1f. Change Order No. 4 for City Hall & Fire Station Expansion I i C 1 -N CITY OF ,..._..... 4 1 _ CHANHASSEN "7 .. 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I (612) 937-1900 IMEMORANDUM TO: Don Ashworth, City Manager IFROM: Jim Chaffee, Public Safety Director IT." II DATE: April 20 , 1989 V/ SUBJ: Approval of Change Order No. 4 , City Hall & Fire Station Expansion Projects IFile Nos. 88-1 and 88-12 I Please find attached proposed Change Order No. 4 for the Fire Station and City Hall . The three major items for the Fire Station include providing a steel plate infill at the concrete columns to provide continuous lintel support for the face brick, I $2 ,292; provide quarry tile in the jacuzzi area , $1 ,089; and provide 3i-inch thick asphalt throughout the parking area in lieu of the li-inch thick pad presently in place, $3 , 336. The major I item for the City Hall is the rooftop unit and roof supports for the condenser unit to supply air conditioning in the City Hall addition lower level library, $5 ,021 . As you can see from the attached budget sheets, we are still well within the contingency range budgeted for. We are rapidly nearing completion of both projects and would expect no I significant change orders to occur from here on . There will , of course, be minor changes as we complete the punch list of both projects. However , we can expect these to be minor. IRecommendation I It is staff ' s recommendation to approve Change Order No. 4 for a total of $9 ,176 for the Fire Station and $6 , 862 for City Hall . I I I I IN E -t--% ? �e. _`- - °g ® , � o® � I CHANHASSEN CITY HALL/CHANHASSEN FIRE STATION II PROJECT NO: 87126/87146 II A. FIRE STATION Item No. 1 The addition of two antenna II supports to the hose tower as required for Fire Station Communications Add $ 531 .00 I Item No. 2 Provide two additional exit lights and relocate one Type G light fixture in Apparatus Room Add $ 487 . 00 IF Item No. 3 Provide steel plate infill at concrete columns - to provide I continuous lintel support for face brick. Add $2,292 . 00 Item No. 4 Provide 4 pitch pockets at roof I for conduit penetrations and replace lock body for Door 214 . Add $ 315 .00 Item No. 5 Provide quarry tile in lieu of II VCT at jacuzzi area. Add $1,089 . 00 Item No. 6 Provide 3 1/2 " thick asphalt I throughout including parking , patch and drive areas in lieu of II 1 1/2 " . Add $3,036 .00 Item No. 7 Provide additional membrane roof over the existing hose tower. Add $ 200 . 00 I Item No. 8 Additional concrete walk added to to connect the north service door II to the east drive. Add $ 396 . 00 I II ATTACHMENT TO CHANGE ORDER NUMBER 4 1 II 1 la s^ Al i�Z q 3� B 1 S •:.. --.u.,)--1,,,, 'x. .off::ia.. « :"« "%oo,a. '4,,.,,, aA., ?e,,«;kaa Item No. 9 Fire rated gypsum board added to I the underside of the existing wood structure. Add $ 385 . 00 Item NO. 10 Relocate hose tower switch, I emt conduit and relocate two lights. Add $ 445 . 00 ISUB TOTAL: FIRE STATION $ 9,176.00 II B. CITY HALL: I Item No. 1 Relocate baseboard heaters in Rooms 215 and 216 . Add $ 292 . 00 I Item No. 2 Provide additional copy machine receptacle; relocate fire alarm bell and additional Type U fixture. Add $ 761 .00 IItem No. 3 Electrical wiring for additional roof top unit to provide air I conditioning for the lower level library expansion area. Add $ 788 . 00 Item No. 4 Roof-top unit, roof supports and II roof patch for condenser unit to supply air conditioning in the City Hall Addition lower level library expansion area. Add $5,021.00 II SUB TOTAL: CITY HALL $6, 862 .00 I TOTAL $16,038 .00 II ATTACHMENT TO CHANGE ORDER NUMBER 4 2 II a I FIRE STATION Budget 947, 000. 00 Contingencies 14 ,000. 00 Contract 773, 400. 00 Architectural/Engineering Costs 72, 340. 00 Supplemental Architectural/Engineering Costs 1, 599. 00 Reproduction/Printing 4, 885 . 00 Soil Testing 1, 739. 00 Asbestos Removal 1, 208. 00 Communications 17, 985. 00 Telephones 8, 000. 00 SAC/Surcharge 1, 492 . 00 Change Order No. 1 7,611. 00 Change Order No. 2 6, 870 . 00 U Change Order No. 3 7, 327. 00 Change Order No. 4 9,176 . 00 BRW 342 . 00 ' Roof Specs 425 . 00 Publication Costs 88. 00 Promotional Expense 206 . 00 Furniture 12 ,998. 00 Lockers 5 , 533 . 00 ' Total $933, 224 . 00 I I CITY HALL Budget $650, 000 . 00 Contingencies 16, 000 . 00 ' Contract 503 , 400. 00 Architectural/Engineering Costs 50, 450. 00 ' Supplemental Architectural/Engineering Costs 2, 310. 00 Reproduction/Printing 4, 527. 00 Soil Tests 371. 00 Telephone 19 , 000 . 00 Roof Specs 609 . 00 Vinkemeier Tree Spade 250. 00 ' Asbestos 645. 00 Promotional 206 . 00 SAC/Surcharge 797. 00 Change Order No. 1 4, 052 . 00 ' Change Order No. 2 12, 974. 00 ' Change Order No. 3 5, 722 . 00 Change Order No. 4 6, 862 . 00 Furniture 34, 500 . 00 Total $646 , 675 . 00 ma 1