E-3a. 2015 Street Projects Carver Beach Area11
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone 952 2271100
Fax 952 2271110
Building Inspections
Phone 952 2271180
Fax 952 2271190
Engineering
Phone 952 2271160
Fax 952 2271170
Finance
Phone 952 2271140
Fax 952 2271110
Park & Recreation
Phone 952 2271120
Fax 952 2271110
Recreation Center
2310 Coulter Boulevard
Phone 952 2271400
Fax 952 2271404
Planning &
Natural Resources
Phone 952 2271130
Fax 952 2271110
Public Works
7901 Park Place
Phone 952 2271300
Fax 952 2271310
Senior Center
Phone 952 2271125
Fax 952 2271110
Website
wwwci chanhassen mn us
MEMORANDUM
TO.
FROM-
DATE-
SUBJECT
Paul Oehme, Director of Public Works /City Engineer
Alyson Fauske, Assistant City Engineer (, T-
December 8, 2014
i
2015 Street Rehabilitation Project No 15 -01 • Accept Feasibility
Study, Call Public Hearing
PROPOSED MOTION
"The City Council adopts the attached resolution accepting the feasibility
report for the 2015 Street Rehabilitation Project No 15 -01 and calls the public
hearing for January 26, 2015
City Council approval requires a simple majority vote of the City Council
present"
BACKGROUND
At the August 11, 2014 work session, staff reviewed with Council the proposed 2015
Street Improvements in the Carver Beach area. Kerber Boulevard, a Municipal State
Aid Route is also proposed to be resurfaced in 2015
On October 27, 2014, the City Council authorized preparation of the feasibility study
On November 19, 2014, staff held an Open House for the proposed project.
DISCUSSION
Every year the City
considers streets that
are in poor condition
to be rehabilitated or
reconstructed For the
2015 Street
Rehabilitation Project,
staff is proposing to
rehabilitate
approximately 4.3
miles of streets in the
Carver Beach
neighborhood The
street segments within
the proposed project
were identified by the
City's Pavement
Management software in conjunction with site investigations
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Paul Oehme
2015 Street Improvement Project
Accept Feasibility Study, Call Public Hearing
December 8, 2014
Page 2
The proposed improvements generally consist of milling and overlaying the pavement surface
Severe pavement and subgrade distresses will be removed and replaced. Minor drainage
improvements are also proposed to be addressed. The water main is thought to be in relatively good
condition since there are no major water main breaks in the area and the hydrant bolts appear to be in
good condition Some hydrants have also been identified as needing replacement because they have
mechanical problems. These hydrants are also proposed for replacement
A feasibility report was prepared by the Engineering Department staff. It is estimated the City will
save about $150,000 with feasibility report preparation, design and construction observation not
being outsourced A copy of the feasibility report is available in the Engineering Department.
Below is a summary of the feasibility findings.
Approximately 4 3 miles of streets are proposed to be milled and overlaid within the Carver Beach
Area The streets in this area are 39 years old with the exception of Nez Perce Court, which was
constructed in 1980 The streets were sealcoated in 1993 and 1998 and various areas were heavily
patched in 2011
The street conditions in this area were last surveyed in 2013 The Pavement Condition Indices
(PCIs) from the survey are shown on the map below.
g \eng \publicA_2015 piojects \15 -01 2015 street improvements \12 -08 -2014 accept feasibility docx
I
mw
�■ ■■ �:.:::
.
iii
■
IA
rL
wMa
1■■■
X11
�..� �� �� ►��
`tea
� �
I � - -- �
g \eng \publicA_2015 piojects \15 -01 2015 street improvements \12 -08 -2014 accept feasibility docx
Paul Oehme
2015 Street Improvement Project
Accept Feasibility Study, Call Public Hearing
December 8, 2014
Page 3
The streets within the project area are generally rural residential with bituminous curb and minimal
concrete curb and gutter to facilitate runoff Curb and gutter is proposed to be added behind the
existing storm sewer manholes that are set within bituminous curb. A small amount of drain tile was
included in the feasibility estimate in the event that groundwater is encountered during construction
and drain tile can be installed to alleviate the situation Rural residential roads are proposed to be
milled and overlaid with four inches of bituminous.
The street widths within the project area range between 16 and 26.5 feet wide. During field
investigation staff noted that many street sections are wider than they appear as soil and sod has
encroached on to the road surface and vegetation has grown on top of the bituminous. The
feasibility study estimate is based on the average observed street widths. Each street segment will be
resurfaced to a consistent width therefore some streets may be wider than they appear today and
there may be more boulevard restoration than a typical mill and overlay project.
Nez Perce Court, the southern 300 feet of Nez Perce Drive and the northern 130 feet of Nez Perce
Drive are urbanized, therefore an edge mill and two inch overlay is proposed for these areas.
The northern 400 feet of Lotus Trail was overlaid by City forces in 2006 While collecting field
data, staff noted that the 2006 overlay was more extensive than originally thought. the overlay was
from Napa Drive to Ponderosa Drive, approximately 1,600 feet The pavement condition within this
segment varies.
Staff has inspected the storm sewer structures and televised the storm sewer that was accessible to
the Utility Department camera Based on these observations some minor replacement and repairs of
the existing storm sewer is proposed with this project. These improvements are included in the
estimated storm sewer costs.
Because there are no additional impervious surfaces that will be added to the 2015 project area, it
does not trigger any of the Federal, State or Local regulations Further, given the era during which
this area was developed, there is very little right -of -way and limited property available to construct
water treatment best management practices.
Water quality improvements should be implemented where they can be in a cost effective manner
The Anti- degradation Plan that the City authored in 2008 indicated that this area contributes a
significant portion of total suspended solids and total phosphorus to Lotus Lake when compared to
the other subwatersheds tributary to Lotus Lake It is also known that there are a few areas with
drainage issues This project will seek to address those issues and provide other improvements
where possible.
There are three areas which are to be reviewed for potential improvements These include Woodhill
Drive near the intersection with Yuma, Lotus Trail near Carver Beach Park, and Lotus Trail near the
beach area at Napa Drive
g \eng \public \_2015 projects \15 -01 2015 street improvements \12 -08 -2014 accept feasibility docx
Paul Oehme
2015 Street Improvement Project
Accept Feasibility Study, Call Public Hearing
December 8, 2014
Page 4
WOODHILL DRIVE
LOTUS TRAIL AT CARVER BEACH PARK
Drainage from Fox Hill Dnve, Lotus
Trail and Broken Arrow has been
directed to a curb cut south of the
parking area for Carver Beach Park.
This has resulted in gully erosion on the
side slope of Lotus Trail and the
delivery of sediment into Lotus Lake.
In 2012, the Riley- Purgatory Bluff -
Creek Watershed worked with
Chanhassen and several landowners to
address drainage from Broken Arrow
However, this did not address the other
two sources nor did it address the gully
that has formed In conjunction with
The current vertical alignment of Woodhill
Dnve is lower than the typical bounce of
the wetland on the north side of the road
This results in frequent inundation of
Woodhill Dnve and subsequent sediment
deposition onto the road It will be a goal
of this project to raise the profile of the
road, improve culvert hydraulics under
Woodhill Drive and provide additional
downstream water quality treatment either
through a filtration swale, pond expansion
or some combination of the two.
this project, a catch basin with a sump manhole will be installed to capture sediment and dissipate
energy before discharging into a stilling basin which will be constructed to provide treatment of the
surface water prior to discharging to Lotus Lake.
Staff has also had discussions with property owners on Broken Arrow about improving the inlet to
the management practice installed in 2012. They have concerns about snow storage and property
access
g \eng \public\ 2015 projects \15 -01 2015 street improvements \12 -08 -2014 accept feasibility docx
Paul Oehme
2015 Street Improvement Project
Accept Feasibility Study, Call Public Hearing
December 8, 2014
Page 5
LOTUS TRAIL AT NAPA DRIVE
The current pond at Lotus Trail and Napa Drive is undersized for its watershed. With the road
project, staff will evaluate possibilities to expand the pond and improve the hydraulics It is clear
that additional depth is not possible
given the proximity to Lotus Lake
improvements is between $20,000 and $30,000
and the water table It may be
possible to expand the surface area
of the pond or provide additional
pre- treatment in the way of
installing a sump manhole and
SAFL baffle There is also another
discharge point which lacks any
treatment prior to discharging into
Lotus Lake This would be a
candidate for an additional sump
manhole and SAFL baffle
Depending upon the amount of
expansion and the depth of sump
manhole, the estimated cost of these
Staff has inspected the sanitary sewer manholes and provided recommended repairs, such as
inflow /infiltration barriers, replacing rings with a riser section, replacing the castings or cover, and
rebuilding the manhole The sanitary sewer system in the project area will be televised this winter to
determine if any of the existing sanitary sewer needs of repair or replacement
The water main in this area is ductile iron. City records do not show any water main breaks in this
area however, and the soils do not appear to be corrosive It is recommended to replace some
hydrants at this time
PROJECT FUNDING
Special assessments to the benefitting properties are proposed to pay for a portion of the proposed
2015 Street Improvement Project No 15 -01 per the City's assessment practice The remaining
project costs are proposed to be paid from City funds. All the utility improvements are proposed to
be paid for by the associated utility fund. The preliminary funding is shown below•
g• \eng \public \_2015 projects \15 -01 2015 street improvements \12 -08 -2014 accept feasibility docx
Paul Oehme
2015 Street Improvement Project.
Accept Feasibility Study, Call Public Hearing
December 8, 2014
Page 6
Funding Source Estimated Amount
Project Cost Budgeted
Assessments /Revolving Assessment Fund
Stormwater Management Fund
Water Utility Fund
Sanitary Sewer Utility Fund
$1,620,070.20
$1,850,000.00
$100,000 00+
$125,00000
$121,365.00
$125,000.00
$76,85900
$75,00000
$1,918,294.20 $2,175,000.00
+ This estimate represents the known storm water infrastructure replacement needs at this time Additional storm
water measures may be added during the design phase
As previously discussed, two street rehabilitation techniques are proposed with this project, therefore
two assessment rolls are proposed to reflect the cost difference between the methodologies
Edge Mill and 2" Overlay Area
Total Estimated Street Cost- $65,318 71
40% assessed. 40% of $65,318.71= $26,127 49
Number of assessable units- 14
Estimated unit assessment- $26,127 49 — 14 units = $1,866.25/unit
Full Depth Mill and 4" Overlay Area
Total Estimated Street Cost- $1,554,75149
40% assessed 40% of $1,554,751 49= $621,900 59
Number of assessable units. 218
Estimated unit assessment- $621,900 59 — 218 units = $2,852.76/unit
The cost estimate for the edge mill and overlay includes a 10% contingency; the contingency for the
full depth mill is 20% due to the severity of pavement distresses and variability associated with a full
depth mill project. Both estimates include 5% indirect costs
SCHEDULE
The proposed project schedule is as follows.
Public Hearing /Order Plans & Specifications
Approve Plans & Specifications, Order Ad for Bids
Bid Opening
Assessment Hearing
Project Begins
Substantial Completion
Attachments- Resolution
CIP Sheets
g \eng \public \_2015 projects \15 012015 street improvements \12 -08 -2014 accept feasibility docx
January 26, 2015
February 9, 2015
March 13, 2015
April 27, 2015
May, 2015
August 30, 2015
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: December 8, 2014 RESOLUTION NO: 2014 -XX
MOTION BY- SECONDED BY:
A RESOLUTION ACCEPTING FEASIBILITY STUDY AND
CALLING THE PUBLIC HEARING FOR THE 2015 STREET
REHABILITATION (CARVER BEACH AREA) PROJECT NO. 15-01
WHEREAS, pursuant to resolution of the Council adopted October 27, 2014, a report has been
prepared by City staff with reference to the above - referenced project, and this report is being received
by the Council on December 8, 2014, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible
NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council.
1 The Council will consider the improvement of such project in accordance with the report and the
assessment of abutting properties for a portion of the cost of the improvement pursuant to Minnesota
Statutes, Chapter 429 at an estimated total cost of the street improvements of $1,620,070.20.
2 Public hearing for the proposed improvements within the 2015 Street Rehabilitation (Carver Beach
Area) Project No 15 -01 shall be held on January 26, 2015 in the Council Chambers of City Hall at 7.00
PM
The clerk shall give mailed and published notice of the hearing and improvement as required by law
Passed and adopted by the Chanhassen City Council this 8th day of December, 2014.
ATTEST
Todd Gerhardt, City Manager Thomas A. Furlong, Mayor
YES NO ABSENT
Projects By Funding Source 2015 thru 2019 Department Street Improvements
City of Chanhassen, MN Contact Paul Oehme
Project # ST -012
Project Name Annual Street Improvement Program
Account #1 601 -xxxx -4751
Account #2
Account #3
Account #4
Type Improvement
Useful Life Unassigned
Category Streets /Highways
Priority n/a
Description Total Project Cost- $22,769,500
Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas
2015 - Carver Beach area (south and west of Carver Beach Road)
MSA - Kerber Blvd overlay (north of West 78th Street) and Dakota Ave (Hwy 5 to Lake Dr E)
2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Mmnewashta Woods Drive
MSA - Park Road overlay and Park Place
2017 - Flamingo Drive area, Ches Mar Drive, Lone Cedar and Saddlebrook Pass neighborhood
MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension
2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street
2019 - Fox Path area, Frontier Trail (north of 77th Street), Choctaw and Kurvers Point
MSA - Minnewashta Parkwav overlav
Justification I
The City uses a Pavement Management System to monitor the condition of the City streets While proper preventative maintenance extends the
life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective
Rehabilitation projects extend the life of the street In cases when utilities or poor sub grade needs to be replaced or where streets have
deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary A feasibility study is written to
consider the merits of the project and scope of work
The Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive The resulting "gap" represents a
missing link in the City's trail system south to Flying Cloud Drive Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in
the absence of a trail This trail seement is planned to be constructed along with the 2017 MSA street reconstruction
Prior
Expenditures
2015
2016
2017
2018
2019
Total
9695,000
Construction
3,250,000
2,460,000
3,022,400
1,687,300
2,654,800
13,074,500
Total
Total
3,250,000
2,460,000
3,022,400
1,687,300
2,654,800
13,074,500
Prior
Funding Sources
2015
2016
2017
2018
2019
Total
9,695 000
Assessment/Revolving
1,850,000
1,560,000
1,622,400
1,687,300
1,754,800
8,474,500
Assess Fund
Total
MSA
1,400,000
900,000
1,400,000
900,000
4,600,000
Total
3,250,000
2,460,000
3,022,400
1,687,300
2,654,800
13,074,500
Budget Impact/Other
This project may decrease maintenance costs
Projects By Funding Source
City of Chanhassen, MN
Project # SS -014
Project Name Sanitary Sewer Replacement
2015 thr•u 2019
Department
Sanitary Sewer Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Account #1 701 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost $1,640,000
Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street
Justification
The City considers the condition of the existing utilities to the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects
Prior Expenditures
925,000 Construction
Total
Prior Funding Sources
925,000 Sewer Utility Fund
Total
2015
2016
2017
2018
2019
Total
75,000
300,000
40,000
250,000
50,000
715,000
Total 75,000
300,000
40,000
250,000
50,000
715,000
2015 2016 2017 2018 2019 Total
75,000 300,000 40,000 250,000 50,000 715,000
Total 75,000 300,000 40,000 250,000 50,000 715,000
Budget Impact/Other I
This project will decrease maintenance costs.
Projects By Funding Source
City of Chanhassen, MN
2015 thr•u 2019
Project# SWMP -019
Protect Name Street Improvement Projects - Storm Water Mgmt
Department
Surface Water Management
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Account #1 720 - 7025 -4751 Account #3 Priority n/a
Account 92 Account 94
Description
Total Project Cost. $1,775,000
kn annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
mdertaken by the engineering and public works departments
Justification
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects
Prior Expenditures
1 100 000 Construction
Total
2015 2016 2017 2018 2019 Total
125,000 200,000 75 000 200 000 75,000 675,000
Total 125,000 200,000 75,000 200,000 75,000 675,000
Prior Funding Sources
2015
2016
2017
2018
2019
Total
1,100,000 Surface Water Utility Fund
125,000
200,000
75,000
200,000
75,000
675,000
Total Total
125,000
200,000
75,000
200,000
75,000
675,000
Budget Impact/Other
nventory, inspection and maintenance of new infrastructure will be required Citywide No map
Projects By Funding Source 2015 thru 2019
Department Water System Improvements
City of Chanhassen, MN Contact Paul Oehme
Project # W -024
Project Name Watermain Replacement
Account #1 700- 7025 -4751
Account #2
Account #3
Account #4
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Description Total Project Cost $4,270,000
Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution
system for street rehabilitation projects
Justification
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets If significant repairs are necessary to the existing water
main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
project in the City
Prior Expenditures
2,375,000 Construction
Total
Prior Funding Sources
2,375,000 Water Utility Fund
Total
2015 2016 2017 2018 2019 Total
125,000 825,000 75,000 770,000 100,000 1,895,000
Total 125,000 825,000 75,000 770,000 100,000 1,895,000
2015 2016 2017 2018 2019 Total
125,000 825,000 75,000 770,000 100,000 1,895,000
Total 125,000 825,000 75,000 770,000 100,000 1,895,000
Budget Impact/Other
Phese projects will decrease maintenance costs