Loading...
E-5. TH 101 MN River Crossing Project: Concurrence of BidsCITY OF CHANHhSSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.2271140 Fax 952.2271110 Park & Recreation Phone: 952227.1120 Fax: 952.2271110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.2271110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site E -5 MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Paul Oehme, Director of Public Works /City Engineer DATE: April 28, 2014 O gao SUBJ: Highway 101 Minnesota River Crossing and CSAH 61 Improvements, City Project No. 13 -04: Approve Concurrence of Bids PROPOSED MOTION "The City Council approves bids for Highway 101 Minnesota River Crossing and CSAH 61 Improvements City Project #13 -04." City Council approval requires a simple majority vote of the City Council present. In March, 2013, the City applied for a DNR trail grant to help pay for trail improvements planned for the project. On February 24, 2014, the City Council approved a Joint Powers Agreement with Carver County and approved plans and specifications. On March 10, 2014, the City Council: 1. Approved a resolution concurring with County State Aid Highway (CSAH) Designation for Highway 101; and 2. Approved a resolution establishing a No Parking Zone for the project area. On March 24, 2014, the City Council advanced State Aid Funds to help pay for the City's share of the project. On April 14, 2014, the City Council approved extension of regular working hours and night working hours. On April 17, 2014, bids for the project were opened. www.ci.chanhassen.mn.us The Counties of Carver and Scott, along with the Minnesota Department of Transportation (MnDOT) and the Cities of Chanhassen and Shakopee have completed the design for a four -lane river bridge over the Minnesota River that will protect the traveling public from 100 -year flooding events. In addition to the Highway 101 bridge, the Highway 101 /CSAH 61 (old 212) intersection, known as the "Y" Chanhassen is a Community for Life - Providing forTodayand Planning for Tomorrow Todd Gerhardt April 28, 2014 MN River Crossing: Approve Concurrence of Bids Page 2 intersection, will be reconstructed with a roundabout to accommodate future traffic demands. This design also accommodates a future north leg to the roundabout. CSAH 61 will also be reconstructed to a 4 -lane design from Bluff Creek Drive to just east of the Highway 101 /CSAH 61 roundabout. A roundabout is planned at the intersection of CSAH 61 and Bluff Creek Drive. The intersection at CSAH 61 and the Highway 101 north leg will still operate with a signal until the alignment up the bluff is improved. A trail is planned along the north side of CSAH 61 and on the west side of 101. PROJECT COSTS Bids Carver County opened bids for the project on April 17, 2014 at 2:00 p.m. The following are the bids received. 1. Ames Construction $49,273,580.35 2. Lunda Construction Company $50,160,869.00 3. CS McCrossan Construction $54,636,181.10 4. Edward Kraemer & Sons, Inc. $60,462,496.72 *Engineer's Estimate was $50,500,000 The Highway 101 Minnesota bridge construction portion of the project was bid at $26,065,667.35. The CSAH 61 improvements and the Highway 101 improvements roadway portion was bid at $23,207,913.00. Funding The City of Chanhassen is responsible for a portion of the project based on requested items included in the project and Carver County cost share policy. Scott County's share is their future tumback plus the LRIP funds. The two Counties are planning to pay for their Highway 101 approaches and split the bridge funding shortfall 50150. The trail costs are not tumback funding eligible. The Highway 101 trail corridor is on Carver County's master trail plan so the trails, underpass and associated retaining wall will be split 50150 between the City and County. The trail improvements along CSAH 61 are 100% City cost. The aesthetic treatment in the roundabouts and entry monument are 100% city cost. A portion of the CSAH 61 project is not tumback eligible. These costs are proposed to be charged to the City per the Carver County cost participation policy. Right -of -way is 75% tumback cost eligible along CSAH 61. The 25% of the remaining right -of -way cost is proposed to be split between Carver County and the City per past projects. The following is a breakdown of the City costs: CSAH 61 Roadway City Share Not Tumback Eligible Per Carver County Cost Participation Policy $209,031 Highway 101 Trail City Share $230,372 CSAH 61 Trail $ 50,188 g: \eng \public \_2013 projects \13 -04 th 101 river crossing - csah 61 improvements \bkgd 042814 concur w bid .dock Todd Gerhardt April 28, 2014 MN River Crossing: Approve Concurrence of Bids Page 3 Roundabout Aesthetics and Entry Monument $ 67,105 City's Engineering Share of Design $ 55,670 Right-of-Way City Share $234,375 Total City Costs $846,741 The City received a Minnesota DNR trail grant for this project in 2013 in the amount of $150,000. The remaining City cost is proposed to come from the Municipal State Aid (MSA) Fund. Staff is still checking with State Aid about all items being eligible for state aid. The City proposed funding is as follows: DNR Grant $150,000 MSA Funds $696,741 Total $846,741 The City budgeted $1,200,000 in MSA funds for the project. MnDOT completed the river bridge design plans and will be responsible for construction administration, geotechnical and surveying work at no cost to the City or County. The proposed project schedule is as follows: • Open House Meeting at Chanhassen Library • Construction Start • Work Substantially Completed; Road Open to Traffic Attachments: Resolution CIP Page May 22, 2014 June, 1014 Fall, 2015 g:\eng\public\-2013 projects \13 -04 th 101 river crossing - csah 61 improvements \bkgd 042814 concur w bid .docx CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: April 28, 2014 RESOLUTION NO: 2014 -XX MOTION BY: BY: A RESOLUTION FOR CONCURRENCE OF BIDS FOR IMPROVEMENTS TO HIGHWAY 101 MINNESOTA RIVER CROSSING AND CSAH 61 IMPROVEMENTS, PROJECT NO. 13-04 WHEREAS, the Chanhassen City Council approved plans and specifications and a Joint Powers Agreement with Carver County for the Highway 101 Minnesota River Crossing and CSAH 61 Improvement Project; and WHEREAS, a total of four bids were opened for the Highway 101 Minnesota River Crossing and CSAH 61 Improvement Project on April 17, 2014; and WHEREAS, Ames Construction was the lowest responsible bidder with a bid amount of $49,273,580.35. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. That the City concurs with the bids for improvements to the Highway 101 Minnesota River Crossing and CSAH 61 Improvement Project. 2. The City recommends a contract be awarded to Ames Construction. Passed and adopted by the Chanhassen City Council this 28" day of April, 2014. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT Capital Improvement Program 2014 rhru 2018 City of Chanhassen, MN Project# ST -031 Project Name 101/61 Southwest Reconnection Project Account #1 Account #2 Account #3 Account #4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Category Strmts/Highways Priority n/a Total Project Cost: $54,200,000 scope of the project includes construction of a four -lane, 4,100 foot long bridge over the floodplain north of the Minnesota River channel, bike a roundabout at the "Y" and additional improvements along County Hwy 61 from Bluff Creek Drive to just west of the "Y" intersection. The ge and roundabout will be constructed to allow Highway 101 traffic across the floodplain drilling construction. County Hwy 61 will be �tructed to four lanes in this area. cost participation to the project is for trail improvements north of the River Bridge, costs for County Hwy 61 per Carver County cost Reconstruct the Hwy 101/Hwy 61 "Y" intersection as a roundabout and make additional improvements along Hwy 61 Reduce the frequency and duration of road closures caused by seasonal flooding of the Minnesota River Valley. Minimize regional and local transportation disruptions that occur when other area river crossings must be closed due to seasonal flooding. the regional trail corridors in Scott and Carver Expenditures 2014 2015 2016 2017 2018 Total Construction 54 ,200,000 54,200,000 Total Funding Sources 54,200,000 2014 2015 5432003000 2016 2017 2018 Total MSA Other Agency Contribution 1,200,000 53,000,000 1,200,000 53,000,000 Total 54,200,000 54,2003000 s project will require the City to plow and maintain the new trails, mow maintenance of street lights and lighting for the trail underpass. P99 in the