Loading...
2003-2007 CIPI I I I I I I 2003-20O7 CIP City of Chanhassen, MN I I Capital Improvements Program Adopted December 9, 2002 1 i I I Todd Gerhardt, City Manager Bruce DeJong, Finance Director I I I I Chapter Chapter Chapter 2OO3-2OO7 Capital Improvements Program Table of Contents 1: Policy Capital Improvement Fiscal Policy ................................................................................................................. 1 2: Tables I: Department Summary ....................................................................................................................... 5 II: Projects by Department .................................................................................................................... 6 III: Sources of Revenue Summary .......................................................................................................... 9 IV: Projects by Funding Source ............................................................................................................ 10 3: Major Equipment Major Equipment Project Summary ............................................................................................................. 15 Refurbish Aerial Ladder ............................................................................................................................... 17 Rescue Boat Replacement ............................................................................................................................ 17 SCBA Upgrades ............................................................................................................................................ 18 Thermal Rescue Camera ............................................................................................................................... 18 13A-Inch Fire Hose Upgrade .......................................................................................................................... 19 Fire Department Laptop Computers ............................................................................................................. 19 Fire Department Turnout Gear ...................................................................................................................... 20 Computer Purchases/Upgrades ..................................................................................................................... 20 Telecommunications Upgrade ................................................................................................................ : ..... 21 Light Duty Trucks: Community Development ............................................................................................ 21 Dump/Plow Trucks ....................................................................................................................................... 22 Street Sweeper .............................................................................................................................................. 22 Vibratory Roll Packer ................................................................................................................................... 23 Equipment Trailer ......................................................................................................................................... 23 Tar Kettle ...................................................................................................................................................... 24 Backhoe ........................................................................................................................................................ 24 Crack Sealer .................................................................................................................................................. 25 Line Striper ................................................................................................................................................... 25 Audio/Visual Equipment Replacement ......................................................................................................... 26 Copier Replacements .................................................................................................................................... 26 Groundsmaster Mower Replacement ............................................................................................................ 27 Light Duty Trucks: Public Works ................................................................................................................. 27 Bobcat Snow Blower .................................................................................................................................... 28 Grounds Mower Replacement ...................................................................................................................... 28 Tractor .......................................................................................................................................................... 29 Tractor Broom .............................................................................................................................................. 29 Trailer ........................................................................................................................................................... 30 Grounds lVlower Replacement ...................................................................................................................... 30 Upgrade Grass Rig ........................................................................................................................................ 31 Dive Team Equipment .................................................................................................................................. 31 Recreation Center Carpet Replacement ........................................................................................................ 32 Web-Enabled Software ................................................................................................................................. 32 Computerized Records Retention System ..................................................................................................... 33 Street Mowers ............................................................................................................................................... 33 Light Duty Trucks: Parks ............................................................................................................................. 34 Cushman Trail Vehicle ................................................................................................................................. 34 Fire Vehicles ................................................................................................................................................. 35 Aerial Maps for GIS ..................................................................................................................................... 35 Front End Loaders ........................................................................................................................................ 36 Easement Jetter ............................................................................................................................................. 36 Sander. .......................................................................................................................................................... 37 Generators ..................................................................................................................................................... 37 Bobcat Tracks ............................................................................................................................................... 38 Bobcat Planer ................................................................................................................................................ 38 Light Duty Trucks: Utilities ......................................................................................................................... 39 Administration Vehicle ................................................................................................................................. 39 I I I I I I ! ! I I Chapter Chapter CSO Vehicle ................................................................................................................................................. 40 Engineering Van ........................................................................................................................................... 40 Fire Department Equipment .......................................................................................................................... 41 Fire Station 3, Vehicles & Equipment .......................................................................................................... 41 4: Municipal Buildings Municipal Building Project Summary .......................................................................................................... 45 Library .......................................................................................................................................................... 46 Public Works Expansion ............................................................................................................................... 46 Senior Center ................................................................................................................................................ 47 Fire Station Capital Improvements ............................................................................ : .................................. 47 Fire Station 3 ................................................................................................................................................. 48 5: Park & Trail Improvements Park & Trail Improvements Project Summary .............................................................................................. 51 Bandimere Community Park ......................................................................................................................... 52 City Center Park ........................................................................................................................................... 52 Curry Farms Park .......................................................................................................................................... 53 Kerber Pond Park .......................................................................................................................................... 53 Meadow Green Park ..................................................................................................................................... 54 Roundhouse Renovation .............................................................................................................................. 54 Tree Plantings ............................................................................................................................................... 55 Picnic Tables ................................................................................................................................................. 55 Half Court Basketball, Bandimere Heights Park .......................................................................................... 56 Skate Park Ramp ........................................................................................................................................... 56 Trash Receptacles ......................................................................................................................................... 57 City Center Commons .................................................................................................................................. 57 Trail Connector, Highway 41 ....................................................................................................................... 58 Trail Connector, North TH 101 to Near Mountain Boulevard ...................................................................... 58 Playground Improvements: Minnewashta Heights Park .............................................................................. 59 Playground Improvements: Lake Ann Park ................................................................................................. 59 Playground Improvements: Lake Susan Park .................... . .......................................................................... 60 Chapter 6: Sanita~3~ Sewer Improvements Sanitary Sewer Improvements Project Summary ......................................................................................... 63 Sanitary Sewer LC-1 Sub-district Extension ................................................................................................ 64 Sanitary Sewer Trunk Extension BC-2 ......................................................................................................... 64 Chapter 7: Street Improvements Street Improvements Project Summary ........................................................................................................ 67 Annual Street Improvement Program ........................................................................................................... 68 I Chapter 8: Surface Water Management Program Surface Water Management Project Summary ............................................................................................. 71 SWMP Implementation ................................................................................................................................ 72 NPDES Permit/Storm Water Management Plan ........................................................................................... 72 Chapter 9: Water System Improvements Water System Improvements Project Summary ........................................................................................... 75 I Well No. 9 ..................................................................................................................................................... 76 Well No. 10 ................................................................................................................................................... 76 Well No. 11 ................................................................................................................................................... 77 Water System Planning ................................................................................................................................. 77 I West 76th Street Tower Repainting ............................................................................................................... 78 Well No. 12 ................................................................................................................................................... 78 Water Treatment Plant .................................................................................................................................. 79 This page intentionally left blank. ! ! I I I I I I I CAPITAL IMPROVEMENTS FISCAL POLICY GENERAL POLICY IChanhassen's Capital Improvements Program reflects an assessment of the community's needs and its ability to pay for major improvements. It is founded on the policy that reinvestment required for replacement, maintenance, or the increased efficiency of existing systems shall have priority over investments for expansion I of or the provision of new services. existing systems I I I FUNDING PRIORITIES Capital spending proposals will generally be funded on the following priority basis: 1. Those projects necessary for contributing to the public health and welfare. 2. Those projects which will help to maintain an existing system. 3. Those projects that will make an existing system more efficient. I 4. I Those projects representing the expansion of an existing system for new service or completely new · _ public facility or service. FUNDING PRINCIPLES i As a result, the following principles shall govern the implementation of the recommended Capital Improvements Program: I 1. I I I I I The city will make all capital improvements in accordance with the adopted Capital Improvements Program. 2. The city will develop a multi-year plan for Capital Improvements and update it annually. . The city will coordinate development of the Capital Improvements Program with development of the annual operating budget. Future optional costs associated with new capital improvements will be projected and included in operation budget forecasts. I I This page intentionally left blank. I I I I I I I I I I I I Tables I I I I I I I I I I I I This page intentionally left blank. I I I I I I I I I I I I Capital Improvement Program City of Chanhassen, MN DEPARTMENT SUMMARY 2003 thru 2007 I I I I Department 2003 2004 2005 2006 2007 Total Major Equipment 962,800 1,113,800 591,700 1,240,900 1,560,600 5,469,800 Municipal Buildings 3,440,000 10,000 375,000 1,700,000 3,500,000 9,025,000 Park & Trail Improvements 1,285,000 370,000 100,000 1,755,000 Sanitary Sewer Improvements 80,000 550,000 630,000 Street Improvements 858,000 2,583,000 958,000 3,208,000 1,367,000 8,974,000 Surface Water Management 330,000 305,000 190,000 185,000 105,000 1,115,000 Water System Improvements 650,000 702,000 705,000 1,252,000 4,675,000 7,984,000 Total 7,525,800 5,163,800 3,469,700 7,585,900 11,207,600 34,952,800 I I I I I I I I l l I Department Major Equipment 100ft. Aerial Ladder Refurbishing Boat/Trailer/Motor Replacement Fire Dept.: SCBA Upgrades Fire Dept.: Thermal Rescue Device Fire Dept.: 1 3/4 Inch Hose Fire Dept.: Laptop Computers Fire Dept.: PPE (Turnout/Helmets) Computer Purchases/Upgrades Telecommunication Purchases/Upgrades Community Bev.: Light Duty Trucks Dump/Plow Truck Replacements/Additions Street Sweeper Vibratory Roll Packer Equipment Trailers Tar Kettle Ford 555C Backhoe Crack Sealer Line Striper Audio/Visual Equipment Copier Replacements Groundsmaster 580 Mower Replacement Public Works: Light Duty Trucks Bobcat Snow Blower Grounds Mower Replacement Tractor Tractor Broom Trailer Grounds Mower Replacement (10') Upgrade 217 Grass Rig Pump/Motor/Water Tank Dive Team Equipment Recreation Center Carpet Web-Enabled Software Computerized Records Retention System Street Mowers Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 2005 EQ-001 0 20,000 EQ-002 0 20,000 EQ-004 0 9,000 5,000 5,000 EQ-005 0 10,000 10,000 E Q-007 0 1,000 1,000 1,000 EQ-009 0 EQ-010 0 15,000 15,000 15,000 EQ-013 0 78,800 68,800 87,700 EQ-014 0 14,000 EQ-015 0 24,000 25,000 EQ-016 0 120,000 270,000 135,000 EQ-017 0 160,000 EQ-019 0 50,000 EQ-021 0 EQ-022 0 EQ-023 0 60,000 EQ-024 0 45,000 EQ-025 0 EQ-026 0 10,000 10,000 10,000 EQ-027 0 115,000 EQ-028 0 78,000 EQ-029 0 EQ-030 0 5,000 EQ-034 0 19,000 EQ-035 0 30,000 43,000 50,000 EQ-036 0 8,000 9,000 EQ-037 0 7,000 EQ-038 0 45,000 EQ-039 0 40,000 EQ-042 0 6,000 EQ-046 3 20,000 EQ-048 0 165,000 100,000 EQ-049 0 20,000 EQ-051 3 16,000 2006 5,000 10,000 1,000 50,000 15,000 79,900 26,000 140,000 25,000 30,000 9,000 10,000 85,000 28,000 20,000 2007 5,000 10,000 1,000 15,000 60,600 57,000 145,000 10,000 36,000 7,000 Total 20,000 20,000 29,000 40,000 5,000 50,000 75,000 375,800 14,000 132,000 810,000 160,000 50,000 25,000 30,000 60,000 45,000 9,000 5O,OO0 115,000 163,000 64,000 12,000 39,000 123,000 17,000 7,000 45,O0O 40,000 6,000 20,000 265,000 20,000 16,000 i I I I I I I I I Department Light Duty Trucks: Parks Cushman Trail Vehicle Fire Vehicles Aerial Maps for GIS Front-End Loaders Easement Jetter Sander Generators Bobcat Tracks Bobcat Planer Light Duty Trucks: Utilities Administration Vehicle CSO Vehicle Engineering Van Fire Department Equipment Fire Station 3 Vehicles and Equipment Major Equipment Total Municipal Buildings Library Expansion Public Works Facility Expansion Senior Center Expansion Fire Station Capital Improvements Fire Station 3 Municipal Buildings Total Park & Trail hnprovements Improvements: Bandimere Community Park Development: City Center Park Playground Replacement: Curry Farms Park Signage: Kerber Pond Park Playground Replacements: Meadow Green Park Roundhouse Renovation: Roundhouse Park Tree Plantings Picnic Tables Half Court Basketball: Bandimere Heights Park Skate Park Ramp Trash Receptacles City Center Commons Hwy 41 Trail Connector N 101 to Near Mountain Blvd Trail Connector Playground Improvement: Minnewashta Heights Park Playground Replacement: Lake Ann Park Playground Replacement: Lake Susan Park ! ! Project EQ-052 EQ-053 EQ-054 EQ-055 EQ-056 EQ-057 EQ-058 EQ-059 EQ-060 EQ-061 EQ-062 EQ-063 EQ-064 EQ-065 EQ-066 EQ-068 MB-O01 MB-O03 MB-OO4 MB-OO8 MB-O09 PK&T-001 PK&T-003 PK&T-004 PK&T-005 PK&T-006 PK&T-009 PK&T-018 PK&T-020 PK&T-022 PK&T-023 PK&T-024 PK&T-028 PK&T-029 PK&T-030 PK&T-031 PK&T-032 PK&T-033 Priority 2 2 o 0 0 o o 0 o 0 o 0 0 o 3 o o 0 0 0 o 0 0 3' 1 1 1 0 0 o o 0 2003 16,000 30,000 15,000 30,000 23,000 23,000 962,800 3,~0,0~ 100,000 3,440,000 55,000 65,000 25,000 10,000 10,000 20 000 70O 000 90 000 80 000 25 000 90 000 115 000 2004 90,000 150,000 31,000 25,000 10,000 1,113,800 10,000 10,000 40,000 275,000 10,000' 30,000 15,000 2005 66,000 15,000 10,000 33,000 30,000 591,700 200,000 175,000 375,000 100,000 2006 68,000 400,000 205,000 1,240,900 1,700,000 1,700,000 2007 72,000 80,000 5,000 6,000 15,000 36,000 1,000,000 1,560,600 3,500,000 3,500,000 Total 296,000 16,000 495,000 30,000 355,000 15,000 5,000 10,000 6,000 15,000 164,000 25,000 23,000 30,000 33,000 1,000,000 5,469,800 3,340,000 1,900,000 100,000 185,000 3,500,000 9,025,000 40,000 375,000 55,000 10,000 65,000 30,000 25,000 10,000 15,000 10,000 20,000 700,000 90,000 80,000 25,000 90,000 115,000 Department Park & Trail Improvements Sanitary Sewer Improvements Sanitary Sewer: LC-1 Sanitary Sewer: BC-2 (Portion) Sanitary Sewer Improvements Street Improvements Annual Street Improvement Program Street Improvements Total Surface Water Management SWMP Implementation NPDES Permit/Storm Water Management Plan Update Surface Water Management Water System Improvements Well Well #10 Well #11 Water System Improvements Repainting: West 76th St. Water Tower Well #12 Water Treatment Plant Water System Improvements GRAND Project SS-002 SS-005 ST-012 SWMP-012 SWMP-013 W-O01 W-O02 W-OO3 W-Ol 1 W-015 W-O18 W-019 Priority 2003 1,285,000 858,000 858,000 305,000 25,000 330,000 70,000 500,000 80,000 650,000 7,525,800 2004 370,000 80,000 80,000 2,583,000 2,583,000 105,000 200,000 305,000 630,000 72,000 702,O0O 5,163,800 2005 100,000 200,000 350,000 550,000 958,000 958,000 190,000 190,000 630,000 75,000 705,000 3,469,700 2006 3,208,000 3,208,000 185,000 185,000 675,000 77,000 500,000 1,252,000 7,585,900 2007 1,367,000 1,367,000 105,000 105,000 675,000 4,000,000 4,675,000 11,207,600 Total 1,755,000 200,000 430,000 630,000 8,974,000 8,974,000 890,000 225,000 1,115,000 700,000 702,000 750,000 500,000 80,000 752,000 4,500,000 7,984,000 34,952,80 I I I I I i Capital Improvement Program City of Chanhassen, MN sources OF REVENUE SUMMAI~¥ 2003 thru 2007 I I I I I Source Assessment Bonds Cable TV Fund Certificates of Indebtedness GO Bonds MSA Park Dedication Fund Revenue Bonds Sewer & Water Utility Fund Surface Water Utility Fund Total 2003 2004 2005 2006 2007 858,000 1,583,000 958,000 2,068,000 1,367,000 10,000 10,000 10,000 10,000 10,000 833,800 1,082,800 713,700 1,196,900 514,600 3,479,000 200,000 1,200,000 4,500,000 1,000,000 1,140,000 1,160,000 370,000 100,000 500,000 4,000,000 695,000 813,000 1,298,000 1,286,000 711,000 490,000 305,000 190,000 185,000 105,000 7,525,800 5,163,800 3,469,700 7,585,900 11,207,600 Total 6,834,000 .50,000 4,341,800 9,379,000 2,140,000 1,630,000 4,500,000 4,803,000 1,275,000 34,952,800 I I I ! I I I l I Source Assessment Bonds Annual Street Improvement Program Assessment Bonds Total Cable TV Fund AudioNisual Equipment CabLe TV Fund Total Capital Improvement Program City of Chanhassen, MN PROJECTS BY FUNDING SOURCE 2003 thru 2007 Project Priority 2003 2004 ST-012 0 2005 EQ-026 0 2006 2007 858,000 1,583,000 958,000 2,068,000 1,367,0O0 858,000 1,583,000 958,000 2,068,000 1,367,000 Total 6,834,000 6,834,000 10,000 10,000 10,000 10,000 10,000 50,000 10,000 10,000 10,000 10,000 10,000 50,000 5,000 10,000 1,000 15,000 60,600 57,000 145,000 36,000 7,000 Certificates of Indebtedness 100ft. Aerial Ladder Refurbishing EQ-001 0 20,000 Boat/Trailer/Motor Replacement EQ-002 0 20,000 Fire Dept.: SCBA Upgrades EQ-004 0 9,000 5,000 5,000 5,000 Fire Dept.: Thermal Rescue Device EQ-005 0 10,000 10,000 10,000 Fire Dept.: 1 3/4 Inch Hose EQ-007 0 1,000 1,000 1,000 1,000 Fire Dept.: Laptop Computers EQ-009 0 50,000 Fire Dept.: PP E (Turnout/He Imets) EQ-010 0 15,000 15,000 15,000 15,000 Computer Purchases/Upgrades EQ-013 0 78,800 68,800 87,700 79,900 Community Dev.: Light Duty Trucks EQ-015 0 24,000 25,000 26,000 Dump/Plow Truck Replacements/Additions EQ-016 0 120,000 270,000 135,000 140,000 Vibratory Roll Packer EQ-019 0 50,000 Equipment Trailers EQ-021 0 25,000 Tar Kettle EQ-022 0 30,000 Ford 555C Backhoe EQ-023 0 60,000 Crack Sealer EQ-024 0 45,000 Line Striper EQ-025 0 9,000 Copier Replacements EQ-027 0 115,000 Groundsmaster 580 Mower Replacement EQ-028 0 78,000 85,000 Public Works: Light Dub/Trucks EQ-029 0 28,000 Bobcat Snow Blower EQ-030 0 5,000 Grounds Mower Replacement EQ-034 0 19,000 20,000 Tractor EQ-035 0 30,000 43,000 50,000 Tractor Broom EQ-036 0 8,000 9,000 Trailer EQ-037 0 7,000 Grounds Mower Replacement (10') EQ-038 0 45,000 Upgrade 217 Grass Rig Pump/MotorRVater Tank EQ-039 0 40,000 Dive Team Equipment EQ-042 0 6,000 tO 20,000 20,000 29,000 40,000 5,000 50,000 75,0OO 375,800 132,000 810,000 50,000 25,000 30,000 60,000 45,000 9,000 115,000 163,000 64,000 12,0O0 39,000 123,000 17,000 7,000 45,000 40,0OO 6,000 I I I I I I I I I i I I Source Project I Recreation Center Carpet EQ-046 Web-Enabled Software EQ-048 Computerized Records Retention System EQ-049 I Street Mowers EQ-051 Light Duty Trucks: Parks EQ-052 Cushman Trail Vehicle EQ-053 i Fire Vehicles EQ-0,54 Aedal Maps for GIS EQ-055 Front-End Loaders EQ-056 Sander EQ-058 I Bobcat Tracks EQ-060 Bobcat Planer EQ-061 Administration Vehicle EQ-063 ICSO Vehicle EQ-064 Engineering Van EQ-065 Fire Department Equipment EQ-066 Senior Center Expansion MB-004 IFire Station MB-008 Capital Improvements Certificates of Indebtedness I I I GO Bonds Telecommunication Purchases/Upgrades EQ-014 Fire Station 3 Vehicles and Equipment EQ-068 Library Expansion MB-001 Public Works Facility Expansion MB-003 Fire Station 3 MB-009 City Center Commons PK&T-028 GO Bonds Total I MSA Annual Street Improvement Program I I MSA Total Park Dedication Fund I Improvements: Bandimere Community Park Development: City Center Park Playground Replacement: Curry Farms Park Signage: Kerber Pond Park IPlayground Replacements: Meadow Green Park Roundhouse Renovation: Roundhouse Park Tree Plantings I Picnic Tables Half Court Basketball: Bandimere Heights Park Skate Park Ramp Trash Receptacles City Center Commons ! ! ST-012 PK&T-O01 PK&T-O03 PK&T-O04 PK&T-O05 PK&T-O06 PK&T-O09 PK&T-018 PK&T-020 PK&T-022 PK&T-023 PK&T-024 PK&T-028 Priority 2003 20,000 165,000 20,000 16,000 30,000 23,000 23,000 100,000 833,800 14,000 3,340,000 125,000 3,479,000 55,000 65,000 25,000 10,000 10,000 20,000 575,000 11 2004 100,000 90,000 150,000 25,000 10,000 10,000 1,082,800 1,000,000 1,000,000 4O,OOO 275,000 10,000 30,000 15,000 2005 16,000 66,000 15,000 30,000 175,000 713,700 2OO,OOO 200,000 100,000 2006 68,000 400,000 205,000 1,196,900 1,200,000 1,200,000 1,140,000 1,140,000 2007 72,000 80,000 5,000 6,000 15,000 514,600 1,000,000 3,500,000 4,500,000 Total 20,000 265,000 20,000 16,000 296,000 16,000 495,000 30,000 355,000 5,000 6,000 15,000 25,000 23,000 30,000 33,000 100,000 185,000 4,341,800 14,000 1,000,000 3,340,000 1,400,000 3,500,000 125,000 9,379,000 2,140,000 2,140,000 40,000 375,000 55,000 10,000 65,000 30,000 25,000 10,000 15,000 10,000 20,000 575,000 Source Hvq 41 Trail Connector N 101 to Near Mountain Blvd Trail Connector Playground Improvement: Minnewashta Heights Park Playground Replacement: Lake Ann Park Playground Replacement: Lake Susan Park Park Dedication Fund Total Revenue Bonds Water Treatment Plant Revenue Bonds Total Sewer & Water Utility Fund Easement Jetter Generators Light Duty Trucks: Utilities Public Works Facility Expansion Sanitary Sewer: LC-1 Sanitary Sewer: BC-2 (Portion) Well ~9 Well #10 Well #11 Water System Improvements Repainting: West 76th St. Water Tower Well #t2 Sewer & Water Utility Fund Surface Water Utility Fund Street Sv/eeper SWMP Implementation NPDES Permit/Storm Water Management Plan Update Surface Water Utility Fund GRAND Project PK&T-029 PK&T-030 PK&T-031 PK&T-032 PK&T-033 W-019 EQ-057 EQ-059 EQ-062 MB-003 SS-O02 SS-005 W-001 W-002 W-003 W-01t W-015 W-018 EQ-017 SWMP-012 SWMP-013 Priority 0 0 0 0 0 20O3 90,000 80,000 25,000 90,000 115,000 1,160,000 15,000 30,000 70,0O0 500,000 80,000 695,000 160,000 305,000 25,0OO 490,000 7,525,800 t2 2004 370,000 31,000 80,000 630,000 72,000 813,000 105,000 200,000 305,000 5,163,800 2005 100,000 10,000 33,000 200,000 350,000 630,000 75,000 1,298,000 190,000 190,000 3,469,7OO 2006 500,000 500,000 34,000 500,000 675,000 77,000 1,286,000 185,000 185,000 7,585,900 2007 Total I 90,000 80,000 25,000 90,000 I 115,000 1,630,000 I 4,000,000 4,000,000 4,500,000 4,500,000 I 36,000 675,000 711,000 15,000 10,000 164,000 500,000 200,000 430,000 700,000 702,000 750,000 500,000 80,000 752,000 I I I I 4,8O3,OOO 105,000 160,000 890,000 225,000 105,000 1,275,000 I 11,207,600 34,952,800 I Major Equipment i I 13 This page intentionally left blank. 14 I I I I i I I 1 I I I I Department Major Equipment I 100ft. Aerial Ladder Refurbishing Boat/TrailedMotor Replacement Fire Dept.: SCBA Upgrades I Fire Dept.: Thermal Rescue Device Fire Dept.: 1 3/4 Inch Hose Fire Dept.: Laptop Computers Fire Dept.: PPE (Turnout/Helmets) I Computer Purchases/Upgrades Telecommunication Purchases/Upgrades Community Dev.: Light Duty Trucks I Dump/Plow Truck Replacements/Additions Street Sweeper Vibratory Roll Packer Equipment Trailers I Tar Kettle Ford 555C Backhoe Crack Sealer I Line Striper AudioNisual Equipment Copier Replacements i Groundsmaster 580 Mower Replacement Public Works: Light Duty Trucks Bobcat Snow Blower Grounds Mower Replacement I Tractor Tractor Broom Trailer I Grounds Mower Replacement (10') Upgrade 217 Grass Rig Pump/Motor/Water Tank Dive Team Equipment Recreation Center Carpet I Web-Enabled So~¥are Computerized Records Retention System Street Mowers I I I I Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 2005 EQ-001 0 20,000 EQ-002 0 20,000 EQ-004 0 9,000 5,000 5,000 EQ-005 0 10,000 10,000 EQ-007 0 1,000 1,000 1,000 EQ-009 0 EQ-010 0 15,000 15,000 15,000 EQ-013 0 78,800 68,800 87,700 EQ-014 0 14,000 EQ-015 0 24,000 25,000 EQ-016 0 120,000 270,000 135,000 EQ-017 0 160,000 EQ-019 0 50,000 EQ-021 0 EQ-022 0 EQ-023 0 60,000 EQ-024 0 45,000 EQ-025 0 EQ-026 0 10,000 10,000 10,000 EQ-027 0 115,000 EQ-028 0 78,000 EQ-029 0 EQ-030 0 5,000 EQ-034 0 19,000 EQ-035 0 30,000 43,000 50,000 EQ-036 0 8,000 9,000 EQ-037 0 7,000 EQ-038 0 45,000 EQ-039 0 40,000 EQ-042 0 6,000 EQ-046 3 20,000 EQ-048 0 165,000 100,000 EQ-049 0 20,000 EQ-051 3 16,000 15 2006 5,000 10,000 1,000 50,000 15,000 79,900 26,000 140,000 25,000 30,000 9,000 10,000 85,000 28,000 20,000 2007 5,000 10,000 1,000 15,000 60,600 57,000 145,000 10,000 36,000 7,000 Total 20,000 20,000 29,000 40,000 5,000 50,000 75,000 375,800 14,000 132,000 810,000 160,000 50,000 25,000 30,000 60,000 .45,000 9,000 50,000 115,000 163,000 64,000 12,000 39,000 123,000 17,000 7,000 45,000 40,000 6,000 20,000 265,000 20,000 16,000 Department Light Duty Trucks: Parks Cushman Trail Vehicle Fire Vehicles Aerial Maps for Front-End Loaders Easement Jetter Sander Generators Bobcat Tracks Bobcat Planer Light Duty Trucks: Utilities Administration Vehicle CSO Vehicle Engineering Van Fire Depadment Equipment Fire Station 3 Vehicles and Equipment Major Equipment Total GRAND Project EO-052 EQ-053 EQ-054 EQ-055 EQ-056 EQ-057 EQ-058 EQ-059 EQ-060 EQ-061 EQ-062 EQ-063 EQ-064 EQ-065 EQ-066 EQ-068 Priority 0 0 0 0 0 0 0 0 0 0 0 0 3 16 2003 16,000 30,000 15,000 30,000 23,000 23,000 962,800 962,800 2004 90,000 150,000 31,000 25,000 10,000 1,113,800 1,113,800 2005 66,000 15,000 10,000 33,000 30,000 591,700 591,700 2006 68,000 400,000 205,000 34,000 1,240,900 1,240,900 2007 72,000 80,000 5,000 6,000 15,000 36,000 1,000,000 1,560,600 1,560,600 Total 296,000 16,000 495,000 30,000 355,000 15,000 5,000 10,000 6,000 15,000 164,000 25,000 23,000 30,000 33,000 1,000,000 5,469,800 5,469,800 I I I I I I I I I I I I I I Project # EQ-001 Type Maintenance Useful Life Project Name 100 ft. Aerial Ladder Refurbishing Category Fire Contact Priority N.A. Department Major Equipment Description This project will refurbish the electrical system on the 1989 Simon LTl. Total Cost $20,000 Justification This vehicle is expected to last 30 years. The recommended refurbishment will keep the ladder viable, functional and safe on the road as well as in the air. The project is consistent with the City Vehicle replacement schedule and advice from fleet maintenance. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 20,000 20,000 Total 20,000 20,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 20,000 20,000 Total 20,000 20,000 I Operational Impact/Other Negligible additional operating costs are anticipated. I 1 Project # EQ-002 Type Equipment Useful Life Project Name Boat/Trailer/Motor Replacement Category Fire Contact Priority n/a Department Major Equipment I Description Total Cost $20,000 Involves adding a dive/rescue boat, trailer and motor. This watercraft is the primary response unit for dive-related emergencies in the lakes and the Minnesota River. It is used to transport rescuers and remove victims in near-drowning and drowning incidents, for fast water rescues in the Minnesota River, recovery activities, dive team support, access to flooded areas during high water emergencies, etc. I Justification The dive team needs a boat for their operations. I Expenditure 2003 2004 2005 2006 2007 Total Maintenance 20,000 20,000 Total 20,000 20,000 I I I I I Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 20,000 20,000 Total 20,000 20,000 Operational Impact/Other Negligible additional operating costs are anticipated. 17 Project # EQ-004 Type Equipment Useful Life Project Name Fire Department: SCBA Upgrades Category Fire Contact Priority n/a Department Major Equipment Total Cost $68,280 Description Upgrades include a "fallen firefighter" alert system that will send an alert signal if an emergency occurs, a "high temperature" alert when the temperature exceeds safe levels, and an "over exertion" alert when respiration exceeds safe levels. The upgrade also includes a computer chip, which logs OSHA-required data on usage, maintenance and repair. Justification This enhancement will improve firefighter safety significantly and reduce OSHA-mandated administrative requirements currently handled on a manual basis. It is consistent with the City's risk management policy. Prior Expenditure 2003 2004 2005 2006 2007 Total 39,280 Maintenance 9,000 5,000 5,000 5,000 5,000 29,000 Total Total 9,000 5,000 5,000 5,000 5,000 29,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 39,2.80 Certificates of Indebtedness 9,000 5,000 5,000 5,000 5,000 29,000 Total Total 9,000 5,000 5,000 5,000 5,000 29,000 Operational Impact/Other This may reduce administrative costs for OSHA record-keeping requirements. Project # EQ-005 Type Equipment Useful Life Project Name Fire Department: Thermal Rescue Device Category Fire Contact Priority n/a I)epartmei~t Description Major Equipment Total Cost $!00,000 These devices enable firefighters to see clearly while navigating a dark smoke-filled structure using infrared technology. Without this technology, firefighters are subject to dangerous zero-visibility conditions. This technology will speed up firefighting operations. Account #400-4102-4705 Justification This project will enhance firefighter safety significantly, improve firefighting operations and allow for fast and safe victim searches. This is consistent with the City's risk management policy. Prior Expenditure 2003 2004 2005 2006 2007 Total 60,000 telaintenance 10,000 10,000 10,000 10,000 40,000 Total Total 10,000 10,000 10,000 10,000 40,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 60,000 Certificates of Indebtedness 10,000 10,000 10,000 10,000 40,000 Total Total 10,000 10,000 10,000 10,000 40,000 Operational Impact/Other This project may lower payroll expenses for paid on-call staff as a result of improved and more efficient fire fighting operations. 18 I I I I I I I I I I I I I I I I I I 1 Project# EQ-007 Type Equipment Useful Life Project Name Fire Department: 13fi -Inch Hose Category Fire Contact Priority Ida Department Description Major Equipment Total Cost $12,500 Involves replacing the existing 1Va -inch hose with a 13,~-inch hose. This hose is connected to the fire trucks and is used by the firefighters to extinguish fire. There are 2 tracks remaining that need this conversion. Account #400-4104-4705 Justification The existing hose is over 15 years old. The larger hose allows for significant improvement in water flow, which in turn, enhances firefighting capabilities. NOTE: $2000.00 to replace hose damaged due to firefighting. Prior Expenditure 2003 2004 2005 2006 2007 Total 7,500 Maintenance 1,000 1,000 1,000 1,000 1,000 5,000 Total Total 1,000 1,000 1,000 1,000 1,000 5,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 6,500 Certificates of Indebtedness 1,000 1,000 1,000 1,000 1,000 5,000 Total Total 1,000 1,000 1,000 1,000 1,000 5,000 Operational Impact/Other No additional operating costs are anticipated. Project # EQ-009 Type Equipment Useful Life Project Name Fire Department: Laptop Computers Catego~' Fire Contact Priority Ida Department Description Major Equipment Total Cost $50,000 I Involves installing laptops in all front-line vehicles to enable responding personnel to access building pre-plans, hazardous materials data, hydrant and other utility maps, address locations, etc. Pre-Plans and Address Locations are planned for 2006 and defer remainder to 2006. Justification I The project will enhance Fire Department operations, allowing for increased safety as a result of easy access to important information. It will also make it easier to find best routes and/or alternative routes when responding to emergencies. Expenditure 2003 2004 2005 2006 2007 Total i Office Equipment 50,000 50,000 Total 50,000 50,000 Funding Sources 2003 2004 2005 2006 2007 Total I Certificates of Indebtedness 50,000 50,000 Total 50,000 50,000 I Operational Impact/Other No additional operating costs are anticipated. 19 Project # EQ-010 Type Equipment Useful Life Project Nalne Fire Department: PPE (Turnout/Helmets) Category Fire Contact Priority n/a Department Major Equipment Description Total Cost $110,000 Replacement of 3-5 sets per 3'ear as a result of damage received from firefighting activities and provide new members with gear after they complete their probationary period. Account 0400-4105-4705 Justification Turnout gear lasts approximately 5-7 years on average. Cost of equipping one new firefighter is approximately S 1500.00. Prior Expenditure 2003 35,000 Maintenance 15,000 Total Total 15,000 2004 2005 2006 2007 Total 15,000 15,000 15,000 15,000 75,000 15,000 15,000 15,000 15,000 75,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 35,000 Certificates of Indebtedness 15,000 15,000 15,000 15,000 15,000 75,000 Total Total 15,000 15,000 15,000 15,000 15,000 75,000 Operational Impact/Other No additional operating costs are anticipated. Project # EQ-013 Type Equipment Useful Lit'e Project Name Colllpllter Purchases/Upgrades Category Administration Contact Priority n/a l)cpurtment Major Equipment Description ~ - ~'[ Z~ "' ~Q~ 3 Total Cost $600~00 Funds the purchase of replacement PCs. lo.cai area network equipment, network and local printers, peripheral hardware and all network and common-user software. Justification The replacement schedule for this equipment is based on the following useful life expectancies: 3-5 years -- PCs, network servers; 4-5 years -- network printers Budgeting and purchasing PCs through this prQject allows the City greater flexibility to direct equipment to where it is needed most, rather than using individual department budgets. l'rit)r Expenditure 2003 2004 2005 2006 2007 Total 224,400 Office Equipment 78,800 68,800 87,700 79,900 60,600 375,800 Total Total 78,800 68,800 87,700 79,900 60,600 375,800 Prior Funding Sources 2003 2004 2005 2006 2007 Total 138,000 Certificates of Indebtedness 78,800 68,800 87,700 79,900 60,600 375,800 Total Total 78,800 68,800 87,700 79,900 60,600 375,800 Operational Impact/Other No additional operating costs are anticipated. 20 I I I I I I I I I I I ! ! I I I I I I Project# EQ-014 Type Equipment Useful Life Project Name Telecommunication Purchases/Upgrades Category Administration Contact Priority n/a Department Major Equipment Description This project funds expansion of the City Hall telephone system to the new Library. Total Cost $247,000 Justification There will be a need to provide telephones to the new Library building. This will fund the equipment and connections necessary to allow phone service using the recently installed phone switch in City Hall. Prior Expenditure 2003 2004 2005 2006 2007 Total 233,000 Office Equipment 14,000 14,000 Total Total 14,000 14,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 233,000 GO Bonds 14,000 14,000 Total Total 14,000 14,000 Operational Impact/Other Project # EQ-015 Type Equipment Useful Life Project Name Community Development: Light Duty Trucks Category Community Development Contact Priority n/a Department Description Major Equipment Total Cost $175,000 Provides for scheduled replacements, which began in 2001. These purchases are consistent with the Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to accommodate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program. Justification These vehicles are used to provide building inspection services throughout the community. The average replacement age is 10 years. Prior Expenditure 2003 2004 2005 2006 2007 Total 43,000 Vehicles 24,000 25,000 26,000 57,000 132,000 Total Total 24,000 25,000 26,000 57,000 132,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 43,000 Certificates of Indebtedness 24,000 25,000 26,000 57,000 132,000 Total Total 24,000 25,000 26,000 57,000 132,000 Operational Impact/Other These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced. 21 Project # EQ-016 Type Equipment Useful Life Project Name Dump/Plow Truck Replacements/Additions Category Street Equipment Contact Priority n/a Department Major Equipment Description Total Cost $1,043,000 These purchases anticipate 5 scheduled replacements and 2 additional dump trucks in the City's inventory. Costs include chassis, dump box, hydraulic system, snow wing, snowplow and sander. Truck chassis costs are hi~ier due to new federal mandated anti-lock braking requirements effective since 2000. These vehicles are purchased using either the Hennepin County or State: of MN cooperative bid systems. Orders for truck chassis are typically required to be placed up to one year in advance of delivery. Account #400-4108-4704 Justification These vehicles are used to provide a variety of maintenance services throughout the community including winter emergency response for plowing and hauling snow. The average replacement age is 16.5 years. Winter emergency service necessitates that these vehicles be reliable and dependable. Growth in the community creates an additional plow route approximately every 3 years. Prior Expenditure 2003 2004 2005 2006 2007 Total 233,000 Vehicles 120,000 270,000 135,000 140,000 145,000 810,000 Total Total 120,000 270,000 135,000 140,000 145,000 810,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 233,000 Certificates of Indebtedness 120,000 270,000 135,000 140,000 145,000 810,000 Total Total 120,000 270,000 135,000 140,000 145,000 810,000 Operational Impact/Other These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced. Project # EQ-017 Type Useful Life Project Name Street Sweeper Category Contact Priority 1)epartment Major Equipment Description This project replaces the 1992 Athey Sweeper, which is used to clean streets, each spring and fall. Justification This unit is subject to heav~ dust and dirt infiltration and needs regular maintenance to continue in running condition. Equipment 8 Years Street Equipment n/a Total Cost $160,000 Expenditure 2003 2004 2005 2006 2007 Total Vehicles 160,000 160,000 Total 160,000 160,000 Funding Sources 2003 2004 2005 2006 2007 Total Surface Water Utility Fund 160,000 160,000 Tota! 160,000 160,000 Operational Impact/Other 2¸2 I I I I I I I I I I I ! I I I I I I I I I I I I Project # EQ-019 Type Equipment Useful Life Project Name Vibratory Roll Packer Category Street Equipment Contact Priority fda Department Major Equipment Description Total Cost $50,000 Purchase is scheduled to replace the 1987 Rosco Vibratory Roll Packer. The purchase is consistent with the Vehicle Replacement Schedule. Justification This machine is used extensively in the patching and overlaying of City streets. The existing unit will be 15 years old. Expenditure 2003 2004 2005 2006 2007 Vehicles 50,000 Total 50,000 Total 50,000 50,000 Funding Sources 2003 2004 2005 2006 2007 Certificates of Indebtedness 50,000 Total 50,000 Total 50,000 50,000 Operational Impact/Other This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced. Project # EQ-021 Type Useful Life Project Name Equipment Trailers Category Contact Priority Department Major Equipment Description Provides for replacement of an existing and the addition of a 20,000 lb (10 ton) capacity tandem axle trailer. Equipment Street Equipment n/a Total Cost $45,000 Fund #400-0000-4705 i Justification These trailers are uscd extensively in the paving operation to transport the paver machine, roll packer and bobcat to each job site. The existing trailer is 20 )'ears old and cannot haul all of the equipment together. This is consistent with the Vehicle Replacement Schedule. i . Prior Expenditure 2003 2004 2005 2006 2007 Total 20,000 Maintenance 25,000 25,000 Total Total 25,000 25,000 1 I 1 I I I Prior Funding Sources 2003 2004 2005 2006 2007 Total 20,000 Certificates of Indebtedness 25,000 25,000 Total Total 25,000 25,000 Operational Impact/Other Both purchases include a limited warranty. 23 Project # EQ-022 Type Equipment Useful Life Project Name Tar Kettle Category Street Equipment Contact Priority n/a Department Major Equipment Description Provides for replacement of the existing tar kettle. Total Cost $30,000 Justification The existing tar kettle is used extensiveIy in the pavement maintenance operations. Due to the nature of its use, the life expectancy is approximately 5-6 years. This is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 30,000 30,000 Total 30,000 30,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 30,000 30,000 Total 30,000 30,000 Operational Impact/Other This purchase will include a limited warranty and Mil eliminate an expensive overhaul on the existing unit. Project # EQ-023 Type Equipment Useful Life Project Name Ford 555C Backhoe Category Street Equipment Contact Priority n/a Department Major Equipment Description Provides for the replacement of an existing 1989 Tractor Backhoe. Total Cost $60,000 Justification The tractor backhoe is used cxtensivclv in maintenance operations. The existing machine currently has 2.300 hours of usage and will be nearly 15 years old at the time of scheduled replacement. This is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 60,000 60,000 Total 60,000 60,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 60,000 60,000 Total 60,000 60,000 Operational Impact/Other This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced. 24 I I I I I I I i I I I I I I I Project # EQ-024 Type Equipment Useful Life Project Name Crack Sealer Category Street Equipment Contact Priority n/a Department Major Equipment I Description Provides for the replacement of an existing crack sealing machine. I Total Cost $45,000 Justification The crack sealer is used extensively in the pavement maintenance operations. Due to the nature of its use, the life expectancy is approximately 6-8 years. This is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Total I Maintenance 45,000 45,000 Total 45,000 45,000 Funding Sources 2003 2004 2005 2006 2007 Total I Certificates of Indebtedness 45,000 45,000 Total 45,000 45,000 I Operational Impact/Other This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit. I Project # EQ-025 Type Equipment Useful Life I Project Name Line Striper Category Street Equipment Contact Priority n/a Department Major Equipment I Description Provides for the replacement of an existing line-striping machine. Justification Total Cost $9,000 I This machine is used to paint pavement markings and stripe lanes on roads. This purchase xvill ensure timely and reliable pavement markinz operations. It is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Total I Maintenance 9,000 9,000 Total 9,000 9,000 i Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 9,000 9,000 Total 9,000 9,000 Operational Impact/Other This purchase will include a limited warranty. I I I I 25 I I Project # EQ-026 Type Equipment Useful Life Project Name Audio/Visual Equipment Categoma' Administration Contact Priority n/a ! 1 Department Major Equipment Total Cost $80,000 Description Provides for the systematic maintenance and upgrading of audio/visual equipment. Replacement will occur in the 1 st Quarter of 2003. 1 Account #210-0000-4705 Justification I The original A/V equipment was purchased in 1989, with the remainder purchased in 1994. This project calls for the systematic maintenance and upgrading of the A/V equipment and additional equipment as new technology develops. Potential projects include: replacement of equipment including, but not limited to, replacing the spotlight system in the Council Chambers and staff microphones. These replacements will ensure the quality of official City meetings and video taping. Prior Expenditure 2003 2004 2005 2006 2007 Total 30,000 Maintenance 10,000 10,000 10,000 10,000 10,000 50,000 Total Total 10,000 10,000 10,000 10,000 10,000 50,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 30,000 Cable TV Fund 10,000 10,000 10,000 10,000 10,000 50,000 Total Total 10,000 10,000 10,000 10,000 10,000 50,000 Operational Impact/Other This purchase will include a limited warrant5'. Project # EQ-027 Type Equipment Useful IAfe Project Name Copier Replacements Category Administration Contact Priority n/a Department Major Equipment Total Cost $137,000 Description Provides for tile purchase of rephtcement copiers for all City departments. Thc copiers ',viii be evaluated each 3'ear and replaced as necessary. The manufacturers have stopped making replacement parts for some copiers in our inventory, so they will need to be replaced if parts availability becomes problematic. Account #400-4109-4703 Justification The project wilt replace copiers as they become obsolete or maintenance costs escalate to unacceptable levels. The manufacturers have stopped making replacement parts for some copiers in our nventory, so they will need to be replaced il' parts availability becomes problematic. Copiers are generally replaced on a 7 year schedule. Prior Expenditure 2003 2004 2005 2006 2007 Total 22,000 Maintenance 115,000 115,000 Total Total 115,000 115,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 22,000 Certificates of Indebtedness 1t5,000 115,000 Total Total 1t5,000 115,000 Operational Impact/Other These purchases x~ilt decrease annual maintenance costs because equipment is generally more reliable than earlier models. 26 ! ! I I I I I I I I I I I I I I I i I Project# EQ-028 Type Equipment Useful Life Project Name Groundsmaster 580 Mower Replacement Category Park Contact Priority n/a Department Major Equipment Description Provides for 1 additional and I replacement of an existing Toro 580, 15 foot, high volume grounds mower. Total Cost $235,042 Account #400-0000-4705 Justification The City currently has 3 high-production grounds mowers that cut a 15' pass. Each machine is used daily during the growing season and takes the place of 2V2 smaller machines used by the City. Due to additional park development, an additional high-capacity machine is needed. The oldest machine was replaced in 2002. This is consistent with the Equipment Replacement Schedule. Prior Expenditure 2003 2004 2005 2006 2007 Total 72,042 Maintenance 78,000 85,000 163,000 Total Total 78,000 85,000 163,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 72,042 Certificates of Indebtedness 78,000 85,000 163,000 Total Total 78,000 85,000 163,000 Operational Impact/Other I This purchase will include a limited warranty and reduce maintenance and repair expenses as compared to the unit replaced. Also, each of these machines takes the place of 2 1/2 smaller machines and makes the mowing operation 150% more efficient. I Project # EQ-029 Type Equipment Useful Life I Project Name Public Works: Light Duty Trucks Category Street Equipment Contact Priority n/a Department I Description Major Equipment Total Cost $177,000 Provides for scheduled replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in the year in order to accommodate the time frames established by Hennepin County and the State of MN Cooperative Purchasing Program. I Justification These vehicles are used to provide a variety of services throughout the community. The average replacement age is 14 years. The additional tracks are required to meet growth needs in the maintenance operations. These purchases are consistent with the Vehicle Replacement Program. i . Prior Expenditure 2003 2004 2005 2006 2007 Total 113,000 Maintenance 28,000 36,000 64,000 Total Total 28,000 36,000 64,000 I I I l I Prior Funding Sources 2003 2004 2005 2006 2007 Total 115,000 Certificates of Indebtedness 28,000 36,000 64,000 Total Total 28,000 36,000 64,000 Operational hnpact/Other These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced. 27 Project # EQ-030 Type Equipment Useful Life Project Name Bobcat Snow Blower Catego13' Park Contact Priority n/a Department Major Equipment Description Provides for replacement of an existing Bobcat Snow Blower. Total Cost $12,000 Justification The existing unit will be 15 years old and is at the end of its useful life. Rebuilding is not cost effective. This purchase is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 5,000 7,000 12,000 Total 5,O00 7,0O0 12,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 5,000 7,000 12,000 Total 5,0O0 7,000 12,000 Operational Impact/Other This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit. Project # EQ-034 Type Useful Life Project Name Grounds Mower Replacement Category Contact Priority l)et)artment Major Equipment Description Provides for replacement of 4 existing lawn mowers over five years. Justification- Equipment Park n/a Total Cost $57,452 With the amount of parkland growing each )'ear, there is increased wear and tear on the City's lawn mowers. They are 12-16 years old and are not dependable. Rebuilding is not cost effective. This is consistent with the Equipment Replacement Schedule. Prior Expenditure 2003 2004 2005 2006 2007 Total 18,452 Maintenance 19,000 20,000 39,000 Total Total 19,000 20,000 39,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 20,000 Certificates of Indebtedness 19,000 20,000 39,000 Total Total 19,000 20,000 39,000 Operational Impact/Other This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit. 28 I i I I I I I I I I I ! I ! I I Project # EQ-035 Type Equipment Useful Life Project Name Tractor Category Park Contact Priority n/a Department Major Equipment Description Provides for replacement of 3 existing tractors over a five-year period. Total Cost $166,900 Account #400-4111-4705 Justification 2003: Unit is 52 years old. It is smaller, used for seeding parks, raking beaches, grading and ball field maintenance. 2004: Unit is 16 years old and is not dependable. Rebuilding is not cost effective. It is used for sweeping finks and trails, grading/leveling parks, fertilizing and weed control. Prior Expenditure 2003 2004 2005 2006 2007 Total 43,900 Maintenance 30,000 43,000 50,000 123,000 Total Total 30,000 43,000 50,000 123,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total i 43,900 Certificates of Indebtedness 30,000 43,000 50,000 123,000 Total Total 30,000 43,000 50,000 123,000 I Operational Impact/Other This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit. I Project # EQ-036 Type Equipment Useful Life Project Name Tractor Broom Category Street Equipment I Contact Priority n/a -Depart[ncnt Major Equipment I I Description Provides for replacement of a Tractor Broom and head for the Ford tractor. Total Cost $17,000 Justification The sweeper broom for the tractor is used extensively in the street sweeping operation and typically has a useful life of 7-8 years. This is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Total i Maintenance 8,000 9,000 17,000 Total 8,000 9,000 17,000 Funding Sources 2003 2004 2005 2006 2007 Total I Certificates of Indebtedness 8,000 9,000 17,000 Total 8,000 9,000 17,000 Operational ImpacdOther . This purchase will not increase maintenance and repair expenses. 29 Project # EQ-037 Type Equipment Useful Life Project Name Trailer Category Park Contact Priority n/a Department Major Equipment Description Provides for the addition of a miller to the existing Park inventory. Justification Total Cost $7,000 Trailer is needed to transport medium-sized mowers to neighborhood parks. This is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Maintenance 7,000 Total 7,000 Funding Sources 2003 2004 2005 2006 2007 Certificates of Indebtedness 7,000 Total 7,000 Operational Impact/Other The purchase will include a limited warranty. Total 7,000 7,000 Total 7,000 7,000 Project # EQ-038 Type Equipment Useful Life Project Name Grounds Mower Replacement (10') Category Park Contact Priority n/a Department Msjor Equipment Description Provides for the addition ora 10' high-volume grounds mower. Total Cost $45,000 Justification The increase of parkland has v.':m-anted tile use of a mid-sized mower that can be transported to parks that are too far for the large mowers to drive.-This is consistent with the Equipment Replacement Schedule. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 45,000 45,000 Total 45,000 45,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 45,000 45,000 Total 45,000 45,000 Operational Impact/Other This machine would replace tile transporting of 2 smaller mowers to smaller neighborhood parks and reduce mowing time. 3O i I I I I ! I ! I I I I I I I I i I I I Project # EQ-039 Type Equipment Useful Life Project Name Upgrade 217 Grass Rig Pump/Motor/Water Tank Category Fire Contact Priority n/a Department Major Equipment Description Total Cost $48,500 I Grass rig/rescue truck #217 is a 1977 Ford pickup, runs as a backup rescue, grass rig, utility runs This truck fire hose hauler, and truck and well. For its limited use it serves its purpose, but it will be 28 years old upon replacement. I I 1 I I I i Account #400-4112-4705 Justification Up~ading the grass fire fighting capabilities with a new tank, pump, and pump motor to foam capabilities will enhance fire extinguishments. The new pump assembly will be built as a "slide in" unit, so it could be utilized in a future truck. With these enhancements, a replacement may be pushed out for five years. Prior Expenditure 2003 2004 2005 2006 2007 Total 8,500 Maintenance 40,000 40,000 Total Total 40,000 40,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 8,500 Certificates of Indebtedness 40,000 40,000 Total Total 40,000 40,000 Operational Impact/Other Project # EQ-042 Type Improvement Useful Life Project Nalne Dive Team Equipment CategolD.' Fire Contact Priority n/a Departmen. t Major Equipment Description Total Cost $12,000 I The Chanhassen Fire Department Dive Team is continuing its improvement of equipment on the dive team. In order to fully outfit the dive team additional equipment needs to be purchased. The equipment would be dry suits, Aga full-face piece with communications, communication rope and control box, and safety back-up air bottle. I 1 I 1 I 1 I Account # 400-4113-4705 Justification This equipment will keep the dive team in compliance with National Fire Protection Association (NFPA) and Occupational Safety and Health Administration (OSHA) standards. This equipment will allow the dive team to safely respond to ice-related/winter water hazards. Prior Expenditure 2003 2004 2005 2006 2007 6,000 Maintenance 6,000 Total Total 6,000 Total 6,000 6,000 Prior Funding Sources 2003 6,000 Certificates of Indebtedness 6,000 Total Total 6,000 2004 2005 2006 2007 Total 6,000 6,000 Operational Impact/Other 31 Project# EQ-046 Project Name Recreation Center Carpet Contact Department Major Equipment Description This project provides new carpet in the reception area, meeting rooms 2 and 3 and the conference room. Justification This carpet is seven years old, stained, and ratty. Type Useful Life Category Priority Improvement 5-10 years Park 3 Expand Existing Service Total Cost $20,000 Expenditure 2003 2004 2005 2006 2007 Total Construction 20,000 20,000 Total 20,000 20,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 20,000 20,000 Total 20,000 20,000 Operational Impact/Other Project # EQ-048 ]'3'pc Improvement Useful Life 5-7 years Project Nalne Web-Enabled Software Category Administration Contact Priority n/a Department Major Equipment Description This project will fund new soft;yarc for Administration, Finance. Park & Recreation. and Building Inspection. Total Cost $265,000 The financial software is expected to be about 5150,000 and the complaint tracking software will be about $15,000 for 2003. For 2004, recreation and building permits are estimated at about SI00,000. Account # 400-4117-4707 Justification New software will allow web access to pa.,,' utility bills, process recreation registrations and apply for building permits. The current software is adequate for current uses but is not web-enabled. There are na~_~in~ functional issues that continue to crop up and will probably not be fixed by the vendors in a timely manner. Expenditure 2003 2004 2005 2006 2007 Total Office Equipment 165,000 100,000 265,000 Total 165,000 100,000 265,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 165,000 100,000 265,000 Total 165,000 100,000 265,000 Operational Impact/Other 32 I I I ! ! I I I I I 1 1 I I I Project # EQ-049 Project Name Computerized Records Retention System Contact Department Major Equipment Description This project will fund a system that will scan and store records on CD's, rather than relying only on paper copies. 400-4124-4703 Type Improvement Useful Life Category Administration Priority n/a Total Cost $95,000 Justification This type of system will allow records to be retrieved much faster than the current method. The possibility of lost or misfiled records will be reduced. Most of these systems also have readers that allow the records to be viewed over the Internet, which will allow easier access to city records for the general public. Prior Expenditure 2003 2004 2005 2006 2007 Total 75,000 Office Equipment 20,000 20,000 Total Total 20,000 20,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 75,000 Certificates of Indebtedness 20,000 20,000 To tal Total 20,000 20,000 Operational Impact/Other Project # EQ-051 I Project Name Street Mowers I Description This item will replace existing flail mowers. I Justification Equipment proposed for replacement: I I I I I 1 i 1991 Edwards Flail Ivlower S10,000 1991 Alamo Flail Mower S6,000 Contact Depart~nent Major Equipment Expenditure 2003 2004 2005 2006 Maintenance 16,000 Total 16,000 Funding Sources 2003 2004 2005 2006 Certificates of Indebtedness 16,000 Total 16,000 Operational Impact/Other Type Improvement Useful Life Categor3' Street Equipment Priority 3 Expand Existing Service Total Cost $16,000 2007 2O07 Total 16,000 16,000 Total 16,000 16,000 33 Project # Project Name EQ-052 Light Duty Trucks: Parks Description This item allows for the replacement of existing equipment. Justification Vehicles proposed for replacement are: 2004 89 Ford 28000 2006 94Chev 34000 89 Ford 31000 94 Chev 34000 91 Ford 310130 2007 95 Chev 36000 2005 90 Ford 33000 95 Chev 36000 89 Ford 33000 Expenditure 2003 Maintenance Total Funding Sources 2003 Certificates of Indebtedness Total Operational Impact/Other Project # EQ-053 Project Name Cushman Trail Vehicle Description This vehicle is used for trail cleanup and maintenance. Justification This replaces a 1990 model. Expenditure Maintenance Total Funding Sources Certificates of Indebtedness Total 2003 16,000 16,000 2003 16,000 16,000 Operational Impact/Other Contact Department 2004 90,000 90,000 2004 90,000 90,000 Contact Department 2004 2004 34 Major Equipment 2005 66,000 66,000 2005 66,000 66,000 Major Equipment 2005 2005 2006 68,000 68,000 2006 68,000 68,000 2006 2006 Type Useful Life Category Priority Improvement Park 2 Improve Existing Service Total Cost $296,000 2007 72,000 72,000 2007 72,000 72,000 Total 296,000 296,000 Total 296,000 296,000 Type Useful Life Category Priority Improvement Park 2 Improve Existing Service Total Cost $16,000 2007 2007 Total t6,000 16,000 Total 16,000 16,000 I I I I I I I I I ! I I I I I I I Project# EQ-054 I Project Name Fire Vehicles i Description This item allows for replacement of existing vehicles. I I I I I 1 I 1 I I I I I 1 Contact Department Major Equipment Justification These vehicles need replacement or major refurbishment based on equipment age rather than mileage. Type Improvement Useful Life Category Fire Priority 3 Expand Existing Service Total Cost $495,000 Expenditure 2003 2004 2005 2006 2007 Total Maintenance 15,000 400,000 80,000 495,000 Total 15,000 400,000 80,000 495,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 15,000 400,000 80,000 495,000 Total 15,000 400,000 80,000 495,000 Operational Impact/Other Project # EQ-055 Type Improvement Useful Life Project Name Aerial Maps for GIS Category Administration Contact Priority n/a Department Major Equipment Total Cost $30,000 Description This project will pa3, for thc Chanhasscn portion of aerial photography and topo~aphy mapping as part of a larger Carver County project. Justification This project will provide maps with more recent development than is chrrently available. The resolution and contouring will be more accurate which is important for making development decisions. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 30,000 30,000 Total 30,000 30,000 Funding Sources 2003 2004 2005 2006 2007 Total Certificates of Indebtedness 30,000 30,000 Total 30,000 30,000 Operational Impact/Other 35 Project # EQ-056 Project Name Front-End Loaders Description Contact Department This projects replaces the front-end loaders used in street maintenance. Justification The existing loaders are aging and require more frequent and expensive repairs. Expenditure 2003 2004 2005 Maintenance 150,000 Total 15o,ooo Funding Sources 2003 2004 2005 Certificates of Indebtedness 150,000 Total 150,000 Operational Impact/Other Major Equipment Project # EQ-057 Project Name Easement Jetter Description Contact Det)artment Major Equipment This equipment will be used for clearing sewer lines in property right-of-way. Justification This smaller unit will cause much less damage to easement property than the existing truck-mounted setup. 2006 205,000 205,000 2006 205,000 205,000 Type Improvement Useful Life Category Street Equipment Priority n/a Total Cost $355,000 2007 2007 Expenditure 2003 2004 2005 2006 2007 Maintenance 15,000 Total 15,ooo Funding Sources 2003 2004 2005 2006 2007 Sewer & Water Utility Fund 15,000 Total 15,ooo Operational ImpacdOther 36 Total 355,000 355,000 Total 355,000 355,000 Type Improvement Useful Life Category Utilities Priority n/a Total Cost $15,000 Total 15,000 15,000 Total 15,000 15,000 I I I ! I I I I i I I I I I I I I i I I I I i I I I I I 1 1 I I I I I I 1 i Project # EQ-058 Project Name Sander Description This sander attachment is scheduled to be replaced. Justification This is scheduled based on equipment age. Expenditure Maintenance Total Funding Sources Certificates of Indebtedness Total Operational Impact/Other Contact Department Major Equipment 2003 2004 2005 2006 2003 2004 2005 2006 Type Improvement Useful Life CategoD' Street Equipment Priority n/a Total Cost $5,000 2007 Total 5,000 5,000 5,000 5,000 2007 Total 5,000 5,000 5,000 5,000 Project # EQ-059 Project Name Generators Description Contact Departlnent Major Equipment This is a portable generator that can be transferred to various lift stations. Justification Type Improvement Useful Life Category Utilities Priority n/a Total Cost $10,000 This is necessary to prevent backups into homes when power is interrupted for an extended period of time at a lift station. Expenditure 2003 2004 -2005 2006 Maintenance 10,000 Total 10,000 2007 Total '10,000 10,000 Funding Sources 2003 2004 2005 2006 Sewer & Water Utility Fund 10,000 Total 10,000 2007 Total 10,ooo 10,000 Operational hnpact/Other 37 Project # EQ-060 Project Name Bobcat Tracks Description. This replaces the rubber tracks on one Bobcat. Contact Department Justification These wear down as the bobcat is used on paved surfaces and is a maintenance item. Expenditure 2003 2004 Maintenance Total Funding Sources Certificates of Indebtedness Total Major Equipment Operational Impact/Other Project # EQ-061 Project Name Bobcat Planer Description 2005 20O6 2003 2004 2005 2006 Contact l)epartment This will allow a bobcat to bc used fol' contouring soil on city projects. Justification This is cheaper and easier to use than a small bulldozer for minor projects. Expenditure Maintenance 2003 2003 2004 2004 Funding Sources Certificates of Indebtedness 38 Total Total Ntajor Equipment 2005 2005 Operational Impact/Other 2006 2006 Type Improvement Useful Life Category Park Priority n/a Total Cost $6,000 2007 Total 6,000 6,000 6,000 6,000 2007 Total 6,000 6,000 6,000 6,000 Type Improvement Useful Life Category Park Priority n/a Total Cost $15,000 2007 15,000 15,000 2007 15,000 15,000 Total 15,000 15,000 Total 15,000 15,000 I I I I I I I I I I I I I I I I I I I I Project # Project Name EQ-062 Light Duty Trucks: Utilities Contact Department Major Equipment Description This allows for replacement of existing vehicles in the Water and Sewer department. Justification This replaces pickups in accordance with the vehicle replacement plan. Expenditure 2003 2004 Maintenance 30,000 31,000 Total 30,000 31,000 Funding Sources 2003 2004 Sewer & Water Utility Fund 30,000 31,000 Total 30,000 31,000 Operational Impact/Other I Project # EQ-063 Project Name Administration Vehicle I Contact Department Description This allows for replacement of an existing vehicle for City Hall. I Justification This replaces a vehicle in accordance with the vehicle replacement plan. I Expenditure 2003 2004 Maintenance 25,000 Total 25,000 1 I Type Improvement Useful Life Category Utilities Priority n/a I Total Cost $164,000 I I I I Funding Sources 2003 2004 Cedificates of Indebtedness 25,000 Total 25,000 Operational ImpacdOther 2005 2006 2007 Total 33,000 34,000 36,000 164,000 33,000 34,000 36,000 164,000 2005 2006 2007 Total 33,000 34,000 36,000 164,000 33,000 34,000 36,000 164,000 Major Equipment 39 2006 2006 2O05 2O05 Type Improvement Useful Life Category Administration Priority n/a Total Cost $25,000 2007 2007 Total 25,000 25,000 Total 25,000 25,000 Project # EQ-064 Project Name CSO Vehicle Description This replaces the CSO pickup. Contact Department Justification This replacement pickup is in accordance with the vehicle replacement plan. Expenditure 2003 2004 Maintenance 23,000 Total 23,000 Funding Sources 2003 2004 Certificates of Indebtedness 23,000 Total 23,000 Operational Impact/Other Project # EQ-065 Project Name Engineering Van Description This vehicle is used for engineering fieldwork. Justification This replaces the van in accordance with the vehicle replacement plan. Expenditure 2003 Maintenance Total Funding Sources Certificates of Indebtedness Total 2003 Operational Impact/Other Contact Del) artment 2004 2004 40 Major Equipment 2005 2005 Major Equipment 2005 30,000 30,000 2005 30,000 30,000 2006 2006 2006 2006 Type Improvement Useful Life Category Administration Priority n/a Total Cost $23,000 2007 2007 Total 23,000 23,000 Total 23,0o0 23,000 Type Useful Life Category Priority Improvement Street Equipment n/a Total Cost $30,000 2007 2007 Total 30,000 30,000 Total 30,000 30,000 I I I I I I I I I I I I Project # Project Name EQ-066 Fire Department Equipment iDescription This replaces various equipment used by the fire department. I I I I I Contact Department Major Equipment I Justification This equipment is either out of date or replaced by more portable equipment allowing for more rapid response time. Expenditure 2003 2004 2005 2006 Maintenance 23,000 10,000 Total 23,000 10,000 Funding Sources 2003 2004 2005 2006 Certificates of Indebtedness 23,000 10,000 Total 23,000 10,000 Operational Impact/Other Project # EQ-068 Project Name Fire Station 3 Vehicles and Equipment Contact Department Major Equipment Description This project purchases vehicles and equipment to make the proposed station fully operational. I Justification The satellite station needs cquipment to function effectively. I Expenditure 2003 2004 2005 Maintenance Total I Funding Sources 2003 2004 2005 GO Bonds I I I l I I Total Operational ImpacdOther This will increase maintenance expenditures. 2006 2006 41 Type Improvement Useful Life Category Fire Priority n/a Total Cost $33,000 2007 2007 Total 33,000 Total 33,000 33,000 Type Equipment Useful Life 20 years Category Fire Priority 3 Expand Existing Service Total Cost $1,000,000 2007 1,000,000 1,000,000 2007 1,000,000 1,000,000 Total 1,000,000 1,000,000 Total 1,000,000 1,000,000 This page was intentionally left blank. I 42 Municipal Buildings ,! This page intentionally left blank. I I I I ! I I I I ! i 1 I Department Municipal Buildings Library Expansion Public Works Facility Expansion Senior Center Expansion Fire Station Capital Improvements Fire Station 3 Municipal Buildings Total GRAND 9,025,000 3,440,000 Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 MB-O01 0 MB-O03 0 MB-O04 0 MB-O08 0 MB-O09 0 3,340,000 100,000 3,440,000 10,000 10,000 2005 200,000 175,000 375,000 2006 1,700,000 1,700,000 10,000 2007 3,500,000 3,500,000 375,000 1,700,000 Total 3,340,000 1,900,000 100,000 185,000 3,500,000 9,025,000 3,500,000 i 1 I I i I I I I I 45 Project# MB-O01 Project Name Library Expansion Description This project provides for the expansion of the current library. Justification Consistent with voter approved referendum in 2000. Contact Department Municipal Buildings Type Improvement Useful Life Category Administration Priority fda Total Cost $5,840,000 Prior Expenditure 2003 2004 2005 2006 2007 Total 2,500,000 Construction 3,340,000 3,340,000 Total Tots! 3,340,000 3,340,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 2,500,000 GO Bonds 3,340,000 3,340,000 Total Total 3,340,000 3,340,000 Operational Impact/Other These projects generally improve building efficiencies. However, with the expansion, there will be a percentage increase based on the expanded footprint of the Library. Project# MB-003 Type Improvement Useful Life Project Name Public Works Facility Expansion Category Utilities Contact Priority n/a I)epartment Municipal Buildings Total Cost $1,900,000 Description This project provides for the upgrade of the Operations and Maintenance Department facilities located at 1591 Park Road. The building layout will be reconfigured for increased efficiency and centralized support. Justification Currently, the Operations and Maintenance Department needs additional space for repairs, accessible meetin~ areas, file and plan storage, supervisory offices and equipment storage. Thc project provides for increased facility efficiency by centralizing activities. Expenditure 2003 2004 2005 2006 2007 Total Planning/Design 200,000 200,000 Construction 1,700,000 1,700,000 Total 200,000 1,700,000 1,900,000 Funding Sources 2003 2004 2005 2006 2007 Total GO Bonds 200,000 1,200,000 1,400,000 Sewer & Water Utility Fund 500,000 500,000 Total 200,000 1,700,000 1,900,000 Operational Impact/Other This project would increase operational costs based on the percentage of the footprint expansion. 46 I I i I I I I 1 I I 1 I Project # MB-004 Type Improvement Useful Life Project Name Senior Center Expansion Category Administration Contact Priority n/a Department Municipal Buildings Total Cost $100,000 Description This project provides for additional space to our current Senior Center based on increased usage of the facility. It will be developed in 2002, and construction will be completed in 2003. Justification Based on increased usage of the current Senior Center. This project is consistent with the Comprehensive Plan. Expenditure 2003 2004 2005 2006 2007 Total I Construction 100,000 100,000 Total 100,000 100,000 Funding Sources 2003 2004 2005 2006 2007 Total I Certificates of I ndebtedn ess 100,000 100,000 Total 100,000 100,000 I 1 Operational Impact/Other This project would increase operational costs based on the percentage of the footprint expansion. Project # MB-008 Type Improvement Useful Life I Project Name Fire Station Capital Improvements Category Fire Contact Priority n/a Department Municipal Buildings Total Cost $216,000 I Description This program includes maintenance for the fire stations, including painting, etc. It also includes a new driveway for Fire Station 1 at the recommendation of the Engineering Department. I I I I 1 l I I Account # 400-4003-4702 Justification The goal is to increase the life of the building through a proactive maintenance pro=oram. The current driveway is in need of replacement at the recommendation of the Public Works Director. The driveway would be replaced with a more suitable surface for the weight of the vehicles at the Fire Station. Prior Expenditure 2003 2004 2005 2006 2007 Total 31,000 Construction 10,000 175,000 185,000 Total Total 10,000 175,000 185,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 31,000 Certificates Of Indebtedness 10,000 175,000 185,000 Total Total 10,000 175,000 185,000 Operational Impact/Other 47 Project # MB-009 Project Name Fire Station 3 Contact Department Municipal Buildings Description This is for a possible fire station in the southern part of the city, which wilt be developed after 2005. Justification Response time from the other two stations will be unacceptable after Hwy 212 is completed. Expenditure 2003 2004 2005 Construction Total Funding Sources 2003 2004 2005 GO Bonds Total Operational Impact/Other 2006 2006 Type Improvement Useful Life Category Fire Priority n/a Total Cost $3,500,000 2007 3,500,000 3,500,000 2007 3,500,000 3,500,000 Total 3,500,000 3,500,000 Total 3,500,000 3,500,000 I I I I I I I I I I I I 48 Park & Trail. Improvements I I I I 49 This page intentionally left blank. 50 I I I I I I I I I 1 Department Park & Trail Improvements Improvements: Bandimere Community Park Development: City Center Park Playground Replacement: Curry Farms Park Signage: Kerber Pond Park Meadow Green Park Playground Replacements: Roundhouse Renovation: Roundhouse Park Tree Plantings Picnic Tables Half Court Basketball: Bandimere Heights Park Skate Park Ramp Trash Receptacles City Center Commons Hwy 41 Trail Connector N 101 to Near Mountain Blvd Trail Connector Playground Improvement: Minnewashta Heights Park Playground Replacement: Lake Ann Park Playground Replacement: Lake Susan Park Park Improvements & Trail 1 1 1 I I I I I GRAND Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 PK&T-001 0 PK&T-003 0 PK&T-004 0 55,000 PK&T-005 0 PK&T-006 0 65,000 PK&T-O09 0 PK&T-018 0 25,000 PK&T-020 0 10,000 PK&T-022 3 PK&T-023 I 10,000 PK&T-024 1 20,000 PK&T-028 1 700,000 PK&T-029 0 90,000 PK&T-030 0 80,000 PK&T-031 0 25,000 PK&T-032 0 90,000 PK&T-033 0 115,000 1,285,000 1,285,000 40,000 275,000 10,000 30,000 15,000 370,000 370,000 51 2005 100,000 100,0o0 100,oo0 2006 2007 Total 40,000 375,000 55,000 10,000 65,000 30,000 25,000 10,000 15,000 10,000 20,000 700,000 90,000 80,000 25,000 90,000 115,000 1,755,000 1,755,000 Project # PK&T-O01 Type Improvement Useful Life Project Name Improvements: Bandimere Community Park Category Park Contact Priority r~a Department Description Park & Trail Improvements Total Cost $40,000 Bandimere is a 30-acre Community Park (9405 Great Plains Blvd. - TH 101). The follo~ving improvements are recommended: 2003 - Silo Restoration - $25,000; 2004 - Play Equipment (Phase II) - $40,000 Account #410-00004705 Justification This project invoh, es the implementation of recomsnendations set forth by the Park & Recreation Commission. It is consistent with the City's efforts to maintain its natural resources and the public's investment in community parks. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 40,000 40,000 Total 40,000 40,000 Funding Sources 2003 2004 2005 2006 2007 Total Park Dedication Fund 40,000 40,000 Total 40,000 40,000 Operational Impact/Other These projects will increase annual operating costs by an estimated 52.000. Project # Project Name PK&T-003 Development: City Center Park Type Improvement Useful Life CategoD' Park Contact Priority n/a I)cI)artmci~t Park & Trail hnprovcments Total Cost $435,000 Description City Center Park is a 10-acre collaborative effort between School District 112 and the City to provide an active park for elementary school children and Chanhassen residents. The Master Plan includes a Park Shelter/Warming House (2004.) and Senior Garden (2005). Major improvements include planting beds. decorative arbors and hard surface paths. 0410-0000-4705 Justification Cit.,,' Center Park is home to the largest outdoor skating venue in the City. The Shelter will replace a rental satellite building. The improvements are consistent with the master plan. Prior Expenditure 2003 2004 2005 2006 2007 Total 60,000 Construction 275,000 100,000 375,000 Total Total 275,000 100,000 375,000 Prior Funding Sources 2003 2004 2005 2006 2007 Total 60,000 Park Dedication Fund 275,000 100,000 375,000 Totnl Total 275,000 100,000 375,000 Operational Impact/Other These projects will increase annual operating costs by an estimated $3.200. 52 I I I I I I I I I I I I I I Project # PK&T-004 Type Equipment Useful Life Project Name Playground Replacement: Curry Farms Park Category Park Contact Priority n/a Department Description Park & Trail Improvements Total Cost $55,000 I Improvements for Curry Farms Park are part of a five-year plan to provide playground equipment replacement in 2004 (summer). Justification Original wood equipment was installed in 1989 and is expected to have a 15-year life span. ComprehenSive Plans call for an active recreation site within ½-mile of every household. I Expenditure 2003 2004 2005 2006 2007 Total Construction 55,000 55,000 i Total 55,000 55,00o Funding Sources 2003 2004 2005 2006 2007 Total I Park Dedication Fund 55,000 55,000 Total 55,000 55,000 IOperational Impact/Other No additional operating costs are anticipated. I Project# PK&T-005 I Project Name Signage: Kerber Pond Park Contact Department Park & Trail Improvements I Description I I Install signage for an existing interpretive trail around Kerber Pond Park (summer). Type Equipment Useful Life CategolD' Park Priority n/a Total Cost $10,000 Note: Four or five locations will be selected for interpretive signage and other appropriate site amenities (bench]table). The sign material will most likely be metal with an appropriate tYame and mounting standards. The project would only be completed if the signs can complement their surroundings. Justification Local history and its intcrprctation is an area in which the Park & Recreation Commission would like to expand. This will improve the overall experience at this location. Expenditure 2003 2004 2005 2006 2007 Total Maintenance 10,000 10,000 Total 10,000 10,000 Funding Sources 2003 2004 2005 2006 2007 Total Park Dedication Fund 10,000 10,000 Total 10,000 10,000 Operational hnpact/Other Effects on annual operations are estimated to be $400. 53 Project # PK&T-006 Project Name Playground Replacements: Meadow Green Park Contact Department Park & Trail Improvements Description Provides for replacement of the existing Novo playground structure at the park. Justification The existing playground was installed in 1984 and is nearing the end of its useful life. Prior Expenditure 2003 2004 2005 6,000 Construction 65,000 Total Total 65,000 2006 Prior Funding Sources 2003 6,000 Park Dedication Fund 65,000 Total Total 65,000 Type Improvement Useful Life Category Park Priority n/a Operational Impact/Other Negligible additional operating costs are anticipated. Total Cost $71,000 2O07 2004 2005 2006 2007 Total 65,000 65,000 Total 65,000 65,000 Project # PK&T-009 Project Name Roundhouse Renovation: Roundhouse Park Contact Dei) artment Description Invoh'es building a neighborhood playground as phase II of the renovation. Justification Park & Trail Improvements Type Improvement Useful Life Category Park Priority n/a Total Cost $30,000 The Roundhouse is a local historic landmark and the namesake for the park. Functions include use as a park shelter, warming house and focal point. Account #410-0000-4702 Expenditure 2003 2004 2005 2006 2007 Total Construction 30,000 30,000 Total 30,000 30,000 Funding Sources 2003 2004 2005 2006 2007 Total Park Dedication Fund 30,000 30,000 Total 30,000 30,000 Operational Impact/Other These projects will increase annual operating costs by an estimated S2,200. 54 I I I I Ii I 1 I I I I i I I I I I ! 1 I I I I Project# PK&T-018 Type Improvement Useful Life Project Name Tree Plantings Category Park Contact Priority n/a Department Park & Trail Improvements Total Cost $45,000 Description This project funds tree plantings in various community and neighborhood parks. Playground and picnic areas receive priority. Justification The best time to plant trees was 20 years ago - the second best time is today. Prior Expenditure 2003 20,000 Construction 25,000 Total Total 25,000 2004 2005 2006 2007 Total 25,000 25,000 Prior Funding Sources 2003 20,000 Park Dedication Fund 25,000 Total Total 25,000 2004 2005 2006 2007 Total 25,000 25,000 Operational Impact/Other Project # PK&T-020 Project Name Picnic Tables Description This project replaces worn picnic tables at various city parks. Justification Each ),ear damaged and dilapidated tables need to be replaced. Prior Expenditure 2003 4,000 Maintenan6e 10,000 Total Total 10,000 Prior Funding Sources 2003 4,000 Park Dedication Fund 10,000 Total Total 10,000 Contact Department Park & Trail Improvements Type Improvement Useful Life Category Park Priority n/a Total Cost $14,000 2004 2005 2006 2007 2004 2005 2006 2007 Total 10,000 . 10,000 Total 10,ooo 10,00o Operational Impact/Other 55 Project # PK&T-022 Project Name Half Court Basketball: Bandimere Heights Park Contact Department Park & Trail Improvements Description Construction of a half court asphalt basketball court with basketball assembly. Justification Introduction of a hard court play surface in this neighborhood park will complement the existing amenities. Expenditure 2003 2004 2005 2006 Construction 15,000 Total 15,000 Funding Sources 2003 2004 2005 2006 Park Dedication Fund 15,000 Total 15,000 Operational Impact/Other Type Useful Life Category Priority Improvement 25 years Park 3 Expand Existing Service Total Cost $15,000 2007 2007 Total 15,000 15,000 Total 15,000 15,000 Project # PK&T-023 Projcct Name Skate Park Ramp Description This project provides an additional ramp at the Skate Park. Justification Contact I)cpartmcnt Park & Trail Improvements Type Useful IAfe Category Priority Equipment 7-10 years Park 1 Maintain Existing Service Total Cost $17,500 The skate park is the busiest park and recreation amenity in tile city. This ramp will provide added interest to the course and reduce congestion. Prior Expenditure 2003 7,500 Construction 10,000 Total Total 10,0o0 2004 2005 2006 2007 Total 10,000 10,000 Prior Funding Sources 2003 7,500 Park Dedication Fund 10,000 Total Total 10,000 2004 2005 2006 2007 Total lO,O00 10,000 Operational Impact/Other 56 I I I I ! I I I I I I I i I I I I I ! I i I I I I I 1 I I I I I I I I I I Project # PK&T-024 Project Name Trash Receptacles Contact Department Park & Trail Improvements Type Equipment Useful Life 10-15 years Category Park Priority 1 Maintain Existing Service Total Cost $40,000 Description This project funds the purchase of 75 waste containers with concrete bases. Justification The department is in the second year of a three-year program to replace our existing unsightly blue plastic trash containers. Prior Expenditure 2003 20,000 Maintenance 20,000 Total Total 20,000 2004 2005 2006 2007 Prior Funding Sources 2003 20,000 Park Dedication Fund 20,000 Total Total 20,000 Operational Impact/Other Project # PK&T-028 City Center Commons 2004 2005 2006 2007 Park & Trail Improvements Contact Department Project Name Description This project will provide landscaping and amenities for the City Center Commons adjacent to the new library. Account # 410-4118-4300 2006 Justification This represents a highly visible parcel in downtown and needs to be appropriately landscaped. Expenditure 2003 2004 2005 Construction 700,000 Total 700,000 Funding Sources 2003 GO Bonds 125,000 Park Dedication Fund 575,000 Total 700,000 Total 20,o00 20,000 Operational Impact/Other Will increase annual operational costs by S4,000 per year. Total 20,000 20,000 Type Improvement Useful Life 30 Years Category Park Priority 1 Maintain Existing Service Total Cost $700,000 2007 2004 2005 2006 2007 57 Total 700,000 700,000 Total 125,000 575,000 700,000 Project # PK&T-029 Project Name Hwy 41 Trail Connector Description This completes a high priority trail segment. Justification The Park & Recreation Commission ranks this project high. Expenditure 2003 Construction 90,000 Total 90,000 Funding Sources 2003 Park Dedication Fund 90,000 Total 9o,ooo Operational Impact/Other Contact Department Park & Trail improvements 2004 2005 2006 2007 2004 2005 2006 2007 Project # PK&T-030 Project Name N 101 to Near Mountain Blvd Trail Connector Contact Description This completes a high priority trail scglncnt. Justification The Park & Recreation Commission ranks this'project high. Det)artment Park & Trail improvements Expenditure Construction Funding Sources Park Dedication Fund Total Total Type Improvement Useful Life Category Park Priority n/a Operational Impact/Other Total Cost $90,000 Total 90,000 90,000 Total 90,000 90,000 Type Improvement Useful Life Category Park Priority n/a Total Cost $80,000 2003 2004 2005 2006 2007 Total 80,000 80,000 80,000 80,000 2003 2004 2005 2006 2007 Total 80,000 80,000 80,000 80,000 55 I I I I I ! ! I I I 1 Project # PK&T-03! Type Equipment Useful Life Project Name Playground Improvement: Minnewashta Heights Park Category Park Contact Priority n/a Department Park & Trail Improvements Description Replacement of existing wood playground structure. Justification Total Cost $25,000 The existing wood structure was installed over 15 years ago and does not currently meet the following federal guidelines and/or laws for safety and I accessibility; Consumer Products Safety Commission (CPSC), American Society for Testing and MateriaLs (ASTM), and Americans with Disabilities Act (ADA). This playground poses a serious liability risk for the city and needs to be replaced. Expenditure 2003 2004 2005 2006 2007 Total I Construction 25,000 25,000 Total 25,000 25,000 I Funding Sources 2003 2004 2005 2006 2007 Total Park Dedication Fund 25,000 25,000 Total 25,000 25,000 I I I Operational Impact/Other Project # PK&T-032 Type Equipment Useful Life Project Name Playground Replacement: Lake Ann Park Category Park Contact Priority n/a Department Park & Trail Improvements I Description Replacement of existing wood playground structure. Justification Total Cost $90,000 The existing wood structure was installed over 15 years ago and does not currently meet the following federal guidelines and/or laws for safety and I accessibility: Consumer Products Safety Commission (CPSC). American Society for Testing and Materials (ASTM), and Americans with Disabilities Act (ADA). This playground poses a serious liability risk for the city and needs to be replaced. Expenditure 2003 2004 2005 2006 2007 Total Construction 90,000 90,000 Total 90,000 90,000 I Funding Sources 2003 2004 2005 2006 2007 Total Park Dedication Fund 90,000 90,000 Total 90,000 90,000 i I I Operational hnpacdOther 59 Project # PK&T-033 Project Name Playground Replacement: Lake Susan Park Contact Department Park & Trail Improvements Description Replacement of existing wood playground structure. Type Equipment Useful Life Category Park Priority n]a Total Cost $115,000 Justification The existing wood structure was installed over 15 years ago and does not currently meet the following federal guidelines and/or laws for safety and accessibility; Consumer Products Safety Commission (CPSC), American Society for Testing and Materials (ASTM), and Americans with Disabilities Act (ADA). This playground poses a serious liability risk for the city and needs to be replaced. Expenditure 2003 Construction 115,000 Total 115,000 Funding Sources 2003 Park Dedication Fund 115,000 Total 115,000 2004 2005 2006 2007 Total 115,000 115,000 2004 2005 2006 2007 Total 115,000 115,000 Operational hnt)act/Other 6O I! ! ! I I I I Sanitary Sewer Improvements I I I I 61 This page intentionally left blank. 62 I I I I I I I I I I Department Sanitary Sewer Improvements Sanitary Sewer: LC-1 Sanitary Sewer: BC-2 (Portion) Sanitary Sewer Improvements GRAND Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 SS-O02 0 SS-O05 0 80,000 80,000 80,000 2005 200,000 350,OO0 550,000 550,000 2006 2007 Total 200,000 430,000 630,000 630,000 I I I I I I 1 I I I 63 Project// SS-002 Project Name Sanitary Sewer: LC-1 Contact Department Sanitary Sewer Improvements Description LC-1 Sub-district extension. Justification Needed to provide service to developing areas. Identified in the 1998 Comprehensive Sewer Policy Plan. Expenditure 2003 2004 200S Construction 200,000 Total 200,000 2006 Funding Sources 2003 2004 2005 Sewer & Water Utility Fund 200,000 Total 200,000 2006 Operational Impact/Other This project will increase maintenance costs. Project # SS-005 Project Nnme Sanitary Sewer: BC-2 (Portion) Description Trunk extension from Point BC 1.1 to BC 1.2. Contact 1)el)artlnent Sanitary Sewer Improvements Justification Needed to provide service to developing areas. Identified in the 1998 Comprehensive Sexver Policy Plan. Expenditure 2003 2004 2005 Construction 80,000 350,000 Total 80,000 350,000 2006 Funding Sources 2003 2004 2005 Sewer g Water Utility Fund 80,000 350,000 Total 80,000 350,000 2006 Operational Impact/Other This project will increase maintenance costs. 64 Type Improvement Useful Life Category Utilities Priority n/a Total Cost $200,000 2007 2007 Total 200,000 200,000 Total 200,000 200,000 Type Improvement Useful Life Category Utilities Priority n/a Total Cost $430,000 2007 2007 Total 430,000 430,000 Total 430,000 430,000 I I I I I I I Street Improvements I I 65 This page intentionally left blank. 66 I I I I I I I l ! Ir I I I I 1 I I Department Street Improvements Annual Street Improvement Program Street Improvements Total GRAND Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 ST-012 0 2005 2006 2007 Total 858,000 2,583,000 958,000 3,208,000 1,367,000 8,974,000 858,000 2,583,000 958,000 3,208,000 1,367,000 8,974,000 858,000 2,583,000 958,000 3,208,000 1,367,000 8,974,000 I I I 1 I I I I I. t I 1 67 Project # ST-012 Project Name Annual Street Improvement Program Contact Department Street Improvements Total Cost Description Provides for routine overlays, maintenance, and improvement of streets as recommended by the Pavement Management System. Justification Appropriate routine maintenance based on the Pavement Management System. Prior Expenditure 2003 2004 2005 2006 2007 725,000 Construction 858,000 2,583,000 958,000 3,208,000 1,367,000 Total Total 858,000 2,583,000 958,000 3,208,000 1,367,000 Type Improvement Useful Life Category Streets/Highways Priority n/a $9,699,000 Total 8,974,000 8,974,000 Prior Funding Sources 2003 2004 2005 2006 2007 725,000 Assessment Bonds 858,000 1,583,000 958,000 2,068,000 1,367,000 Total MSA 1,000,000 1,140,000 Total 858,000 2,583,000 958,000 3,208,000 1,367,000 Total 6,834,000 2,140,000 8,9?4,000 Operational Impact/Other This project may decrease maintenance costs. I I I I I I I I I I I 1 68 ! Surface Water Management Improvements 69 This page intentionally left blank. 70 .! I I I I I I I I I Department Surface Water Management I SWMP Implementation NPDES Permit/Storm Water Management Plan Update I I Surface Water Management Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 SWMP-012 0 305,000 105,000 SWMP-013 1 25,000 200,000 2005 190,000 2006 185,000 2007 105,000 Total 890,000 225,000 330,000 305,000 190,000 185,000 105,000 1,115,000 GRAND 330,000 305,000 190,000 185,000 105,000 1,115,000 I I I I I I I I I I I 71 Project # SV~IP-012 Project Name SWMP Implementation Contact Department Surface Water Management Description This project implements projects identified as high priority by the NPDES II study. Justification These projects are necessary to meet federal government requirements for storm drainage. Expenditure 2003 2004 Construction 305,000 105,000 Total 305,000 105,000 Type Improvement Useful Life Category SWMP Priority n/a Total Cost $890,000 2005 2006 2007 Total 190,000 185,000 105,000 890,000 190,000 185,000 105,000 890,000 Funding Sources 2003 2004 2005 2006 2007 Total Surface Water Utility Fund 305,000 105,000 190,000 185,000 105,000 890,000 Total 305,000 105,000 190,000 185,000 105,000 890,000 Operational Impact/Other Project # SWMP-013 Type Maintenance Useful Life 5-10 years Project Name NPDES Permit/Storln Water Management Plan Update CategoD' SWMP Contact Priority 1 Maintain Existing. Service Department Surface Water Management Description This project will fund the NPDES permit process and update the Storm Water Management Plan. Total Cost $225,000 Justification This plan has not been fully updated since the inception of the prog. ram in the early 1990's. After thc NPDES standards are set, we should update our plans in compliance with the permit requirements. Expenditure 2003 2004 2005 2006 2007 Total Planning/Design 25,000 200,000 225,000 Total 25,000 200,000 225,000 Funding Sources 2003 2004 2005 2006 2007 Total Surface Water Utility Fund 25,000 200,000 225,000 Total 25,000 200,000 225,000 Operational Impact/Other This is expected to have no operational impact. 72 I I I I I I I I I I I I I I I I I i I I I Water System Improvements I ! 73 I I I This page intentionally left blank. I I I I I i I. I I 74 -! I I 1 I I Department Water System Improvements IWell g9 Well #10 Well #11 Water System Improvements I Repainting: West 76th St. Water Tower Well #12 Water Treatment Plant I I I I I I I I I I Water System Improvements GRAND Capital Improvement Program City of Chanhassen, MN PROJECTS BY DEPARTMENT 2003 thru 2007 Project Priority 2003 2004 W-O01 0 70,000 W-O02 0 W-O03 0 W-011 0 500,000 W-015 0 80,000 W-018 0 W-019 0 650,000 650,0OO 630,000 72,000 702,000 702,000 75 2005 630,000 75,000 705,000 705,000 2006 675,O00 77,000 500,OOO 1,252,000 1,252,000 2007 675,000 4,000,000 4,675,000 4,675,000 Total 700 OOO 702 000 750 000 500 000 8OOOO 752 000 4,500 000 7,984,000 7,984,000 Project # W-001 Project Name Well Contact Department Water System Improvements Description Provide municipal water supply well. Well siting and engineering will begin in 2003, with construction in 2004. Justification Needed to provide service to developing areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plan. Type Improvement Useful Life Category Utilities Priority n/a Total Cost $700,000 Expenditure 2003 2004 Planning/Design 70,000 Construction 630,000 Total 70,000 630,000 2005 2006 2007 Total 70,000 630,000 700,000 Funding Sources 2003 2004 Sewer & Water Utility Fund 70,000 630,000 Total 70,000 630,000 2005 2006 2007 Total 700,000 700,000 Operational Impact/Other This project will increase maintenance costs. Project// W-002 Project Name Well #10 Description Contact l)epartlnent Water System Improvements Provide municipal water supply well. Well siting and engineering will begin in 2004, with construction in 2005. Type Useful Life Category Priority Total Cost Justification Needed to provide service to dexcloping areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plan. Expenditure Planning/Design Construction 2003 2004 2005 2006 2007 72,000 630,000 Total 72,000 630,000 Funding Sources Sewer & Water Utility Fund Total 2003 2004 2005 2006 2007 72,000 630,000 72,000 630,000 Operational Impact/Other This project will increase maintenance costs. hnprovenlent Utilities n/a $702,000 Total 72,000 630,000 702,000 Total 7o2,ooo 702,000 76 I I I I I I I I I I I I I I I I Project# W-003 Project Name Well#Il Contact Department Water System Improvements Description Provide municipal water supply well. Well siting and engineering will begin in 2005, with construction in 2006. Justification Type Improvement Useful Life Category Utilities Priority n/a Total Cost $750,000 Needed to provide service to developing areas. Identified in the 1998 Comprehensive Water Supply and Distribution Plan. I Expenditure 2003 2004 2005 2006 2007 Total Planning/Design 75,000 75,000 I Construction 675,000 675,000 Total 75,000 675,000 750,000 Funding Sources 2003 2004 2005 2006 2007 Total I Sewer & Water Utility Fund 75,000 675,000 750,000 Total 75,000 675,000 750,000 I Operational Impact/Other This project will increase maintenance costs. I I I I Project # W-011 Type Improvement Useful Life Project Name Water System Planning Category Utilities Contact Priority n/a DePartment Water System Improvements Total Cost $500,000 Description Study options for the construction of a water treatment plant and model the distribution system. Justification Public demand and high maintenance costs may require water treatment to address high iron and manganese levels. Potential need and sites are identified in the 1998 Comprehensive Water Supply and Distribution Plan. Expenditure 2003 2004 2005 2006 2007 Total I Planning/Design 500,000 500,000 Total 500,000 500,000 I Funding Sources 2003 2004 2005 2006 2007 Total Sewer & Water Utility Fund 500,000 500,000 Total 500,000 500,000 I Operational Impact/Other This project will increase maintenance costs. I I I I Project # W-01$ Type Improvement Useful Life Project Name Repainting: West 76th St. Water Tower Category Utilities Contact Priority n/a Department Description Water System Improvements Provides for the recoating of the interior and exterior surfaces of the W. 76th St. Water Tower. Total Cost $80,000 Account #710 Justification This type of infrastructure requires recoating approximately every 10 years to protect the life of the metal structure and maintain healthy potable water. This project will extend the service life of this water storage facility. Expenditure 2003 2004 2005 2006 2007 Total Construction 80,000 80,000 Total 80,000 80,000 Funding Sources 2003 2004 2005 2006 2007 Total Sewer & Water Utility Fund 80,000 80,000 Total 80,000 80,000 Operational Impact/Other This project does not increase operational costs. Project # W-018 Project Name Well #12 Contact Department \rater System hnprovements Description Provide municipal water supply well. \\'ell siting & design in 2006 with construction in 2007. Justification Need to provide service to developin7 areas identified in the 1998 Comprehensive Water Supply & Distribution Plan. Expenditure Planning/Design Construction Total 2003 Type Improvement Useflfi Life Category Utilities Priority n/a Total Cost $752,000 Funding Sources Sewer & Water Utility Fund Total 2OO3 Operational Impact/Other 2004 2005 2006 2007 Total 77,000 77,000 675,000 675,000 77,000 675,000 752,000 2004 2005 2006 2007 Total 77,000 675,000 752,000 77,000 675,000 752,000 78 I I I i I I I I I I I I I I I I I I I I I I I I I I I I ! 1 I I I I Project # W-019 Type Improvement Useful Life Project Name Water Treatment Plant CategoI-y Utilities Contact Priority n/a Department Water System Improvements Description Construct Water Treatment Plant with siting and design in 2006 and construction in 2007. Justification Total Cost $4,500,000 Public Demand & High maintenance costs. Potential need and sites identified in 1998 Comprehensive Water Supply & Distribution Plan. Expenditure 2003 2004 2005 2006 2007 Total Planning/Design 500,000 500,000 Construction 4,000,000 4,000,000 Total 500,000 4,000,000 4,500,000 Funding Sources 2003 2004 2005 2006 2007 Total Revenue Bonds 500,000 4,000,000 4,500,000 Total 500,000 4,000,000 4,500,000 Operational Impact/Other Project will increase maintenance costs. 79 I I I I I I I I I I I I I I I I I I !