Loading...
H-1. 2014 Street Reconstruction Project: Accept Bids-Assess Hearing-Award Contract0 CITY OF CHANHA3SEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.m n.us MEMORANDUM TO: Paul Oehme, Director of Public Works /City Engineer FROM: Alyson Fauske, Assistant City Engineera�r atc�. DATE: April 28, 2014 SUBJ: 2014 Street Reconstruction Project No. 14 -01: Accept Bids, Hold Special Assessment Hearing and Award Contract PROPOSED MOTION "The City Council adopts the attached resolution accepting the bids and awards the contract for the 2014 Street Reconstruction and Utility Project No. 14 -01 to GMH Asphalt Corporation in the amount of $2,225,529.91. The City Council adopts the assessment roll for City Project 14 -01, Minnewashta Shores and Kiowa Trail Street and Utility Reconstruction and the attached resolution." City Council approval requires a simple majority vote of the City Council present. POLICY DECISION /ACTION TO BE CONSIDERED Prior to the completion of the assessment hearing, any property owner who wants to object to their assessment must file a signed written objection or they waive their right to appeal. The Council may accept or modify the assessment amount as presented. PROJECT SUMMARY Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2014 Street Improvement Project, staff is proposing to reconstruct approximately 1.1 miles of streets. The street segments within the proposed project were identified by the City's Pavement Management software, site investigations and known utility problems in the area. The project includes the Minnewashta Shores neighborhood in the northwest corner of the city, and Kiowa Trail west of Lake Riley. Chanhassen is a Community for Life - Providing for Todayand Planning for Tomorrow City Project 14- 0lAssessment Hearing April 28, 2014 Page 2 Proposed 2014 Street and Utility Reconstruction Project ti h rem Ji Srm�ry .Y M 1 I i. • 'g I d City Project 14- OlAssessment Hearing April 28, 2014 Page 3 Minnewashta Shores: Street Improvements The streets in the Minnewashta Shores project area were constructed in 1971. With the exception of Barberry Circle, the streets were sealcoated in 1994 and 1999. The street conditions were surveyed in 2011 and the pavement condition indices (PCIs) ranged between 15 and 45. A PCI of 100 represents a new street. Streets with a PCI below 45 typically indicate distresses that require a full reconstruction, therefore it is no longer cost effective to repair the streets with minor maintenance or perform a bituminous overlay. Barberry Court will be 22 feet wide; the remaining streets will be 24 feet wide. There is 50' of right of way in this area. The proposed pavement section includes 18" of sand, 8" of Class 5 and 3.5" of bituminous as recommended by the soils engineer. High back, B -618 curb is proposed to be installed in this area. The public street extending from the Cypress /Dartmouth intersection will be removed and the driveway to 3241 Dartmouth Drive will be reconstructed in its place. A curb cut will be installed west of the new driveway to allow for users of the homeowners' association (HOA) lot to access the HOA property. Minnewashta Shores: Water Main Improvements The water main in this area is cast iron pipe and has six documented breaks. The plans include replacement of the existing water main with PVC pipe and replacement of the portion of the water services within the right of way. G:\ENG\PUBLIC\_2014 PROJECTS \14 -0I Street Reconstruct ion \04 -28 -2014 assessment hmg.docx City Project 14 -01 Assessment Hearing April 28, 2014 Page 4 Minnewashta Shores: Sanitary Sewer Improvements Staff has investigated and televised the condition of the sanitary sewer in this area. Most of the sewer pipe is in good structural condition, although some require mineral removal, grouting and /or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. Approximately 170 feet of sewer is proposed to be replaced due to the condition of the pipe and is shown in red on the graphic to the right. The sanitary sewer services that access these sections of the pipes are also proposed to be replaced. No sanitary sewer backup problems have been recorded in this area however a number of pipe sags have been identified in this pipe segment. Trenchless technologies such as cured -in -place pipe lining and pipe bursting were not considered for the sewer replacement as the sag would remain. Directional boring was evaluated however moving equipment to a drilling pit at the downstream end would still require removal of the trees. --- - - - -- -- Staff has met with the residents affected by the __ - — " pipe replacement. Due to the location of the pipe, additional easement is needed on 3110 Dartmouth Drive. Staff will continue to work with the property owner. Seven residents in this area contacted staff requesting that their sewer services be televised from their home to the sewer lateral within the street. This service was offered in order to determine if there are any issues with the services. Four of the services could not be televised due to issues accessing the sewer clean outs. Two of the services were televised and are in good condition. Due to a sag in one of the services, only a portion could be televised. This resident is aware of the sag. Minnewashta Shores: Storm Sewer Improvements The project area is developed therefore there is minimal space to provide traditional stormwater management, namely treatment ponds. The HOA owns a property south/east of Cypress Drive. Staff has contacted the HOA and discussed opportunities for stormwater management facilities within this common area. The graphic below shows the proposed stormwater management in the HOA lot and has been distributed to residents within the HOA. The proposal includes the installation of a sump manhole with a St. Anthony Falls Laboratory (SAFL) Baffle for pretreatment of the runoff. Runoff from low intensity rain events would flow to the west, then through a series of filtration basins before discharging to Lake Minnewashta. The filtration basins are similar to those installed with the Laredo Drive improvements at Kerber Pond Park in 2007. Excess runoff from G:\ENG\PUBLIC \_2014 PROJECTS \14 -01 Street Reconstruction \04 -28 -2014 assessment hmg.dmx City Project 14- OlAssessment Hearing April 28, 2014 Page 5 high intensity rain events would flow through an overflow pipe and discharge to the lake. The HOA lot will be regraded and the export material from the street section will be placed and regraded in the park. The park will be much more flat and useable for park activities. Also, the creek that cuts through the park will be eliminated. The HOA has granted the easements necessary to perform the work. The City is applying for a $40,000 grant from the Minnehaha Watershed District. DRIVE xw u., ell 7L7 /V .W;D MEEp_ I f r ���% � LCSEt PLL OUYME ILMdAIIL IEl£L FLAATIMI PIIS � 1/ ' CPIIgF YifS 1(10 fl£VAIENS ICI I ;R 'YS tlItlME MIIpR lEE3 F)' .�iAa9 m w we Een[wv �J Ipp.£ BFmE BCFEMATIC LEVEL LAKE A990CIATION PROPHiiY II FFOVEMENT8 ? l Mowa Trail: Street Improvements Kiowa Trail will be a 22 feet wide street within a 60' wide right of way. The current street was built in 1979 and sealcoated in 1992 and 1997. The 2012 pavement condition survey of Kiowa Trail calculated a PCI of 13. A PCI score below 40 indicates the street is in need of major improvements and typically needs to be reconstructed. Based on soils investigation the City has completed, the proposed pavement section includes 18" of sand, 8" of Class 5 and 3.5" of bituminous as recommended by the soils engineer. Surmountable concrete curb and gutter is proposed to be added to this area to improve drainage and help extend the life of the streets. Draintile will be installed along both sides of the street. Due to steep driveways and the topography in the area, widening the roadway is problematic. Surmountable curb is proposed due to the narrow roadway. G:\ENG\PUBLIC \_2014 PROJECTS \14-01 Sheet Reconstmchon \04 -28 -2014 assessment hmg.do x City Project 14- 0lAssesstnent Hearing April 28, 2014 Page 6 The barrier between Springfield Drive and Kiowa Trail was removed on April 7, 2014. Traffic counts were taken between April 9 to April 15 to monitor the speed and volume of traffic and the location indicated on the graphic to the right. The average speed ranged from 19 mph to 21.6 mph. The 85t' percentile ranged from 23.9 mph to 27.9 mph. According to the 6a' Edition of the Institute of Traffic Engineers Trip Generation Manual, a single- family home Count taken at lowest point just north of catch basin across from the park parking lot 3andimere r J J ?so I t r;r 9sai ll 4[.Ffl _ Par' �aEs esro a>FS T I i K'�g3° 4sa. jl ti �f 7 \ generates an average of 9.57 trips /day. The traffic volumes measured on Kiowa ranged from 60 to 81 trips per day, which would be traffic from six or eight homes. The seven properties marked with a red star have historically accessed their properties via Kiowa Trail. The observed traffic volumes reflect the traffic pattern that was present when the barrier was up. Kiowa Trail: Water Main Improvements Currently, Kiowa Trail does not have City water service. These properties are all on wells. An 8" public water main is stubbed to Kiowa from Springfield Drive at the north end of the project area. Twelve -inch trunk water main was recently installed within Highway 101 and an 8" water main was stubbed to Kiowa Trail. Public 8" water main will be installed with the 2014 Street and Utility Improvements project to provide public service to the residents along Kiowa Trail. The design will include a pressure reducing valve (PRV) station. Water services will be stubbed to the property line. The cost of the water main improvements is proposed to be 100% assessed to the benefiting property owners; the City will pay 100% of the PRV station cost since this is a system -wide improvement need and does not benefit all of Kiowa Trail. Property owners will be able to connect to City water after going through the normal connection permit process. In the past, the City has allowed existing wells to be left in service until such time that the well fails. Kiowa Trail: Sanitary Sewer Improvements Sanitary sewer was installed in Kiowa Trail in 1977. The sanitary sewer was televised and is in good condition and will require some mineral removal, grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repairs are proposed to be fixed with the 2014 project. GAETIGPUBLIC�_2014 PROJECTS \14 -01 Street Reconstruction \04 -28 -2014 assessment hmg.docx City Project 14 -01 Assessment Hearing April 28, 2014 Page 7 One resident in this area contacted staff requesting that their sewer service be televised from their home to the sewer lateral within the street. This service was offered in order to determine if there are any issues with the services. Based on the televising this service is in good condition. IGowa Trail: Storm Sewer Improvements The stormwater runoff from about the southern 1/3 of Kiowa Trail will be treated in a pond that was constructed with the Highway 101 improvements. A shelf of iron filings is proposed to be installed along the edge of the existing pond in Bandimere Park to provide additional treatment. The proposal also includes porous pavement for the Bandimere Heights Park parking area; this design would be similar to that which was installed at the Public Works Facility. Based on staff conversations with the Riley- Purgatory-Bluff Creek Watershed District, $20,000 of cost -share improvement funds is available for these improvements. M 1►T • a r� M F. I The northern storm sewer system outlets to Lake Riley via a storm sewer pipe through a private property. This pipe is in poor condition and should be replaced. City staff is working with the property owner regarding replacement of this pipe and installing a vegetated swale for rate control and water quality purposes. An easement will be acquired once the swale design is finalized. ASSESSMENT HEARING PROCEDURE Staff will provide a brief explanation of the work along with the proposed assessment amount. Any issues that the City Council wishes to discuss regarding the project financing is appropriate during the public hearing portion of the project. Public testimony should be received for the project. The property owners should be reminded that if they wish, they must file a written G:\ENG\PUBLIC \_2014 PROJECTS \14 -01 Street Reconstmcdon \04 -28 -2014 assessment hmg.docx City Project 14 -01 Assessment Hearing Apri128, 2014 Page 8 objection with the city either prior to or during the actual project hearings. Objections after the public hearing are invalid. An assessment objection is a request by the property owner for the Council to review the assessment amount. Staff may have an immediate response to individual comments. If the City Council feels an objection cannot be addressed immediately the objection should be received and referred to staff for investigation. The remaining assessment roll should be adopted in order for the process to stay on schedule. At the next City Council meeting, a report will be presented to Council regarding all objections. If there are no objections filed, or if Council feels confident staff's investigation will not result in any changes being made to the assessment roll, a motion by the City Council adopting the assessment roll as prepared is needed for the project. ASSESSMENT OBJECTIONS Objections may be filed up to and at the public hearing. At the time of this submittal, no written objections have been received. If any written objections are received in the interim prior to the Council meeting, they will be provided to the council at the public hearing. Staff comments and recommendations will also be provided at the public hearing. The City Council may choose to adopt staff's recommendation or revise the assessment roll. If additional objections are filed either prior to or at the hearing, they should be received and if necessary referred to staff for investigation and resolution. PROJECT SUMMARY: ASSESSABLE COSTS Improvements within the Minnewashta Shores project area include reconstruction of the street, the replacement of sanitary sewer and water main, and storm sewer improvements. Forty percent (40 %) of certain street improvement costs are proposed to be assessed against the benefitting properties. Improvements within the Kiowa Trail project area include reconstruction of the street, installation of new water main, repair of sanitary sewer, and storm sewer improvements. Forty percent (40 %) of certain street improvement costs and 100% of the new water main costs (except for the pressure reducing valve cost) are proposed to be assessed against the benefitting properties. PROJECT COST, ASSESSMENTS AND FUNDING Per the City's assessment practice, forty percent (40 %) of certain street costs in both project areas are proposed to be assessed to the benefiting property owners; the City will be responsible for the remaining 60 %. One hundred percent (100 %) of the utility costs in the Minnewashta Shores area will be paid for by the respective enterprise funds. In the Kiowa Trail area, one hundred percent (100 %) of the water main pressure reducing valve costs, the sanitary sewer repair costs and the storm sewer improvement costs will be paid by the City. The remaining water main costs within the Kiowa Trail area will be assessed one hundred percent (100 %) to the benefitting property owners since it will be a new improvement. Funding for this project was G: \ENG\PUBLIC\_2014 PROJECTS \14-01 Street Reconstruction \04 -28 -2014 assessment hmg.dmx City Project 14 -01 Assessment Hearing April 28, 2014 Page 9 budgeted in the 2014 CIP. The following is a breakdown of the project estimates, project costs and proposed funding. MINNEWASHTA SHORES t-easuifly Bid Streets $956,87719 $971209.17 Storm $129,273.98 $170,177.07 Water (City) $416.59439 $478,063.35 Water(Asse55eo) - Sewer $24,352.10 $60,644.97 Total $1,527,097.66 $1,680,094.57 Street Assessment $6,82629 $6,695.56 Water Assessment KIOWA TRAIL Feasibility Bid $442,359.08 $486,438.11 $79,938.65 $77,027.84 $18.150.00 $60,246.58 $170,371.39 $150,816.35 $188,521.39 $211,062.93 $30,670.72 $9,594.54 $741,489.84 $784,123.42 $6,805.52 $4,507.96 $7,098.81 $6,284.01 TOTAL BUDGET Feasibil6y Bid $1,399.236.27 $1,457,647.29 $1,400,000.00 $209,212.63 $247,204.91 $220.000.00 $605.115.78 $689,126.28 $700,000.00 $55,022.82 $70,239.51 $300,000.00 $2,268,587.50 $2.464,217.99 $2,620.000.00 The total project cost includes a 3% construction contingency and 7.5% indirect costs such as survey costs, soils testing, engineering costs, construction observation, etc. The assessments were calculated as follows: Minnewashta Shores: Streets Total Assessable Street Reconstruction Cost: $669,556.27 40% Assessed: $267,822.51 $267,822.51 - 40 units = $6,695.56/unit (Preliminary Assessment: $6,826.29) Kiowa Trail: Streets Total Assessable Street Reconstruction Cost: $293,017.25 40% Assessed: $117,206.90 $117,206.90 _ 26 units = $4,507.96 /unit (Preliminary Assessment: $6,805.52) Mowa Trail: Water Main Total Assessable Water Main Construction Cost: $150,816.35 100% Assessed $150,816.35 _ 24 units = $6,284.01 /unit (Preliminary Assessment: $7,098.81) Bandimere Heights Park was assessed two units of benefit for the street improvement. The water main assessment does not include Bandimere Heights Park since the park will not benefit from the new water main. Terms for the assessments proposed are at equal annual installments over ten (10) years at an interest rate of 5.25 %. The street bid was higher than expected due to the site constraints within each project area. The assessable street costs within the Minnewashta Shores area were slightly lower than estimated; GAENG\PUBLIC\ 2014 PROJECTS \14 -01 Street Rmonstmction \04 -28 -2014 assessment hmg.docx City Project 14- 0lAssessment Hearing April 28, 2014 Page 10 therefore the proposed final assessment is $130.73 less than the estimate in the feasibility study. The lineal footage of street per assessable unit in the Minnewashta Shores neighborhood is higher than the Kiowa Trail area, which accounts for some of the difference between the two assessments. The proposed Kiowa Trail assessment is $2,297.56 lower than the feasibility estimate due to lower bid prices over estimate of the street width then what is planned. Due to the alignment of the water main within the Minnewashta Shores area, some of the boulevard removal and restoration costs were moved from the street budget to the water main budget. The cost of the pressure reducing valve in the Kiowa Trail neighborhood was higher than estimated. A neighborhood open house was held April 16, 2014 to discuss the final project design and assessment amounts with the residents. Two property owners attended. BID OPENING /AWARD OF CONTRACT Bids were received and opened and read out loud on Thursday, March 27, 2014 at 2:00 p.m. Four bids were received. The lowest responsible bidder is GMH Asphalt Corporation at $2,225,529.91. The bids have been tabulated and are summarized below. Bidder Total Bid 1. GMH Asphalt Corporation $2,225,529.91 2. Valley Paving, Inc. $2,258,601.79 3. Forest Lake Contracting, Inc. $2,392,015.35 4. Northdale Construction Co. Inc. $2,523,828.83 GMH Asphalt, Inc. has worked in the City of Chanhassen on street resurfacing projects in 2006, 2007, 2011 and 2013. The utility subcontractor, Kusske Construction Company has worked on various utility projects within Chanhassen, including the Century Boulevard Street and Utility project in 1997, the Well #9 transmission main in 2004, and various drainage projects in the early 2000s. Both companies' work, ability to manage a project like this, and customer service delivery has been acceptable. SCHEDULE Begin work in Kiowa Trail area Mid -May, 2014 Begin work in Minnewashta Shores area Mid -June, 2014 Substantial completion Late August, 2014 Install wear course in all project areas Spring, 2015 Attachments: 1. Assessment Rolls 2. Resolutions 3. CIP sheets G1ENG\PUBLIC\_2014 PROJECTS \14 -01 Street Reconstruction \04 -28 -2014 assessment hmg.docx F- 0 Y O N N d` O N O c � K CU w h 0) � Y V1 V) Q CU a o o � N �L M m Z F o 0 0 o O O o 0 0 0 0 0 o g o 0 0 0 0 0 0 o q o 0 It v It v v v v v v v v v a v v v o w a N S W 00 W 00 00 W 00 00 00 00 CO W 00 00 W W W W o0 00 W W W w W 00 W F N N N N N N N N N N N N N N N N N N N N N N N N N W CC a Lo Lo w Lo C 3 Vw V} VT VT VT V! VT N Vf VT V! V? VT N VT VT VT Vf V} N V} V} VT V? N N Q Q H lD w W w W O W W W W W w w w w w w lD w w lD lD w w w Z F D) Ol T D) m 0) m O m m m m m m m m m m (n N m m m D) O) n n n n n n n N n n n n n n n t\ n n n n n W 0 0 0 0 O O O O O O O O O O O O O O O O O O W V Ifi U1 u) V V V n CC v- v a a v- v N C H V! VT Vf VT Vf VT V} V} V} N N VT VT V} V! V? VT VT VT VT N N VT VT VT IA a a Y O N N N M V e-I 0 w H 1l N 'i w N M m a 1 0 ~ J Z Q Z Z Z Z ❑ ❑ ❑ ❑ in °a °a °a H in ❑ O ❑ w Z Z z z ❑ N N N N F- N F F H H H Fes- H o C7 C7 o o z0 l7 J W W W S S S W 2 2 z 2 Z S 2 2 y) N N 2 V) v) O of O ❑ V) ❑ ❑ V) ❑ an W W W W W W W w W W w H❑ appaa�a� W ❑❑ W❑ 111 CCz C W o: W oczzzrc�� W W W W W W W❑ z W❑ �-- W �- H W H W �_ �_ �_ �_ �_ �_ _� a a O O O O H ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ O 2 ❑ 2 2 ❑ 2 ❑ Z z Z Z Z Z z z z Z Y Z Y Y Z Y z m m m m m m d m m m Y m Y W m m W W m W J J J J J J J J J J J J J J J J J J J J J J J Y OL K C K C OG C C C C OL 0! d' d' K C OG C OG C CL K 0! W� r- a a a a a a a a a a a a a a a a a a a a a a a w a 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V Y Y Y Y Y Y Y Y Y Y Y Y Y ]p X Y Y X X Y X Y X Z m0) N O eY O M v) N O N 1n O e-I l O' W O H O N N N pap O F O V) to I� n w w W m 0 0 N W W N n n n W W m m O N U O N N N N N N N N M M M M M M M M M M 0) VI tD O) O) Ol N T O) Ol 01 a) Ol D7 O) at O) Ol o) Ol Ol Ol O O) a1 0) � Ol 0) T N cc W w 0 = 2 a N _ cr 1= W w U J cw C❑ J ywj VZf Y tl QQ W Y z j of w �i 2 Y Z O z Q CO C Z W z� w z W zO a J m C °� z❑ W a 0> vJi O W i- l7 Y ? 0 z z g N w Q Q Z IVa- z O z z Z u J vaHi Ui 2 2 2 Z w w oil N O Z W a yZj c I� 0 0= C J w g 0 w w= 0 a Q W Q W W z {~/) U a)S w 3 a V1 p3 m} H O z 06 y� w U co Z m Y❑ d 3 z z z= W o7i w 1^ Z H a U Z p7S U z❑ 0 co w Se U O W a W w Z u a N w U U o W W Y Y Z i❑ Z J O C Z❑ W W O H 3 LL Q }? z a w 0 0 a ❑w 4S a= Q ❑ d I- z x U a O v�'i 0 LL Z a a � z s Z a� z 0 a a U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p0 0 0 0 m V m 0 tD N 1l N H 00 N M D) c} O O O 00 0 0 )D o m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N V C' N V N O O O N O O �-i O e-I tD O tD lD O l0 O LA h N Ol N N D) N O1 Ol GP Ot O) O) O) M G1 Ol tD O) t0 W O) W G1 N N Ol 0 0 0 0 0 O O O O O O O O M O m N O N N O N 0 0 0 O N Ln 0 N <n N LM CL N N N N N N N N N N N N N N N N N N N N N N N N N J Z uO d rl N M V V1 tD I 00 O) O N N M V Y) lD I, 00 Ol O H N m V Q O� d z M m H d O L N L N d C cC G N O V N U GJ O a` c 0 u 3 H C O ar N N L ti O N C N H G1 h Q O c iz N Ln N M F- W W W lD W W ID D W ID 10 0 W ID ID t0 10 10 10 W W W W LD W W W W W W Z Ln,ILnLnul Cq vj Lnv� w�LnLMVnLn Ln Ln Ln Ln Ln Ln Ln LnLnLn u�LnLnLn ui f- Ln Z of W of LD of W m W m W m W m m a) 0 o) W of W o) W o) W m m 0l W at W of W a) W of W m W of W of W m m al m m ID a) W m W a) W of W o1 W a) W W l0 lD W l0 W W W W W W W l0 W W W LD W W LD W to 0 W l0 LO l0 LD l0 lD N Q Vf i/} V} V} V? V? VT VF Vn VF VF V} V1 V? VT V? in VT V? V} V? VT Vn VT VT VT LT Vn V? V? � a Y m N N N N N N rl N N co M m m m rl 1 Q m N I- M V N N lD N <D N V m N N J Z O H a Lo to Ln N N Ln N N N N N N N Ln Ln W W W W W W W W W W W W W W W u „ a a¢ a a a a a ¢ r - a a a a¢ r a w F- F- F- Vf N !n VI N to N N 10 V7 to N N N N a z z z z z z z � z z z z z z z z z z z z z z z z z z z z z z z J J J J J J J J J J J J J J J Ly W W W W H W H W H W H W {� W H W H W F- W F- W F- W W H G N N V 1n Vn V N N to Vf VI N N to V7 Q In Ln Lo N Vf In V1 Ln N to Lo N N N VI Z 8 r 0 r 0 r 0 } 0 }} 0 0 Y r `� `� `� L3 } }} r r r} a m m m m 0 0 0 0 0 0 0 0 0 1' C K C 5 0 0 0 0 0 0 0 U u U u u 2 x x 2 2 2 x F- Z z z r Y} Y Y D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 » > 'n w a: w z z N Ln Ln Ln Ln Ln to Ln Ln Ln 0 0 Ln Ln Ln O O O O O O O w w C K D: C w K N N N N 1n N N N h 10 N VI Ln V1 N c c i c O O O m m m m m W a W z W z W z W z W W w W W W W W W W C G F- G F- F- G F- < F- G F D m m m m a a a a o_ z a w s z a. z a. w a w a m a s a ¢= a. D_ z z z z s z M M M a a a a a r>> Y Y Y r r Y} Y Y r r }} a¢¢¢ a a¢ Q a a a m m m m m U U U U V U U u V V U u u U U 0 0 0 0 0 0 0 W O rt 0 0 N O N H O N O N O N O N 0 0 0 O r O c O .-� rl H N N O r N N M N N N N M O O N N N N M m R 0 N M M cr C N N N M O N N N N N N N N N N N N N N N N N N N M m M M M m N rl N N N N la 1p tD lD W l0 m b m O l0 m lD tD W W lD lD O m W lD m CO M M M M M M M M z > w } W O W Y u Z z a 1-- c W} J z Z w Y W G W r a O U a 0 LL N z W Y z] J z O x S J c 0 = to w_¢ a K K W r r z W W u m Q K N x Q J Z a: z Z Y J 0 w Z ¢ Z O z Z¢ -' g O m m Y z V U J w r r U g F- v¢i z W z a N a s Z W Y N Z c z Q °Zf O J N c ciz W Y p C= K Q U Q O Z K of 10 a6 � OZS K G Q J Q= cc C J Y m¢ D: QS Qf cc C W Y u z t= W a Z O% p_ Q N z 0Y1 Z} C m J O W V W Y Y w W z D: C m Z Z Z Z a 0 w W w a x�ZI F-¢ Fx.. m m m a � J p co Q O¢ O w 0 0 0 W Z w a: w g O H H O O a x F- O i- F Z z- Y Sc a 0 U D a Y m J m z n n D H Ln O O O O O O O O O O O O O O O 'D 0 O O O O O O O O m O n M l N Ln w M r N N c M O V o m I, W O m m W V M N O O O O O O O N O N O N O N r r r e N O r O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O n n rl F, r n t, t. L. L, n t, t, t, v v c v v v w W W W m W W W W W LD W W W N N N H N H eO i Ln o Ln Ln Ln Ln Ln Ln Ln Ln Ln u Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln N Ln Ln Ln Ln o LN n N N N N N N N N N N N N N N N N N N N N N N N N J Z ui a u 0N K N m Ln lD n m o1 U0.4 M V Ln lD Il W O1 a, O N N M e} Lo tD Il m al O a N N N N N N N N N N M Z N Ln N M N v V L O Y L 3 N c c N O N 0) O a` c 0 Y V c O u O! C N 01 Y v N 0 N O G 01 H 01 h h Q 0 c ii R N M M lA V1 N N N � C7 C7 W � W W Z � xx F Q Q to W W w n n^ n n ^^ Z Z Z_ Z_ m K K K z K C C = 2 2 = 0 O 0 0 p p p p p p GO G c c G c c G c c G W W W W W W 0 0 0 0 0 0 p p O p of of of v� of of N O N N N N N N N N N m M O N N M Ln N N N N M co M m ro m m m m M M M M M M M M M Z Z w Z Z Q v O z 0 W W Q Q V Z W Z = w O Z N Q Y a OG Z N O Z Z Y 2 Z W m m > J w m O Y z m¢� Q N 0 o� J J a Z Q CL p Q ZQ 2 w Q z Y p Q 06 0 F- U p Q W p Q z Y Q w z 7 K u 0 U_ O Qa m s d (Q9 0 0 0 0 0 0 0 0 0 0 N V1 to I, m N M V O N N O O O O N N N r, n 0 0 0 0 0 0 0 0 �mn �0r1 ea-I w w w to w tD w V V 0 Ln 0 0 Ln 0 N N N N N N N N N N N N M V In to I, 00 m O R N M CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: April 28, 2014 RESOLUTION NO: 2014 -XX MOTION BY: SECONDED BY: A RESOLUTION CALLING THE ASSESSMENT HEARING FOR THE 2014 STREET IMPROVEMENT PROJECT NO. 14-01 WHEREAS, Minnesota State Statute 429 regarding special assessments for public improvement projects requires City Council to officially set the assessment hearing date for capital improvement projects. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF CHANHASSEN, MINNESOTA: 1. A hearing shall be held on the 28`" day of April, 2014 in the Council Chambers at City Hall at 7:00 p.m. to pass upon such proposed assessment and at such time and place all persons owning property affected by such improvement will be given an opportunity to be heard with reference to such assessment. 2. The city clerk is hereby directed to cause a notice of the hearing on the proposed assessment to be published once in the official newspaper at least two weeks prior to the hearing, and shall state in the notice the total cost of the improvement. The clerk shall also cause mailed notice to be given to the owner of each parcel described in the assessment roll not less than two weeks prior to the hearings. 3. The owner of any property so assessed may, at any time prior to certification of the assessment to the county auditor, pay the whole of the assessment on such property, with interest accrued to the date of payment, to the City of Chanhassen, except that no interest shall be charged if the entire assessment is paid within 90 days from the adoption of the assessment. The property owner may at any time thereafter, pay to the City of Chanhassen the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 15 or interest will be charged through December 31 of the succeeding year. Passed and adopted by the Chanhassen City Council this 28"' day of April, 2014. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: April 28.2014 RESOLUTION NO: 2014 -XX MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING BIDS AND AWARDING CONTRACT FOR THE 2014 STREET IMPROVEMENT PROJECT NO. 14 -01 WHEREAS, pursuant to an advertisement for bids for the 2014 Street Improvement Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Bidder Total Bid 1. GMH Asphalt $2,225,529.91 2. Valley Paving, Inc. $2,258,601.79 3. Forest Lake Contracting, Inc. $2,392,015.35 4. Northdale Construction Co., $2,523,828.83 Inc. AND WHEREAS, GMH Asphalt is the lowest responsible bidder with a total bid awarded of $2,225,529.91. NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with GMH Asphalt in the name of the City of Chanhassen for the 2014 Street improvement Project according to the plans and specifications therefore approved by the City Council and on file in the office of the city clerk. 2. The city clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Passed and adopted by the Chanhassen City Council this 28d' day of April, 2014. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT Capital Improvement Program 2014 thru 2018 2016 City of Chanhassen, MN Department Street Improvements AssessmenVRevolvin0Asscss 1,400,OOD Contact Paul Oehme Project# ST -012 Type Improvement Project Name Annual Street Improvement Program Useful Life Unassigned Account #1 601 -tooct -4751 Category Streets/Highways Account #3 Priority da Account #2 Account #4 500,000 Description - -� Total Prolcct Cost: $21,145,000 umum project to rehabilitate and reconstruct streets in the Ctty. Current 5 -year plan shows the following neighborbood areas: 2014 - Dartmouth Drive, Cypress Drive and Kiowa Trail 2015 - Carver Beach area (south and west of Carver Beach Road), Ches Mar Drive, Lone Cedar, Saddlebrook Pass neighborhood MSA - Bluff Creek Drive and Trail 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewashta Woods Drive MSA - Park Road, Park Court, Park Drive and Park Place 2017 - Flamingo Drive area and 96th Street USA - Kerber Blvd and bituminous trails 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue and 64th Street NAV A Uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends th e street and Is cost effectivc, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. nation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have ted to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to the merits of the project and scope of work. Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents e ing link in the City's trail system, Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in the absence of a trail. This trail rent will be constructed alone with the out s t,ACe Prior 6,295,000 Total Prior 6,295,000 Total 2014 2015 2016 2017 2018 Total Total 11400,000 9,150,000 2,90,000 2,900,000 21500,000 1216501000 Funding Sources 2014 2015 2016 2017 2018 Total AssessmenVRevolvin0Asscss 1,400,OOD 1,850,000 1,500,000 1,50,000 1,500,000 7,750,000 MSA Park Dedication Fund 800,000 1,400,000 1,400,000 1,000,000 4,600,000 500 500,000 Total 1,400,000 3,1501000 2,900,000 2,900,000 2,500,000 12,85,000 may decrease maintenance costs. no7 Total Project Cost: 53,875,000 Lem for s t of existing water on main lines in coordination with the reconstruction of the CiTy street projects ar minor fixes of water tem for street rehabilitation projects. tification City considers the condition of the existing utilities in the process to select streets for rehabil olidating these projects and also to avoid potential cuts in recently If significant in an effort to realize cost s improved streets. gnificant repairs are necessary to the e: y replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an :ct in the City. Prior Expenditures 1,675,000 Construction Total Capital Improvement Program �' 2014 thru 201$ City of Chanhassen, MN Department Water System Improvements Contact Paul Oehme # W -0 24 FProject ct Name Watermain Replacement Type Useful Life hnprovemem Unassigned !!! Aceoum #1 700 - 70254751 Account #3 Category Utilities Account #2 Account #-0 _ Priority rd, Total Project Cost: 53,875,000 Lem for s t of existing water on main lines in coordination with the reconstruction of the CiTy street projects ar minor fixes of water tem for street rehabilitation projects. tification City considers the condition of the existing utilities in the process to select streets for rehabil olidating these projects and also to avoid potential cuts in recently If significant in an effort to realize cost s improved streets. gnificant repairs are necessary to the e: y replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an :ct in the City. Prior Expenditures 1,675,000 Construction Total Prior Funding Sources —1,6-75700-01 Water Utility ` Total decrease 2014 2015 2016 2017 2018 Total Total 700 000 125,000 700,000 75,000 600,000 2200,000 2014 2015 2016 2017 2018 Total Total 700,000 125,000 700,000 75,000 600,000 2 ,200,000 costs. P117 Capital Improvement Program 2014 thru 2018 City of Chanhassen, MN Department Sanitary Sewer Improvements Contact Paul Oehm , Project # SS-014 Type Improvement Project Name Sanitary Sewer Replacement Usefal Life Unassigned Account #1 701 - 7025 -0151 Account #3 Category Utilities Amount #2 Priority We Account #4 Description Total Project Cost: $1,596,000 N Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City ® ® ®® street, Justification The City considers the condition of the "istiug utilities in the pro cess to select streets for rehabilitation M consolidating these projects, in an effort to realize cost savings by Prior Expenditures P 2014 2015 2016 2017 2018 Total 625,000 Construction 300,000 75,000 300,000 40,000 250,000 965,000 Total Total 300,000 75,000 300,000 40,000 250,000 965,000 Prior Funding Sources 2014 2015 2016 2017 625,000 Sewer Utility Fund 300,000 75,000 2018 Total Total 300,000 40,000 250,000 965,000 Total 300,000 75,000 300,000 40,000 250,000 985,000 Pas Capital Improvement Program 2014 rhru 2018 City of Chanhassen, MN Project# SWMP -019 Project Name Street Improvement Projects - Storm Water Mgmt Account #1 720 - 7025 -4751 Account #3 Account #2 Account #4 amount set aside for sterm water management infra by the engineering and public works departments. Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority a/a Total Proleet Cost' $1,625,000 or expansion associated with street imarovem, nprovement projects frequently require construction or expansion of storm water management inb astmcture in state and local regulations, as well as protecting existing and proposed development adjacent to the projects. to comply Prior 900,000 1 Total Expenditures i:onSUUCtIen Total 2014 40,000 200,000 2015 50,000 50,000 2016 200.000 200,000 2017 75,000 75,000 2018 200,000 200,000 Total 725,000 725,000 Prior 9007OOD Funding Sources Surface Water lJtilFty Fund Total 2014 200,000 200,000 2015 50,000 SO,OOD 2016 200,000 200,000 2017 75,000 75,000 2018 200,000 200,000 Total 725,OOD 725,000 Total P106