Loading...
13e. Downtown Landscaping Update CITY OF _______ 1 , AN EN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I (612) 937-1900 MEMORANDUM ...- ITO: Don Ashworth, City Manager ,_ _e._' 10- IFROM: Gary Warren, City Engineer ,_ - DATE: August 9 , 1989 r ;t .ur.I; 1 7„ , 40% SUBJ: Downtown Landscaping Update �- File No. 86-11A-8 I Since I will be on vacation August 14 , 1989 , I thought it would be helpful to update the Council on the status of the downtown landscaping repairs . As you are aware, Noble Nursery removed the I majority of dead plant stock on Friday, July 28 , 1989 . Likewise, City staff has removed the weed growth from the planting areas . As a result of our meeting held with representatives of BRW on Monday, August 8 , 1989 , the attached plan of study has been sub- 1 mitted by BRW for removing and replacing the plant material as well as assessing the existing design for deficiences and correcting these deficiences as a part of the program. It is I anticipated that resolution of this matter will happen shortly with a final planting list provided to Noble Nursery no later than August 15 , 1989 . IThe implications of this action should result in the City receiving the landscaping that it had intended for the downtown area while addressing some of the design concerns and contractor I problems which have been raised over the past year. The commit- ment from all parties is to have this matter resolved by the close of this fall ' s planting season. As you I think are aware , I the fall planting season commences August 15 . As has been con- veyed to us by representatives of BRW, the landscape repairs and any modifications will be completed within the City ' s present Phase I planting budget. It appears that this matter is moving I rapidly to resolution and I would expect that we will see some of the new plantings and modifications occurring prior to the next City Council meeting . I will keep you appraised of further deve- 1 lopments as they occur in this regard. Attachments : 1. August 7 , 1989 memorandum from BRW. I2 . August 1 , 1989 BRW letter to Shafer Contracting. c: Don Ringrose , BRW , Todd Wichman, BRW 1 Gary Ehret, BRW I .1 f - - 1 i r.f � p �•r PLANNING .l��� pl TRANSPORTATION I ENGNEERNG 1l 1 - URBAN DESIGN 13RW INC THRESHER SQUARE 700 THIRD STREET SOUTH MINNEAPOLIS.MINNESOTA 55415 • PHONE- 612 3700:00 FAX 612'3701378 I ,l; MEMORANDUM t I, DATE: August 7, 1989 II f TO: Don Ashworth n Gary Warren ,, i.Ii FROM: Todd Wichman, ASLA ;5 RE: Chanhassen Phase I Redevelopment Landscape Recommendations ' I i.1 f 1 t 1) Plant material removal and replacement bil a. Identify all dead and marginal plantings for removal . 1. b. After removal by landscape contractor, reassess streetscape prior to # ' replacement of plant material . c. Substitute appropriate trees for those removed. ,' h. 2) Assessment of existing design i ,_ a. Analyze sightlines, composition, location, overstory versus understory plantings, tree species, etc. Take corrective action where necessary. I b. Analyze plant bed locations adjacent to roadways, determine areas to R be replanted or replaced with sod and/or concrete. ii i 3) Maintenance by landscape contractor k r I a. Repair landscape fabric (weed barrier) . Ensure adequate coverage at edges and back of curb locations. � I b. Mulch and/or remulch plant beds with 3" depth (minimum) of shredded g hardwood mulch. [ P c. Weed existing beds and fertilize plantings to optimize plant growth. r I MINNEAPOLIS DENVER PHOENIX TUCSON S . PETERSBURG I Don Ashworth Gary Warren ' August 7, 1989 Page 2 ' 4) Phases II and III Redevelopment s Ia. Review existing design and plant material selection criteria. b. Rework designs (as necessary) to make consistent with proposed Phase I ' changes. TW/lm 1 1 PLANNING r ! TRANSPORTATION ENGINEERING URBAN DESIGN 8RW INC THRESHER SQUARE 700 THIRD STREET SOUTH MINNEAPOLIS.MINNESOTA 55415 PHONE 612 370-0700 FAX 612 370.1378 August 1, 1989 h ' e6, _ I (A "'"° Shafer Contracting Company, Inc. 30405 Regal Avenue Shafer, MN 55074 Attn: Mr. George Mattson RE: City of Chanhassen Project 86-11 Dear George, ' We are aware of Noble' s concern regarding replacement of dead plant stock in the downtown area. The City of Chanhassen and ourselves are both anxious to resolve this issue to everyone' s satisfaction. We expect to have resolution to the plant material replacement within about one week, but will provide you and Noble a final list no later than August 15, as Noble has requested. We will be contacting them directly regarding resolution of some of these issues. We will keep you informed. ' We look forward to good fall planting conditions so that this issue may be resolved. Sincerely, BRWW,, INC. 71)()/.? Gary A. hret, PE Project Manager GAE/sk 'I1 cc: Gary Warren ! ' Greg Roy File 7-8706 i AN AFFILIATE or THE BENNE 11 RINGROSE WOLSFELD JARVIS i.IGINER INC GROUP DAVID J BENNETT DONALD W RINGROSE RICHARD P WOLSFELD PETER E JARVIS LAWRENCE J GARDNER THOMAS F CARROLL CRAIG A AMUNDSEN •,:NALG E HUNI MARK G SWENSON .URN B IAcNAMAHA RICHARD D PILGRIM DALE N BECKMANN DENNIS J SU/L'IF JEFFREY L BENSON RALPH C GLUM .Wv.D L uRAHAM MINNEAPOLIS DENVER PHOENIX TUCSON ST PETERSBURG