1m. Settlement for Brian Tichy II :LrY) ,
CITY OF
"1::1! I
I ,
, .�`
, , ,_ t . 690 COULTER DRIVE •• P.O. BOX 147 •• CHANHASSEN, MINNESOTA 55317
I (612) 937-1900
MEMORANDUM
IITO: Don Ashworth, City Manager
II
FROM: Gary Warren, City Engin r
'� 3�9
DATE: March 9, 1988
I SUBJ: Approval of Settlement for Brian and Nancy Tichy
File No. 85-19A, Lake Lucy Road Improvements
II This is an issue that pre-dates my tenure as City Engineer but which I have been
involved with trying to settle over the past nine months. As the attached docu-
mentation relates, the driveway access to Mr. Tichy's property located at 1471
Lake Lucy Road has been steepened as a result of the Lake Lucy Road improvements.
II The driveway access was steep in the first place and as a result of our road
construction was further steepened due to the need to meet state aid require-
ments for vertical alignment. Unfortunately, the construction documents did not
II properly address driveway transitions of this nature and as a result we have
been working with Mr. Tichy to mitigate the situation.
1 After meetings in the field with Mr. Tichy, our Lake Lucy Road contractor
improved his driveway approach in accordance with Mr. Tichy's request. After
completion, Mr. Tichy informed us that this was not acceptable and the City
further agreed to participate by providing him with fill material for his
I contractor to utilize in further improvements to the driveway. Contrary to our
understanding, this was still not satisfactory compensation in that Mr. Tichy
has petitioned the City for reimbursement of his alleged costs to the tune of
I $3,386.45.
While not entirely satisfied with the scenario that has unfolded on this item,
nonetheless I do support the $2,500 settlement that we have proposed to resolve
II
this matter once and for all. This is a reduced amount from his request which
recognizes the fill materials which the City had earlier donated. Mr. Tichy is
in agreement with this settlement.
IIIt is therefore recommended that the City Council authorize a $2,500 disburse-
ment from the Lake Lucy Road improvement fund for settlement of this claim
I with Brian and Nancy Tichy contingent on them entering into a settlement
agreement with the City for this claim.
Attachments: 1. February 25, 1988 letter from Vesely, Miller & Steiner
I 2. December 17, 1987 letter from Vesely, Miller & Steiner
3. December 1, 1987 letter from Grannis, Grannis, Farrell & Knutson
4. November 18, 1987 letter from Vesely, Miller & Steiner
I
I
VESELY, MILLER & STEINER
PROFESSIONAL ASSOCIATION
ATTORNEYS AT LAW
SUITE 400
NORWEST BANK BUILDING
HOPKINS, MINNESOTA 55343
JERRE A. MILLER JOSEPH C. VESELY(RETIRED)
JEREMY S. STEINER 612-938-7635
February 25, 1988
MA", 0 1 1'282
Mr. Roger N. Knutson
GRANNIS, GRANNIS, FARRELL
KNUTSON
P. 0. Box 57
403 Norwest Bank Building
161 North Concord Exchange
South St. Paul, MN 55075
Re: Brian Tichy - Lake Lucy Road
Dear Mr. Knutson:
Mr. Tichy accepts your settlement offer of $2, 500.00.
Please remit the City draft to my attention payable to Brian
Tichy and Nancy Tichy.
Thanks very much for your assistance.
s//
J 'You s very truly,
%eA.
1
JAM/j w '
cc Brian Tichy
1
MAR X11988
CITY OF CHANh1AS5ttV ,
- 1
VESELY, MILLER & STEINER
IPROFESSIONAL ASSOCIATION
ATTORNEYS AT LAW
SUITE 400
INORWEST BANK BUILDING
HOPKINS, MINNESOTA 55343
JERRE A. MILLER JOSEPH C. VESELY(RETIRED)
IJEREMY S. STEINER 612-935-763S
December 17, 1987
II
I Roger N. Knutson , Esq.
Grannis, Grannis , Farrell & Knutson
403 Norwest Bank Building
I 161 North Concord Exchange
South St . Paul , Minnesota 55075
Dear Mr. Knutson :
The fill provided to Mr. Tichy by the City was not the result of any
settlement agreement or some sort of accord and satisfaction but
I merely a gratuity extended to him if he wished to use it to aid in
repair of the condition in his premises left by the City' s boulevard
construction.
II The important feature for the City to grasp is that the road was
raised to a level of 4 feet which is 3 feet beyond the representation _
concerning the proposed elevation leaving Mr. Tichy with an unmanage-
Iable elevation on his driveway in the winter time.
His previous roadway elevation was 8% and it has now been increased to
I 15. 25%. This grade is unmanageable . His car went off the road during
the last, modest snow storm , and he is out-of-pocket $3 , 386.45 in his
attempt to renovate the mess left him by the City ' s work on the road.
IThe elevation on his driveway now exceeds the maximum allowable in a
FHA financed transaction which further diminishes the value of the
property as a whole.
IAs City Attorney I expect you will convey Mr. Tichy ' s offer to settle
for $3, 386. 45 to the City Council and furnish me its response. At
this point all he seeks to recover is the actual out-of-pocket loss
Ithis project has caused him.
Yo ery truly,
I
-/- ' : • 1-
' cc : Brian Tichy
I
r
LAw OFFICES --
GRANNIS, GRANNIS, FARREI.L & KNUTSON
I
DAVIT) I.. GRANNIS- 1871-1961 PROFFSSI(1NAI. ASSO(IA1ION TLI E(.OPIER.
DAVID L. GRANNIS,JR - 1910-1980 PrIST Or•FU:E Box 57 (612) 455-2359
VANCE B GRANNIS 403 NOR WEST BANK BUILDING; DAVID L. ILIRMF.YER
M.CECILIA RAY
VANCE B GRANNIS,JR 161 NORTH CONCORD EXCHANGE II o-rF B. KNP.TSCH
PATRICK A. FARR El I.
DAVID L. GRANNIS, III SOUTII ST. PAUL, MINNESOTA 55075 MI(UAEL J. MAYER
ROGER N KNUTSON
I
TELEPHONE (612)455-1661
December 1 , 1987
II
Mr. Jerre A. Miller II Vesely, Miller, and Steiner
Norwest Bank Building
Suite 400
IHopkins, Minnesota 55343
RE: Tichy - Lake Lucy Road
Dear Mr. Miller: II
I am legal counsel for the City of Chanhassen. The City
I
engineer has asked me to respond to your letter of November 18,
1987. The City initially restored your client' s driveway in
accordance with the plans he approved. When the work was II completed in accordance with the plan he complained. To settle
his complaint it was agreed that the City would give him 20 loads
of clay and 5 loads of black dirt and that he would be
responsible for completing the(iveway d pay" ng for it. I
GR N , GRANNI , FAFRELL
& NUTS.N, P.A.
I
yBX - /.■�
,�' Roger N. unu son
RNK: sr> I
cc: -Don Ashworth
Larry Brown
II
Gary Warren
I
II
DEC 0 2 1987
I
CITY OF CHANHASSEN
I a3a 9s11unn1IIeN1
VESELY, MILLER & STEINER
1861 6 T PION PROFESSIONAL ASSOCIATION L�'/"-t2 e-F �,.:7 .l.-t�
♦ry c. IPA
a
cau Gl ATTORNEYS AT LAW ��
I N SS NtiH3 JO A11� SUITE 400
N❑RWEST BANK BUILDING
HOPKINS, MINNESOTA 55343
JERRE A. MILLER
I JOSEPH C. VESELY(RETIRED)
JEREMY S. STEINER
612-938-7635
I C _ a `c« ,
November 18 , 1987
z. l/L e_l_/u,,. �',
1 Mr. Larry Brown , --,. � / t j
Assistant City Engineer .0 �/ y— tceQ�
CITY OF CHANHASSEN 3, 71 Gt <2tct_.G ,L e ��
I 690 Coulter Drive -r� . / 6Ly'7`LL ��?.�zs�
P. O. Box 147 �' « ,{
Chanhassen, MN 55317 ��LC,zI-� f
-4, J .
- Re: Tichy - Lake Lucy Road � ' c ,�'
Dear Mr. Brown: � tom', ��� �����C;
I /`c zZ� ctc t.
This office has been retained by Brian Tichy in connection £4.ithi��
the damages and expenses he has incurred by reason of an alleged
I improvement to that portion of Lake Lucy Road which serves as
access to his permises at 1471 Lake Lucy Road . •
For reasons still unknown to Mr . Tichy, the road bed was raised
Ivertically by four feet. This left his driveway access so
steep, the bed of the driveway was actually lost to view when
negotiating a turn into his yard and the resulting change in the
I topography of his lot required timber walls to be constructed
around existing trees, grading , landscaping and a major
reconstruction to his driveway totalling out-of-pocket costs to
him of $3 , 386 . 45 .
IThe unfortunate thing about this so-called im n
City ' s representation to Mr . Tichy initially be the
I one foot increase in road bed height. He was totally unprepared
for the City' s determination to increase the road bed by four
feet in front of his driveway which, in addition to the
I out-of-pocket costs he has incurred to repair this damage, has
diminished the value of his property because of a difficult
access now provided to him, the threat of on-coming vehicles
when exiting from his driveway to Lake Lucy Road , increased
I surface drainage into his front yard and the obvious problems
snow and ice will cause him.
I Demand is hereby made upon the City of Chanhassen to reimburse
Mr. Tichy for the out-of-pocket damages he has sustained because._
I NOV 1 J 1987
CITY OF CHANHASSEN
of the City' s involvement in this project and I urge your
representative to contact me at an early convenience to discuss
the reduction in value the project has caused Mr. Tichy' s real
estate.
Y,.ours v ry trul ,
Je r A L-Miller
JAM/jw
cc Brian Tichy
i