Loading...
G-3. TH 101 Contract for Environmental Assessment and Preliminary DesignCITY of 7700 Market Boulevard PC Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 C?- 3 MEMORANDUM TO: Todd Gerhardt, City Manager /J FROM: Paul Oehme, Director of Public Works /City Engineer �I 'v DATE: October 13, 2014 SUBJ: TH 101 - Pioneer Trail (CSAH 14) to Flying Cloud Drive (CSAH 61) Project No. 14 -08: Approve Consultant Agreement with Kimley -Horn and Associates for Environmental Documentation and Preliminary Design PROPOSED MOTION "The City Council approves a Consultant Agreement with Kimley -Horn and Associates in the amount of $ $265,610 for TH 101 Environmental Documentation and Preliminary Design between Pioneer Trail (CSAH 14) and Flying Cloud Drive (CSAH 61) Project No. 14 -08. City Council approval requires a simple majority vote of the City Council present. BACKGROUND In 2007, an environmental scoping study was completed for TH 101 from Lyman Boulevard to the Scott County line that evaluated several alignment options, safety improvements and environmental review for potential improvements. The study was a partnership between MnDOT, Carver County and the City of Chanhassen. Since this study, the section of TH 101 from Lyman Boulevard to Pioneer Trail has been reconstructed to four lanes, and the section south of Flying Cloud Drive over the Minnesota River is currently under construction and will be completed in 2015 to a four -lane design. The section of TH 101 from Pioneer Trail to Flying Cloud Drive is the last section of TH 101 needing improvements south of TH 5. In 2009, MnDOT resurfaced this section of TH 101; however, this work did not address most of the safety or capacity issues along the corridor. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Planning for improvements to TH 101 between Pioneer Trail and Flying Cloud Drive is Public Works necessary to determine a proposed layout for the last remaining section of the roadway 7901 Park Place between TH 5 and the Scott County line. The preliminary design and environmental review Phone: 952.227.1300 process for this section of TH 10l will address numerous constraints including steep Fax: 952.227.1310 grades /challenging topography, poor sight distances and blind intersections, limited right -of- way, and possible historic and cultural resource impacts. The roadway has many blind Senior Center driveways and sharp curves. The section of roadway down the bluff is steep and treacherous Phone: 952.227.1125 especially during inclement weather. As the city and the region develop, more traffic is Fax: 952.227.1110 expected to use this corridor and the accident rate is only expected to increase. Numerous accidents have occurred on this section of roadway over the past several years. Wehsite www.ci.chanhassen.mn.us The City completed a Corridor Land Use and Utility Study this year along Flying Cloud Drive to see if land use should be changed, gage level of interest in private development or redevelopment and see if City services can be extended to this corridor economically. The study indicated utilities can be extended to this corridor economically under the right market Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt TH 101 — Pioneer Trail to Flying Cloud Drive Consultant Agreement October 13, 2014 Page 2 conditions. TH 101 north of Flying Cloud Drive was identified as the main utility corridor to provide services to this area. In order for properties along Flying Cloud Drive to develop to the highest and best use, TH 101 north of Flying Cloud Drive needs to be upgraded. DISCUSSION The objective of this project is to identify a "preferred build" alternative, gain local support for the project, obtain environmental approval of the project, generate a staff - approved layout, and develop documentation of right -of -way needs. Final design and construction administration work is not part of this contract. The corridor can be officially mapped once this project is completed. TH 101 is a roadway of regional significance with direct connections to the TH 101 Minnesota River Crossing, which is currently undergoing expansion from two lanes to four lanes. TH 101 north of Pioneer Trail is complete as a four -lane roadway. TH 101 is classified as a minor arterial; however, existing safety, capacity, and continuity issues keep it from fulfilling its role in the regional roadway network. Its ability to function as a minor arterial will improve as these remaining issues on the last segment of the corridor are resolved. A combination of existing demands, local development, and regional growth contribute to a long -term travel demand that cannot be safely and efficiently served by the existing roadway. The opening of TH 212 through Chanhassen in 2008 and the completion of the four -lane expansion of TH 101 from Lyman Boulevard to Pioneer Trail this year are important steps in addressing the future traffic demands. Growth in Scott County also is anticipated which will add demand on the TH 101 River Crossing to and from the city of Shakopee. The character and condition of the existing roadway does not safely and efficiently serve existing and future needs. The existing roadway has segments with very narrow shoulders and steep ditch slopes and embankments. Many off -road hazards are protected by guardrails adjacent to the travel lane. Warning signs inform drivers of sharp curves with 15 -30 miles per hour (mph) advisory speeds. Blind intersections and substandard stopping sight distances are prevalent. Crash analysis performed as part of the Corridor Scoping and Environmental Screening Study (2007 Scoping Study) identified crash and severity rates more than twice the average for two -lane rural highways. The predominant crash type has been "run- off -the road ", a symptom of the poor sight conditions, tight curves, and undulating terrain through the project area. In order to help secure funding for reconstruction, environmental documentation and preliminary design work should to be completed at this time. This work is necessary with or without federal funding. The City of Chanhassen, Carver County and MnDOT again intend to partner to complete the environmental and preliminary design work. The cost for this work will be split equally between the three agencies. MnDOT is currently drafting the joint powers agreement however the agreement is not ready at this time but should be ready in the next six weeks. Federal funding applications are due at the end of November. Project readiness points are given to projects that are currently being studied or designed. Also some information for the study will be used in the federal application if the City Council authorizes sending in an application. Public involvement will be an important component of the project. One of the most significant steps of the preliminary design study will be to "set the course" for the project with the public, including the completion of a very thorough and thoughtful alternatives analysis. The public's support for making improvements will be critical. Communication of the project's purpose and need is critical to moving the project forward. Of equal importance is building trust from those impacted by proving that the design has been tailored to achieve project objectives while being responsive to the environmental, property access and right -of -way issues brought forward by the stakeholders. The project anticipates many on -site meetings with property owners and g: \eng \public \ -2014 projects \14 -08 th101 -pioneer trail to csah 61 \bkgd 101314 appr contraot.doc Todd Gerhardt TH 101 — Pioneer Trail to Flying Cloud Drive Consultant Agreement October 13, 2014 Page 3 at least two public open houses are planned for the project. A website will be updated on a regular basis with study information, project schedule and contact information. Utilities are planned to be extended to this area along with the future roadway improvements. The study will identify a preferred utility alignment. CONSULTANT CONTRACT COSTS AND FUNDING Staff sent out three requests for proposals to consultants for this work. The partnering agencies decided to send proposals to consultants that had worked in the area in the past on similar projects and were in good standing with the agency partners. The three consultants who were sent a proposal were SRF Consultants, SEH, Inc. and Kimley -Horn and Associates. SRF Consultants decided not to submit a proposal due to their existing workload. Kimley -Horn and Associates and SEH, Inc. decided to partner and submit a joint proposal. On October 2, 2014, the City received one proposal for the work. The proposal cost submitted from Kimley -Horn and Associates /SEH is $265,610. Representatives from MnDOT, Carver County and City of Chanhassen reviewed the proposal. Based on the information submitted in the proposal, the agency partners recommend Kimley -Horn and Associates be awarded the contract for this work. In 2010, Kimley -Horn and Associates completed the environmental documentation and preliminary design for the section of TH 101 from Lyman Boulevard to Pioneer Tail. That project was very similar to the work planned for this project. For reference, the City received four proposals in 2010 for the environmental documentation and preliminary design for the section of TH 101 from Lyman Boulevard to Pioneer Trail. Proposals at that timed ranged from $224,858.00 to $354,703.44. Kimley -Horn and Associates' work on that project was acceptable. Staff feels the cost Kimley -Horn and Associates submitted is acceptable based on the 2010 proposals. Kimley -Horn and Associates also completed the construction administration and inspection for the TH 101 improvements from Lyman Boulevard to Pioneer Trail project. Their work on this project was acceptable. SEH, Inc. completed the final design for the Flying Cloud Drive improvements for the TH 101 Minnesota River Crossing Improvements. Their work and background knowledge on that project will be very helpful to complete the preliminary design. Most of the project work is proposed to be completed by Kimley -Horn and Associates. Public management, environmental worksheet writing, utility and traffic are planned to be completed mainly by Kimley -Horn and Associates. SEH, Inc. will work primarily on preliminary design some traffic aspects of the project surveying and drainage. The City of Chanhassen will take the lead on the project. The City has budgeted for this work in the 2014 CIP (ST -032). The City's share of the study is proposed to be funded with Pavement Management funds. Including funding 1/3 of the cost of the project, MnDOT will provide 1' contour survey drawings, take soil borings and possible historic building impacts. The study includes only a high level review of cultural resources review. No archeological work is part of the study. If reviewing agencies require a more in -depth archeological study including on site investigation, this work will need to be contracted out separately. The contract is a time and materials based work not -to- exceed amount. Hours will be billed separately for each project area. As with all engineering contracts, the consultant must submit periodic invoices that staff will review before processing. The consultant will be required to submit timesheets verifying the hours worked on the project and expense sheets. Staff will review the invoices and expense sheets for accuracy and g: \eng \public \ -2014 projects\14 -08 th101 - pioneer trail to csah 61 \bkgd 101314 appr contract.doc Todd Gerhardt TH 101 — Pioneer Trail to Flying Cloud Drive Consultant Agreement October 13, 2014 Page 4 conformance to the contract. If the joint powers agreement with the other agencies is not in place before 33% of the project is completed, the City has the right to stop the project or void the contract. SCHEDULE The preliminary schedule for the project is attached to this background. The work is scheduled to be completed in late 2015. Attachments: 1. Resolution 2. Project Area Map 3. Schedule 4. CIP Page 5. SRF letter g: \eng \public \_2014 projects \14 -08 th101 -pioneer trail to csah 61\bkgd 101314 appr contract. doe CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: October 13, 2014 RESOLUTION NO: 2010 -XX MOTION BY: SECONDED BY: A RESOLUTION APPROVING CONSULTANT AGREEMENT WITH KIMLEY -HORN AND ASSOCIATES FOR TH 101 (BETWEEN PIONEER TRAIL AND FLYING CLOUD DRIVE) FOR PRELIMINARY DESIGN SERVICES AND ENVIRONMENTAL DOCUMENTATION BE IT RESOLVED that the City of Chanhassen enter into a consultant agreement with Kimley -Horn and Associates for the following services: To provide preliminary design services and environmental documentation of TH 101 between Pioneer Trail (CSAH 14) and Flying Cloud Drive (CSAH 61). NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. Enter into a consultant agreement with Kimley -Horn and Associates to provide Environmental Assessment and Preliminary Design services. Passed and adopted by the Chanhassen City Council this 13th day of October, 2014. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT Pioneer Trail w r c I& 7 0 d TH 101 from CSAH 14 (Pioneer Trail) to CSAH 61 (Flying Cloud Drive) Environmental Assessment Worksheet and Preliminary Design f - TH 101 City of • r - CSAH 14 to CSAH 18 ■ Proposed 4 -lane Pioq ■ 2014 completion eel Tja�� CSAH 61 to CSAH 14 l� ■ Proposed 4 -lane r F101 Project Location 61 z West CSAH 61 Carver County TH 101 River Crossing/ CSAH 61 Wye ■ 4 -1ane bridge ■ Roundabout ■ 2014 letting 14 East CSAH 61 Hennepin County z RICE LAKE 101 CSAH 61 East ■ Raise road above flood APPENDIX F - SCHEDULE ID Task Name _ _- - 1 - PROJECT MANAGEMENT 1.1 Administration 1.2 General Coordination 1.3 OA/QC 1.4 Project Schedule TASK 2 - PUBLIC AND AGENCY INVOLVEMENT 2.1 PMT Meetings (12 Meetings) 2.2 Public Open House Meetings Newsletter #1 Open House Meeting #1 Newsletter #2 Open House Meeting #2 2.3 Public Hearing 2.4 City Council and County Board Meetings 2.5 Agency Coordination Meetings 2.6 Property Owner Meetings 2.7 Utility Coordination Meeting 2.8 Project Websde TASK 3 - GEOTECHNICAL STUDIES 3.1 Soils Information 3.2 Technical Memorandum TA_ SK 4 - SURVEYING AND MAPPING 4.1 Surveying and Mapping 4.2 DTM TASK 5 - TRAVEL FORECASTING 5.1 Travel Forecasts 5.2 Technical Memorandum TASK 6 -TRAFFIC STUDIES 6.1 Highway Operations 6.2 Safety 6.3 Technical Memorandum T_ ASK 7 - PRELIMINARY DESIGN 7.1 Develop Concept Alternatives 7.2 Evaluate Concept Alternatives and Identify a Preferred Build Alternative 7.3 Develop and Refine Layouts and Profiles 7.4 Prepare Typical Sections 7.5 Prepare Profiles and Cross Sections 7.6 Identify Utilities 7.7 Prepare Preliminary Drainage Design 7.8 Prepare Design Memorandum 7.9 Prepare Cost Estimates 7.10 Right -of -Way TASK 8 -ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) 8.1 Prepare EAW Document 8.2 Distribute EA/EAW 8.3 Responses to Comments 8.4 Prepare Final EAW Document TASK 9 - EASEMENT /RIGHT -OF -WAY EXHIBITS AND DESCRIPTIONS 9.1 Prepare Right -of -Way and Easement Documents 9.2 Prepare Right-of-Way Plat Start Mon 11/3/14 Mon 11/3114 Mon 1113/14 Mon 11/3114 Mon 1113/14 Mon 11/3/14 Thu 11/13/14 Mon 115/15 Man 115/15 Mon 2015 Mon 525115 Mon 622115 Mon 720115 Tue 116115 Man 11/3/14 Mon 219/15 Mon 420/15 Mon 11/3/14 Mon 3116/15 Mon 3116115 Mon 5/4/15 Mon 3/16/15 Mon 3/16115 Mon 514/15 Mon 1113114 Mon 1113/14 Mon 115115 Mon 1/12/15 Mon 1112115 Mon 2116/15 Mon 3116/15 Mon 11/3/14 Mon 11/3/14 Tue 116/15 Mon 3215 Mon 427115 Mon 427/15 Mon 427/15 Mon 427/15 Mon 4/27115 Mon 4/27115 Mon 427115 Tue 116115 Tue 1/6/15 Mon 716115 Mon 720/15 Mon 8/31/15 Mon 9121115 Mon 921/15 Mon 921/15 Finish Fri 10/30115 Fri 10130/15 Fri 10130/15 Fri 10130/15 Fri 10130/15 Fri 10130115 Thu 10/8115 Fri 626115 Fri 119/15 Fri 216/15 Fri 529/15 Fri 626/15 Fri 7/31115 Fri 10/30/15 Fri 10/30/15 Fri 10/30/15 Fri 511/15 Fri 10130/15 Fri 5/29115 Fri 5/1/15 Fri 529/15 Fri 5/29115 Fri 5/1115 Fn 5129/15 Fri 1/30/15 Fri 12/15 Fn 1/30115 Fri 4/10/15 Fri 2127/15 Thu 3/12115 Fri 4/10/15 Fri 7/3/15 Fri 1215 Fri 2/27/15 Fri 713/15 Fri 7/3/15 Fri 7/3115 Fri 7/3/15 Fri 713115 Fri 7/3/15 Fri 7/3115 Fri 7/3/15 Fri 9118115 Fri 7/3/15 Fri 7/17/15 Fri 828115 Fri 9/18115 Fri 10130/15 Fri 10/30/15 Fri 10 /30/15 Nov. Dec _. Jun Jul Aug _- _� _I .___ .Oct_ Jan _ _ _ Mar Apr _('r1?Y - - 1 -- - -- -_ -- - - -- -- -` -- - - - - -- -� - _ - " - - -- - _ -- - - _ -- - - - - -� -- - -- _ -- -- _- - - - _- - - - -_ -� _TASK 2 3 4 5 6 1 1 1 1 1 1 I 1 1 1 1 1 ■ ■ ■ 7 20 21 22 23 24 25 26 27 - 1- - 1)♦ - - - - ^^ 28 29 30 _31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 Kimley »)Horn F -1 Capital Improvement Program 2014 thru 2018 City of Chanhassen, MN Project # ST -032 Project Name TH101 Imp - Pioneer Tr to Flying Cloud Dr (CSAH 61) Account #1 Account #2 Account #3 Account 44 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost: $27„300,000 This project will reconstruct TH 101 from Pioneer Trail (CSAH 14) to Flying Cloud Drive (CSAH 61). This is the last section of TH 101 that needs improvements from TH 5 into the City of Shakopee. The improvements are proposed to improve safety, mobility and to plan for future growth in the region. The project is consistent with the 2007 TH 101 corridor scoping study. State, Federal and Carver County funds are proposed to help pay for most of the improvements. The City contribution to the project is anticipated to help pay for some environmental work, watermain improvements, corridor landscaping, trails and storm sewer improvements. The tentative schedule is to complete predesign and environmental review in 2014. Right of way acquisition would take place in 2016 and construction would commence in 2018. Justification and mobility on TH 101. The project also plans for growth in the region. Expenditures 2014 2015 2016 2017 2018 Total Planning /Design 600,000 600,000 Land Acquisition 7,700,000 7,700,000 Construction 19,000,000 19,000 000 Total 600,000 7,700,000 19,000,000 27,300,000 Funding Sources 2014 2015 2016 2017 2018 Total MSA 600,000 600,000 Other Agency Contribution 525,000 7,700,000 17,900,000 26,125,000 Street Pavement Management 75,000 75,000 Water Utility Fund 500,000 500,000 Total 600,000 7,700,000 19,000,000 27,300,000 would be responsible for the of the trunk watermain and P100 W99 I ENC i N EERS PLANNERS DESIGNERS consulting Group, Inc. September 25, 2014 Mr. Paul Oehme, PE City Engineer /Public Works Director CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 -0147 SUBJECT: TH 101 FROM CSAH 14 (PIONEFRTRAIL) TO CSAH 61 (FLYING CLOUD DRIVE) ENVIRONMENT ASSESSMENT WORKSHEET AND PRELIMINARY DESIGN CITY PROJECT NO. 14 -08 -01 Dear Mr. Oehme: Thank you for providing SRF Consulting Group, Inc. with the opportunity to provide the City of Chanhassen with a professional services' proposal for the above - referenced project. After careful review of the RFP, we regret that we will not be making a submission on this project. We appreciate the time you took to discuss this project with us. We welcome the opportunity to work with the City of Chanhassen on projects in the future, including the TH 101 Regional Solicitation funding applications, and we appreciate your consideration of our firm on upcoming efforts. If you have any questions or would like further information about our services, please contact us at 763.475.0010. Sincerely, SRF CONSULTING GROUP, INC. Nathen A. Will, PE (MN IL) Senior Associate NAW /JRD /gjd 01�� j2 ?We!k � James R. Dvorak, PE (MN MI) Vice President SRF P14735 S:\ Marketing \Pmpora& \2014 Lra,,Pmpora4 \_No Go I.eaea \P14735_Clmnharren M 101 EAW` &pnh'm Aerrgn.Aonv www.srfconsuIting.com One Carlson Parkway North, Suite 150 1 Minneapolis, MN 55447 -4443 1 763.475.0010 Fax: 763.475.2429 An Equal Opporhrnity Employer