F-4. 2015 Street Projects: Authorize Preparation of Feasibility StudyCITY OF CHANHASSEN 7700 Market Boulevard PC Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.2271160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 F4 MEMORANDUM TO: Paul Oehme, Director of Public Works /City Engineer FROM: Alyson Fauske, Assistant City Engineer a� DATE: October 27, 2014 SUBJ: 2015 Street Rehabilitation Projects No. 15 -01 and 15 -02: Authorize Preparation of Feasibility Study PROPOSED MOTION "The City Council approves a resolution authorizing the preparation of a feasibility study for the 2015 Street Rehabilitation of Carver Beach Area, Project No. 15 -01 and Kerber Boulevard Improvements, Project No. 15 -02. City Council approval requires a simple majority vote of the City Council present." At the August 11, 2014 work session, staff reviewed with Council the proposed 2015 Street Improvements to the Carver Beach area. Kerber Boulevard, a Municipal State Aid Route is also proposed to be resurfaced in 2015. Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2015 Street Improvement Projects, staff is proposing to rehabilitate approximately 4.3 miles of streets in the Carver Beach area and 1.4 miles of Kerber Boulevard. Website www.ci.chanhassen.mn.us The street segments within the proposed project were identified by the City's Pavement Management software in conjunction with site investigations and are shown on the map above. I - l�.w c:�rvc phry�q fgrd QrmatepRq�ni ofe •�R �yjd ngiowTaday on b5leaning for Tomorrow Paul Oehme 2015 Street Rehabilitation Projects October 27, 2014 Page 2 The proposed improvements generally consist of milling and repaving the pavement surface. Severe pavement distresses will be removed and replaced. Minor drainage improvements are also proposed to be addressed in the project areas. Miscellaneous water main and sanitary sewer manhole repairs are proposed for replacement in these areas. A feasibility report will be prepared by the Engineering Department staff. Design of the Carver Beach area improvements will be done in- house. Due to the large scope of the projects, plans for the Kerber Boulevard improvements will be completed by Kimley -Horn and Associates. Construction observation will be done by City staff. Project 15 -01: Carver Beach Area Approximately 4.3 miles of streets are proposed to be milled and overlaid within the Carver Beach Area. The streets in this area are 39 years old with the exception of Nez Perce Court, which was constructed in 1980. The streets were sealcoated in 1993 and 1998 and various areas were heavily patched in 2011. The northern portion of Lotus Trail was overlaid by City forces in 2006 and is therefore excluded from the proposed project. The street conditions in this area were last surveyed in 2013. The Pavement Condition Indices (PCIs) from the survey are shown on the map below. G:\ENG\PUBLIC\_2015 PROTECTS \15 -01 2015 Stmt Improvements \10 -27 -2014 order fmibilky &cx - 11 ar va 14 .. w Carves 18 14 12 Beach 15Piayv'o a v�wwwr 15 N 4wlq c.r.� fir? 4 6x y 18 16 w c.. ¢. %0 �0 a e• ° 16 ; .......e.. _ 13 i war 22 o' ?� 0 Al a i •S Green t. Pao G:\ENG\PUBLIC\_2015 PROTECTS \15 -01 2015 Stmt Improvements \10 -27 -2014 order fmibilky &cx Paul Oehme 2015 Street Rehabilitation Projects October 27, 2014 Page 3 A PCI below 45 typically warrants reconstruction; however, the utilities in the area are in fair condition and therefore staff is recommending a full depth mill and overlay of the streets at this time. Ringo Drive is currently gravel and is proposed to be paved. The profile of Woodhill Drive is proposed to be raised at the low point to alleviate some drainage concerns. Subgrade corrections would be done as needed. There is very little concrete curb and gutter within this project area. The area is fully developed therefore there is no area to construct conventional stormwater management facilities. Staff will examine the south end of Lotus Trail to identify potential stormwater improvements in the area. Staff will continue to gather information on the existing storm sewer pipes and draintile within the area and provide storm sewer improvement recommendations in the feasibility report. The sanitary sewer system will be televised to determine the scope of repair work. The Utility Department has performed a visual inspection of the sewer manholes and provided a list of work to be completed with this project. The water main in this area is ductile iron. City records do not show any water main breaks in this area. It is recommended to replace the bolts on the valves and some hydrants at this time. Most hydrants in the area are not easy to maintain and can cause operational problems. Typically, gate valve bolts that are in the ground and exposed to soils for this length of time have a tendency to corrode and break. Proiect 15 -02: Kerber Boulevard (north of West 78th Street Kerber Boulevard north of West 78th Street to Powers Boulevard is proposed to be resurfaced in 2015. This project area consists of 1.4 miles of improvement. The portion south of West 78th Street was resurfaced in 2011 with the West 78th Street improvements. Funding for this project is predicated on MnDOT advancing funds from the state aid account. Kerber Boulevard was constructed in 1980, with the exception of the southern leg between City Hall and West 78th Street, which was constructed in 1940. The street was overlaid in 1996 and last seal coated in in 2007. The PCI of the street segments are shown on the adjacent graphic. A PCI of 100 represents a new street. For a local street, a PCI between 45 and 65 typically warrants a mill and overlay. Subgrade corrections would be done as needed. The street is urbanized. Damaged curb and gutter will be replaced. Some storm sewer improvements are anticipated. G:. G\PUBUa 2015 PROMCM15 -01 2015 Str hmprowm=ft \10 -27 -2014 order fmibility.doex 1 -- r ih r d d n � p Paul Oehme 2015 Street Rehabilitation Projects October 27, 2014 Page 4 There is no sanitary sewer within Kerber Boulevard. Sanitary sewer crossings will be televised to determine the scope of repair work. Ductile iron water main is within the street. There is one documented water main break just north of West 78fl' Street. Staff recommends that the valves and some of the hydrants be replaced in conjunction with the project. Typically, gate valve bolts that are in the ground and exposed to soils for this length of time have a tendency to corrode and break. Curb ramps to the trail along Kerber Boulevard will be replaced in accordance with the Americans with Disabilities Act requirements. The trail along Kerber Boulevard has a low PCI rating as shown on the graphic to the right, and should be replaced at this time. No new trail segments are proposed to be added to Kerber Boulevard. The loop detectors to the signals at West 78a` Street will be evaluated to determine if they will be impacted by the proposed improvements. The City has received requests to install a pedestrian crossing from the Chanhassen Library to the strip retail center on the west side of Kerber Boulevard and where Redwing Lane intersects Kerber Boulevard. The City's consultant will analyze these areas and provide a recommendation. 44 42 KERBER BLVD nz LO yv Paw lg -0 o� N 0 L O n Cbanlussen V m Pond Pa h we• r z M m c-, M center ,L Part In r O G:E GWURLILI_2015 PROTECTS\15-012015 Street Improvements \10.2]- 2014orda Radbility.dou Paul Oehme 2015 Street Rehabilitation Projects October 27, 2014 Page 5 PROJECT FUNDING Funding for the project is anticipated to come from several sources. Forty percent (40 %) of the street improvement costs in the Carver Beach area would be assessed back to the benefiting property owners, per the City's assessment practice. The remaining 60% of the street costs would be a City cost. The majority of the Kerber Boulevard road and trail improvements will be paid using Municipal State Aid (MSA) funds from the State. A portion of the street improvement costs are proposed to be assessed to the Carver County CDA and the townhome development on the southwest corner of Kerber Blvd and Santa Vera Drive. The proposed assessment methodology and estimated assessment will be included in the feasibility report. The storm sewer, sanitary sewer and water main improvements replacement costs would be funded by the respective utility funds in the annual utility budgets. The following is the anticipated recommended project budget and funding sources: Funding Source Amount Budgeted Assessments/Revolving Assessment Fund $1,850,000 Municipal State Aid Fund (MSA) $1,400,000 Stormwater Management Fund $125,000 Water Utility Fund $125,000 Sanitary Sewer Utility Fund $75,000 $3,575,000 Budgets for the proposed work were included in the proposed 2015 CIP. The budgets will be reviewed and updated based upon current construction cost estimates. The proposed project schedule is as follows: Neighborhood Meeting Accept Feasibility Report Public Hearing; Order Plans & Specifications Approve Plans & Specifications; Order Ad for Bid Assessment Hearing Project Begins Substantial Completion Attachments: CIP sheets Resolution G: E G\PUBUC\ 2015 PROJECTS \15 -01 2015 Street Imp vemmn \iO 27-2014 order fe ilildy.docx November, 2014 November, 2014 February 9, 2015 February 23, 2015 April 27, 2015 May, 2015 August 31, 2015 Capital Improvement Program 2015 rhru 2019 City of Chanhassen, MN Project# ST-012 Project Name Annual Street Improvement Program Account #1 601 -xxxx -0751 Account#2 Account #3 Account #4 Department Streetlmprovements Contact Paw Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Total Project Cost: $22,769r5d0 Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2015 - Carver Beach area (south and west of Carver Beach Road) MSA - Kerber Blvd overlay (north of West 78tb Street) and Dakota Ave (Hwy 5 to Lake Dr E) 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewashta Woods Drive MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area, Ches Mar Drive, Lone Cedar and Saddlebrook Pass neighborhood MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point MSA - Minnewashta Parkway overlay uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the e street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. anon projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have ted to a point where rehabilitation will no longer be practical, reconstruction of the skeet is necessary. A feasibility study is written to the merits of the project and scope of work '.12 improvement project included a pedestrian trail along the fast 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in a trail. This trait semrent is planned to be constructed along with the 2017 MSA street reconstruction. Prior Expenditures 2015 2016 2017 2018 2019 Total 9,695,000 Construction 3,250,000 2,460,000 3,022,400 11687,300 2,654,800 13,074,500 Total Total 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 Prior Funding Sources 2015 2016 2017 2018 2019 Total 976955000 Assessment/Revolving 1,850,000 1,560,000 1,622,400 1,687,300 1,754,800 8,474,500 Assess Fund Total MSA 1,400,000 900,000 1,400,000 900,000 4,600,000 Total 3,250,000 2,460,000 3,022,400 1,807,300 2,654,800 13,074,500 Capital Improvement Program 2015 fhru 2019 City of Chanhassen, WN Project# SWMP -019 Project Name Street Improvement Projects -Storm Water Mgmt Account#1 720 - 70254751 Account #2 Account #3 Account #4 Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Priority Na Total Project Cost: $1,775,000 An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2015 2016 2017 2018 2019 Total 1,100,000 construction 125,000 200,000 7500 200,000 75,000 675,000 Total Total Total 125,000 200,000 75,000 200,000 75,000 675,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total 77100,000 1 Surface Water Utility Fund 125,000 200,000 75,000 200,000 75,000 675,000 Total Total 125,000 200,000 75,o00 100,000 75,000 675,000 inspection and maintenance of new infrastructure will be required. Citywide. No map Capital Improvement Program 2015 thru 2019 City of Chanhassen, MN Project # W -024 Project Name Watermain Replacement Account #1 700 - 7025 -4751 Account 93 Account #2 Account #4 :ment of existing water main lines in coordination with the reconstruction of the City street for street rehabilitation projects, Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigncd Category Utilities Priority n/a Total Project Cost: $4,270,000 oroiects or minor fixes of water City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by ;olidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water i, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing ect in the City. Prior Expenditures 2015 2016 2017 2018 2019 Total 2,375,000 Total construction 125,000 Total 125,000 825,000 825,000 75,000 75,000 770,000 770,000 100,000 100,000 1,895,000 1,895,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total 2,375,000 Water Utility Fund 125,000 825,000 75,000 770,000 100,000 1,895,000 Total Total 125,000 825,000 75,000 770,000 100,000 1,895,080 projects will decrease maintenance costs. Capital Improvement Program 2015 thru 2019 City of Chanhassen, MN Project# SS-014 Project Name Sanitary Sewer Replacement Account #1 701 - 7025 -4751 Account #3 Account #2 Account #4 Prior 925,000 Total Prior 925,000 Total prii9lnnrarfeIIDTri rQo[MMvWT-•nIke."b AMd these projects. Sources 2015 75 6 process to select streets Department Sanitary Sewer Improvements Contact Paul Oebme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Total Project Cost: $1,640,000 t of the City street. an effort to realize cost savings by 2016 2017 2018 2019 Total project will decrease maintenance costs. Total 75,000 300,000 40,000 250,000 50,000 715,000 2015 2016 2017 2018 2019 Total 75,000 300,000 40,000 250,000 50,000 715,000 Total 75,000 300,000 40,000 250,000 50,000 715,000 project will decrease maintenance costs. CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: October 27 2014 RESOLUTION NO: 2014 -XX MOTION BY: SECONDED BY: AUTHORIZE PREPARATION OF FEASIBILITY STUDY FOR THE 2015 STREET REHABILITATION (CARVER BEACH AREA) PROJECT NO. 15-01 AND KERBER BOULEVARD IMPROVEMENTS PROJECT NO. 15-02 WHEREAS, the areas for improvements in 2015 are as follows: Carver Beach Area Kerber Boulevard (except for the northern portion of Lotus Trail) NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby authorizes preparation of a feasibility study for the 2015 Street Rehabilitation (Carver Beach Area) Project No. 15 -01 and Kerber Boulevard Improvements Project No. 15 -02. Passed and adopted by the Chanhassen City Council this I& day of June, 2013. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT