3a. Change Orders for City Hall & Fire Station CITYOF a.
i
"kj k CHANHASSEN
1 ,..., , ,, .
r 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
I (612) 937-1900
MEMORANDUM
IITO: Don Ashworth, City Manager
I FROM: Jim Chaffee, Public Safety Director ad1040
Late 1 -71011
DATE: January 9 , 1989 i-' -g7 ____—
1 SUBJ: Approval of Change Order No, 1 , Chanhassen City Hall
Addition and Chanhassen Fire Station Addition and Remodeling
IIThe Fire Station addition and remodeling and the City Hall addi-
tion have been moving ahead, but somewhat behind schedule. At
1 the present time, both projects are approximately 3 weeks behind
schedule due to a combination of bad weather , i .e. wind, and a
delay in the steel necessary for construction. The attached
Change Order No. 1 is a summary of miscellaneous individual
1 change order items which have accrued to date during the
construction. The attachment to the change order defines in
detail the specific items which comprise this change order. The
1 net impact is an addition to the contract in the amount of
$7 , 611 . 43 for the Fire Station and $4 ,052 .00 for City Hall . The
total amount for both projects is $11 , 663 . 43 .
ilAs you will note from the attached letter from Jack Anderson,
this change order represents approximately 2 .5% of the completion
amount to date. He indicates that this is considerably less than
IIthe 7% to 10% which is typical for a project of these dimensions.
There are predominantly three reasons why these change orders are
II made necessary and include: 1) refinement of design in order to
meet Codes; 2) necessary work not bid because of hidden (not
observed) items; and 3) items to better suit owner' s needs.
There will be additional change orders as we progress through
these projects; however, I would anticipate that they would not
exceed the contingency that was budgeted.
II am therefore recommending that Change Order No. 1 be approved
in the amount of $11 , 663 . 43 .
I
I
1
Y � 2 ,:!,'. , Wiz. .. .u....... .. <.w 3 .ate :.:arty M .m< „„ x
1
J.NICHOLAS RUEHL,AIA
I
BERTIL E.HAGLUND,AIA
1
January 4, 1989 1
Mr. Jim Chaffee
ICity of Chanhassen
690 Coulter Drive
P.O. Box 147
Chanhassen, Minnesota 55317
1
RE: Chanhassen City Hall Addition
Chanhassen Fire Station, Addition and Remodeling
I
Dear Mr, Chaffee:
Enclosed please find a copy of Change Order Number One for the City Hall and Fire I
Station. The copy consists of the AIA document form filled out, an attachment explaining
each item within the Change Order and attachments with Contractor's backup information. I
As per our conversation it is interesting to note that the projects are about$470,000
complete and this Change Order amounts to about$11,000. At about 2.5%the amount of
I
change orders at this time is considerably less than the 7%to 10%which is typical for
projects such as these.
If you have any questions please call. Thank you.
I
Sincerely, 5 -
t�, j 1 /_ ��;L L____.---•
1
i!
• Jack Anderson,AIA I
JA:km I
Enclosure
•
cc: Earl Moquist, Adolfson&Peterson I
M:\87126\doc\ltpr3
I
I
EOS CORPORATION 470 Water Street, Excelsior, MN 55331 (612) 474-3291
„r:;y�� .s���„ ,r,.;`q't�;� .1 `�`�";°'�"`�`;"°���\�G. c��_. ?../�C��.��.... .,;\`�\�G, ::::�\�€>31 !`M, �^�'.'y;,^�ix•�.r�• ,,,; ,�,o�� ���. . r ��.�'iz ,., .' _.
J.NICHOLAS RUEHL,AIA
BERTIL E.HAGLUND,AIA
1
January 4, 1989
' Mr. Earl Moquist
Adolfson&Peterson Inc.
6701 West 23rd Street
' Minneapolis, Minnesota 55440
Re: Chanhassen City Hall Addition
Chanhassen Fire Station,Addition and Remodeling
' Dear Mr. Moquist,
' Enclosed please find three copies of Change Order number one for the above referenced projects.
Please sign all Three copies and send to Jim Chaffee, of the City of Chanhassen.
If you have any questions please call.
' Thank You.
Sincerely,
Jack Anderson, AIA
' JA:ja
' Enclosure
cc. Jim Chaffee
EOS CORPORATION 470 Water Street, Excelsior, MN 55331 (612) 474-3291
LFIAINlit
Distribution lo:
ORDER OWNER 0 Jim Chaffee. 1111 X11.1 DOCUMENT G70f ARCHITECT I@ 0. F. & project boot:
CONTRACTOR El 3 originals
HELD
OTHER fscl Jeff Rudin, EXE Associates
I
l'ROIECTChanhassen City Hall Addition and CHANGE ORDER NUMBER:
(name. address) Chanhassen Fire Station Addition 1
and Remodeling INITIATION DATE: 12-29-88 I
TO (Contractor):
E "7 ARCIII1ECT'S PROJECT NO: $7126/87146
Adolfson and Peterson, Inc. I CONTRACT FOR: Prim Construction I
P. 0. Box 9377
Minneapolis, Minnesota 55440
L J CONTRACT DATE. 9-15-88
I
You are directed to make the following changes in this Contract:
See the following Attachments:
I
•: Change Order No. 1 Attachment (4 pages)
C.O. 1- A (4 pages)
1
'' B (3 pages)
il
C (2 pages)
t' D (15 pages)
I
E (1 page)
F (2 pages)
rr G (3 pages)
I
Ni I
I
I s.tltt)unitl signed by bulb the U.,nmr Mill Arc hitot l
I
tit};nalurt•111 Iht• C 1101(411(11 uuli(,tL•. Iu, ,ugmcmc'nl I'rt•tt•illi, including any adjustment in the (unbar 1 Suet t,r (t,nlrm i tour
The original 1Contract Sum) (CA}lr{atmiddoxiszy,}{ . ;xt) was
Net change by previously authorized Change Orders $ 1,2/6,800.00 '
The (Contract Sum) (§.40.Sirt�RRSbh.�,Z�i0(scai f�o0l) prior to this Change Order was S �-
1he (Contract Sum) (k; rsay,1}CoNsit :roan ftmlksvill be (increased) (d'ixteswKd7'•�&I) S1,276,800.00
by this Change Order $ 11, 663.43 . '
The new(Contr.i t Suitt) (Sc.+:9NZUS. k}t.+,uSttv,\C).1.t) including this Change Order will be $ 1 , 288,463 .43
The Contract Time will be (rt,•s(frjc , n K(1) (unchanged) by
The Date of Substantial Completion as of the (late of this Change Order therefore k unchanged. ( 0 ) Oa)'
I?OS Cor Authorized:
I
tx�ration AdolEson & Peterson City of Chanhassen
if/() Water Streer _ � 1 �\�5r . 3rd Sweet �) () (nttlrorDrive
Address Address
l:xcelsio�, r)innes�, a 55331 Minneapolis, n Addles.
, Minnesota 55440 Chanhassen, i'it nesut;, 5531
BY IIY __ I
IiY
t)All j. it"?1 DATE t)A1f
A1A DOCUM1NT Clot • CIIANCI ()RULR • AI'(tl l'tllt t1)1IIl)N • AIA" • of I
tilt AA1tRICAN INSIITUt( OI ARCI1111CIS, 1;.P,NI\V YORK,\\•L., N\\' 1\'ASttiN(,IUN, I)C Now, — 197t1
I
1
1
CHANHASSEN CITY HALL/CHANHASSEN FIRE STATION
PROJECT NO: 87126/87146
A. FIRE STATION
Item No. 1 Remove existing wood structure Add $1, 190 . 00
' and replace with steel and concrete
floor as per Proposal Request
No. 3 .
The existing wood floor was a
hidden condition - noncombustible
construction is necessary to meet
Building Code.
Item No. 2 Adjustments to hardware schedule Add $ 104 . 00
' for Fire Station (as per attached Oct. 19
letter from Adolfson & Peterson. )
This item included changing threshold type
at quarry tile (three locations ) , adding
masonry anchors at two additional door
frames, adding 4 " door head at three locations
and credit for changing locks to latches
in six locations .
Item No. 3 Installation of Post indicator Add $1, 925 .50
valve at the Fire Station.
1 This was requested by the City
of Chanhassen and allows for
additional water line control .
Item No. 4 Install additional length of Add $ 105 . 00
11 drain tile to encompass entire
existing building as per Proposal
Request No. 1, Item No. 3 .
1
ATTACHMENT TO CHANGE ORDER NUMBER 1 1
1
Item No. 5 As per Proposal Request No. 1, Add $ 262 . 50
Items 4 and 7; provide additional
furring and fire rated wall.
This was necessary to enclose '
exposed piping and revised area of
fire rated wall was necessary to
comply with Code. '
Item No. 6 Provide eight additional fire Add $2 ,219 . 70
dampers in fire rated walls
and extend exhaust duct 20 ' .
Additional fire dampers are necessary
to protect all duct penetrations of '
fire rated walls and floors; and because
of existing floor to floor height
limitations, lower level exhaust duct was
extended to meet distance requirements from
roof top mech units .
Item No. 7 Electrical work involved with Add $1, 088 . 84 '
future jacuzzi as per attached
contractors Proposal Request.
Item No. 8 Mechanical work involved with Add $ 477 . 54 '
future jacuzzi (hot and cold
water and drain) as per attached
Proposal Request.
Item No. 9 Install 4 ' deep sump basket in Add $ 238. 35
lieu of 3 ' depth.
This is necessary due to existing
elevation and will allow for
optimum sump operation.
SUB TOTAL: FIRE STATION $7, 611 . 43 '
ATTACHMENT TO CHANGE ORDER NUMBER 1 2 '
IL ' -
II
II
IB. CITY HALL:
Item No. 1 Installation of post indicator Add $1, 925 . 50
Ivalve at the City Hall .
This was requested by the City of
Chanhassen and allow for additional
II water line control.
Item No. 2 Deduct number of locks and Deduct $ (62 . 00)
I cylinders as per Owner -
Architect review.
Item No. 3 Reconnect gas piping to gas Add $ 276 . 15
Imeter.
The existing gas meter had to be
I relocated by the gas company due
to construction and reconnection
was therefore necessary.
I Item No. 4 Handicapped toilet fixtures at Add $ 92 . 00
lower level in lieu of standard
height fixtures .
IThis is necessary to make each
bathroom stall comply with
I handicap requirements and comply
with uniform Building Code.
Item No. 5 Provide 20" x 18 " duct in lieu Add $ 301 . 35
Iof 14 " x 6 " for 18 ' .
This was to provide a more
Iadequate duct design.
I
I
I
IATTACHMENT TO CHANGE ORDER NUMBER 1 3
II
II
II
Item No. 6 Tie existing sprinkling system Add $1,519 . 00
II
together with existing sprinkler
system, relocate siamese to south
wall and size to lines to accommodate
future addition.
II
Existing information did not reveal
that the existing system could be
I
extended.
SUB TOTAL: CITY HALL $4 ,052 . 00 1
I
TOTAL $11,663 .43 I
I
I
1
I
II
I
II
II
ATTACHMENT TO CHANGE ORDER NUMBER 1 4