Loading...
9. Feasibility study for Lake Drive East and 184th Ave, call for Public Hearing 1 CITYOF .0 AN EN 1 � _ -�\ 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937-1900 MEMORANDUM E ✓ Whfkr- TO: Don Ashworth, City Manager ,��. FROM: Gary Warren, City Engineer yes ► � ACS DATE: August 24 , 1989 -" 'pia Uxr SUBJ: Accept Feasibility Study for Lake Drive East and 184th Avenue; Call Public Hearing Improvement Project No. 89-6 The attached feasibility study has been prepared by the City ' s r consultant as directed by the City Council and covers the easterly portion of Lake Drive East from Dakota Avenue to 184th Avenue. The report, I find, is complete and accurate in detail r and will be verbally presented to the Council at Monday night ' s meeting . r As noted, staff and our consultant have involved the Datasery - personnel intimately in the preparation of this report since the majority of the improvements cross and impact the Datasery pro- perty. The impetus for the project, as noted, is to interface r with the Trunk Highway 5 improvements and Part 5 of the report presents a reasonable schedule for the project from inception through to collection of assessments . 1 The total estimated project cost is $928 , 800 and it is antici- pated that $314 , 050 ( 34%) will be covered through a combination of MnDOT funding and tax increment funding. The report does not r contain an assessment roll at this time, although the assessment area has been defined and the assessment methodology also pre- sented in the report. A preliminary assessment roll will be r generated for information purposes in time for the public hearing. r It is therefore recommended that the attached feasibility study for Improvement Project No. 89-6 be accepted by the City Council and a public hearing be set for October 9 , 1989 . Attachment: Feasibility Study. c: Bud Osmundson , OSM r