Loading...
1c Crestview Circle Proj 00-05 1-~ - CITY OF CHANBASSEN MEMORANDUM TO: Scott A. Botcher, City Manager City Ctnttr Drive, PO Box 147 FROM: b4nbIWm Minnesota 55317 Phont612.937.1900 DATE: GtntralF4x 612.937.5739 tginttring Fax 612.937.9152 SUBJ: blit Safety Fax 612.934.2524 'eb www.ci.chanhaJSmmn.us Teresa Burgess, Public Works Director/City Engine~~ May 22, 2000 Receive Feasibility Study and Call for Public Hearing for Crestview Circle Improvement Project 00-05 City Council is requested to receive the attached Feasibility Study prepared by WSB & Associates, Inc., consultant engineers for the above project, and call a Public Hearing for June 12,2000. This project was initiated based on a petition received from the neighborhood requesting a feasibility study for street and utility improvements ort Crestview Circle. One hundred percent of the abutting property owners signed the petition. An Informational Meeting was held on Wednesday, May 17, 2000, in the City Council Chambers at Chanhassen City Hall. Property owners on Crestview Circle were invited to attend the meeting to make comments on the feasibility study and the recommendations therein. The feasibility study includes the following funding recommendation: Sanitary Street Street Fundine: Source Sewer Watermain Option 1 a ODtion 2b Assessments $9,180 $9,450 $37,200 $75,720 City Utility Fund $9,800 $9,400· $0 $0 . 24' wide, rural bituminous street without concrete curb and gutter. Does not meet current City design standards, but is similar in nature to the surrounding streets. b 28' wide, urban bituminous street, còncrete curb and gntter, and storm sewer. Receiving the report and calling the public hearing does not approve the findings or authorize preparation of plans and specifications for the project. Attachment tjb CIOOCUME_llkimILOCALS--IITemplstaffreport - 5-22.doc , City of Chanhassm. A f.TlJWinr communitv with ckan lakes, qualitv schoob, a charminr downtown, thrivinr busint"", and beaucifùl parks. A mat .lace to live. work. and .Ja.c.