Loading...
1a. Plans & Specs of Stratford Ridge 1 1_c 1 CITY OF . . _.., 1 \ , / . CHANHASSEN .,4 • , .. �� -_ 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I (612) 937-1900 MEMORANDUM ITO: Don Ashworth, City Manager IFROM: Larry Brown, Staff Engineer DATE: April 21, 1988 1 SUBJ: Approval of Plans and Specifications for Stratford Ridge Project File No. 88-3 , Robert Pierce 1 This 15-lot subdivision is located adjacent to Minnewashta Parkway approximately 0 . 6 miles south of Trunk Highway 7 . The 1 plat was approved by the City Council on February 8, 1988 . The plans included the construction of sanitary sewer, watermain and storm sewer along with the proposed road construction of 1 Stratford Ridge and Stratford Lane. The plans adequately address looping of the watermain and fire Ihydrant protection as required as per the final plat approval. The Watershed District has given preliminary approval subject to II the City Council' s approval for the discharge into Lake Minnewashta from the ponding site along the rear of Lots 2 , 3 and 4 of Block 2 . 1 The plans show sanitary sewer and water services being extended from Minnewashta Parkway for Lots 2 and 3 of Block 2 . These lots must be serviced from Stratford Ridge due to the location of the 1 pond. In addition, it is desirable to provide the curb stops in a standard location in the event of an emergency. It is therefore recommended that the plans and specifications 1 dated "Received April 22, 1988" be approved upon the following conditions: Il . The developer shall obtain and comply with all conditions of the Watershed District permit. 1 2 . Wood-fiber blanket or equivalent shall be utilized to stabi- lize all slopes greater than 3 : 1. 1 I I Don Ashworth April 21, 1988 Page 2 3 . All erosion control shall be in place prior to the commen- cement of any grading, and once in place shall remain in place throughout the duration of construction. The developer shall make periodic checks of the erosions control and make repairs promptly. Removal shall be the responsibility of the developer. 4 . Check dams shall be placed every 100 feet across all drainage swales. 5 . Hay bales shall be placed and staked around all storm sewer inlets. 6 . The applicant SHALL maintain one lane of traffic across Minnewashta Parkway at all times. Both lanes MUST be open and driveable during evening hours . 7 . The applicant shall provide for appropriate warning signs along Minnewashta Parkway prior to the initiation of construction along Minnewashta Parkway. I 8 . The applicant shall agree to daily clean up which includes on and off-site clean up. i 9 . All public improvements shall conform to the City' s standards for urban construction. 10. On-site disposal will not be allowed. 11. The OWNER must notify all residents affected by any water interruption 24 hours in advance. The City will NOT be responsible for notification. 12. All catch basin castings shall be R-3250-A or equivalent. 13. The beachlot landscaping plan shall be approved by the City Planner prior to construction. II i.� i I