E-3b. Bandimere Park Expansion Project Encroachment AgreementCITY OF
7700 Market Boulevard
PC Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.2271110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
3b
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Todd Hoffman, Park and Recreation Director
DATE: August 25, 2014 tl
SUBJ: Bandimere Park Expansion Project PK &T— 114: Approve Encroachment
Agreement With Magellan Pipeline For Work In Pipeline Easement
PROPOSED MOTION
"The City Council approves an encroachment agreement with Magellan Pipeline
for work in the pipeline easement for the Bandimere Park Expansion Project.
City Council approval requires a simple majority vote of those present.
BACKGOUND
The City Council approved a purchase agreement acquiring two properties totaling 4.5
acres to expand Bandimere Community Park in May of 2012. The east lot has a Magellan
Pipeline traveling through it.
Recreation Center
DISCUSSION
2310 Coulter Boulevard
The Magellan Pipeline crosses north/south through the 9151 Great Plains Boulevard
Phone: 952.2271400
property. The plans for the Bandimere Park expansion calls for grading and filling over
Fax: 952.227.1404
the top of the Magellan Pipeline and within the pipeline easement. In order for this work
to take place, an encroachment agreement between the City and Magellan Pipeline needs
Planning &
Natural Resources
Pp agreement to be approved. This a eement outlines the requirements for the contractor to work in
Phone: 952.227.1130
the pipeline easement. It also specifies the necessary insurance coverage of the
Fax: 952.227.1110
contractor. The work within the easement will be coordinated with the Magellan Pipeline
construction inspector.
Public Works
7901 Park Place
The City attorney has reviewed the agreement.
Phone: 952.227.1300
Fax: 952.227.1310
SCHEDULE
Senior Center
Demo House /Complete Grading Operation September /October 2014
Phone: 952227.1125
Restoration/Final Completion November 15, 2014
Fax: 952.227.1110
ATTACHMENT
Web Site
1. Encroachment Agreement
www.c i. chanhassen. mn. us
g: 1pazx�u��ba�t�yl�s, t,# a�trmprNrftq !{at!ita���ridfn�4ai�Fo!>'nd Planning for Tomorrow
(Drafted by & when filed return to: Magellan Pipeline Company, L.P., P. O. Box 22186, MD OTC -9 (S. Guthrie), Tulsa, Oklahoma 74121 -2186,
9181574- 7350.)
ENCROACHMENT AGREEMENT
This Encroachment Agreement ( "Agreement ") is made and entered into by and between
Magellan Pipeline Company, L.P.; a Delaware limited partnership, whose address is P.O. Box
22186, Tulsa, Oklahoma, 74121 -2186, (hereinafter called "Magellan "), and the City of
Chanhassen, MN, a Minnesota municipal corporation, whose mailing address is 7700 Market
Boulevard, PO Box 147, Chanhassen, MN 55317, its successors, assigns and grantees
(hereinafter called "City ").
WITNESSETH:
WHEREAS, City represents and warrants that City owns the right to construct the Bandimere
Park expansion, to include road (driveway) removal, culvert removal and grading on all the
certain land (hereinafter "Subject Land "), described on attached Exhibit "A" and made a part
hereof; and
WHEREAS, Magellan is the owner of certain pipelines, pipeline facilities and appurtenances
(hereinafter referred to as the "Magellan Facilities ") and easement rights therefor, (hereinafter
referred to as the "Easement', whether or not rights were granted in one or more documents or
acquired by operation of law). For purposes of this Agreement only, "Magellan's Easement
Tract" shall be considered to be any area within Fifty (50) feet of any Magellan Facilities,
unless a different right of way tract width is specifically described in the Easement, in which
case such specified width shall define Magellan's Easement Tract. The land referenced in the
Easement includes a portion of the West Half of the Southwest Quarter (W' /2SWt /4)
of Section 24 of, Township 116 North, Range 23 West, Carver County, Minnesota, pursuant to
those certain instruments recorded in the records of said county and state and described as
follows:
Encroachment Agreement EA -P Xing — 4-4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
1) Right of Way Agreement as to a pipe line or pipe lines dated September 4, 1954,
from Arthur Bandimere and Shirley Bandimere, husband and wife, and Delta
Bandimere, a single man, in favor of Great Lakes Pipe Line Company
(Magellan's predecessor in title), its successors and assigns, and filed for record in
Carver County Office of Register of Deeds, Book 57 Deeds, at Page 458; and
2) Partial Release of Right of Way dated December 14, 1967 and recorded in Book
15 of Satisfaction, Page 292 -297, Instrument 03012, Carver County Register of
Deeds, from Williams Brothers Pipe Line Company to Arthur Bandimere and
Shirley Bandimere, husband and wife, and Delta A. Bandimere and Gladys
Bandimere, husband and wife, releasing a portion of the rights granted in the
Right of Way Agreement listed above; and
3) Right of Way Agreement as to a pipe line or pipe lines dated July 28, 1954 from
Catherine Klein, a widow, in favor of Great Lakes Pipe Line Company
(Magellan's predecessor in title), its successors and assigns, and filed for record in
Carver County Office of Register of Deeds, Book 57 Deeds, at Page 452; and
4) Partial Release of Right of Way dated March 6, 1985 and recorded as Document
No. 40390, Microfilm Roll 4, Microfilm Page 64 -66, Office of County Recorder,
County of Carver, MN, from Williams Pipe Line Company to Stanley E. Klein
and Joyce E. Klein, husband and wife, releasing a portion of the rights granted in
the Right of Way Agreement listed above; and
WHEREAS, for the purposes of this Agreement an "Encroachment" is defined as any use of
the land within Magellan's Easement Tract by someone other than Magellan which could
interfere with Magellan's Easement rights or could create safety concerns related to Magellan's
Facilities as more fully described in Magellan's General Encroachment Requirements as set
forth in attached Exhibit `B" and incorporated herein by reference. Magellan does not permit
or authorize any Encroachments unless specifically approved in a written agreement
identifying all "Approved Encroachments "; and
WHEREAS, City desires to obtain Magellan's consent for one or more Encroachments on
Magellan's Easement Tract;
NOW, THEREFORE, in consideration of the covenants and agreements herein and other good
and valuable consideration, the receipt and sufficiency of which is hereby acknowledged,
Magellan, subject to the following terms and provisions, hereby consents to the Encroachments
listed below. as "Approved Encroachments" described and limited pursuant to the following
specified plan drawings, which were furnished by City to Magellan ( "Plan Drawings ") and
attached hereto as Exhibit "C ":
Encroachment Agreement EA -F Xing — 4-4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13.633
1) City of Chanhassen, MN, Park and Recreation Department, Bandimere Park Expansion,
Park Grading Plan, Grading Plan & Erosion Control Plan, Exhibit "C" Sheets 1, 2, & 3;
TERMS AND PROVISIONS
Approved Encroachments. The Approved Encroachments, as further identified,
described and limited in the Plan Drawings as set forth in Exhibit "C" are limited to the
following:
(a) Removal of Road and Culvert. The project proposes to remove an existing road
and culvert within the Magellan Easement and crossing the Magellan Facilities.
City is required to adhere to Exhibit `B" - General Encroachment Requirements
in section D.5.g which requires the minimum requirement of 4 feet of compacted
cover between the surface and the top of the Magellan Facilities. Exhibit `B"
Section E.7 requires excavating within 2 feet of the Magellan Facilities shall be
done by hand- digging until the pipeline is exposed and its location is accurately
known A Magellan Representative must be on site while work is being performed
within the Magellan Easement. Exhibit "C" Sheets 1, 2, 3);
(b) Adding Fill over the Magellan Facilities. The project proposes to add fill over the
pipeline to prevent swamp -like conditions. The maximum cover over Magellan
Facilities is 8 feet. The proposed plan creates 7 feet of total cover which is
acceptable. The appropriate erosion control plan Exhibit "C" Sheet 3 must be in
place over Magellan Facilities to provide protection from exposure;
(c) Note provisions 11 and 12 herein below for Heavy Equipment Crossings and
Maximum Unsupported Span Length (Excavation) requirements. Additionally,
Magellan Representative is required to be present during construction of the
proposed improvements to confirm minimum clearance and depth of cover
requirements have been met and that the existing Magellan Facilities are not
damaged.
2. No Other Encroachments. Except for the Approved Encroachments as defined in the
Agreement, Company shall not create, erect, place or construct any other Encroachment
on, above or below the surface of the ground on Magellan's Easement Tract, or change the
grade or elevation of the ground surface within Magellan's Easement Tract or at any time
plant or allow any trees thereon or cause or permit any of these to be done by others, without
the express prior written permission of Magellan.
3. Magellan On -Site Representative. Exclusive of Saturday, Sunday, and legal holidays, City
shall notify Magellan a minimum of 48 hours in advance of any Encroachment activities on
Magellan's Easement Tract so that Magellan may arrange to have a representative present.
At Magellan's option and at City's sole cost and expense, Magellan's representative may be
Encroachment Agreement EA -F Xing — 4-4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
on site during all Encroachment activities over or within ten feet (10) of the Magellan
Facilities to confirm that no damage occurs to the Magellan Facilities. The presence of
Magellan's representative or any verbal instructions given by such representative shall not
relieve City of any liability under the Easement or this Agreement, and will not change the
terms of the Easement or this Agreement, which may only be changed by written agreement
by authorized representatives of City and Magellan. If pipeline, coating, cathodic protection
and/or any other repair of Magellan Facilities is required by Magellan or if the safety of the
Magellan Facilities is jeopardized, in Magellan's sole judgment, City shall stop all
construction activities on Magellan's Easement Tract until said repairs are completed or
until any unsafe construction practices are resolved to the satisfaction of Magellan's on -site
representative. Written notification of such construction activity shall be made to
MAGELLAN PIPELINE COMPANY, Howard White, Coordinator of Operations &
Maintenance, 2728 Patton Road, St Paul, MN 55113; Office:(651) 6354279, Cell: (612)
759 -9452, Fax: (651) 633.5464, or such other representative of Magellan, which Magellan
may from time to time designate.
4. Protection of Magellan Facilities. City shall protect the Magellan Facilities if excavating
and backfrlling become necessary within Magellan's Easement Tract. If excavating within
2 feet of any Magellan pipeline or when otherwise deemed necessary by Magellan's on -site
representative, City shall perform any necessary digging or excavation operations by hand
digging. City shall reimburse Magellan for all costs of having a representative of Magellan
on -site during construction activities related to the Approved Encroachments.
5. Breach. If either City or Magellan breaches this Agreement and the non - breaching party
commences litigation to enforce any provisions of this Agreement, the reasonable cost of
attorneys' fees and expenses will be payable to the non - breaching party by the breaching
party upon demand, for all claims upon which the non - breaching party prevails.
6. Insurance. City shall procure or cause its contractors and subcontractors to procure and
maintain in force throughout the entire term of this Agreement insurance coverage described
below with insurance companies acceptable to Magellan for work performed related to the
construction of the Approved Encroachments. All costs and deductible amounts will be the
responsibility and obligation of the City or its contractors and subcontractors. Prior to
commencing any activities related to the construction of the Approved Encroachments, the
City must deliver to Magellan certificate(s) of insurance, naming Magellan Midstream
Partners, L.P. and its Affiliates as an additional insured. The limits set forth below are
minimum limits and will not be construed to limit the City's liability:
(a) Workers' Compensation insurance complying with the laws of the State or States having
jurisdiction over each employee and Employer's Liability insurance with limits of
$1,000,000 per accident for bodily injury or disease.
n
Encroachment Agreement EA -F Xing — 4-4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
(b) Commercial General Liability insurance on an occurrence form with a combined single
limit of $5,000,000 each occurrence; and for project specific, an annual aggregate of
$5,000,000. Coverage must include premises /operations, products /completed operations,
and sudden and accidental pollution. Magellan Midstream Partners, L.P. and its
Affiliates (hereinafter defined), and its and their respective directors, officers, partners,
members, shareholders, employees, agents, and contractors shall be included as additional
insureds. The term "Affiliate(s)" as used herein means, with respect to Magellan
Midstream Partners, L.P., any individual, corporation, partnership, limited partnership,
limited liability company, limited liability partnership, firm, association, joint stock
company, trust, unincorporated organization, governmental body, or other entity
(collectively, a "Person') that directly, or indirectly, through one or more intermediaries,
controls, or is controlled by, or is under common control with Magellan Midstream
Partners, L.P. The term "control" (including the terms "controlled by" and "under
common control with "), as used in the previous sentence means the possession, directly or
indirectly, of the power to direct or cause the direction of the management and policies of
Magellan Midstream Partners, L.P. or such Person, as applicable, whether through
ownership of voting stock, ownership interest or securities, by contract, agreement or
otherwise.
(c) The Sudden and Accidental Pollution can be a separate, stand alone policy, but must still
meet the $5,000,000 minimum limit requirement. If the coverage is written on a claims -
made policy form, the coverage must be maintained for two (2) years following
completion of the work activities related to the Approved Encroachments.
(d) In each of the above policies, the City or its contractors and subcontractors agrees to
waive and will require its insurers to waive any rights of subrogation or recovery either
may have against Magellan and its affiliated companies.
(e) Regardless of the insurance requirements above, the insolvency, bankruptcy, or failure of
any such insurance company providing insurance for the City or its contractors and
subcontractors, or the failure of any such insurance company to pay claims that occur,
such requirements, insolvency, bankruptcy or failure will not be held to waive any of the
provisions hereof.
(f) In the event of a loss or claim arising out of or in connection with the construction of the
Approved Encroachments, the City agrees, upon request of Magellan, to submit a
certified copy of its insurance policies for inspection by Magellan.
(g) The City shall require all of its contractors and subcontractors for work related to the
construction of the Approved Encroachments to provide adequate insurance coverage,
all to be endorsed with the Waiver of Subrogation wording referenced in Section (d)
above; any deficiency in the coverage, policy limits, or endorsements of said contractors
and subcontractors, shall be the sole responsibility of the City.
5
Encroachment Agreement HA -P Xing — 4 -4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
7. Indemnification. City will indemnify, save, and hold harmless Magellan, its affiliated
companies, directors, officers, partners, employees, agents and contractors from any and all
environmental and non - environmental liabilities, losses, costs, damages, expenses, fees
(including reasonable attorneys' fees), fines, penalties, claims, demands, causes of action,
proceedings (including administrative proceedings), judgments, decrees and orders resulting
from Company's breach of this Agreement or caused by or as a result of the construction,
use, maintenance, existence or removal of the Approved Encroachments and Other
Encroachments located on the Magellan Easement Tract. The presence of Magellan's
representative or any instructions given by such representative will not relieve Company of
any liability under this Agreement, except to the extent that such liability results from
Magellan's or its representative's gross negligence or willful misconduct.
8. Damage or Loss. Company covenants that:
(a) If at any time, in the sole opinion of Magellan, it becomes necessary for Magellan, to
cross, occupy, utilize, move or remove all or portions of the Approved Encroachments
placed on Magellan's Easement Tract or constructed pursuant to this Agreement, for
any purpose, including but not limited to surveying, constructing new facilities,
maintaining, inspecting, operating, protecting, repairing, replacing, removing or changing
the size of a pipeline(s) and appurtenances on Magellan's Easement Tract and such
activities by Magellan result in damage to or destruction of the Approved
Encroachments, then repair, replacement or restoration of such Approved
Encroachments shall be at the sole cost and responsibility of Company.
(b) If at any time, any encroachments belonging to or permitted by City which are not
authorized by this or another written agreement ( "Other Encroachments ") are found to
be on Magellan's Easement Tract, Magellan may at any time request Company to
remove such Other Encroachments, and if City refuses or fails to do so within a
reasonable time, Magellan's may remove them from Magellan's Easement Tract to a
location off of Magellan's Easement Tract at City's expense, unless they are allowed to
remain by a written agreement between Magellan and City. Should such removal
activities by Magellan result in damage to or destruction of the Other Encroachments,
then repair, replacement or restoration of such Other Encroachments shall be at the sole
cost and responsibility of City, and such Other Encroachments may not be repaired,
replaced or rebuilt on Magellan's Easement Tract without a written agreement between
Magellan and City.
(c) If during the exercise of the rights granted by the Easement or by this Agreement, the
Approved Encroachments and Other Encroachments, if any, are damaged, destroyed
or suffer loss of value, City agrees to release Magellan, its affiliates, and its and their
respective directors, officers, members, partners, shareholders, employees, agents and
0
Encroachment Agreement EA -F Xing — 4 -4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
contractors from and against any and all liabilities, and damages or losses which may
arise as a result of the damage to or loss of use of the Approved Encroachments and
Other Encroachments, if any, caused by Magellan, its employees, agents and
contractors.
9. Magellan Rights. Magellan and City agree that the existence of the Approved
Encroachments or this Agreement does not constitute a waiver of Magellan's rights under
the Easement. Magellan hereby reserves and City hereby grants and confirms all of
Magellan's rights, title and estate as set forth in the Easement.
10. The terms and conditions of this Agreement will constitute covenants running with the land
and be binding upon and inure to the benefit of the parties hereto, their successors, assigns
and grantees. This Agreement may be executed in two or more counterparts, each of which
shall be deemed an original, but all of which together shall constitute one instrument. This
Agreement shall become effective upon its complete execution by the parties hereto.
11. Heavy Eguiument Crossings. Although exact construction equipment is not known at this
time, pipeline stress calculations have been performed based on an assumed maximum
loaded vehicle weight of 80,000 lbs. The stress calculations further assumed that the gross
loaded vehicle weight was evenly distributed between two (2) axles resulting in a maximum
wheel load of 20,000 lbs. Based upon these assumptions and the pipeline depths provided by
Magellan, equipment meeting the aforesaid criteria may safely cross the Magellan pipelines;
however, a Magellan field representative will need to be present to verify the pipeline
depth of cover prior to allowing equipment to cross. A minimum cover of three (3) feet
shall be maintained for all equipment crossings over Magellan Facilities.
Tracked equipment and equipment exceeding the maximum wheel load specified
above will not be allowed to cross the Magellan Facilities without further evaluation of
the pipeline stresses. If equipment exceeding the maximum wheel load specified above will
need to cross the pipelines, detailed information will need to be received in order to perform
pipe stress calculations. The following information will need to be received to perform a
more thorough analysis of wheeled vehicles: loaded vehicle weight, number of axles on the
front and rear, and weight distribution between the front and rear axles. For equipment on
tracks, the following information is needed: loaded vehicle weight, length of track in
contact with the ground, and track width.
12. Maximum Unsupported Span Length (Excavation Requirements). Certain precautions
will need to be implemented to ensure the safety of the Magellan Facilities. Magellan's
standard practice is to conduct non - destructive evaluations and/or weld on reinforcing
sleeves on all girth welds that will be fully exposed when the native supporting soil under
the pipeline will be removed for a length greater than or equal to the respective pipeline's
safe maximum allowable unsupported span length.
Encroachment Agreement EA -F Xing — 4 -4-14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
Based on the pipeline specifications and maximum operating pressure for the Magellan
Facilities, the safe maximum unsupported span length is 65 feet.
The City will need to pay careful attention to the unsupported pipe length of the Magellan
Facilities. If more than the safe maximum unsupported span length for the Magellan
Facilities has been exposed, Magellan will require non - destructive evaluations of the girth
welds and will make repairs as necessary. Costs associated with repair work or the need for
a pipeline contractor for assistance will be the responsibility of the City.
IN WITNESS WHEREOF, the parties have set their hands on the dates expressed below.
MAGELLAN PIPELINE COMPANY, L.P. CITY OF CHANHASSEN
By Its General Partner, Magellan Pipeline GP, LLC
By Its Undersigned Authorized Signatory:
By:
Name:
Date:
2014
By:
Name: _
Title: Mayor
Date:
2014
Encroachment Agreement EA -P Xing — 4-4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
STATE OF OKLAHOMA
SS
COUNTY OF TULSA
Before me, the undersigned, a Notary Public in and for the county and state aforesaid, on this
day of 2014 personally appeared , to me
personally known to be the Authorized Signatory for MAGELLAN PIPELINE GP, LLC, a
Delaware limited liability company, who being duly sworn did acknowledge to me that she
executed the foregoing instrument on behalf of said limited liability company as the free and
voluntary act and deed, for the uses, purposes and consideration therein set forth.
Witness my hand and official seal.
My commission expires:
STATE OF MINNEOSTA
R &y
COUNTY OF CARVER
Notary Public
Before me, the undersigned, a Notary Public in and for the County aforesaid, on this day
of , 2014, personally appeared to me known
personally to be the Mayor of the City of Chanhassen, MN, a Minnesota municipal corporation,
who being duly swom did acknowledge to me that he executed the foregoing instrument on
behalf of said City of Chanhassen as the free and voluntary act and deed of said City, for the
uses, purposes and consideration therein set forth.
Witness my hand and official seal.
Notary Public
My Commission Expires:
Encroachment Agreement EA -F Xing — 4 -4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
EXHIBIT "A"
SUBJECT LAND
THE WEST HALF OF THE SOUTHWEST QUARTER (WthSW' /4) OF SECTION 24 OF
TOWNSHIP 116 NORTH, RANGE 23 WEST, CARVER COUNTY, MINNESOTA
10
Encroachment Agreement EA -F Xing — 4-4 -14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13 -633
EXHIBIT °B"
GENERAL ENCROACHMENT REQUIREMENTS
11
Encroachment Agreement EA -F Xing— 4-4-14 — Tracts 7339 & 7340, Carver County, MN - Agent HCP - Project 13-633
EXHIBIT "B» TO ENCROACHMENT AGREEMENT, 1 of 4
MAGELLAN PIPELINE
Megelleds EaearroxTran. For
L MAGECIAN RIGHT OF WAV
loBnwing:
msulriagcovm(veoicalbames
PRACTICE.
COMPANY, L.P.
other activities of the Owner on be
- Location and depth of a0 Magellan
from be surface of the lard to be top
Magellan Easement Tana be
pipelines and facilities
of Magellan's pi,afida) is not gbrab,
Magadan fold representative shall
1. Permnaf Fifteen, and Figures
- The width of Magellan's Evsemem
than eight feet (g').
General Encroachment
determine whether Magellan's
To Be Near Offer shall Man`s
Tract
Requirements
codt'ouous preserve or panume
Easement Tract In order b keep
- AS[andardwdmin,whandnt
g. Eraalan Control Materials.
monitoringiveneroschment
Magellan lights of way clear for
masvicamely displayed containing
Cmsimicmnal bmebbe may be
A. GENE k6l, - These requirements
acuvi[ies will be required and shall
mmosiany maintenanre. inspection
the following language:
showed on Magellan's Eawmem
dada the minsurro mndards of
inform the Owner. A Magellan
antl emergency access. personal
Tract for temporary periods of
pramim far wriamehmems by a
representative will be made available
property and furores shall not be
WARNING
com[racdon end rearredon.
).ad, ,(including any developer,
upon All hours notice(emchuave of
phase. stored Or maintained 0n
91611- PRESSURE PIPELINE(S)
buaness -city. utility company or
weekends and holidays) to determine
Magellan's Easement Tract. Pam0al
Recreation a dAr Conservation
9. Proof or'15Be W Pmcerh.
iodividoal working far. a,.. behalf
the location and approximate depth
property and fixtures include, but ere
Prohibited Without compliance with
Magellan may ratimm Ow or to
of, m with permission of landowner)
of any Magellan pipelines. NO
not handed lo, smarts, sheds,
Stab One -Call AND Without Witrom
provide p ... fofcummt ownership of
(herein referred to colItnively as
maerva[ion shallhe cammencel
automobiles, trailers, mobile homes,
Pemtissma From MAGEU.iN
the land where the proposed
'Owner') to pipeline monitors and
without prior writes approval from
above - ground swimming ports,
PIPELINE MAORANY, LP.
ewmachdmr is to be labeled. Sach
rightsafway (' Magelan's
Magellan and verification by
business equipment, pro0at
proof may be in the farm are Title
primmest Tres.', owned ar operated
Magellan of the location and
inventory, scrap meld, boulders.
O. WdBen Encroachment
Commitment, This policy, or a copy
by Magellan Pipeline Company, L,P,
approximate depth of its Firestone,
large rocks, debris, junk and piles of
Agreement Reaulred. A waited,
of a recorded Warranty Deed.
( "Milgrim'). Upon writes Rqucm
mmaian.
Mllyexecutedli .OnSobegan
by Owrnrm Magetvn,awpy of
3. Magellan's FacN &s.
Agreement most be of place between
10. Siddivsion net Magellan
these miamum requirements shall W
Magellan's facilities include. but am
2. Encerachronls Sublest m Hefne
Magellan and Owrer before Owner
requires a copy of the Subdivision
Claimed from Magellossis, aaemmt
provided to any developer. business
net limited b, Eaemem, rights of
..a.. work on any
Plat dapptcable, if the plat has been
x-rigoijubjucl took termx of its
entity, utility company or Individual
way, pipelines, meter and valve tiles,
enaoachmen,
recorded, Maybin captions a copy
waking on babalforowner or with
aboveground piping msi folds and
2asemem(iwlvding right army
indicating the book and beat, of
be permission drowse, within
cathodic prostration systems.
agreements] and other written
S. Cam- , Unless otherwise agrad m
the recording.
Magellan'a E eared Tract. Specific
agreement), Magellan may keep
writing, almst to Magellan that
c'umantmces mayao hire additional
A. Laud Use Chance. Notification.
Magelmes Eeament Tract clear of
msaa from any encroachment should
11. ramdon and AS0entist
The landowner and tenant Iran,,
Depth of Pihelimes. A Magellan
pm:aolions or more stringent
items that may hinder lheexemiseof
be paid by Owner. Suchoostshad
methods In order to norcel the
must notify Magellan at any and
Magelan's rights m mrmruch
IocNtic, but rot he limited to:
repreadadive is normally available
integrity of Magellan's pipelnes and
every time when [be land ass will he
cosmic, fnsport, maintain, re mbrarA
roedukadion, romea dsom lowering
with AS hours notice (exclusive of
lsatism Marcos ca Bummer Tract
changed for find on m sdjamenno
access lea pipelines and other
and prmecdon of Firms". Including
wcekeadsaMhotdays) bde[ermine
for purposes or thess Genemi
Magellan's ES.emem Tmm.
buddies. Clearing of the Magellan's
engineering evaluating and design,
the locomen. and approdrdm, depth
Encrosearmnt lumbement shall be
Examples crouch land use changes
EaumentT..t Shall enchide, but not
field labor and real estate research
of the pipelin(s). Ntracning nine[
considered to la srry tea within fifty
met
be limited to the following: removal
and document preparation and
depths or pipelines may refits, par.
(50) fa[ ofary Magadan pipeline or
' Change from pmtum to carnation
oftress, brash, manm ether
handling
boning or hand - digger, by. and at
other MSgcUrm owned or operated
• Change in depth of t(Iling(e.g,
vegetation and no.- permitted
expense of Owner in the presence of
facility unless a diflerert Fight of way
old wing deeper or deep - breaking the
encroachments bceted oa m
6. PJcetne rmeedity lnsomdon
an amhodead Magellan
Pear to the immll.bor filmy
width is specified by arc mm ore
land)
ovefimrging all or part of.,
representative. NO escava[lon on
ramoded fight of Way of manmenl
• Change N that lCnaCP3 wW be wt
MWIISa'S Easement Tract. T. Or
structure, parking wt. roadway, or
MageltKS Ememmf Tram Shan lake
d0cuaent(honam. wllec[ivedy tail
dare -Set
other vegemban overhanging
other facility which might interfere
place without approved by Magcllm.
"Easement", whetMrore or more),
. Change from agricuhoml use to
Magellan's Easement Tract may be
with or binder Magellan's Inspection
in which case such specified width
residential commercial or induafinl
ode- hummed.
ofany pipeline or facil'ay. Magellan
12. Vertical Semaratin Between
Magellan Poultme or Facility and
shall&Fia Magellan's garment
"se'
will perform an integrity review of it
Tract.
- Change from residential to
C. ENCROACHMENT PLANNING
pipeline and my other assets which
an Encrombee 0111a10r
commerc is[ or from mmmerofad to
mayhe afechd by the Imposed
stDtct. Vertical sepnoman1,
I. Enemmhmnl DeRalim. M
industrial.
1. Plan Review R ... head by
S[NCtrm, parking lot. roadway or
defined in this document as the
"encroachment " is my use Of [be
5.Gvemunit Raulatiooand
M.Ma . For any O"imchomi,
other encroaching facility in order to
vertical distance between tit
IanA within Magellan's Eurobond
Magadan must be provked project
data that Magellan's asset
amounted part Ora Magellan
thisho v Guidet.ea Owner mum
Tract which could imerlhre with
plans to review, end approve. odor to
comply with integrity regdifPNant
piNMe. facility re eropmenma(far
Magellan's Eminent rights or which
comply with oil applicable laws and
the m,nes hereareccuning, for
and in add. Magellan to make any
example, [be ou .:,a of [he pipe [for
bandit rsmmfety concerns for
ragamions. mw on as Magellan's
purpcse5 ofdars'. pmmndon.
needed changes psur to cumbeieo.
unamed pipet or the outside of the
Magellan pipefinea and/or facilities
potiaesasexpresmed herein. Owner
ofanycrcroechmcnts
pipecasin, functional pipe]) and the
located on Magellan's Easement
is also hereby rofrmtl to the
2. xt R rmi »- adr�y -�v Candidate �g late P6n..
ou[ermoal pen of the emouifor,
Tram. Encroachment include, not
Gbrmnon Ground Alliance Best
Owner must subml[ complete Idiom
7. SWI On Magellan's Easement
Object. (for example, the outside of
ere no[ trotted to: sonal.as, forma.
practices Which can be found on the
W Magelan for revew. barometric
Treat Remnvine, said Addiae, No
the ercroaching piphre or the
personal property, landscaping,
wrbahm:
plans could delay Magellan's
sou shall he removed from or added
outideofitmndui0.
Foreign utilities, foreign pipelinm,
WWw,commongroandallianm.wm
engineering impa[mudy and
to Magellan's Eminent That
roadways, railroads, mangy
(Ser'Progmm Information "/ "Best
insuffokn[information could result
with..[ written Submission from
13. Carw[rmcdan Ron[ . now .I
crossings, wrier impouMment,
prociiese) and which is available
Or licensed wars plans mull
Magellan, My Son added most be
InPonandon. Owner Shall provide to
welds, heavy equipment and heavy
from Common Groartl Milan. in
include
ckor(with., mmamicents, trash or
Magellan beformadion as to the type,
foods oa Magellan's Easement Tract,
booklet form for eery refnums. Beat
- Aplanviewofthepmjec[wish[be
debris) fill dot ant mm[ he theitedin
sire, and weighof ... Mason.
and elm any abevetion. djgging,
Pmerms addresses the "A wmmon
pipenne(s) location ineWded.
amount So met Ihe
equipment that will be used over or
drifting, barrel of and soon Jan.
issues for damage promotion for an
- M tlustmdon in profile of the
in [be virtually of bm pipaive(s).
removal or disturbance of soli or
encroaching party, including, amps,
existing Surface elevations. the
subsoil within Magellan's Easement
others: Planning and Dredge; Orr`
proposed surface ehyame, and the
D. ENCROACHMENT DESIGN
Treat
Cat Center, Loosing and Marking;
eleva[im of be Magellan pipefine(a).
RFANREMENTS&
Exavaion; and Mapping.
- A wmprehensivemnity /armature
STANDARDS
2. Mamlian Reoresenative
pct theevea ofa called wt..
/grading plan depicting the
Reouired O.,Su,. Magellan
haws ant regulation. Magellan's
relationship on the pipeMe(s).
1. Risk of Las and Database.
pipeline systems opemle al high
policies and the Common Ground
- A proper legal description of the
Oce"lall mar the risk of bas,
pressure& and for safety mawm,
Allmnw Hal Prectices, the roPowmg
projectdocatim.
damage Sharon, dominated many
Magellan requires it company
priodty shalt govern encroachment
- Complete landscaping piano,
swmue. fence, landscaping Or
represemmives b W on -sile while
or Mugetan's Easement Trace ]at
- Complete plans Far backfslling and
improvement placed within @e
Owner m ommeadng or performing
laws amt regaadoa; 2nd --
c.mpacdoa of bsckfill mmerial,
boundana of Magellan's Easemest
other activities which could endanger
Magellan policies: and 3eA --
3. Pjers Must Show Magelon's
Tract and shat hold Magellan
the Magellan pipelines or Other
Common Ground Alliance Bert
harmless
Eesemmf Teset PIceM -s and
facilities on
Pmcient
Fpolfdee, At wnstucreon plans
(pelnt) Srow, And, where all or
any part ofMagellmi s Easement
Tract, any Magellan pdpeline m
facility is leaned most ma[ad [be
Page 1 of 17 Page 2 of 17 Page 3 of 17 Page 4 of 17 Page 5 of 17
General Encroachment Requirements — (L.P.— 1/1/07)
RXHTRTT "B" Tn F,NCRnACNMFNT ArRT4.FMFNT ') -f-
swclures and for mycon sep.hatul
damages which may arise met of
Magellan or its designees exercking
Magellan . Easement rights or which
May .1. out orsxening
Magellan's Basement Tmm, pipelines
orfaeilities.
2. B.IWimen, Structures aad
Va..
a. BYlldinga and Structures. No
buildings, ruses barns, mmm,
patios, playhouses, shade, septic
systems or drain fields,
swimming Pools (show,ground
nreaba- ground), namorced
concrete slabs or Other similar
emmumms will be permitted oa
the Magellan's Easement Tract.
N goods System not permuted.
No septic- system, including any
laeral tines wul he permitted on
Magellan's Easement Tract
c Residual, Wells. Retaining walk
are not permhted on Magellan's
Easement Tract.
d. Fences. No Noce shall he
constructed or arammaud an
Magellan's Easement Tract
without a written agreement
e. Requirements for Eaters. if
fencing .. Magellan's Eammem
Tract In authorized by a written
agreement with Magellan, the
fencing most comply with the
following:
1) Not Parallel to Pipeline. No
fence shall he allowed to be
constructed parallel closer
then 10 feet to any Magellan
pipeline, with. the
boundmies of Magellan's
Easement T.4
2) Fence Pats Lucatiora No
fence Posts will be allowed to
be within five (5) had ofany
Magellan pipeline or facility.
3) Genes Required. Magellan
may require any lease
constructed within the
boundari. of Magellan's
Easement Tract to have gales
of such size and smub0ity as
in recess ay or convenient for
Magellan to access its
pipeline mayor facilities for
he operations, including
impeetbna at each point
where the lance so. a
Magellan pipeline or facility
bound., Magots shall he
arwed to pal a Mainline
lock on such gates, which will
arw a. 1. Magellan's
Basement Tract motor
facilities through such gums.
4) Angle of b'eaee Cresol It
is pmR.d that farm
crossings be as close to 90
degrees as possible.
3. Lnndeanine. Elevation
('hannea and Wamr.
a Latdxeping Deflation,
Landscaping shall include,
but rot bellmied m, tree,
shrubs, underground
torpedo. or sprinkler
systems, sidewalks ... ther
Pat" retabni.g walk tetras.
orotler land grade changes,
whhin
Page 6 of 17
h. General Landsaping
Requirements. The following am the
general moss for landscaping on
Magellan's Easement Toro:
I )WnIWP Approval. Landscaping
proposed to be done on Magellan's
Foment Tram must be mpmved
by Metal].. in a written
mcmaehm.r agreement, Among
other terms, the eas,aechmcnl
agreement will releeae Magellan
from any liability for damages to
the landscaping from the exercise
of Magellan's Easement rights.
2) Teems Not Frondfkd. Trees
ere not permitted oa Magellan's
Easement Tun.
3) Monte. Shrubs exceeding 3
feel a height anym oWlmcdng
the view of any Moral Ian pipeline
roil Sidewalks,
:ms, field drain lines
then are t. moss e
at an angle leas ran 45 degrees
and most comply with other
applicable pmvlsiom orthis
document.
c No Water Bodies on Msgdli
Easement Tract. Retention of water,
including but not limited to,
Livestock ponds, lakes mention
ponds. or wetlands may not be
constructed or formed on Magellan's
Faeement Tract.
d. Senate Grade nM Elevation
Changes Surface owl, or elevation
changes must be reviewed and
approved in writing by Magellan.
4. Fareea Pinellas & Milk,
Cro.lna, No foreign pipelines or
ufky fires ofany type shall be
allowed to be construacd parallel la
any Magellan pipeline within the
boundaries ofMegellan's Easement
or,
a Minimum Angle for
FipelineNtilty Crating. Any
foudgn pipeline or ulalgy the, is
proposed m cross a Magellan
pipeline must cross the Magellan
pipeline at an angle as close to 90
degrees a possible, but in no Overt at
an made less than 45 degrees,
b. Vertical separation
Requiremerthe for Creasing. Foreign
piper e(a),aflitiot(excepthigh-
.11,e Hues— ve below) or now
lines should coma Magellan
pipeline(s) with at kart 24 inches of
venial aepustion. Special written
authoriaalion most be given in the
event vertical .,.firm is kit than
that spxif,d in these Gemeral
Encroachment Requiremeau. The
preferred method par a foreign
pipeline or unity to comes a Magellan
pipeline is a cmu below the
Magellan pipeline.
e W'eMng Tape Requred. When
any foreign pipeline craftily line is
proposed to crow a Magellan
pipeline, Owner mum place 6" wide
MchtaswpCan No. 8288T I2 or
equal within Magellan's Easement
Tout
Page 7 of 17
1) The tape must be placed directly
over (parallel to) and at least 15
inches above the ford'. line far
the entire distance that O
...pir. Magellan's Easement
Tract, Additionally, the rope
must be placed d'ueclty puns,
(parallel to) and al last 15
inches above each Magellan
pipeline that is croascd for a
minimum dvstance which is the
greaterop.
(a) a minimum distance of 20
fxt on each side of the
Magellan oh line, or
(b) across the entire width of
Magellan's Easement Trent
2) The placement of warning tape
on each side nfMe,,11 n
pipelme(s) will not be returned
for utility cables that are
Installed using the document
drill erjecking method.
d. Crossings By Metal Pipeuarea or
Condmts. Mrtsuie pipe cresting
Magellan pipeline(s) may require
Magellan to perfnmt s cathode
protection intamrerce, survey. if
i nsulco na with Magellan's
atho lk p rmcdon system is
detected and remedktic n is
arromerY, Owner agrees to
sentiment with Magellan and w
meet r,roasury adjustnwnts in
0voca s interfering ammic pipe or
ather semndiation to crones., such
interference problem inure that the
Magellan cathodic promotion
system is operating properly,
m. Grassing Requirements.
fxtrka), fiber optic, local servke
conarmothalar, long dis[arce
carrier misphoce, and utility cables
should cmea Magellan pipelioe(s)
with a minimum of2"emi es of
VPllfedf PPdaINIOn.
All each U.,
mat be covered with a Conners
Slab for the full width of the
lam went Tract. Grequesled by
Magellan. If such linty have an
exposed eoncentric cannot, a eat
point from the ground wire shall he
mobbed by the power company.
I. Costal Requirerwam For
Lin. Going Over a Magellan
Pipeline, in the event the electrical,
floor plic, kcal service
communication, long dimaase
canter telephone, and ufity cables
able crosses mar a Magellan
pipeline, each be shall be rotated
to red courco it across rpefuil
widlp Id hidgdlan'l Easement
Tend, unless a variance k granted
by Magellan, as set Pooh below.
g. Wells. Authorization for
Varbmce. Owar mat have wrhrn
aulhorienticn from Magellan for any
'arl5ase Bom the vertical
separation requirements listed above
and/or for any vera. From the
tequ nonent far
Of 1
General Encroachment Requirements — (L.P.— 1/1/07)
electrical Soon in red concrete.
It. UUl ly Poky old Guy Anchors.
Utility poles and guy anchors
shall nor be placed oa Magotwe
Gasmen( Trail without a wlillen
a Onchan t. With a written
agreement, poles and ..bars
may be placed no never then 20
feel to any Magellan pipeline.
Poles shall not be slowed to ran
parallel to a Magellan pipeline
within the Magellan Hasemenl
Tract.
1. furecdorml DrilBngf Baring.
I) 1§kr m commencing any
hotuantnd directional Grilling,
Owner shall submit plans
showing procedure and
material drood,lione far
Magellan's approval. The
plans and deacript.. shall
Include, but not be Surged to
the yellowing:
• profile end plan showing
location of entry and exit
points
• Work space required to
perform the work
• Mud containment ad
disposal sies
2) Owner shall positively locate
and slake the location of
Magellan's exkdng pipelines
and other underground
Faplities, including exposing
any fooddilien Instant whhin
10 test of the designed drilled
Path. No, to ammment,
Offing oprmom Owner
mail modify driing procdces
and dowo-lwle assemblies to
Samoan damage to
Magellan's rusting pipelines
and other facilities. Owner
shag he repondble for arses
and ropers occasioned by
damage all Magellan
pipelines and other facilities
resulting from dfrg or
boring opcoadams,
3) At All lime& Owner map
prevent, and maintain
uswmentatlon to document
and accurately locale the pilot
Note and the doll bit, to
measure drill -suing trial And
Unformed loads, and to
manure drilling fluid
discharge rate and pressure,
At Magellan's request. Coona
shall promptly provide
Magellan with reasonable
access to importation and
mailings provided by three
insuumems Nshming copies
or my written documentation,
4) Pilot Hom
The pilot hole shall be
drilled along the path
shown in the plan and
pros a drawings No pilot
M1ob shall he made that
wt, result N any of the
encroaching udoy being
installed in violation of
laws and reg.ludows or of
Magellan's regovenams
decrumad hesem.
Howes¢,. safrxy for say
adjacent oolitic, aa&.,
omctures k of utmost
Indicators. Tnemrare,
thelistingof.poselmn
disc. or mlersom
heron Sara rot regard
Game, from rcponibilily
for safe operations or far
damage to adjacent
uuuties aad onaclures
• Btokra.monot
sp ,fed in the plan and
feel
• Alignment of a1 -20 Feel as
and as it does not coat, 1.
within 10 fast of Magellan's
pipeline
• Initial penetration aground
surface at erect Iocalion shown
in the plan and profile
drawings
• Mal penetration of the
ground audace within M -10
teal OF We moment and
whom -r30 fed and -0 fast of
des length shown in the plan
and profile drawings
• Curves shall be drilled at a
radius equal to or greater than
Shut specified in the plan snd
.profile drawings. The driled
radius will he alculate l over
any 3johm (range 2 type drill
Anse) segment using the
following formula:
Rdrulel= (Ldrlkd/Aavg)x
ISO&
Whom: Rdrilied A sled radius
aver Wriled
fddflrd = length drilled; no
less then 75 em and no greater
than 100 feet
Aan = mid change in angle
over Untied
• At the completion of the pilot.
ham O,OUng, Owner shelf provide
to Mageuan a rahelafnn of
horizontal and vertical roommates.
Whop zed to the drilled entry
point, which accumely describe
the location of the pilot bole.
5) Drilling Fluids
-The composition of drHim, fluids
proposed for no shall comply with
all applicable laws and regulation.
• Owner's ms,.ethic far
obtaining, transporting and aiming
any woe, required for drilling
fluids.
• Dispaal o£tlruing Ruide aad
drf callings dell be Owner's
ra stmainfty And had he
conducted in compliance with
applicable laws and regulation,
Ehi ing fluid shall not he disposed
of by placing Fluids on or under
the a,f. of Magellan's
Faeemem Tree.
• Owner mail employ best efforts
to maintain fail annular cbculation
ofdruling fluids Dri ing fluid
retums at location Other ban
entry and exit forms shalt be
minimised. If snnuW circulubn
is lost, Owoor shell take slops to
notion, cbeuleliar. if i eavenent
surface return ofdrerg fluids
occur, they shall be ion medialely
contained with hand- placed
Sentient (e.g., bay bales, sand bage,
At fences, cam.) and collecmd
using pumps as pretrial. If the
amount ofsurface velum is net
gral enough to allow prxtksl
collector, the oriented area wall be
diluted with fresh water mad the
fluid will be allowed to dry and
dissipate naturauy, it
Page 10 of 17
EXHIBIT "B" TO ENCROACHMENT AGREEMENT, 3 of 4
the amount of surface return exceeds that mimmum competed corer over the carrier pipe. as • Owmahallple¢SU- inchwfdeplastic degrees.
which can be contained with had -plared mensuted from me base of the rail to the rap or line warning tape, MCMVkr{;am No. S28ST12 or W Vertical Separation Requiremenm far
barriers. small collodion $mapslasts, then 5 pipe, u follow. (sea Figures I and I: equal, overmelpipcluefor Newidihor the Waterway Cmssiag. Pipelimes to be crossed
cubic yerds )may be used unless perdu or temporary mad or equipment crossing, plus an meat hoe a minimum vertical separation of
other regulations pmhibil the use of momedinn
a omach. t (hc amount . Do pace return
eaceeds that g hauls, ba eonminad and
the retur using barriers or smell sumps, or if
the return m drilling ing a occurs m the holy
ofwaterdrupes drface donsomu will to
suspended until surface remm volumes can be
uolld
6) .
6J Asa an Drawinglanand profile draweto
Magellan an v-built plan antl the in drawing
or the laud crossing snowing Inn lenapon of
additional 20 feu past each outside edge Ofswh
MiM�urnat
Lotion of
Plrmlirm
(bmmactM Cover
Dot, To, ar
the wmenway m the outermost pmt ore
% one
Under track mature
Magellan pipeline, facility orappurmwnce
proper (below
6.0f t
Damon of mil)
Roadways and drlMWays, shall be installed With
Underall other
3) Aiding Weight to%pelitu rot Negative
strikes within the
3.0 font
tight of way or from
k Heavy Equipment - Defwtion and
Regttiremenu. Heavy equipment shell be defow
the banned orditcMS
Magellan adding sufficient weight or
additional 20 feu past each outside edge Ofswh
five (5) wl, u measured from the bmmm of
used on of formation provided by Owner to
temporary rood or equipment crossing
the wmenway m the outermost pmt ore
Magellan'spipelme.
k. Owner Required W Peabody Magryhn
Magellan pipeline, facility orappurmwnce
4,0 feet
Pipeline, Magellan may requoe Owner to put in
Prevention %an. For safety and
Roadways and drlMWays, shall be installed With
place addhMnal cover and/or smbDizmoon
3) Aiding Weight to%pelitu rot Negative
(umbeta, seal plate, crushed rock, wxmte slab.
Buoyancy. Owner And beer the not or
k Heavy Equipment - Defwtion and
Regttiremenu. Heavy equipment shell be defow
cin at any approved equipment standing in order
Magellan adding sufficient weight or
%Effis]aP& No roadway, driveway. raimad or
to prowl Magclao pipelines, raking into account
mechanical do,!. to any Magellan pipeline
as vehicles having a grog weight in excess of
possibleeff"u, of weather, pipeline depth, and
cmas:d by a waterway m order to creme
to be constructed pmmiei to any Magellan
type of vehicles proposed to crass [be pipelines,
negative buoyancy for such pipeline.
pipelines or facill Should binadng be
Mquidan will analym each proposed crossing
pipelbm within [be boundaries of Magellan's
f new craving as . 11 as the bosom, of
Minimum
used on of formation provided by Owner to
RRlutlno-
Over Tao 0
P1WG4€
Magellan'spipelme.
g. Roadway and Driveway Crosdngy.
determine any additional depth or protection (bat
4,0 feet
(Bebwsudaceof
Prevention %an. For safety and
Roadways and drlMWays, shall be installed With
may no required for safe pipeline operation,
e. Magellan Wdlben Approval
S. Roadway, Driveway. Railroad and Eguimnent
a minimum wmpacmd cover over the come
pipe, w mevored from the rap of be roadway
k Heavy Equipment - Defwtion and
Regttiremenu. Heavy equipment shell be defow
Required — Plan To Be Subdued.
Magellan mum approves any proposed
Iha bottom ofmtchrs
%Effis]aP& No roadway, driveway. raimad or
equipment crosangs of., type shall be armed
amuse ro tM mp of the pipe, as follows (see
as vehicles having a grog weight in excess of
blasting mumaions that mould affect its
Prevention Ple n for Blasting New
to be constructed pmmiei to any Magellan
Figarea 2 and 4):
80,000 wands. Heavy equipment shall be
pipelines or facill Should binadng be
pipelbm within [be boundaries of Magellan's
pmMbdd from working d. 11, oa mop of tee
neconuy. a comprehensive plan must be
Easement Tract
a. Pipeline Integrity Irnpection. A pipeline
maturity review ¢hall be performed by Magelan
as described N provision "6" under "C
Env achmenr plannine" (above),
b. Load Bearing cad Stress Lindy
Requirernenh. Prior many road, driveway, rag
W Or equipment nosing wnslNmian.
Magellan's engines, me at deterpro ewhetherthe
proposed w.posted tourer meets 1.0 lad ring
requirements and provides adequate protection to
imah nnm on Magellan's pipeline or mho
f ilit d m' O f
L+ntmn of Much
Minimum
Comoamed Cover
Over Tao 0
P1WG4€
Under roadway
ban a minimum of feet of crew. Magellan
surface proper
4,0 feet
(Bebwsudaceof
Prevention %an. For safety and
oavemem)
due to external Jones if no vehicles here it rocs
Uddr all other
surfaces within the
3.0 feet
fight of way or from
determine required pipeline depth for one
Iha bottom ofmtchrs
wbve pipeline. FOr vehaks having all.,
submitted to Magelloo for review ad
weigh, of 80.000 pounds or Mss, [be pipeline mbar
written approve),
ban a minimum of feet of crew. Magellan
b. Shortly CoroideradoM— Damage
must analyze am additional longitudinal arnss
Prevention %an. For safety and
due to external Jones if no vehicles here it rocs
meervatwn of Marietta. aavv, all
weight in excess of 80,000 pounds in order m
biting shall be in accordance with
determine required pipeline depth for one
blood, smm. end local governing
Operation.
agencies and the Magellan's " Damsge
Prevention Ple n for Blasting New
6. Parkim, (u as had Other Pawanent
Company lundlilies ". A copy ofaeil plan
will be made swilable upon notions,
a. Parking LOland Pavement Requfremenm.
All puking Imo and whet pavement installed on
M ¢ran'& Easement Tract mail consist of a
MCAVATTON NEAR MAGELLAN
%P., U
ec ems en moat use any ell
additional requirements necessary fp provide flexible surface such as asphalt. No reinforced
M1. Cmsdng %patinas Tnnsporeing Highty
adequamproing Over It. will be loud, b.BTATE°ONEdALL^RFUG ENEIMo
Volatile LiquMa For Magel'sn pipdrcs
e.NOCravot e g eta Bend,Povd U.thpatine Depth Odelamsor ,LOb TM excavmwnnraai,Deffrdtn Draw A't@ as
Irenspontng highly volatile liquids minimum
sod icline bond (pint oflnolhe allowed rocross depth met companies cover king lot f. performed OneDdnheion"abow ahaRbe
cover Fara crossing sladminage dkmb must be 4.0 p perfornRd by Owner vicinity of
d. a pipeline bend (poem of inflection). most meet or exceed companies vb maser y
should be am Angle of Crossing. Crossings far. Additional Depth erred. Depth gwony, alisted , andErevinus "Roadway, EasemntTrucilunit propert Magellan's
should s)Do oe loa.hot degrees to than 30n p Drivewab,Resroad, and Pquipmenl CYOVings' Easement Tract boom made to the awr
greater than the minimum dnpthsaumtl above may
pipelines) v possibb, bbl wt pew then 30 section above not0lcmion has been made I0 the appropriam
dcgt es. mss o'f mfor a pipeline due to (na combined '•One C.U. system and a Magellan
s, Pipeline Cetold assuea. Magellan no oral hoevofimamal pipgellanreuureandc each l T. Walerwev Crravinea. septetion. Ali of a silowin which Magellan
boding pleasure Magellan will analyze each
cased roadway, and railroad crossings oa danger conducts All of o stems on which Magellan
the proposed curving Uesptl on informmiun providetl
adofaroads athecerrierpiimunder roadways ¢.%peso¢ Depth Mopflomenm,lf Owner mes.wlsch note operations haw notification
Call"
by Owner to determine any additional depth that
ad reorned acquires umm,,mhe outs, pink i wheovstocross a Magelan .urri'ewith er lees, which rrquhe4g -02-hoursnolifis.
cousitofelnsu tensating, the car heavier will may
oupowlmdfods andeEne for vte rOolinn. wntergey(dver,mream,aing .atmion canah or prmr making. valiontelmedatai0
incomes the alorheal well jy such rary goods and asst had, Ctouwinge Mattegedbch) my crossing muocanditin agency will One-0am, the .mm Om -Cell
lhkknev to or. d odne the additional Any urn road or craving must meet the following Magellan's pipelines din bra m exceeding the agency will nom Magellan la mark
rmluuemenrs:
or addrom!cosser wmexmrnes bads.Re road minimum tlep0below tie bosom of the ettudldy.mareuunabined timely
wild ondcrouis king widened Did and the •MUlLLe ucmdete site
atio, approved bye waterway forwmplunce with than current manner, the location ofthe Magellan's
Magellan Geld repreaenmtiw
rand or ant err r is being of and n i other and line construction tins. wdaNa and ktletah stare. Pipeline facilities in the vicinity of [M
• Mual provide adequate protwlion for
dryired, ten Magellan Of theect Wpipe is and local regulations. preposeA enaaachmenl.
required, pipe an may elactdho)to he determined by the gancifition. b. 1) Minimums far Waterway g. mmgn:
deRnnined by Its appropriate Magellan
rating pope to the toning cm vllow. In sh Minimum Angle m Crogrees Cravings 2. ON, list is o mfwd CATTON. The
engineer, w that the wmpectd were mcels
accommodate of end mad aurfaw. Ifwho is should S) Wore Ira .1 degrees (o Magellan following riot is b, u sli monveniencd bur
or track sim nmentlondst noraadwass, thew adequateirowim to fin anones,o the pipone(a)as possible, but wtkv then 45 it ausemsenruedby Magellan d bemmpleu the
or l smcmre, m dual cmentl acruv the adequate f otherlen ro soh sows on the Dome each smiss crone neon 11 were ). copled
emirs length of the roadway or railroad right of Pipeline Of other fwililiv. from each sote'awrb sins,¢ and call
way. Owrw is required a ecU end cos the
t Railroad Ceasdng Requirements. Railroads loodam oho " ify. l numbeds) torus
shall be insmlled with a brntion of entivity.
Page 11 of 17 Page 12 of 17 Page 13 of 17 Page 14 of 17
General Encroachment Requirements — (L.P.— 1/1/07)
General Encroachment Requirements — (L.P.— 1/1/07)
EXHIBIT "B» TO ENCROACHMENT AGREEMENT, 4 of 4
he found on each ends', "ON &CALL" webshi s
Avkarurs- www.orlmrseall.comf
- 8004828998
Colorado- ww,e.unac2,org/
-80D 922.1987
RBmis www.BlmoisldEBdoM
- 800892 -0123
Iowa - www.lowaopecall.cuM
- 800292 -8989
Kansas- www,WnsesunecalLCoM
- 8003447233
Minnesola- tutuw.goph sdwaonecalLory/-
r —\End
- 800252.1166
Mismurf- www.mol..]LcoM
- 800344 -7483
Nebraska - www..- diggas.wM
- 800331 -5666
Noah Dakota- www.rtdormcall.caml
- 9007950555
Oklehome- www.ce0okiesoM
- 800522 -6543
South Dakota - wwwsdorluell.roMindtocup
- 800 781-7474
Texas - www.leesso UILCOM
- 800245A545
W hemada - wwsi.di,,uoh.lf.EeMdl
- 800 242 -8511
Alw..d dy, the National Otre -Cal Dumber —(888)
258.8808- may be used to reOnes a proposed
exfavation and m subsequently notify underground
u08ty operators with ...^m in the vaefnily.
3. Eduestion Ran Aoorowd.(Nmer shall subrnk to
Magellan for its approval plans for any proposed
excavation us the Magellan Gasmen Trot. No
excavation on Magepan's Easement Tram shell be
Commenced unto Owrcer has scoured Magellan's wr4kn
approval of the pons. The excavation work shall M al
compliance with ell applicable Lwa and regulations,
Ownerisalso relempolthe Common
ent), Alliance
Rest Practices (refererretl in his doamen0.
4. Meselian Reerusudm v¢ Olt -Site far Eada mBm.
A Magellan mpresenruian must be on -she when an
excavation is occurring on Magellan's Easement'Bact
(see provision "2 " ands- "A. Gerei Ig( "begiamV on
W" l).
S. Removal of Side.C.W.. Teeth from
Side- cmdung teeth shell bs mmmnd fined buckets of
excavating Nuipment.
6. Pereltel Eseavatine wu irttl. When, in preparation
for crossing any Magellan pipeline with any outer
pipe0ne or with ¢kart; line. communicatbn had.
roadway or any other structure or facility, Owner oeMe
to fund a Magellan pipeline by use of mechanical
means. Owner must perform such locating activity by
excavating pmapel to the Magellan pipeline with such
mechanical means, but
Pape 1s of 17
wrpnvision).
7. Exrtmine nifeRne br HeM. Ibmseating whMn 2 feet ciliary Magellan
pipeline shall be done by handrAfggang until the pipeline E exposed anal its
location is accurately known. Then, Conn, most position the excawma
equipment so that from the point of operations the edulpmem w01 not reach
within 2 feet ofany Magellan pipeline.
RAILROAD AND HIGHWAY CROSSINGS
below boil of ma
hum,di
bebwtlikh
fa+men�
o
Mlnlmum depth
Mlnlmum d¢Rh P
M 'mumYntl
MlnYnum depm minepe
below Ilah t
=7
Q below bopped of rail
Mlnlmum depth RaM6ad { \�rMnep¢.tl{hh
= "`
below dn¢na \ Vent
p
- -`'� --
MinMUm depth Dabw pmtntl `Ibcaead camerpipe
r —\End
I.NOA4ID FWUROAD CFDS9NG
seal f:uMfp canter qP�
RGUFE3
CASED RAILROAD CROSSING
FIGURE i
mhMum deph Daneee dMM
bebwdlah �blnsay
peed
ar . — Caeierppe
Eml eeelPVe' gArp Mnrnam dust bale.
once of Pavement
CASE HGhVVAYCISDfflNG
RGUFE2
Pane 16 of 17
General Encroachment Requirements — (L.P.— 1/1/07)
deptlt rC akhway
hum,di
bebwtlikh
1
tlme ®d CeMergpe
Mlnlmum depth be low
Busses, Of Pavement
UNCASED HIGHWAY CROSSING
RGUFE4
Pane 17
EXHIBIT "C"
PLAN DRAWINGS
12
Encroachment Agreement EA -F Xing —4-4-14—Tracts 7339 & 7340, Carver County, MN -Agent HCP -Project 13 -633
U
z
Q
W
woo
Dm
0 O O
F-
W
Z j
w W w w
j
o
O}
o
Z
J
WT3
°ohm
w
W®
l7
a
t'_<
O<ZZ Z
wx
k
a'
Q
�0
N�WU'E
ZpOOa a
o
Q
'I 0
Z
~
Z
4ZO���w
<
Q
�a
'.'
wow
00x�aC)U
C
N
p
0 0
w
� p�
a O F' p O OJ
O
U
w N
=
Y
i
O
J
w
Q
O
w0�
�+'NO O-
W�
O
Y
Q�cc
o
�y
O >a >EF
W<Ux00
w
wz
1
> G
I
d
f7 u
u �
m p
� o
N Y
Uu
a
`o p
X
x
W
X
XX
X
X
X
_ _,�
X i z
� Vie;
Vii•,
rva
X
�
Ig
\
X
ssF
X
iFF
R
ti
X
p
z a
is
I
J
a
R
, .
,
-
VIOMNNM'N36SWNVHD JO "10
xu
Ile 034 4
f1 r