11. Permit Process and fee for Sprinkler Permits CITYOF � \ 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 :. bGoik- MEMORANDUM TO: Don Ashworth, City Manager . ., .pc,,, FROM: Jim Chaffee, Public Safety Director /4---" 1 I-a3-� DATE: January 18, 1989 °°°--- 1 SUBJ: Establishment of a Fire Sprinkler Permit and Fee Structure 1 Please find attached memos from Scott Harr and Mark Littfin suggesting the implementation of a fire sprinkler permit and fee structure. I fully concur with their recommendations . 1 The Council may wish to schedule a public hearing on the matter prior to taking any actions . Recommendation It is staff' s recommendation to approve the establishment of the attached fire sprinkler permit and fee structure. 1 1 i 1 1 1 1 1 CITYOF . f II , m N A 1 - i CHANHASSEN II „. .. 1 , .,,.-, 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 II MEMORANDUM TO: Jim Chaffee, Public Safety Director 1 FROM: Scott Harr, Asst. Public Safety Director II DATE: January 17, 1989 SUBJ: Fire Sprinkler Permits 1 This memo is in support of our proposal to seek a fire sprinkler permit fee schedule. The benefits of such a program are many, particularly considering the rapid development of fire sprinkler technology. II Bearing in mind that the City of Chanhassen now requires sprinkler systems in many of its commercial developments, our II Fire Inspector is having to spend considerable time reviewing plans and inspecting the installations of fire sprinkler systems . Having recently attended a workshop on the topic of fire sprinkler systems, I can attest to the high technology that is II involved in this area of the fire service. The proposed permit application process, with the fee schedule, II will serve two purposes. First, it will establish a process by which fire sprinkler installations will be monitored. This will be done by requiring a plan review of the system, as well as inspections of the installation, with final tests . Secondly, the II fee schedule will provide the City of Chanhassen with a minimal recovery of the additional costs incurred by us for plan review and inspection time. 1 The fee schedule that we are proposing is that recently adopted by the City of Eden Prairie. Fire Inspector Mark Littfin and I 11 have worked with Eden Prairie Fire Marshal Phil Mathowitz in developing a "per head" fee schedule. The fee amounts shown reflect a middle of the road figure, determined by reviewing the fees required by other area cities. 1 Please feel free to let me know if you have any additional questions. I commend Fire Inspector Mark Littfin for his efforts in pursuing this matter. II 1 11 C. ,r,� CITY OF 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 MEMORANDUM 1 TO: Scott Harr, Assistant Public Safety Director ' FROM: Mark Littfin, Fire Inspector DATE: December 27, 1988 SUBJ: Fire Sprinkler Permit Application Attached are samples from Eden Prairie, Plymouth, Edina, and Brooklyn Center regarding permit fees . Both Plymouth and Brooklyn Center base their fees on job cost. Edina and Eden Prairie base theirs on number of sprinkler heads . I would recom- mend the latter. 1 Eden Prairie is in the process of raising their fees . A copy of both is included. Phil Mathiowetz also feels we would be able to justify charging what his new proposed permit fee will be. We could, however, charge less . If a formal fee does get approved, a letter is sent to all the 1 fire sprinkler companies in the Twin Cities informing them of the change. I will still be using Phil Mathiowetz as a consultant until I become better educated with fire sprinkler systems. ' I would also like to move quickly on this , if possible, because of future commercial construction and additional consultation needed on larger projects . Possibly a meeting with yourself, 1 Ron, and I to review the permit fees would be necessary. I have additional information coming from Minnetonka, Burnsville, and Chaska. 1 1 1 1 1 SPRINKLER PERMIT APPLICATION Owner: Date: Site Address: Contractor: Phone: Number of Heads Amount 1-5 $30.00 Total Number Heads on job: 6-25 $30.00 for first 5 heads plus $17.00 for each Permit Fee $ ' additional 10 heads or fraction thereof Standpipe Fee $ 26-50 $69.00 for first 25 heads State Surcharge $ ' plus $11.00 for each additional 10 heads or Watermeter $ fraction thereof Total Fee $ 51-200 $102.00 for the first 50 heads plus $7.50 for each additional 10 heads or fraction thereof 201+ $214.50 for the first 200 heads plus $5.00 for each additional 10 heads or fraction thereof Relocate sprinkler heads, piping or appliances: Fees the same as for new heads. Standpipes $25.00 for first standpipe plus $5.00 for each additional standpipe ' Fire Pump $45.00 Fees must be paid, plans approved and a permit issued prior to beginning any ' work, except that minor work may be arranged verbally with the Fire Inspector provided that the permit application, fees and plans are approved by the Fire Inspector within five (5) working days. Work started without approval will be subject to a fee equal to the permit fee as provided in the Building Code. Allow ten (10) working days for review and approval. Approved plans are required to be on the job site. If you have any questions, please contact the Fire Inspector at 937-1900. Signature: I II CITY OF PLYMOUTH COMMUNITY DEVELOPMENT DEPARTMENT Permit Number 3400 PLYMOUTH BOULEVARD PLYMOUTH, MN 55447 I559-2800 EXT. 224 PLUMBING PERMIT APPLICATION IIPLEASE PRINT OR TYPE ALL INFORMATION AND COMPLETE ALL ITEMS Street Address: Suite/Unit No. : IProperty I.D. No. (PIN) [available at Public Service Counter or from Tax State- ment] IIThe Applicant is: Owner ❑ Contractor ❑ Other ❑ Property Owner Name: IAddress: City I . State: ZIP: Telephone No. **NOTE Your City Contractor Number alone will complete this Section: IIContractor Name: State Lic. No. II **City Number Address: _ City State ZIP Telephone No. I **NOTE Your City Contractor Number alone will complete this Section: IApplicant Name (If Other): Lic. No. **City Number Address: City: IIState ZIP Telephone No. Are the Fees for this Permit to be Invoiced? Yes ❑ No ❑ ICLASS OF WORK USE TYPE New ❑ IAlter/Remodel ❑ Single Family ❑ Industrial ❑ Number of Stories ❑ Two-Family ❑ Public ❑ Number of Dwelling Units II Addition Involved Multi-Family ❑ Church ❑ Repair ❑ ❑ Federally Financed? II ❑ Commercial ❑ Other ❑ Other Yes ❑ No IPLEASE CONTINUE APPLICATION ON OTHER SIDE _. ;`J OCT 18 1988 ICi< < Qr CHANFiASSEN 30B COST: $ Completion Date: 1 NUMBER OF FIXTURES: Please use a separate application for each building and/or each owner/occupied dwelling unit. ' sprinkler heads drinking fountain water heating device standpipes shower _ water softener II water closet floor drain septic or drainfield lavatory sump pump rainwater leader bath tub catch basin fixture on future opening sink urinal gas pipe (per outlet) II dishwasher slop sink swimming pool piping disposal future fixture opening yard sprinkler wash tray Other: I REMARKS: (explain all items checked OTHER; further describe the work) I _ i I HEREBY APPLY FOR A PLUMBING PERMIT, AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND ACCURATE; THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO STAR( II WITHOUT A PERMIT. I UNDERSTAND AND HEREBY AGREE THAT THE WORK FOR WHICH THE PERMIT ISSUED SHALL BE PERFORMED ACCORDING TO; (I) THE CONDITIONS OF THE PERMIT: (2) THE APPROVED PLANS AND 11 SPECIFICATIONS; (3) THE APPLICABLE CITY APPROVALS, ORDINANCES, AND CODES; AND, (4) THE STATE BUILDING/PLUMBING CODES AND REGULATIONS. I UNDERSTAND THAT THE PERMIT WILL EXPIRE, AND BECOME NULL AND VOID IF WORK IS NOT II STARTED WITHIN 180 DAYS, OR IF WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS ANYTIME AFTER WORK HAS COMMENCED; AND, THAT I AM RESPONSIBLE FOR ENSURING THAT ALL II REQUIRED INSPECTIONS ARE REQUESTED IN CONFORMANCE WITH THE STATE BUILDING CODE. THE FOLLOWING APPLIES TO YOU IF YOU ARE AUTHORIZED TO HAVE YOUR PERMIT FEES INVOICED: I UNDERSTAND AND AGREE THAT MY SIGNATURE SHOULD AND WILL BE CONSTRUED AS THE EQUIVALENT I OF SIGNING THE PERMIT(S) FOR WHICH THE FEES ARE TO BE CHARGED AND INVOICED. II Applicant's signature Date forms(plbg)1-2 I 5/88 II I II II 0- - II . PLUMBING PERMIT II 1. Plumbing Permit Fee Plumbing Permit Fee = BASE + FIXTURES If "Use-Type" = Single Family or Multi-Family then BASE _ $10.00 II If "Use-Type" = Commercial or Industrial then BASE _ $15.00 FIXTURES = the sum of (# of fixtures x fee/fixture) according to the I following schedule: INDEX FIXTURE OR FIXTURE OPENING FEE I1 Water Closet $ 7.00 2 Lavatory (wash basin) 7.00 3 Bath Tub 4 Sink 7.00 I5 Dishwasher 7.00 6 Disposal 7.00 7 Wash Trays 7.00 II8 Drinking Fountain 7.00 9 Shower 7.00 10 Floor Drain 7.00 I ll Sump Pump 7.00 12 Catch Basin 7.00 13 Urinal 7.00 14 Slop Sink 7.00 II15 Future Fixture Opening 7.00 16 Water Heating Device 4.00 - 17 Water Conditioning Device (Softener) 7.00 I18 Septic Systems and/or Drainfield 7.00 19 Rainwater Leader 20.00 20 Installation of fixture on future opening 7.00 21 Gas Piping p g 3.00 p g (per applicance outlet) 2.00 II 22 Swimming Pool Piping 23 Yard Sprinkler 20.00 15.00 I2. Fire Protection System Permit Fire Protection System Fee = SPRNK + STNDP If "Fire Sprinkler" = yes then SPRNK = .005 x "Job Cost" IIf "Standpipes" > 0 and "Floor Count" < 3 then STNDP = "Standpipes" x 1 If "Standpipes" > 0 and "Floor Count" ) 3 then STNDP = "Standpipes" x "Floor Count" x $5.00. II 3. S.A.C. Metro Sewer Availability Charge: If SAC Fee has not been previously paid on this site then calculate SAC Fee Iaccording to method under Building Permit. 4. Water R.E.C. I If Water REC Fee has not been previously paid on this site then calculate Water REC Fee according to method under Building Permit. I (3) II II 1 CITY OF EDINA SPRINKLER PERMIT FEES EFFECTIVE JAN. 1, 1987 ALL SPRINKLER PERMIT FEES SHALL BE BASED ON A PER HEAD SCHEDULE AS FOLLOWS: ' NUMBER OF HEADS AMOUNT 1-5 • $40.00 (minimum fee) 6-25 $40.00 for first five, plus II $22.00 for each additional ten or fraction thereof 26-50 $84.00 for first 25, plus II $17.00 for each additional ten or fraction thereof 51-200 $135.00 for first 50, plus $11.00 for each additional ten or fraction thereof 200+ $300.00 for first 200, plus $5.00 for each additional II ten or fraction thereof STANDPIPES (non-spr. buildings only) $45.00 for first standpipe II and $5.00 for each additional o FIRE PUMP $45.00 All fees to include additional 50c State Sur Charge, not to exceed $1,000 permit fee. APPROVALS Plans shall be approved, permits secured, and fees paid prior to starting any sprinkler work. Work started without aproval shall be subject to an investigation fee equal to the permit fee, as provided for in Uniform Building Code, Section 304 (d) . ' Signed applications, fees (make check payable to the ("CITY OF EDINA") , and three sets of completed plans should be mailed to the Edina Building Department. Allow a minimum of 10 working days for review and approval. Permits will be returned by mail with plans. Approved plans are required to be on the job site. If it is acceptable to the contractor, plans may be delivered to the job site and left with the job foreman. Approval for minor work may be arranged verbally with the Fire Department (Allen Rothe or Ted Paulfranz) , provided application and fees & plans are approved by the Fire Department within 5 working days. TED PAULFRANZ - 927-8868, ext. 313 OCT 19 1988 CITY OF CHANHASSE' f PLUMBING PERMIT APPLICATION CITY OF BROOKLYN CENTER, MiN ESOTA 55430 II , Department of Planning and Inspection Phone (612) 561-5440 1. Job Location: Date II 3. Building Type: New Existing Use: Residential Commercial Industrial Public I4. Contractor Master License No. • I5. Business Address: Phone No. 6. Completion Date: Valuation: $ I 7. Description of Work: Indicate the number and floor location after each type of fixture and device. Use (B) for basement, (1), (2), (3j, etc.; (P) for Penthouse; (R) for Roof. EXAMPLE: Sinks: 1(B) 2(1) 3 (2) 1(P) . INSTALLED ROUGHED-IN ONLY INSTALLED IIClosets: Catch Basins: Urinals: Water Heaters: I' Bathtubs: Ground Run to Bldg.: • Showers: Rainwater Leaders: I Basins: Water Treating or Filtering Device: • Sinks: -- Irrigation: III Flash Trays: - Repair/Alteration: Drink. Fount. . • Potable Water Well Drilling: I Floor Drains: Other 8. FEE COMPUTATION Refer to Other Side For FEE SCHEDULE A. Minimum Fee @ .$18.75 $ 0..,- ire Suppression System I B. Installed Fixtures x$1.0.00 Standpipes, 1-3 floors @ $30.00 $ \' C. Roughed-In Fixtures x 6.25 add'1 floor @ $ 3J5 D. Catch Basins x 15_00' =— ______ E. Water Heater x 10.00 Automatic Sprinklers---- -- • II F. Ground Run to Bldg.@ $15.00 1st floor @ $62.50 \ $ . G. Rainwater Leader @ $10.00 . add'l floor @ $18.75 \ H. Water Treating or -� ) Filtering Device x 12.50 P. Gas Piping------ r- I. Potable Water Drilling 0 $25.00 Up to 2 inch diameter pipe J. Underground Irrigation Conn. 25.00• 1-3 openings @ $5.75 $ • II M. Repair/Alteration @ 3% of Value add'l openings @ $2.50 • N. New Single Family Dwelling @ $55.00 • *K & L (Sewer/Water Connection & Disconnection 2 inch and over - Lse -separate application Form No. I4) 1-3 openings @ $15.00 $ II 9. TOTAL FEES (SUM of A-M) (Minimum Fee $18.75) $ ' add'l openings @ 3.25 STATE SURCHARGE ($.50 up fa-57000 Permit Fee) $ _• TOTAL AMOUNT DUE $__ • II10. NOTICE TO APPLICANT: • TAT—This is is NOT a permit. Do not commence work until a permit has been issued. B. Separate permits are required for Water Service and Sewer Service work; Mechanical System, Electrical System I and Building work. C. Permits become null and void if work authorized therein is not commenced within 60 days of issuance, or if work is suspended or abandoned for a consecutive period of 120 days at any time after said work has commenced. D. It is the applicant's responsibility to call for required inspections. E. Inspector requires 24 Hour Notice. _ I11. APPLICATION • The wi 'ersianed hereby makes application for a permit for the work herein specified, agreeing to do all work in strict accordance with City Ordinances, applicable codes and rulings of the Building I Official; and, hereby declares that this application has been reviewed and that all the facts and representations stated here)n are true and correct. II Signature of AppTicant-Owner/Contractor/Agent Date _ . P/I Form No. 8 (Revised 9-86) Approved by: RESOLUTION NO. 86-123 1 i3' _ 2.- Plumbing Permit Fees Plumbing permit fees shall be• - -fixtures and devices and of the ot type ofosystem orlplumbi a number of set " '._ ,�; below. A_plumbing fixture is defined as a device intended to be connected to --- the plumbing-system,- such-as any sink,-bathtub, or any other such•devices.'3'W.4:. ' yy a _,��,, Fee '� ' � ; ` (a) Minimum Fee _ . _... . _ ,,-_.. {` '' ` ;. (b) Plumbing fixtures installed - .. 10.00 - (c) Plumbing fixture opening for future installation • ,~', t_ -. ,: -.., .. ::- • - Ilation 6 25 3 (a, .:Catch basin installed _.n rt. ' 5«?�;� __-- _ _._ ._ 15.00 X (e)= TWafer heater installed 10.00 _ ,,-.''.• k� (f) -Ground run to building (g) Rainwater leader 15.00 — as, : �.. - 10.00 II (h) Installation of water treating or filter device 12.50 (1) Potable water well drilling 25.00 =.^Y (j) Irrigation connection - 25.00 (k) Sewer or Water connection 31.2 5/ onn c I . ✓ (1) Sewer or Water disconnection 31.25/dfs- conn. ' • . • 1 (m) Repair or alteration of existing plumbing or water 3% of distribution system II cost (n) New single family dwelling plumbing system (including 55.00 ' 1 Y , _ fixtures, devices, openings, and water piping) _ Y li v:; .-- � ',:':;14;.-,;:-:4:44,::. --- (o) Fire S uppression Systems •- Standpipes, 1-3 floors - 30.00 ` Each additional floor 3.75 A I utomatic Sprinklers, 1st floor 62.50 Each additional floor 18.75 •(p) A plumbing permit shall be ♦ � required for gas piping; the permit fees are set forth below. (Fees for gas fitting of appliances and heating systems are '°i.' set forth under Mechanical System Permit Fees contained in this schedule. ' Up to 2-inch 'diameter -pipe•. - -•:r - .1-3 openings Y �., 5.75 opening Each additional p 2.50 ..t.' '. ,{ ,`:' 2-inch and over diameter pipe ' - 1-3 openings 15 .00 > - - Each additional opening - < : �t- -- ,. -_ ..?ti,•...>�:..�o-4't=.?s ? �• - -'-2-ii ..,-,l I . . _ CITY OF EDEN PRAIRIE I937-2700 ext . 382 FIRE SPRINKLER SYSTEMS TENANT/ IOWNER DATE SITE ADDRESS SUITE# I CONTRACTOR PHONE Permission is hereby granted to the above Contractor to perform the following work in strict accordance with the iden Prairie Ordinances : I1- -5 ..heads 15 .00 Total Number 6-25 heads 15 .00 first 5 heads plus of heads on I10 .00 each additional 10 heads or Job . fraction thereof . Standpipes : $ I 26-50 heads 35 . 00 first 25 heads plus 7 . 50 each additional 10 heads or Permit Fee $ fraction thereof . 51-200 heads 57 . 50 first 50 heads plus State Sur-chg I 5 .00 each additional 10 heads or TOTAL FEE : $ fraction thereof . I 201 and up 132 . 50 first 200 heads plus 2 . 50 each additional 10 heads or Rct# fraction thereof . IStandpipes 1-3 Floors 113180 each stairway I 10 .00 each additional floor or fraction thereof for each stairway. I CONTRACTOR TO SUBMIT SPRINKLER PLANS & CALCULATIONS FOR APPROVAL . I hereby acknowledge that I have read this application and state that the above is correct and agree to comply with all the ordinances of the City of Eden Prairie and the laws of the State of Minnesota regu- Ilating the installation, alteration or repair of Fire Sprinkler Systems . IAUTHORIZED SIGNATURE OF APPLICANT BUILDING DEPARTMENT APPROVAL I • '• _� EFFECTIVE 1/1/89 I w 4 City of BURNSVILLE 1 Eah 13 B313 rnusvilst leHig,MN way 55337 MECHANICAL PERMIT FEE SCHEDULE PLUMBING PERMITS: ' Minimum Fee$10.00 +.500 State Surcharge. Single Family Residence $55.00+ .500 State Surcharge(No Gas Piping Included). Non-Residential Fee shall be computed at 1.33%of contract+.05%of valuation. Private Disposal Systems$20.00 +.500 State Surcharge. Water Softener$10.00 +.500 State Surcharge Alterations and Repairs- Minimum Fee Reinspection Fee$10.00 All equipment provided by others shall be part of plumbing contract. Well Permits $20.00 + .50c State Surcharge. HEATING, AIR CONDITIONING, VENTILATION, OR REFRIGERATION PERMITS: Minimum Fee$10.00 +.500 State Surcharge Single Family Residence$55.00+.500 State Surcharge(No Gas Piping Included) Alterations and Repairs- Minimum Fee Non-Residential Fee shall be computed at 1.33%of the contract+.05%of valuation. Permits shall cover only single installations. Multiple furnaces, boilers, and etc. shall be considered separate installations. All equipment provided by others shall be part of heating contract. REFRIGERATION SYSTEMS: For any permit for the installation of a refrigeration system;for the first system included in such permit, having a rated capacity of 3 horsepower or less,$20.00,and for each additional refrigeration system on the same permit having a rated capacity of 3 horsepower or less, $9.00. For capacities in excess of 3 horsepower but not to exceed 15 horsepower,$25.00 for each system.For capacities in excess of 15 horsepower, but not to exceed 50 horsepower,$50.00+.500 State Surcharge for each system. For capacities in excess of 50 horsepower,$75.00 for each system. For any permit for alteration or repairs to any existing refrigeration system or equipment,where the cost of the proposed work does not exceed $500,$10.50. However,the total fee at said rate shall in all instance exceed the sum$50.00 for each refrigeration sys- tem or its equipment included in such permit. GAS PIPING PERMITS: Minimum Fee$8.00 +.500 State Surcharge Each Fixture or Appliance$8.00 +.500 State Surcharge. Alterations and Repairs- Minimum Fee -EIRE PROTECTION EQUIPMENT: ' Stand Pipes and hose cabinet shall be computed at 1.33% of the contract plus 5%State Surcharge. Sprinkler Systems shall be computed at$10.00 for the first 10 heads and$5.00 for each additional 10 heads or part therof+.500 Surcharge. Alterations and Repairs- Minimum Fee $10.00 +.500 State Surcharge. SEWER AND WATER PERMITS: Residential S&W Permit$35.00 +.500 State Surcharge. Commercial S& W Permit$65.00+.500 State Surcharge. Commercial Fire Line Permit$65.00 +.500 State Surcharge. Alterations or Repairs- Minimum Fee$10.00+.500 State Surcharge. Service Station underground fuel storage tanks and piping permit fee to be 1.33%o fhte contract+.05% of valuation for State Surcharge. UTILITY PERMITS: To include on site installation of Fire Lines,Hydrants,Sanitary Sewer,Manholes and Storm Sewer,Per- mit I fees to be 1.33% of contract + .05% of valuation for State Surcharge. DEC 2 9 1988 FORM 43100-61T(' CHANh,As L