r MEMORANDUM
Poloct ad_.
TO: Don Ashworth, City Manager
Date Susr,:,t:
FROM: Gary Warren, City Engineer
Date imu.; to 1Cta,r11...
DATE: November 9 , 1988
rSUBJ: Review Lake Drive/Trunk Highway 101 Feasibility Study
Concepts; Set Public Hearing Date
rFile No. 88-22
r In order to keep pace with the schedule commitments for the
installation of public improvements to service the Rosemount
site, the following schedule has been laid out for the public
improvement process.
rd November 14, 1988 - Review feasibility concepts; establish
December 12 , 1988 public hearing date.
ra November 23, 1988 - Public hearing notice to newspaper.
a November 28 , 1988 - Accept final feasibility study.
ra December 1 , 1988 - Mail individual property owner notices of
hearing.
A December 12 , 1988 - Public hearing; authorize preparation of
plans and specifications.
rAdherence to this schedule will allow for completion of plans and
specifications for the public improvements on Lake Drive and
Market Boulevard by early February, 1989 . Construction would
r then be undertaken during the 1989 construction season so that
improvements can be completed in time for the December 15 , 1989
occupancy date established by Rosemount.
In order to meet this schedule, as can be seen the public hearing
date needs to be established for December 12 , 1988 . In order to
make the Council feel more comfortable with the feasbility study
r concepts at this time it was felt appropriate that these con-
cepts, although not complete, should be briefly reviewed with the
Council at the November 14 meeting.
r
r
1
Don Ashworth
•
November 9 , 1988
Page 2
Gary Ehret of BRW will be present to make a brief presentation on
the overall feasibility study concepts. As noted, the final
feasibility study is scheduled to be presented to Council on
November 28 , 1988; therefore, if the Council has any problems
with the concepts being presented Monday night, this will be an
excellent opportunity to give BRW and staff direction so that the
final feasibility study will be accurate in its presentation. '
It is therefore recommended that the City Council set December
12 , 1988 as the public hearing date for the Lake Drive (C.R. 17
to Great Plains Boulevard)/Trunk Highway 101 feasibility study.