F-1. 2015 Street Project - Kerber Blvd - PH and Order Plans49 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone. 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Website www.ci.chanhassen.mn.us F -1 Il % L�1�7;1��111i� TO: Paul Oehme, Director of Public Works /City Engineer FROM: Alyson Fauske, Assistant City Engineer l DATE: February 9, 2015 94,0 SUBJ: 2015 Street Rehabilitation Project (Kerber Boulevard) No. 15 -02 Public Hearing; Order Plans & Specifications PROPOSED MOTION "The City Council orders the preparation of plans and specifications for the 2015 Street Rehabilitation (Kerber Boulevard, Powers Boulevard to West 781H Street) Project No. 15 =02." City Council approval requires a simple majority vote of the City Council present. BACKGROUND At the August 11, 2014 work session; staff reviewed with Council the proposed 2015 Street Improvements to the Carver Beach area. Kerber Boulevard, a Municipal State Aid Route, is also proposed to be resurfaced in 2015. On October 27, 2014, the City Council authorized preparation of the feasibility study. On December 11, 2014, staff held an Open House for the proposed project. At the December 8, 2014, City Council meeting, the feasibility study was accepted and the public hearing was called for February 9, 2015. DISCUSSION Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2015 Street Rehabilitation Project, staff is proposing to rehabilitate approximately 1.4 miles of a Municipal State Aid street: Kerber Boulevard. This street was identified by the City's Pavement Management software in conjunction with site investigations. C: \Users \je &a�ifas Leon" a`.l OmmUrlli}Ii0f Lliente�rovi ing or looayana fanni g orTomorrow 2015 Street Rehabilitation (Kerber Blvd.) Project No. 15 -02 February 9, 2015 Page 2 Kerber Boulevard north of West 781h Street to Powers Boulevard is proposed to be resurfaced in 2015. The portion south of West 78th Street was resurfaced in 2011 with the West 781h Street improvements. Kerber Boulevard was constructed in 1980, with the exception of the southern leg between City Hall and West 78th Street, which was constructed in 1940. The street was overlaid in 1996 and last sealcoated in 2007. The street conditions in this area were last surveyed in 2013. The PCIs are established when the street section is surveyed every three years; the pavement management software then interpolates the pavement deterioration based on the historical data. The PCIs are based on the type the pavement distress, the severity of the distress, and the number of distresses within a street segment. Load related distresses —where the base material under the roadway cannot support the weight of the traffic on the street — decrease the PCI more so r than a non -load distress. An example of a load related pavement distress is an alligator crack. A transverse crack is an example of a non -load ® ® ®® pavement distress as it is caused by exposure to repeated temperature extremes. ..f Y Example of an alligator Example of transverse crack cracks The severity of the pavement distress also factors into determining the PCI for a street segment. The severity is determined by the dimension of the pavement distress. For example, a low severity G:\ENG\PUl3LlC\_20l5 PROJECTSV 5 -02 Kerber Boulevard Overlay \02 -09 -2015 15 -02 public bearing.docx 2015 Street Rehabilitation (Kerber Blvd.) Project No. 15 -02 February 9, 2015 Page 3 pothole is less than one inch deep, medium severity is one to two inches deep, and a high severity pothole is more than two inches deep. The more severe the pavement distress, the lower the PCI. The PCI also accounts for the number of distresses present. For example, the more potholes within a street segment, the lower the PCI. The PCI of the street segments from the 2013 survey are shown on the adjacent graphic. A PCI of 100 represents a new street. For a local street, a PCI between 45 and 65 typically warrants a mill and overlay. The storm manholes in the area have been inspected. These manholes do not meet the City's current construction standards; however they will not be replaced at this time for the following reasons: 1. They are still functioning and replacement costs would exceed the amount budgeted for storm sewer improvements. 2. The street costs would increase due to the area that would be disturbed. 3. The time required to excavate and replace the structures would delay the project. •.FrW J/ K�� ...... Meadow Green r i Park S. n � � a Chanhassen Pend Park It —� .. �� Park R At this time, deteriorated rings within the storm manholes will be replaced and the circular inlet grates will be replaced with vane grates to improve inlet efficiency. Example of a circular inlet grate MOM' G:\ENG\PUBLIC`, 2015 PROJECTS\15 -02 Kerber Boulevard Overlay \02 -09 -2015 15 -02 public hearing.docx Example of a vane grate 2015 Street Rehabilitation (Kerber Blvd.) Project No. 15 -02 February 9, 2015 Page 4 The water main is thought to be in relatively good condition since there are no water main breaks recorded in the area and the hydrants are in good condition, therefore no water main work is proposed with this project. The sanitary sewer system in the project area was televised and staff received the results December 18, 2014. Upon review of the televising records, it is recommended some of the sanitary sewer should to be replaced due to sags in the pipe. Some minor manhole work is also proposed. The trail along Kerber Boulevard has a low PCI rating as shown on the graphic to the right, and is recommended to be replaced at this time. Staff is recommending the trail be bid out as an alternate bid. No new trail segments are proposed to be added to Kerber Boulevard. Curb ramps to the trail along Kerber Boulevard should be replaced in accordance with the Americans with Disabilities Act requirements. PROJECT FUNDING N Q ItERBER BLVD kyl p� m o / MM cM Special assessments to the benefitting properties are `�- m proposed to pay for a portion of the proposed 2015 0 Street Rehabilitation Project No. 15 -02 per the City's assessment practice. The City's share of the project is proposed to be paid for with Municipal State Aid funds (gas tax funds) which the City annually receives from the State. However, the City will need to advance funds from the State Aid account since the City's account does not have sufficient funds to pay for this project. The State encourages cities to advance fund projects since the State Aid account has sufficient funds to cover these types of projects. The State does not charge any interest for these advancements. The sanitary sewer improvements are proposed to be paid for by the Sanitary Sewer Enterprise Fund. The preliminary cost and funding for the project is shown below: Funding Source Estimated Amount Project Cost Budgeted Municipal State Aid Fund $1,385,000.00 $1,400,000.00 Assessments $24,563.41 Sewer Utility Fund $47,000.00 $85,000.00 Total $1,429,563.41 g: \eng \public \_2015 projects\15 -02 kerber boulevard overlay \02 -09 -2015 15 -02 public hearing.docx 2015 Street Rehabilitation (Kerber Blvd.) Project No. 15 -02 February 9, 2015 Page 5 Kerber Boulevard is a 40 -foot wide collector road with few properties having direct access to the street. The City's practice is to assess benefitting properties 40% of the equivalent cost of a 31 -foot wide residential roadway. Due to the limited number of benefitting properties, assessments are proposed to be established by a front - footage basis. The IRET (Byerly's) property was assessed for 100% benefit to West 78`h Street with the 2011 resurfacing project and therefore is not included in the proposed assessment roll for City Project No. 15 -02. The preliminary assessment calculations are shown below. Estimated cost of Kerber Boulevard resurfacing, 31 -foot wide road: $906,675 Total front footage of Kerber Boulevard: 15,242 ft $906,675 - 15,242 ff = $59.49/ff 40% assessed: 40% of $59.49/ff = $23.79/ff Carver County CDA: 397 ff x $23.79/ff= $9,444.63 West Village Townhomes: 635.51 ff (per CIC plat) x $23.79/ff = $15,118.78 $15,118.78= 64 units (per CIC plat) = $236.23/unit The cost estimate includes an 8% contingency and 5% indirect costs. Terms of the assessments are proposed over eight (8) years and the interest rate would be set at prime rate plus 2% at the time of the bid opening. Public hearing notices have been mailed to property owners. SCHEDULE The anticipated project schedule is as follows: Accepts Bids /Award Contract; Assessment Hearing Project Begins Substantial Completion Attachments: 1. CIP Pages 2. Resolution G:\ENG,.PUBLIC. 2015 PROJECTS \15 -02 Kerber Boulevard Overlay \02 -09 -2015 15 -02 public hearing.docx April 27, 2015 July 6, 2015 August 30, 2015 Projects By Funding Source 2015 t&z, 2019 Department Street Improvements City of Chanhassen, MN Contact Paul 0ehrric Project # ST-012 Project Name Annual Street Improvement Program Account #I 6,01-xxxx-4751 Account #3 Account #2 Account #4 Description Type Improvement Useful Life Unassigned Category Streets/Ilighways Priority n/a Total Project Cost. 522,769,500 Annual project to re-habilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood arms: 2015 - Carver Beach area (south and west of Carver Beach Road) MSA - Kerber Blvd overlay (north of West 78th Street) and Dakota Ave (Hwy 5 to Lake Dr E) 2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewaslita Woods Drive MSA - Park Road overlay and Park Place 2017 - Flamingo Drive area, Ches Mar Drive, Lone Cedar and Saddlebrook Pass neighborhood MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension. 2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street 2019 - Fox Path area, Frontier Trail (north of 77(h Street), Choctaw and Kurvers Point MSA - Minnewashta Parkway overlay Justification The City uses a Pavement Management System to monitor the condition of the City streets, While proper preventative maintenance extends the life of the street mid is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. The Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Blutl'Creek Drive. The resulting "gap" represents a missing link in the City's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in the absence of a trail. This trail segment is planned to be constructed along with the 2017 MSA street reconstruction, Prior Expenditures 2015 2016 2017 2018 2019 Total Construction 3250,000 2,460,000 3,022.400 1,687,300 2,654,800 13,074,500 Total Total 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 Prior Funding Sources 2015 2016 2017 2018 2019 Total 9,695,000 AssessmenViRevolving 1,350,000 1,560,000 1,622,400 1,687,300 1,754,800 8,474,500 Assess Fund Total MSA 1,400.000 900,000 1,400,000 900,000 4,600,000 Total 3,250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500 , s project may decrease maintenance costs, Projects B Funding Source 2015 thru 2019 J b Department 5urtace Water Iviauiagemeral City of Chanhassen, MN Contact Paul Oehmc Project 4 SWMP -019 Project dame Street Improvement Projects - Storm Water Mgmt Account #1 720- 7025 -4751 Account #2 Account p3 Account #4 Type Improvement Useful Life Unassigned Category SWNIP Priority n/a Description Total Project Cost: $1,775,000 An annual amount set aside foot, storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments, Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 2015 2016 2017 2618 2019 Total 1,100,000 Construction 125,000 200,000 75,000 200,000 75,000 675,000 Total Total 125,000 200,000 75,000 200,000 75,000 675,000 Prior Funding Sources 2015 2016 2017 2018 2019 Total 1,100,C00 Surface Water Utility Fund 125,000 200,000 75,000 200,000 75,000 675,000 Total Total 125,000 200,000 75,000 200,000 75,000 675,000 Budget Impact/Other Invcntory, inspection and maintenance of new infrastructure will be, required. Citywide. No map 5 Enterprise rise Funds p 701 Sewer Utility Expenditures 84 2014 to 2012 2013 2014 2015 2015 Budget %Inc /(Dec) Actual Actual Budget mt Description 260,000 5.7% 4010 Salaries &Wages -Reg 241,468 246,742 6,626 246,000 9,000 8,000 (11.1 %) 4011 Overtime -Reg 9,182 6,421 6 482 6500 , 6,500 14,000 0.0% 0.0% 4012 Stand -By Pay 8,041 13,126 14,000 0.0% 4020 Salaries & Wages -Temp 33 67 42,000 5.0% 4021 Overtime -Temp 37,148 37 571 40,000 48,000 9.1% 4030 Contributions- Retirement 40,496 40,892 44,000 7,200 16.1% 4040 Contributions- Insurance 6,242 6,955 6,200 _ 0.0% 4050 Workers Compensation - - 385,700 5 % 4060 Unemployment 351,243 358,462 365,700 * Total Personal Services 15,954 13,890 8,500 10,000 5,000 17.6% 0.0% 4120 Supplies- Equipment 1280 5 987 5,000 10,000 0.0% 4140 Supplies- Vehicles 9,142 10,534 10,000 4,500 0.0% 4150 Maintenance Materials 4,083 3,301 4,500 1,000 0.0% 4160 Chemicals 14,672 14,683 14,000 2000 2, 0.0% 4170 Motor Fuels & Lubricants 2,064 967 2,000 0.0% 4240 Uniforms & Clothing 2 715 3,449 ___ 2� -- - -- 48,300 2 3.2 /o 4260 Small Tools & Equipment 46,800 * Total Materials & Supplies 17,448 27,724 23,000 23,000 6,000 0.0% 0.0% 4300 Fees, Services 6,000 6,000 6,000 7,500 25.0% 4301 Auditing 5,176 7,726 6,000 75,000 7.1% 4310 Telephone 66,324 73,785 70,000 5,200 (5.5 %) 4320 Utilities 5,141 5,024 5,500 2,000 0.0% 4330 Postage 2,646 1,443 2,000 0.0% 4340 Printing &Publishing _ 193 193 - 0.0% 4350 Cleaning & Waste Removal 100 400 400 0.0% 4360 Subscriptions &Memberships 4,506 3,866 4,200 4,200 (66.7 %) 4370 Travel & Training 41 317 1,500 500 0.0% 4410 Rental- Equipment 152 _ - 13,000 0.0% 4440 License & Registration Insurance General Liability 13,000 13,000 13,000 1,451,000 1,579,600 8.9% 4483 4509 Remit to Other Agencies 1,506,629 1,398,891 4,266 5,000 4200 (16.0 %) 4510 Repair & Maintenance- Building 2 233 1,762 1,000 1,000 0.0% 4520 Repair & Maintenance - Vehicles 405 22,430 28182 26,000 26,000 85,000 q, 0.0% 0.0% 4530 Repair &Maintenance -Equip 91,841 79001 , 85,000 0.0% 4551 Repair & Maintenance -Sewer 8,797 2,435 10,000 10,000 0.0% 4553 Emergency Repairs Sewer 769 �_ 7.8% 4933 Sales Tax �� 1,755,010 - 1,654,823 1,709,600 1,842,600 * Total Contractual Services 2,156,163 2,066,096 2,122,100 2,276,600 7.3% ** Total Expenditures 84 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: February 9, 2015 RESOLUTION NO: 2015 -XX MOTION BY: SECONDED BY: A RESOLUTION ORDERING IMPROVEMENTS & AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2015 STREET IMPROVEMENT (KERBER BOULEVARD) PROJECT NO. 15 -02 WHEREAS, on December 8, 2014, the City Council received the feasibility report for the 2015 Street Reconstruction Project (Kerber Boulevard) and called for the public hearing to be held on February 9, 2015 for the 2015 Street Improvement Project (Kerber Boulevard), and AND WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given, and the hearing was held thereon on the 9`h day of February, 2015 which all persons desiring to be heard were given an opportunity to be heard thereon. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. Such improvement is necessary, cost- effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as proposed in the Council resolution adopted February 9, 2015. 3. Authorizes preparation of plans and specifications for the 2015 Street Improvement (Kerber Boulevard) Project No. 15 -02. Passed and adopted by the Chanhassen City Council this 9`h day of February, 2015. ATTEST: Todd Gerhardt, City Manager Denny Laufenburger, Mayor YES NO ABSENT