder on the Audubon Road project. We have had good experience with them. It is therefore recommended that the project be awarded to the low I bidder, Imperial Developers . It is also recommended that since the low bid including Alternates 1 and 2 is below the base bid budget, the City accept and award Alternates 1 and 2 as well . The total award for the low bidder with Alternates 1 and 2 is Itherefore $239 , 393. IAttachments 1 . Letter from OSM dated March 15 , 1989 . I2 . Bid Tabulation. cc :. Laurie McRostie, OSM II I Schelen d , � Mayeron& - Associates,Inc. I 2021 East Hennepin Avenue I Minneapolis,MN 55413 612-331-8660 FAX 331-3806 Engineers Surveyors II Planners March 15, 1989 City of Chanhassen II 690 Coulter Drive Chanhassen, MN 55317 1 Attn: Mr. Gary Warren, P.E. City Engineer I RE: Lake Ann Park Site Development OSM Comm. #4207.1 Dear Mr. Warren: II At 10:00 a.m. March 14, 1989, bids were received on the above referenced project. II A total of 12 bids were received. We have checked and tabulated the bids and are enclosing a copy of the bid tabulation for your file. The low bidder was Imperial Developers, Inc. of Bloomington, Minnesota in the I amount of $222,912.00 for the base bid. Alternate Bid #1 was for the amount of $9,399 and Alternate Bid #2 was for the amount of $7,082. IIWe recommend the City award the project, including the two alternate bids, to Imperial Developers, Inc. We have retained a copy of the low bid, and are returning all bids and securities 1 to you for your file. When the project has been awarded, please let us know so we can prepare the II contracts. Sincerely, i ORR-SCHELEN-MAYERON AND ASSOCIATES, INC. � � t1 . 5}7��,��aa a ar t' OF roV;il .M Laurie McRostie fIIA; you I Enclosures ^r 77- ;' der • /hit I I Fyual Opportunity Employer II 1 , BID TABULATION 1 SITE GRADING, FIELD CONSTRUCTION AND ROAD AND PARKING LOT CONSTRUCTION AND LANDSCAPING II LAKE ANN PARK CHANHASSEN, MINNESOTA BIDS OPENED: March 13, 1989 at 10:00 a.m. ORR-SCHELEN-MAYERON 1 & ASSOCIATES, INC. ICONTRACTOR BID SECURITY BASE BID ALTERNATE #1 ALTERNATE #2 Imperial Developers 5% 222,912 9399 7082 1 Preferred Paving 5% 224,400.70 12291 6055 Leonard Wangerin 5% 229,910.75 9640 7065 IIValley Paving Corporation 5% 244,306.55* 11327 11035 Enebek Construction 5% 256,593.90 12773 6770 IIM. J. Ryan Construction 5% 258.346.75 18075 8485 IGammon Brothers 5% 271,620.50 15616 7459 Hardrives, Inc. 5% 277,548 13496 11995 IIMatt Bullock Contracting 5% 277,698.25 15665 11205 Barber Construction 5% 278,478.70 16870 11647 1 Finley Brothers Ent. 5% 295,147.50* 22895 6890 1 Central Landscaping 5% 330,029.25 13255 10005 IEngineer's Estimate 282,660 14460 9020 I HEREBY CERTIFY THAT THIS IS A TRUE AND 1 CORRECT TABULATION OF THE BIDS AS RECEIVED ON: 1 DATE March 14, 1989 ' BY 1~ 6�: L„....,,�� )(c �'{-t-1- Laurie McRostie *Denotes Corrected Figure OSM COMM. NO. 4207 II II 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1