Loading...
1e. Change Order No. 2 for Ground Storage Reservoir r I CITY OF 1 e i _:1 F- CHANHASSEN 1 Ai ..1 \, k # 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I (612) 937-1900 Action by city ^.dmini;ti' MEMORANDUM .,,.. ,,. __ ___. II TO: Don Ashworth, City Manager M 7./6_/._11 I FROM: Gary Warren, City Enginee -- DATE: Jul 6 , 1988 Y_ ', v� �_ I July SUBJ: Approval of Change Order No. 2 for Ground Storage Reservoir Project No. 86-3 IThe ground storage reservoir was placed on line June 20 , 1988. With the exception of site cleanup and the installation of an I altitude valve on the downtown elevated storage tank, the project is relatively complete. The attached Change Order No. 2 covers the work which was necessary to raise the 24-inch mainline to a suitable depth for connection to the reservoir. You may recall 1 the 24-inch jacking and valving at the intersection of Powers Boulevard and Lake Lucy Road was done under separate contract last winter. At the time of entering the contract for the reser- Ivoir the actual elevation of this watermain line was not known. It is therefore recommended that the attached Change Order No. 2 I in the amount of $3 , 241 be approved and that a new contract ceiling price of $617 , 450 be established. Attachment: Change Order No. 2 • ( , I ORR-SCHELEN-MAYERON & ASSOCIATES, INC. 1 2021 E.HENNEPIN AVE.•SUITE 238 MINNEAPOLIS, MINN.55413 I CHANGE ORDER NO. 2 3.5 Million Gallon II 3,241.00 Reservoir RE: Hydrostoragez Inc. Contractor I P. 0. Box 1685 .Des. Moines,. Iowa . .50306 I Dear Sir(s) Under your contract dated Litny .21 19.87. with I the City of Chanhassen Owner for construction of 3.5 Million Gallon Surface Reservoir 1 we are authorized by the owner to hereby direct you to . .install. .adrii.ti oval .f.i.tti ngs.. and labor to bring the 24" water line from its excessive depth in the II county ditch to the desired elevations as it enters the tank site. The cost breakdown is as follows: SEE ATTACHED II ' . 1 and to add to (deduct from) the contract, in accordance with contract and specification, the sum of II Three Thousand Two Hundred Forty-one and 00/ 100 Dollars There will be an extension of -0- days for completion. I The date of completion of contract was 7/1/ 19 .88. and now will be 7�1 19 88 Amount of original contract Total Additions Total Deductions Contract to Date II $612,150.00 CO #1 $2,059.00 $617,450.00 CO #2 3,241.00 II Approved 19. . . . Respectfully Submitted, Owner ORR-SCHELEN-MAYERON -- J`ZN Approved ' /7 19 i' . ASSOCIATES INC. WI L) OS-FORAGE, INC. ,/� . . . - Per ' 19 ' in / • - Contractor - 7 '-j'.. - - - ,a+∎. .r�ry e.. ...�Ru , st+G:. .�.,e..si.:,+:z+:?c.t.a-.e: +:iws•=.— 'V tATTACHMENT CHANGE ORDER NO. 2 ' 3.5 MILLION GALLON RESERVOIR CITY OF CHANHASSEN 1 1 - 24" 1/8 Bend $ 986.00 1 - 24" 1/16 Bend 1,145.00 ' Labor - 2 men x 6 hrs. x $80.00/hr. 300.00 Backhoe w/operator - 6 hrs. x $80.00/hr. 480.00 Subtotal $2,911.00 Administration 330.00 ' TOTAL $3,241.00 1 „Al 1 1 1 1 ' Irig to Consent Agenda Item 1 f— 1 ay .lohnson Item if-1 Change the last sentence of Condition 2 (erosion control) as follows. 2. . . . All erosion controls shall remain intact until an established vegetative cover has been produced/ and the city engineer approves their removal. 1