D-3. Kerber Blvd Street Project, Call Assmt HearingCITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone.- 952.227.1180
Fax- 952,227.1190
Engineering
Phone- 952.227.1160
Fax- 952.227.1170
Finance
Phone: 952.227.1140
Fax- 952.227.1110
Park & Recreation
Phone-, 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax- 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone- 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Website
www.ci.chanhassen.mn.us
MEMORANDUM
TO: Paul Oehme, Director o Public
Works/City Engineer
FROM:
A] Qn-n FmioVP Assistant City -P-nailnep.
DATE: April 13, 2015
SUBJECT: 2015 Street Improvement (Kerber Boulevard) Project No. 15-02:
Call Assessment Hearing
PROPOSED MOTION
"The City Council adopts a resolution calling the assessment hearing for the
2015 Street Improvement (Kerber Boulevard) Project No. 15-02 for Monday,
May 11, 2015.
City Council approval requires a simple majority vote of those present,"
BACKGROUND
At the August 11, 2014 work session, staff reviewed with Council the proposed
2015 Street Improvements to the Carver Beach area. Kerber Boulevard, a
Municipal State Aid Route, is also proposed to be resurfaced in 2015.
On October 27, 2014, the City Council authorized preparation of the feasibility
study.
On December 11, 2014, staff held an open house for the proposed project.
At the December 8, 20141 City Council meeting, the feasibility study was
accepted and the public hearing was called for February 9, 2015.
IV
The City Council authorized the preparation of plans and specifications at the
February 9, 2015 meeting.
On February 23, 2015, the City Council approved the plans and specifications and
authorized the advertisement for bids
Bids were opened on Monday, March 30.,2015 and were below the Engineer's
estimate.
gAeng\pubCh anhamwisa Gm manly hearing.docx
DISCUSSION
Every year the City considers streets that are in poor condition to be rehabilitated or
reconstructed. For the 2015 Street Rehabilitation Project, staff is proposing to rehabilitate
approximately 1.4 miles of Municipal State Aid street, Kerber Boulevard.
This street was identified by the
City's Pavement Management
software in conjunction with
site investigations.
The proposed improvements
generally consist of milling four
inches of pavement and
repaving.
Severe pavement and subgrade
distresses will be removed and
replaced.
Kerber Boulevard is an urban
street section. Damaged curb
and gutter will be replaced with
this project.
Minor drainage improvements
are also proposed to be
addressed.
The water main is thought to be
in relatively good condition
since there is only one
documented water main break
in the area.
The sanitary sewer system in
the project area was televised
and staff received the results
December 18, 2014. Upon
review of the televising records,
it is recommended some of the
sanitary sewer should to be
replaced due to sags in the pipe.
Some minor manhole work is
also proposed.
The bid opening was Monday,
March 30, 2015. It is
recommended to call the
assessment hearing in order to keep the project on schedule.
g:\eng\public\_2015 projects\15-02 kerber boulevard overlay\public and council meetings\20150413 cc memo call assessment hearing. docx
2015 Street Rehabilitation Project 15-02:
Call Assessment Hearing
April 13, 2015
Page 3
FUNDING
Special assessments to the benefitting properties are proposed to pay for a portion of the
proposed 2015 Street Rehabilitation Project No. 15-02 per the City's assessment practice. The
City's share of the project is proposed to be paid for with Municipal State Aid funds (gas tax
funds) which the City annually receives from the State. However, the City will need to advance
funds from the State Aid account since the City's account does not have sufficient funds to pay
for this project. The State encourages Cities to advance fund projects since the State Aid account
has sufficient funds to cover these types of projects. The State does not charge any interest for
these advancements. The sanitary sewer improvements are proposed to be paid for by the
Sanitary Sewer Enterprise Fund. The preliminary cost and funding for the project is shown
below:
Fundmi! Source Estimated Amount
CZY Project Cost Budgeted
Municipal State Aid Fund $1,3855000.00 $1140000.00
Assessments $245563.41
Sewer Utility Fund $47,000000 $855000.00
Total $1 4561563.41 $1 A55000.00
Kerber Boulevard is a 40 -foot wide collector road with few properties having direct access to the
street. The City's practice is to assess benefitting properties 40% of the equivalent cost of a 31 -
foot wide residential roadway. Due to the limited number of benefitting properties, assessments
are proposed to be established by a front -footage basis.
The IRET (Byerly's) property was assessed for 100% benefit to W. 78th Street with the 2011
resurfacing project and therefore is not included in the proposed assessment roll for City Project
No. 15-02.
The cost estimate includes 8% contingency and 5% indirect costs.
Per State Statute, the City Council must call the assessment hearing and publish the hearing date
at least two weeks prior to the assessment hearing. Staff will publish the notice in the April 9,
2015 edition of the Chanhassen Villager. This schedule provides just over two weeks time
between the publication date and the assessment hearing.
SCHEDULE
The anticipated project schedule is as follows:
Assessment Hearing May 11, 2015
Work Begins July 6, 2015
Substantial Completion August 309 2015
Attachments: 1. Resolution
2. CIP sheets
G:\ENG\PUBLIC\-2015 PROJECTS\15-02 Kerber Boulevard Overlay\Public and Council Meetings\20150413 cc memo call assessment hearing.docx
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: April 13, 2015 RESOLUTION NO:
MOTION BY:
SECONDED BY:
2015 -XX
A RESOLUTION CALLING THE ASSESSMENT HEARING FOR THE
2015 STREET IMPROVEMENT PROJECT (KERBER BOULVEARD) NO. 15-02
WHEREAS, Minnesota State Statute 429 regarding special assessments for public
improvement projects requires City Council to officially set the assessment hearing date for capital
improvement projects.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
CHANHASSEN, MINNESOTA:
1. A hearing shall be held on. the 11th day of May, 2015 in the Council Chambers at City
Hall at 7:00 p.m. to pass upon such proposed assessments and at such time and place all persons
owning property affected by such improvements will be given an opportunity to be heard with
reference to such assessment.
2. The city clerk is hereby directed to cause a notice of the hearing on the proposed
assessments to be published once in the official newspaper at least two weeks prior to the hearing,
and shall state in the notice the total cost of the improvements. The clerk shall also cause mailed
notice to be given to the owner of each parcel described in the assessment rolls not less than two
weeks prior to the hearings.
3. The owner of any property so assessed may, at any time prior to certification of the
assessment to the county auditor, pay the whole of the assessment on such property, with interest
accrued to the date of payment, to the City of Chanhassen, except that no interest shall be charged if
the entire assessment is paid within 90 days from. the adoption of the assessments. The property
owner may at any time thereafter, pay to the City of Chanhassen the entire amount of the assessment
remaining unpaid, with interest accrued to December 31 of the year in which such payment is made.
Such payment must be made before November 15 or interest will be charged through December 31
of the succeeding year.
Passed and adopted by the Chanhassen City Council this 13th day of April, 2015.
ATTEST:
Todd Gerhardt, City Manager Thomas A. Furlong, Mayor
YES NO ABSENT
Projects By Fundin, g Source
City of Chanhassen, NN
Toi ect 4 ST -012
�roject Name Annual Street Improvement Program
Department
Street Iinprovements
Contact
Paul Ochme
Type
Improvement
Useful Life
Unassigned
Category
Streets/Highways
Account #1. 601-xxxx-4751 Account #3 Priority n/a
Account #2 Account 44
DiptTotal Pr Ject Cost.- S22,769,500
escrion 01
Annual project to rehabilitate and. reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas-,
2015 - Carver Beach area (south and west of Carver Beach Road)
MSA - Kerber Blvd overlay (north of West 78tb Street) and Dakota Ave (Hwy 5 to Lake Dr E)
2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewashta Woods Drive
MSA - Park Road overlay and Park Place
201.7 - Flamingo Drive area, Claes Mar Drive, Lone Cedar and Saddlebrook Pass neighborhood
MSA - Bluff Creek Drive overlay and Bluff Creek Drive Trail extension.
2018 - Orchard Lane, Forest Avenue, Forest Circle, Oriole Avenue, 64th Street and 96th Street
2019 - Fox Path area, Frontier Trail (north, of 77th Street), Choctaw and Kunters Point
MSA - Minnewashta Parkway overlyX
Justification
The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
Rehabilitation projects extend the life, of the street. In cases when utilities or poor sub grade needs to be replaced or where streets have
deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is witten to
consider the merits of the p Ject and scope of work..
onsi PQJ
The Highway 212 improvement project included a pedestrian trail along the first 2,500 feet of Bluff Creek Drive. The resulting "gap" represents a
missing link in the Gig's trail system south to Flying Cloud Drive. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in
e absence of a trail. This trail seament is fanned to be constructed aloe a with the 2017 MSA street reconstruction.
Prior Expenditures 2015 2016 2017 2018 2019 Total
I
9, ,Loa Construction 3t250,000 2,460,000 3,022,400 1,687,300 2,654,800 13,074,500
Total Total 3,250,000 2x460,000 3,022,400 16871300 2654tOOO 13tO74,500
Prior. Funding Sources
9,695,000 Assessment/Revolving
Assess Fund
Total. RAO A
2015 2016 2017 2018 2019 Total
--- - ------ --------
1, -
850,000 1,560,000 1,622,400 1,687o300 1*754,800 8,474,500
1,400,000 900,000 11400,000 900,000 41600,000
Total 31250,000 2t4601,000 3tO22,400 11687,300 21654t800 13,074,500
Budget Impact/Offier
This project may decrease maintenance costs.
88
I
I
I
0
Projects By F 2015 thru 2019
Department surface Fater Management
City of Chanhassen, MN Contact Paul Oehme
Project # SWW-01.9 Type Improvement
Prn ect Name
useful fife Unassigned
Streetpr v t Storm Water Mgnit
Category
Account #1 720-7025--4751 account #3 Priority n/a
Account #2 Account #4
Description Total Project este $1,775,000
An annual amount set aside for storm eater management in=frastructure construction or expansion associated with street improvement protects
undertaken by the engineering and public works departments.
ust cat o
Street improvement projects frequently require construction or expansion of stem water management in�strucomplyr .
�e in ander to
federal, state and local regulations, as well as protecting existing and proposed development adjacent to tl�e ro, ects.
Priori Expend tures 2015 2016 2017 2018 2019 Total
1,100,0001 Conatruott4n125� �,� 7�,C�� ���, 750000
675,000
0o
�'+ T to ,125,000 200,000 75,000 .00,000 75,000 675 000
.prior Funding Sources 2015 2016 2017 2018 2019 Total
0 Surface Water Utility Fund 125,000 200,000 75,000 200,000 75
000 675,000
Total Total 125,000 200,000 75,000 240p0 75,000
675 000
Budget Impact/Mer
Mventory, inspection and maintenance of new infra trueture -rill be required. Citywidef lea map
2015 Enterprise Funds
701 Sewer Utility Expenditures
2014 to
12 2013 2014 2015 2015
Account Description Actual Actual Budget Budget % Inc/(Dec
4010
Salaries & Wages -Reg
241,468
246,742
246o08O
260,000
5.7%
4011.
Overtime -Reg
9,182
6,626
91000
8,000
(11.1%)
4012
Stand -By Pay
6,421,
6,482
6,500
6,500
0.0%
4020
Salaries & Wages -Temp
8,041
13,126
14,000
14,000
0.0%
4021
Overtime -Temp
33
67
-
-
0.0%
4030
Con tributions- Retirement
37,148
37,571
40,000
42,000
5.0%
4040
Contributions -Insurance
40,496
40,892
44x000
48*000
9.1%
4050
Workers Compensation
6,242
6,955
6,200
7,200
16.1%
4060
Unemployment
2,212
-
-
-
0.0%
Total Personal Services
351)243
358j46_2
365j7O0
385.,70-0-
5.5%
4120
Supplies -Equipment
15,954
13,890
8,500
10,000
17.6%
4140
Supplies -Vehicles
11280
5,987
5;000
5A0
0.0%
4150
Maintenance Materials
9,142
10,534
10,000
10,000
0.0%
4160
Chemicals
4,083
3,301
4,500
4t500
0k0%
4170
Motor Fuels & Lubricants
14,672
14,683
14,000
14,000
0.0%
4240
Uniforms & Clothing
2,064
967
2,000
2,000
0.0%
4260
Small Tools & Equipment
2;715
3,449
2,800
2,800
0.0%
Total Materials & Supplies
4.9,911
52,811
46o800
48,300
3.2%
4300
Fees, Services
17,448
27,724
23,000
23)000
0.0%
4301
Auditing
6,000
6,000
6,000
6,000
0.0%
4310
Telephone
50176
7,726
6,000
7,500
25.0%
4320
Utilities
66,324
73,785
70p000
75,000
7.1%
4330
Postage
5,141
5,024
5,500
5o200
(5.5%)
4340
Printing & Publishing
2,646
1.o443
21000
2,000
0.0%
4350
Cleaning & Waste Removal
b
1.93
-
-
0.0%
4360
Subscriptions & Memberships
100
440
400
400
0.0%
4370
Travel & Training
4,506
3,866
4o200
4,,00
0,00/0
4410
Rental- Equipment
41
317
L500
500
(66.7%)
4440
License & Registration
152
-
-
-
0,0%
4483
Insurance -General Liability
13o000
.130000
13,000
13,000
0.0%
4509
Remit to Other Agencies
11506t629
1,398,891
1.f4,51,000
1,579,600
8 . 9 c/o
4510
Repair & Maintenance -Budding
2,233
4,266
5,000
4o200
(16.0%)
4520
Repair & Maintenance - Vehicles
405
1,762
1,000
1,000
0,00/0
4530
Repair & Maintenance -Equip
22,430
28,182
26t000
26,000
0.0%
4551
Repair & Maintenance -Sewer
91,841
79,001
85,000
85,000
0.000
4553
Emergency Repairs -Sewer
8,797'
2,435
100000
MON
0.0%
4933
Sales Tax
21140
769
-
-
0.0%
Total Contractual Services
1,755,010
1,654,823
11709,600
1,842,600
7.80,E
Total Expenditures
21156,163
2pO66,096
21122,100
2,2,BOO7.3%
04
I