Loading...
2 Feasibility Study/Lake Drive CITY OF CHANHASSEN 7700 Market Boulevard PO Bo,147 Chanh3ssen, MN 55317 Administration Phone 95212711110 fax: 9521271110 Building Inspections Phone: 952127.11BO fax 952.2271190 Engineering Phone 9521271160 fax 952127.1170 Finance Pt:'J;ie:952.227.1140 f".9522271110 P¡rk & Recre¡tion Phone: 952227.1120 fax 951217.1110 P.~crea!i:)n Center 2310 Cou!~o;!r Bou!evard PhOne: 951.1171400 fax 951.1171404 Planning & N¡tural Resources Phone 951127.1130 fax 9511171110 Public Works 1591 Park Road fhone9511171300 fax 951.117.1310 Senior Center Phone 951.1171115 f,x:952117.1110 WebSile www.ci.chanhassen.mn.us ;;. MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Teresa J. Burgess, Public Works Director/City Engine~ 6 ~ ~~~ ~ DATE: SUBJ: Public Hearing on Feasibility Study for 2002 MSA Roadway Improvement Project 01-08 Requested Action Council is requested to hold the Public Hearing for the Lake Drive East portion of the project located in Hennepin County. Discussion The City Council held the Public Hearing for this project on January 23,2002; however, the properties located in Hennepin County did not receive the proper mailed notice. This Public Hearing is intended to provide those property owners in Hennepin County that are impacted by this project the opportunity to speak to the Council and to meet the Minnesota State Stature requirements for assessment projects. A copy of the Staff Report from January 23, 2002 is attached. Recommended Motion No formal motion is required, unless Council desires to change the action taken on January 23, 2002 to approve the plans and specifications and authorize advertisement for bids. Attachment: January 23,2002 Staff Report c: Joel Rutherford, HTPO (no enclosures) Chris Thibodeau-Feist g:\englpubliclOl-oS'staffreport 5-13-02 ..doc The Cily 01 Ch¡nhmen . A growing communily wllh clean lakes. qualily schools, a charming downlown, thriving businesses, winding lrails, and beaulilul parks. A g"al place 10 live, work, and olav. CITY OF CHANHASSEN 690 City Cmm' Drivt PO Box 147 Chanhasst1l, Min/1lJOf4 553/7 Phont 952.9311900 GtI"ral Fax 952,931.5ì39 EllgÙlterÙlg Department Fax 952.931.9152 Building Department Fax 952,934.2524 lreb Site UlIl'll~ci.chnnhassm.mn.tlS 3 - MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Teresa 1. Burgess, Public Works Director/City Engine~ January 23,2002 DATE: SUB]: Public Hearing on Feasibility Study; Authorize Preparation of Plans & Specifications and Approve Consultant Work Order for 2002 MSA Roadway Improvement Project 01-08 Requested Action Council is requested to: · Hold the Public Hearing · Accept the Feasibility Study · Authorize Preparation of Plans & Specifications · Approve the Consultant Work Order Discussion The City Council has previously received the feasibility study for the project. The study considers improvements to the streets listed below. Rehabilitation Maintenance Audubon Road Stellar Court Coulter Boulevard Pointe Lake Lucy Lake Dr.lLake Dr. E. Mulberry East & West Lake Lucy Road Heather Court Saddlebrook Curve Shadow Lane The total cost of the Rehabilitation project based on the recommendations in the report is estimated at $1,134,661.82. The Maintenance would be done within the existing City budget. Assessments are proposed for the Rehabilitation projects and calculated as follows: Total Project Cost = 60% Paid by City + (MSA Fund and Levy) 40% Assessed to abutting Property . Owners Assessment Amount = Per Parcel 40% of Total Project Cost Total Number of Parcels Assessed The City ojChanhasstll. A "owin! community with clean lakes. aua/in'sclmnk fl rhflrmi", ,In",",""," ",.;,,;,," /,,,,;".,,., .." /,.....;/:,/ ...L, ,_... .1.__ .. "... ,..I. ....1 Todd Gerhara, January 23,2002 Page 2 There are three levels of work that were considered for the Streets: Reconstruction, Rehabilitation, and Maintenance. Descrintion: Similar to: Reconstruction: Removal of existing street Leveling a house and and construction, May starting from the ground include sanitary sewer or up watermain work. May recycle the existing asphalt as gravel base after it is ground. Rehabilitation: Repair of problem areas to Residing a house and full depth. Milling of edge installing new windows or full width of existing asphalt. Repair to existing catch basins and/or curb and gutter, Overlay of 2" of asphalt. Maintenance: Pothole filling, Patching, Painting the existing crack sealing, seal coat. siding Roads were selected based on the City's Pavement Management System. Rehabilitation is substantially less expensive than Reconstruction. Ifroads are rehabilitated in a timely manner, reconstruction can be avoided unless utility work is required, The Request for Proposals and Consultant selection for the Feasibility Study included the preparation of plans and specifications. The Consultant has reviewed the original proposal and made adjustments based on the recommendations in the feasibility study. Recommended Motion Move to accept the feasibility study and authorize preparation of plans and specifications for City Project No. 01-08 as recommended in the feasibility study. Also move to approve the Consultant Work Order for the preparation of plans and specifications. The Consultant Work Order will be distributed at the City Council meeting on Monday, January 25, 2002. Attachment: Feasibility Study c: Joel Rutherford, HTPO (no enclosures) Chris Thibodeau-Feist g:\eng\public\Ol-08\staffreport 1-28-02.doc