1a. Plans & Specs Bluff Creek Dr. w. Ci CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937-1900 MEMORANDUM TO: Don Ashworth, City Manager 1 FROM: Gary Warren, City Engineer « 1 per DATE: March 9 , 1988 1 SUBJ: Approval of Plans and Specifications for Bluff Creek Drive City Project No. 80-5 On April 6 , 1987 , the City Council authorized preparation of construction documents for Bluff Creek Drive road improvements. 1 This is based on the feasibility study prepared by Engelhardt and Associates dated March 11, 1987 . The attached plans have been prepared in accordance with this feasibility study. The roadway which is an existing 22-foot wide gravel road in poor condition, is proposed to be upgraded utilizing the City' s rural 1 standard section, i.e. 24-foot roadway with drainage ditches from County Road 14 (Pioneer Trail) to West Hesse Farm Road. The southern portion of the roadway from West Hesse Farm Road to Trunk Highway 212 will be the City' s urban roadway section uti- lizing barrier concrete curb and gutter and storm water drainage piping to properly handle the runoff and slope difficulties in this area. 1 The steepest grade on the new design is 8% . As anticipated, a certain amount of muck excavation will be necessary to address the poor soils on the north half of the project. What was not 1 anticipated in the feasibility study however, is the need for concrete crib retaining walls along the tighter portion of the roadway corridor from the railroad tracks ( station 56+75) to just 1 past the Bed and Breakfast (HSE no. 1161) station 64+00. This is a trade-off between the cost that would be otherwise for property acquisition and extensive side slope grading. 1 The horizontal alignment of the road has also been improved in particular at the location of the Bed and Breakfast where we have jogged the road 10 feet to the northeast to get further away from 1 the Bed and Breakfast property. This had an impact in increasing our retaining wall quantities but is a necessary improvement for clearance in this area. 1 1 •A ' Don Ashworth March 9 , 1988 Page 2 The feasibility study estimated the total project cost to be $535, 282 . The revised engineer' s estimate including the 30% mark-up for contingencies, legal, administrative and engineering is $667, 580 or an additional $132 ,298. This increase results directly from the need for retaining walls which had not been anticipated in the feasibility study and which is estimated to cost $146,398 including the earth fill. When Council accepted the feasibility study, they indicated a preference for assessing 20% of the project costs to benefitting property owners . The remaining cost would then be paid from the City' s Municipal State Aid (MSA) funds . The feasibility study envisioned that this would encumber a little over two years of State Aid allotments based on $215,000 of annual allotment being received from the State. Fortunately, we have recently received the State Aid Apportionment Report for 1988 which indicates that the City' s State Aid construction allotment has increased by $62, 365 for a total 1988 construction allotment of $248,449 . This year a significant amount of time was spent updating our entire MSA "needs" reports to maximize the system needs . This, coupled with the recent legislation which appears to have a good chance of passing which will provide more state monies into this fund (see administrative presentation item no. 16) , should assure us that next year' s allotments should be as good as , if not better than, this past year. If it remains the same and the construction bids are as estimated by this recent engineering update, this project will consume a little over two years of our State Aid construction dollars ( see Attachment #2) . We obviously will be closely watching the bidding process to see how the project pans out as it relates to the engineer' s revised estimate and also the allocation of State Aid funds in the future. The plans are currently under review at the State Aid office and we anticipate receiving State approval to proceed with the pro- ject by the end of March. It is therefore recommended that the City Council approve the plans and specifications for Bluff Creek Drive improvements as prepared by William Engelhardt and Associates dated February 19, 1988 and that staff be authorized to advertise for bids. Attachments : 1 . Area Map 2 . Feasibility Study Excerpt, Page 7 f A;t: Nr 1 UM -Ur. ...)",„ . .„ ( [ GI. i J. -1? ' Mai ' I \ 1:4319 ga II- --1 \ 1 Ng 11111 wi,ftwommIt IA% kr I ..., I ._. 1---1 1. illiir4e/p" 1 r I , WI • lit,I r illil!r1 I I 1. z,' 2 I • a, a. 1 --Z ""air-i--- 0 I Ill 1111P - ,-- -- _ L I I . - _i. Ahilitilip8 1 1111114mmii,,.4.....4 Ak ..., • • 111110 10 ui C I : I ' \ ' . i o..it. . _ _ 4/ _ ------... .. m. _ 141 _ .• - 7-7----v? I ,...,.,a1H4 ,, 1 : . , _._ ...... ,c• • LD , A . .L.„1.; .. _ . . k_. . ■ , / , \ ----\\ -: i _ ..,_ =NM =MO i I NW .... I . • . - . Noenanv . • ... 1 : S . -1 •:.,•.,..• - I\ .--• 0 . 4...v.:.;A:,..; 1 E x C vte T ruz. ,.., Fr30,41/4S i c 1 ri7 S7`L,,✓0 1 SUMMARY OF COSTS IZEV1SC il C`STl % Al Ige TOTAL ESTIMATED PROJECT COST $ 535 , 282 .00 W01/ 5- 20% ASSESSED 1 Local Participation $ 107 ,056 .40 ¢I 33, - - N.S.A. Funds $ 428 , 225 . 60 534) O(o‘k1 32% ASSESSED f 1 Local Participation $ 171 , 290 . 24 Z13� "`9 - M. S .A. Funds $ 363, 991 . 76 453,' S1 43% ASSESSED 1 Local Participation $ 230 , 171 . 26 4Z B7) OSCi N.S .A. Funds $ 305 , 110 . 74 3_ )6Z-11 tt ASSESSMENT PER UNIT (Local Participation/66 Units) di 1 20% Assessed $ 1622 . 07/Unit *Zc�Z3/Nv►+ ii 32% Assessed $ 2595 . 31/Unit 3 Z37/U�'1 1. 43% Assessed $ 3487 .44/Unit 43 491 Ltut+ I 0 f,5 3 4) I III 16 2 4B, 4 l is g 1 g • I I -7- 1 I 1