A-5. Update on CSAH 61 Corridor and Utility StudyCITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.2271160
Fax: 952.227.1170
A -5
MEMORANDUM
TO: Todd Gerhardt
FROM: Kate Aarenson, AICP, Community Development Director
Paul Oehme, PE, Public pWorks Director /City Engineer
DATE: May 12, 2014 O
SUBJ: CSAH 61 Corridor and Utility Study
The consultants have completed the first two tasks in the planning process and staff is
prepared for the open house on May 22nd at the Chanhassen Library. A parcel -by-
parcel analysis of the site was completed resulting in the potential development of
200 acres along the corridor. The sewer and water study by SEH is underway. This
will determine if municipal services can be provided along the corridor.
Finance
The corridor study will provide abundant data as the city moves towards the next
Phone: 952.227.1140
Fax: 952.2271110
update of the comprehensive plan in 2018. If the city needs to reexamine land uses or
delivery of municipal services, this study will provide the supporting data.
Park & Recreation
Phone: 952.227.1120
ANALYSIS
Fax: 952.227.1110
Recreation Center
The purpose of the open house is provide an opportunity for affected parties to learn
2310 Coulter Boulevard
about the following upcoming projects:
Phone: 952.227.1400
Fax: 952.227.1404
• 101 River Crossing
Planning &
• County Road 61 Flood Mitigation Project
Natural Resources
• Corridor Study
Phone: 952.2271130
Fax: 952.2271110
Representatives from MnDOT, Carver and Hennepin Counties as well as city staff
Public Works
will be attending the open house. Notices for the meeting were sent to 278 addresses.
7901 Park Place
Phone: 952.227.1300
The following maps will be available for review and comment:
Fax: 952.227.1310
Senior Center • MnDOT River Crossing Plans
Phone: 9522271125 • Hennepin County 61 Flood Mitigation Plans
Fax: 9522271110 • Natural Resources and Constraints
Web site o Wetlands and Fens
www.ci.chanhassen.mn.us o Flood Plain
• Tree Cover, Open Space and Surface Water
• Buffer zones and Slopes
Chanhassen is a Community for Life - Providing torToday and Planning torTomorrow
Todd Gerhardt
CSAH 61 Corridor and Utility Study
May 12, 2014
Page 2
• Developable Parcels
• Zoning
• Land Use 2030
• Alternative Scenario's
• Parcel Access and alternatives
• Potential Sewer and Water Plans
This is the first of two open houses. The second is proposed for some time in July. A summary
of the comments from both meetings with be shared with the City Council. Attached are the
maps the will be used at the meeting as well as the Corridor Planning Process.
ATTACHMENTS
1. Notice of Open House.
2. Open House Notification Area Map.
3. Open House Display Boards (12) prepared by SRF.
4. Figure 1 — LB Development - Growth Areas.
5. Figure 3 — Waste Water Flow Conveyance Recommendation (2030 CP).
6. Figure 4 — LB Water Service Development.
g: \plan \61 corridor study \study update cc.docx
at %C2._ ,�,
Open House
Highways 101 / 61
Southwest Reconnection Project &
Highway 61 Future Development and Utility Study
May 22, 2014, 4:00 PM - 6:00 PM
Chanhassen Public Library
7711 Kerber Boulevard, Chanhassen
Please join us at an open house for the upcoming reconstruction project affecting
the Highway 101 River Crossing, the County Road 61 /Flying Cloud Drive corridor,
and the study of land uses and potential City services in the corridor. Attendees
will be able to learn about the Reconnection project, view project timelines and
construction staging, and ask questions about the project. The event will be
hosted by the following partner agencies: the Minnesota Department of
Transportation (MnDOT), Carver County, Scott County, and the Cities of
Chanhassen and Shakopee.
Highway 101 / County Road 61 Flood Mitigation Project
The project will construct a new four -lane Highway 101 spanning the floodplain
between the existing Highway 101 Minnesota River Bridge in Shakopee and
County Road 61 /Flying Cloud Drive in Chanhassen. The goal is to minimize
transportation disruptions caused by seasonal flooding of the Minnesota River.
Additionally, the Highway 101 /County Road 61 "Y" intersection will be
reconstructed as a roundabout to accommodate the new Highway 101 Bridge and
future traffic growth.
Flood Mitigation Project Current Status
Construction is anticipated to begin mid -May and will last through the Fall of 2015.
The project will be constructed in stages to maintain traffic, although temporary
closures will occur. Representatives from MnDOT and Carver County will be
present to discuss the traffic staging plan and detours.
Corridor Study
The City of Chanhassen is working on a Highway 61 Corridor study for potential
future development. The City intends to prepare for the anticipated development
interest in the area by creating a more comprehensive plan for the Highway 61
Corridor. The study includes a utility analysis to determine if it is cost effective to
extend municipal sewer and water services to the study area. If municipal
services are determined not cost effective to service the area, the scope of the
study may change to review alternative land use and development plans. City
staff will be present to review the scope of the report, give an update on the status
and answer any questions.
_.HPoEgrtie �`q j
/VhUNTY j.r/' u'. gq �� //'�ry�+r
i
a
v
a�
'o
d
13 Waeh'nlp�on 6,vd ® }' ,az�.
a oedara ® or A1'
is eaoseveitor
le cowmea Leae � -. ���?��
rc Freedom tans ��
18 Ntle entlance C iee
n
19 Freed el Leas
28 Freedom Lane
0 ernre �A
i I
KZ
feet
RdbN
All Properties South
of Pioneer Trail
March 26, 2014
OVERVIEW
PROJECTINTENT
The County Road (CR) 67 corridor is a key future gateway to the City of Chanhassen. Impending
transportation and infrastructure changes may increase the development potential of parcels within
the study area. The City desires to complete a framework plan that will guide future public and private
sector decision- making, shaping this important gateway to the city.
M 13MJ W M L1141MA _ F,,"
1 Kitlliall aGradent,
2 Flapalp
3 Cmrlder AnalYS+s
e Open Repeal
5 Oevelopmem 0ptiopa
6 Opefloo ll
$.I. C
Julm CpentlVPlennfnp Cnmmlesm WOA ------I��
B Summery Document ®�
8 CKy Cpunrn etM /ar pknn4g Cammisslan ACtbn _______�
tool
Apt
mloy
r,
U,
o
®�
®�
STUDY AREA
1. Kickoff/Data Gathering
0® field Trip
)® Corridor Analysis
establishstvdyarea COnstraini givens
,miles / "ifthens"
• parcel by parcel issues antl challenges
Open House I
• prolect'ommetion sharing
- ®property masers. developers.'mterestetl parties
Development Options
• establish arcane, oternatives and development scananos for each parcel
> Open Housell
• seek Input es to preferred recommendations and options
S® Joint Council/Planning Commission Mrk Session
• share work Completed t0 date
• summame feedback from hereas
• seek buy -in as to preferred solutions and recommendations
)® Draft Summary Document
City Council andior
Planning Commission Action
COUNTRY ROAD 61 CORRIDOR STUDY 0 PEN HOUSE #1 DRA"" Mit, 22, 2014 (�'Jyy ;,;�;;;;;;Ri1:4 *I T
� munm t
an'n9/POpsee
■ gt�n%oo-war
tm�ee
wd�*�mr
■ �++nPo,n.mea
mmmor.,n
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 Ma,22.2014 :, „;•;;'an:�* -,
Bit.
%dr
r
r
i oaa,e,.
�/' luSUetW1U1Ne
y
,IIL I�I
'� I�1
+g/m uN mu�ea.y
�
1 .4 z•4��,
�
��� aeee�mary
-e.fll ._ lZ 1 x-r. �� rnrmm.n,r
_ vs2r�
zr.Nnwem
!�
+4+d �
4�_�a.. S �H y'
{ 1
xa uM
4NI"tgTPo�iM
�=' ergecmrm)
® fuwY CenuraNN
Y��l�
1 ! ••
L uwwNaMib:me
t ✓
RFSrnIRCES
HOW
r .,baw�m,�aai
/ y�gA
fl�
■ r�r uenaar
/�
■ ruN��rranm
k ,1 Me
�
*1
f°^( yMrPOF
4d t 1 \ ax,yr:�t
�
llp oJ
��y 'n.a�wy1 "7
`
RESOURCES
HOW RESOURCES
�
CONSTRAIN PARCEL DEVELOPMENT
� • ,yp
xC: Plr II f .9.�iA�IO�q _pr l �) L{M
•� "A �2 l��
. a
11 • I
i;D • - .l ;
� munm t
an'n9/POpsee
■ gt�n%oo-war
tm�ee
wd�*�mr
■ �++nPo,n.mea
mmmor.,n
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 Ma,22.2014 :, „;•;;'an:�* -,
Bit.
%dr
r
r
i oaa,e,.
�/' luSUetW1U1Ne
y
,IIL I�I
RFSrnIRCES
HOW
RESOURCES CONSTRAIN PARCEL DEVELOPMENT
� munm t
an'n9/POpsee
■ gt�n%oo-war
tm�ee
wd�*�mr
■ �++nPo,n.mea
mmmor.,n
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 Ma,22.2014 :, „;•;;'an:�* -,
Bit.
f A
0
fl sYktmMOwery
J � .0� ( WNF�arcol
A'A Yr'. a de Mnih
�� MIMOmI
� a F [.� ■ r,. w,rvenwre�
`S} amr
� Ynm'am.n
!' C 9 t *?9B s�reamr mx mn
RESOURCES HOW RESOURCES CONSTRAIN PARCEL DEVELOPMENT
tiry&uMary
.� vaimm.Yaa,y
♦ V
m�mYe i
en "�arvYw,aa
G,�� »rea�a �a „v
oe
J4 '°
er
«c 'Y
r
w•oa �
+�
\__
It
Qa�nsrmwrcmNu
J'� i.,.r —�
RESOURCES
HOW RESOURCES CONSTRAIN
PARCEL DEVELOPMENT A
fl sYktmMOwery
J � .0� ( WNF�arcol
A'A Yr'. a de Mnih
�� MIMOmI
� a F [.� ■ r,. w,rvenwre�
`S} amr
� Ynm'am.n
!' C 9 t *?9B s�reamr mx mn
RESOURCES HOW RESOURCES CONSTRAIN PARCEL DEVELOPMENT
le
crvoo e
� fx ;f 9 /Pmposs�
Sopn 6
(wntl qyM 1
utl
OCann n
abnre�o�yu fi
oY,k<r nv.
r H2O sr vas n,.m,
COUNTRY ROAD 61 CORRIDOR STUDY 0 PEN HOUSE #1 DRAFT ma,, 22, 2014
tiry&uMary
.� vaimm.Yaa,y
♦ V
m�mYe i
en "�arvYw,aa
i
oe
o-
�
«c 'Y
r
w•oa �
��rrwae
le
crvoo e
� fx ;f 9 /Pmposs�
Sopn 6
(wntl qyM 1
utl
OCann n
abnre�o�yu fi
oY,k<r nv.
r H2O sr vas n,.m,
COUNTRY ROAD 61 CORRIDOR STUDY 0 PEN HOUSE #1 DRAFT ma,, 22, 2014
OPPORTUNITIES AND CONSTRAINTS
��h OV
Azz-
11
a_
t
m
FnyM9R'roPnsal
■
CenyYain�lartels
_
�
oe..n�aen i
a-
f.�
J
Azz-
11
a_
t
m
COUNTRY ROAD 61 CORRIDOR STUDY 0 P E N HOUSE #1 DRAFT m 2 :,2014
FnyM9R'roPnsal
■
CenyYain�lartels
_
�
oe..n�aen i
a-
COUNTRY ROAD 61 CORRIDOR STUDY 0 P E N HOUSE #1 DRAFT m 2 :,2014
PROJECT CONTEXT
f�1
COUNTRY ROAD 61 CORRIDOR STUDY 0 PEN HOUSE #1 DRAFT may 22, z01
.
Fr„ •yy u9.�a
g� rc
q
� ��``'' tr}%° t ia?tY' ty;y zy't��,�,47M•�eF .Yi �—
,,.
d'',-
COUNTRY ROAD 61 CORRIDOR STUDY 0 PEN HOUSE #1 DRAFT may 22, z01
PROJECT CONTEXT
LAND lJGE 2030
wa�ao��dary
r
' uXCmekOwlry
Olstd[L
Land Ne3030
9 0[
�m
=M
s.�e�a�e
M v � <
HIGH
na mxnu w
ue<mm
�.�.�,, -. �usmeLm.Lw,La,m.,rc. :m f•
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 May a2 2014 (�'�y'�;;��j;j;Lq
OPPORTUNITIES AND CONSTRAINTS
w; J��al1 �R ,1j- 'r= R,h,�r @✓'� n�l' ,�'- T+J'�11 P_�..d.%
. +mss ♦: ��.. R. %F
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 DRAFT Mn , 22, 2Di4
cm.�a
s may rew�my
�.u;�a'naroua
aymm,:mm
nme�O�
OKIll
OIF
�wsnEOOUSwO-s
ti
�w10 I>OeIm
5
Ec
�wrsexw�«om oe.sm+
y
—Lle ll
aESill
X51..
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 DRAFT Mn , 22, 2Di4
OPPORTUNITIES AND CONSTRAINTS
ALTERNATIVE SCENARIO
'� _� � i- tuNReek DONCaurse '� tl �
_ 11 � J•� 1 i ,� Sj..
Il
COUNTRY ROAD 61 CORRIDOR STUDY 0 P E N H 0 U S E# 1 ORAFT
!r .N
R�
Ma, 22 , 2014 �I�p���6:9lC:. 4f� *1416
Is9.nd
- - --
orukcr NOUnary
ng,MAOxd
•�.. _
loll
x
�Xy
' EluttCrceMnO
IeN VSe MIa
!^
AG ICULNAF
!OFFICE
i�PoNNSFONENSFA(F
7W&,CSEMI FUBVC
�flEEIDENT4HIGN OENAry
YYyy
'I flESIUwMt UPUF LDi
{'G
NESmEx,wLOw Dwsry
rxi
�.+•
'1♦flESIOFNDNMEDIUMDFHSIIV
y �`�
� IXEO VSEMIp4E
•0F
4
0
..
y
Ma, 22 , 2014 �I�p���6:9lC:. 4f� *1416
PARCEL DEVELOPMENT
/
0
� 4 1
'�S'r �•;— �' �; � "ela +� r `!'_. 1 e r,oi�meW.my p
� YI p ��1�:�' •I� ■ Wn9aatd9rttls ':
j
•' • � � � y .�'j� a � /��yiL,^ E 1 rl. ,� El CtrelTabblartNa
N' .. .�. __. •-- � ".: �� �. �rJ �d�gN!'r- -cR.�� �I �aL4]I.a:. n��wiy.. \mot
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 DFzAF?" mw?:,zo�n �►�ii�i�6ii °;y; m�
1 �
1
/
` -J
J J
•
^lam
'}
•� J.—
- __
J
0
� 4 1
'�S'r �•;— �' �; � "ela +� r `!'_. 1 e r,oi�meW.my p
� YI p ��1�:�' •I� ■ Wn9aatd9rttls ':
j
•' • � � � y .�'j� a � /��yiL,^ E 1 rl. ,� El CtrelTabblartNa
N' .. .�. __. •-- � ".: �� �. �rJ �d�gN!'r- -cR.�� �I �aL4]I.a:. n��wiy.. \mot
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 DFzAF?" mw?:,zo�n �►�ii�i�6ii °;y; m�
PARCEL DEVELOPMENT
/ f
i
C
1
�' li9end u �
Pget<w neary �
a
Nil Yne a
J tall
- ---l-ny.
a¢ I�nICIwRO¢n
H MWx <fneY/Eet �
■ mnmalnee vneaa vya
Lj xwupuNevarcdr
? I vpoo,eam,ese
COUNTRY ROAD 61 CORRIDOR STUDY 0 PEN HOUSE #1 DRAFT Mw > -z z01, �. ,; "0 *,=
y�
i
z
_
,A
/ f
i
C
1
�' li9end u �
Pget<w neary �
a
Nil Yne a
J tall
- ---l-ny.
a¢ I�nICIwRO¢n
H MWx <fneY/Eet �
■ mnmalnee vneaa vya
Lj xwupuNevarcdr
? I vpoo,eam,ese
COUNTRY ROAD 61 CORRIDOR STUDY 0 PEN HOUSE #1 DRAFT Mw > -z z01, �. ,; "0 *,=
PARCEL DEVELOPMENT
.. .'. ... a ✓e
t,
R
LepenA
Pa.cNtine��
itlCentm
H p�>en b,vvre,�r 1
.]� � RwMpabl¢pam¢Ir e
\y✓ �� Nvneud bHpe
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 DRAFT may ?z, 2014 �N� };j ;j',�p� i
fYl
�
R
J -�
4a.
— t
.. .'. ... a ✓e
t,
R
LepenA
Pa.cNtine��
itlCentm
H p�>en b,vvre,�r 1
.]� � RwMpabl¢pam¢Ir e
\y✓ �� Nvneud bHpe
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1 DRAFT may ?z, 2014 �N� };j ;j',�p� i
PARCEL DEVELOPMENT
'�
-77 -
J
it �
✓
J
MrJ
lb
4,
>
Tll
COUNTRY ROAD 61 CORRIDOR STUDY OPEN HOUSE #1
Me,, 12, 204