1d. Change Order No. 1 for Public Works Garage w id 1 CITY OF ______ 1 \ 1 ,N, CHANHASSEN 1 \ , i _ . . , - 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I ,-.. (612) 937-1900 Action by City Administrator MEMORANDUM Endorsed L.'''. modifi-f, 1 'iPjec TO: Don Ashworth, City Manager -=—� tJif j�4ee__V ,)etc Sl'tiriwt r' i; ( , ;:'li.iion 1 FROM: Gary Warren , City Enginee DATE: July 6 , 1988 ~ `'� "`` i SUBJ: Approval of Change Order No. 1 , Public Works Garage Expansion File No. 87-22 IThe public works garage expansion has been moving rapidly towards completion. The attached Change Order No. 1 is a summary of I miscellaneous individual change order items which have accrued to date during the construction. The attachment to the change order defines in detail the specific items which comprised this change order. The net impact is an addition to the contract in the I amount of $3 ,725 . This will increase the total contract ceiling to $239 ,035 or approximately li%. All items have been indivi- dually reviewed with me at the time of construction authorization land I find them acceptable. The project is over 85% complete at present and we have been very satisfied with the work which has been performed by Fullerton I Construction Company. I would anticipate one additional change order prior to project completion to wrap up any final miscella- neous items . It is therefore recommended that Change Order No. 1 I be approved in the amount of $3 ,725 and a new contract ceiling be established at $239 ,035 . IAttachment: Change Order No. 1 I I I I I . • CHANGE I Dktribution to: ORDER OWNER 694 EXCELSIOR BOULEVARD 'VA HOC hi11E!'�'7 C�01 ARCHITECT ❑ SUITE ONE CONTRACTOR ❑ CORPORATION (812J474 gMINNESOTA 55331 I FIELD ❑ OTHER ❑ ARCHITECTS •SPACE PLANNERS•INTERIOR DESIGNERS I PROJECT: CHANHASSEN PUBLIC WORKS CHANGE ORDER NUMBER: 1 1 (name, address) ADDITION INITIATION DATE: June 23, 1988 TO (Contractor): I r ARCHITECT'S PROJECT NO: 87156 FULLERTON LUMBER COMPANY CONTRACT FOR: General Construction 123 Columbia Court N. , t Chaska, MN 55318 L. 1 CONTRACT DATE: March 28, 1988 You are directed to make the following changes in this Contract: I ' See Attached I I I 1 I I \,a %acid until signed b) both the Omncr and Architect Signature 01 the Contractor indicates his agreement here%,ith, mciudinc an adjustment in the Contract Sum or Contract Time. I The original (Contract Sum) (aCCITZOIP-IletnigtIMIX110aIX was $ 235,310 Net change b■ pre%iously authorized Change Orders $ —0— The (Contract Sum) (Ztat >;tM00 prior to this Change Order was $ 235 , 310 , • The (Contract Sum))¢ 1t ;a ieXC CtOilR! Rtgd) will be [increased) i ot:t dXbonotlar l ) by this Change Order $ 3, 725 The new (Contract Sum ttomte n including this Change Order will be S 239 ,035 I tn The Contract Time will be atAlteclvxsetifx(unchanged) by ( —0— ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Unchanged Authorized: II EOS Corporation Fu 1 erton Lumber IAN CONTRACT O: qC� tv of C'hanhagsPn ater STreet 1 2 3 Columbia Cou t b btRCoulter Drive Address Address Addres, II - P. 0. Box 147 - / ''\ � -- ' C ■ II h. i.1. �: Chanhassen, MN 55317 ' r•� / —' I 86-:"" �(� f3Y �. BY DATE Ec DATE C'1 „i2 y DATE I AIA DOCUMENT 6701 • (11 A .(a a)I(Ul R • ;IT II ltl-ti I'L I tt)■ • \1:\" • r itt711 111: -'.'I'•I( \\ I\o I! If n' \re I'ml!( 1� I"i•. \I1. \!tt'l \',I •.:. .\ 'ot. \r,ti0\ f)( 'rl!tae. G701-1978 • S I I ATTACHMENT TO CHANGE ORDER NUMBER 1 I CHANHASSEN PUBLIC WORKS PROJECT NO: 87156 Item No. 1 Hardware change for Door 115A Add $ 52 . 00 ', This will provide better and easier door operation than what was initially specified. Item No. 2 Increase capacity of electrical feeder cable Add $ 656 . 00 IThis was necessary by code to match existing underground cable I size . L u en. I Item No. 3 Change from cast iron slab piping to P.V.C. Deduct $ ( 800 . 00) The contractor had inadvertently I used P .V.C. in lieu of cast iron. Due to the fact that the existing was installed as abs (plastic ) I and P.V.C. meets code, P.V.C. was accepted with a deduct . IItem No. 4 New Overhead Door Add $2 , 007 . 00 The existing door was in need of I repair and would have needed replacing soon. IItem No. 5 Additional electrical outlets ,etc . Add $1, 300 . 00 This involved additional elec- t trical outlet and telephone outlet locations necessary to satisfy office requirement. Also, an I $80 . 00 cost was involved with removing an existing obstruction so that the feeder could be pulled Ito the transformer vault . • :...e..<. .n. � .....� .. a :;; 6l�.iie >..:.: �4.em.P1 , Item No. 6 Damper change of location Add $ 115 . 00 This was necessary because of the new rated gypsum board ceiling being installed in the existing Oil Storage Room. Item No. 7 Plywood on Roof Add $ 275 . 00 This was necessary to properly terminate the roofing against the rockface concrete block. Item No. 8 Exterior siding size adjustment Add $ 120 . 00 The existing siding size is not available. New siding has to be cut to match existing. TOTAL ADD TO CONTRACT $3 , 725 . 00 FaLIE � Tt ILUMBER COMPANY CONSTRUCTION DIVISION ' Mailing Address: Telephone 123 Columbia Court N. 612-448-3200 Chaska, Mn. 55318 - June 24,1988 EOS Corporation 470 Water St. Blvd. Excelsior, MN 55331 Attn: Jack Anderson Dear Jack, IThis letter is written in reference to our past meeting at the job June 9,1988, regarding some change order items. ' 1. Install new damper in entrance corridor due to sheetrock storage room. $115.00 2. Per your phone call on Friday, June 10, the city will contribute towards the planning of the siding for the 'sf.)._,. front of the building. $120.00 3. Plywood on existing rock face wall above roof to allow _�_;-�_:_• proper application of metal. $275.00 ' As per your phone call on Friday you said that the city accepted all of these items. Please put in next change order. Si erely, 1 5r1 0 ,.„14). Greg Ottum ' Project Supe intendent - - GO/Pks - -