2 Feasibility Study/Lake Drive
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Bo,147
Chanh3ssen, MN 55317
Administration
Phone 95212711110
fax: 9521271110
Building Inspections
Phone: 952127.11BO
fax 952.2271190
Engineering
Phone 9521271160
fax 952127.1170
Finance
Pt:'J;ie:952.227.1140
f".9522271110
P¡rk & Recre¡tion
Phone: 952227.1120
fax 951217.1110
P.~crea!i:)n Center
2310 Cou!~o;!r Bou!evard
PhOne: 951.1171400
fax 951.1171404
Planning &
N¡tural Resources
Phone 951127.1130
fax 9511171110
Public Works
1591 Park Road
fhone9511171300
fax 951.117.1310
Senior Center
Phone 951.1171115
f,x:952117.1110
WebSile
www.ci.chanhassen.mn.us
;;.
MEMORANDUM
TO:
Todd Gerhardt, City Manager
FROM:
Teresa J. Burgess, Public Works Director/City Engine~ 6 ~
~~~ ~
DATE:
SUBJ:
Public Hearing on Feasibility Study for 2002 MSA Roadway
Improvement Project 01-08
Requested Action
Council is requested to hold the Public Hearing for the Lake Drive East portion of
the project located in Hennepin County.
Discussion
The City Council held the Public Hearing for this project on January 23,2002;
however, the properties located in Hennepin County did not receive the proper
mailed notice. This Public Hearing is intended to provide those property owners
in Hennepin County that are impacted by this project the opportunity to speak to
the Council and to meet the Minnesota State Stature requirements for assessment
projects.
A copy of the Staff Report from January 23, 2002 is attached.
Recommended Motion
No formal motion is required, unless Council desires to change the action taken
on January 23, 2002 to approve the plans and specifications and authorize
advertisement for bids.
Attachment: January 23,2002 Staff Report
c:
Joel Rutherford, HTPO (no enclosures)
Chris Thibodeau-Feist
g:\englpubliclOl-oS'staffreport 5-13-02 ..doc
The Cily 01 Ch¡nhmen . A growing communily wllh clean lakes. qualily schools, a charming downlown, thriving businesses, winding lrails, and beaulilul parks. A g"al place 10 live, work, and olav.
CITY OF
CHANHASSEN
690 City Cmm' Drivt
PO Box 147
Chanhasst1l, Min/1lJOf4 553/7
Phont
952.9311900
GtI"ral Fax
952,931.5ì39
EllgÙlterÙlg Department Fax
952.931.9152
Building Department Fax
952,934.2524
lreb Site
UlIl'll~ci.chnnhassm.mn.tlS
3
-
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM:
Teresa 1. Burgess, Public Works Director/City Engine~
January 23,2002
DATE:
SUB]:
Public Hearing on Feasibility Study; Authorize Preparation of
Plans & Specifications and Approve Consultant Work Order for
2002 MSA Roadway Improvement Project 01-08
Requested Action
Council is requested to:
· Hold the Public Hearing
· Accept the Feasibility Study
· Authorize Preparation of Plans & Specifications
· Approve the Consultant Work Order
Discussion
The City Council has previously received the feasibility study for the project. The
study considers improvements to the streets listed below.
Rehabilitation Maintenance
Audubon Road Stellar Court
Coulter Boulevard Pointe Lake Lucy
Lake Dr.lLake Dr. E. Mulberry East & West
Lake Lucy Road Heather Court
Saddlebrook Curve
Shadow Lane
The total cost of the Rehabilitation project based on the recommendations in the
report is estimated at $1,134,661.82. The Maintenance would be done within the
existing City budget.
Assessments are proposed for the Rehabilitation projects and calculated as
follows:
Total Project Cost = 60% Paid by City +
(MSA Fund
and Levy)
40% Assessed to
abutting Property .
Owners
Assessment Amount =
Per Parcel
40% of Total
Project Cost
Total Number of
Parcels Assessed
The City ojChanhasstll. A "owin! community with clean lakes. aua/in'sclmnk fl rhflrmi", ,In",",""," ",.;,,;,," /,,,,;".,,., .." /,.....;/:,/ ...L, ,_... .1.__ .. "...
,..I. ....1
Todd Gerhara,
January 23,2002
Page 2
There are three levels of work that were considered for the Streets:
Reconstruction, Rehabilitation, and Maintenance.
Descrintion: Similar to:
Reconstruction: Removal of existing street Leveling a house and
and construction, May starting from the ground
include sanitary sewer or up
watermain work. May
recycle the existing asphalt
as gravel base after it is
ground.
Rehabilitation: Repair of problem areas to Residing a house and
full depth. Milling of edge installing new windows
or full width of existing
asphalt. Repair to existing
catch basins and/or curb and
gutter, Overlay of 2" of
asphalt.
Maintenance: Pothole filling, Patching, Painting the existing
crack sealing, seal coat. siding
Roads were selected based on the City's Pavement Management System.
Rehabilitation is substantially less expensive than Reconstruction. Ifroads are
rehabilitated in a timely manner, reconstruction can be avoided unless utility work
is required,
The Request for Proposals and Consultant selection for the Feasibility Study
included the preparation of plans and specifications. The Consultant has reviewed
the original proposal and made adjustments based on the recommendations in the
feasibility study.
Recommended Motion
Move to accept the feasibility study and authorize preparation of plans and
specifications for City Project No. 01-08 as recommended in the feasibility study.
Also move to approve the Consultant Work Order for the preparation of plans and
specifications. The Consultant Work Order will be distributed at the City Council
meeting on Monday, January 25, 2002.
Attachment: Feasibility Study